CM-2018-1919 - 10/26/2018Page I of Contract Quantity Adjustment/Change Order kduM.- mv,m.is Department: Building Construction General Services Project Name: FS9, Phase 2 Date: 10/12/18 City Project Change Order/Quantity ID Number Adjustment No. 2 Vendor Prime Construction 20907 Martin Lane, Ptlu erville 512.244-7799 Company Name Address Phone No. Justification 1.) Additional labor and material needed to complete the three Feet of drive expansion to the existing round drive not included in the engineers plans. This scope included dowelles with #4 bars @ 14" on center to match the Geotech concrete spacing rebar recommendation with the bars being epoxied in to the existing concrete at an embedment depth of 12" or more and to extend into the new concrete at least 12". 2.) Supply and install Brazos gravel and weed fabric in the island at the EMS Bay due to drainage issue SUMMARY Amount % Change Original Contract Price: $425,574.00 Previous Quantity Adjustment(s): I This Quantity Adjustment: $0.00 Total Quantity Adjustment(s): $0'00 Total Contract Price with Quantity Adjustment(s): $425,574.00 i Previous Change Order(s): $5,529.00 1% This Change Order: $2,611.65 0.6% Total Change Order(s) To Date: $8,140.65 1.9% Adjusted Contract Price (Orginat Contract Price Plus r Quantity Adjustment(s) Plus Change Order(s)]: $433,714.651 - +N Difference between Original and Adjusted Contract Prices: $8,140.65 Original Contract Time: 90 Days Time Adjustment by previous Quan. Adj./Change Order: 0 Time Adjustment by this Quan. Ad] /Change Order: 0 New Contract Time: 0 Prepared By: Z2�IiC,0 Richard Will, Building Construction Manager, CORR y Signature Printed Name, Title, Company Date gpra_kfils Contractor: / Brian Ritter. President, Prime Construction Company, Inc. 10-12-18 Gty Project Signature Printed Name, Title, Company Date � � r �� Manager. Chad McDowell General Services Director CORR f Signature Printed Name ' me, Title Date Mayor/CityGUy-,r Manager ,--Lau , G Mana er (j Signature Printed Name, Title Date GILD -2 01-1gf<9 Page 2 or Contract Quantity Adjustment/Change Order Rouronauc Project Name: FS9, Phase Z Quan. Adj./Change Order No.: �RITTER- BOTKIN PRIME CONSTRUCTION COMPANY, INC. Irn 11.PCCIUS-1.COM 20907 Martin Ln Pftugerville, TX 78660 (effice) 512.244.7799 (fa%) 512.990.9886 CHANGE ORDER Estimate 02 Project: City of Round Rock - Firestation No 9 Renovations Date: 10-9-18 This Change Order Estimate includes the following modifications to the scopes of work originally contracted for the subject project between Ritter— Botkin Prime Construction Company Inc. (Contractor) City of Round Rock (Owner): SCOPE: Furnish and install all materials, tools, and labor required for the following scopes of work 1. Additional labor and material for 3' drive extension not called out $1,501.00 in plans 2. Supply and install Brazos gravel in island at EMS Bay $770.00 - Include killing existing grass; install new fabric weed barrier - Include 2-4" aggregate SUB TTL: $2.271.00 15% OHP: $340.65 TTL: $2,611,65 Fire Station 9 Phase 2 Change Order#02 Summary Date:10/12/2018 Two additional changes to scope were identified during the FS9 construction. These changes will require additional cost. 1.) Additional labor and material needed to complete the three feet of drive expansion to the existing round drive not included in the engineers plans. This scope included dowelled with 04 bars @ 14" on center to match the Geotech concrete spacing rebar recommendation with the bars being epoxied in to the existing concrete at an embedment depth of 12" or more and to extend into the new concrete at least 12". 2.) Supply and install Brazos gravel and weed fabric barrier in the island at the EMS Bay due to drainage issues causing sediment to intrude into the EMS Bay overhead door. Change Order # to the contract: 02 Cost: $2,611.65 Total this Change Order: $2,611.65 Contingency Original Available Balance: (not including Change Order) $6,779.21 $6,779.21 Betterment Original: Available Balance: $15,000,00 $0.00 The additional funds needed for this change order have been identified by the CORR Building Construction Superintendent and the CORR Financial Manager. $2,611.65 will be transferred from the existing contingency into the Prime Construction contract. rT Cityof Round Rock NQROCK Agenda Item Summary Agenda Number; Title: Consider executing Quantity Adjustment/Change Order No. 2 with prime Construction Company, Inc. for the Fire Station No. 9 Project (phase 2). Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 10/26/2018 Dept Director: Chad McDowell, General Services Director Cost: $2,611.65 Indexes: 2017 General Obligation Bonds Attachments; Change Order, iAF Department: General Services Department Text of Legislative File CM -2098-1919 Consider executing Quantity Adjustment/Change Order No. 2 with prime Construction Company, Inc. for the Fire Station No. 9 Project (phase 2). With this change order additional labor and material needed to complete the three feet of rive expansion to the existing round drive way not included in the engineers plans. Cost. $2,611.65 Source of Funds: 2017 General Obligation Bonds Cffy ofRound Rack Page 1 Pdnfed on 10/25/2018