Loading...
CM-2018-1929 - 11/2/2018Pagc 1 -11 b Contract Quantity Adjustment/Change Order ROIIV:IRGCil e ca r. 31116 Department: Utilities and Environmental Services Project 2016Wastewater Collection System Rehabilitation - Manhole Rehabilitation, Open Name: _ Cut, and, Point Repairs _ Date: 10/24/18 City Project Change Order/Quantity ID Number RHB16 Adjustment No. 2 Vendor T Gray Utility & Rehab Co., LLC P. O. Box 2176 - Cypress, Texas 77410 281-455-0899 Company Name Address Phone No. ]ustification Quantity Adjustment / Change Order 112 is needed for Change Order Items required not in Bid list, SUMMAKY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s). This Change Order: Total Change Order(s) To Date. Adjusted Contract Price (Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices - Original Contract Time: Time Adjustment by previous Quan. Adj,/Change Order - Time Adjustment by this Quan. Adj./Change Order: New Contract Time: � ffzya Signature Submitted for Approval Eddie Zapata, Senor Project h Printed Name, Title, Company Approvals Amount % Change $1,362,800.00 $0.00 $0,00 $0.00 $1,362,800.00 $57,950,00 4% $14,300.00 1D16 $72,250.00 5% $1,435,050.00 $72,250,00 180 30 0 210 er 1L4125)2 U 19 Date Contractor, ! *h'-- Gerald Hoff auir, Project Manager SI nature _ Printed Name, Title, Company c Date City Project } A, /% „ u Eddie Zapata, Senior re !' Printed Name. Title Manage Laurre Hadley, City Signature Printed Name, Title �M-.Zo��-��z� _ 10/2512018 Date � Contract Quantity Adjustment/Change Order ,._.15 2016Wastewater Collection System Rehabilitation - Manhole Rehabiiltatlon, Open Cut, Project Name: and Point Repairs Quan. Adj./Change Order No.: Page 3 of 3 Contract Quantity Adjustment/ Change Order 2016Wastewater Collection System Rehabilitation - Manhole Rehabilitation, Open Cut, Project Name: and Paint Repairs Quan. Adj /Change Order No.: 2 uanti Ad ustment Data Bid Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 0 z 0 a J_ m a W J J0 J = Z wa o� w a W F- N -12 City of Round Rock R OUND OC1C Agenda Item Summary SCAS Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 2 with T. Gray Utility & Rehab Co., LLC for the 2016 Wastewater Collection System Rehabilitation - Manhole Rehabilitation, Open Cut, and Point Repairs Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 11/2/2018 Dept Director: Michael Thane, Director of Utilities and Environmental Services Cost: $14,300.00 Indexes: Self -Financed Wastewater Construction Attachments: QA -CO #2.pdf, LAF.pdf, Quote.pdf, MAP.pdf Department: Utilities and Environmental Services Text of Legislative File CM -2018-1929 The City is required to continue our Wastewater Collection System Rehabilitation program in order to comply with the Texas Commission on Environmental Quality's (TCEQ) Edwards Aquifer Recharge Zone Protection Program which requires that wastewater collection systems located over the Edwards Aquifer be inspected and rehabilitated every five years. The elimination of defects will not only help to protect the Edwards Aquifer, but will also reduce inflow and infiltration entering the City's wastewater collection system, thereby reducing the City's treatment cost. The City has completed the inspection of 12 sub -basins to determine areas that require rehabilitation for this project. The work being performed under this contract includes sub -basins BC -01, BC20-Z, CC32-Z, CC34-Z, CC35-Z, CC37-Z, LC092, LC 152, LC 162, LC17-Z, LC18-Z & LC 192. The project includes 2,450 LF of new 8 -inch through 10 -inch pipe installed by pipe bursting, 2,650 Ll' of 8 -inch through 42 -inch CIPP liner, and construction of six manholes. T. Gray Utility Company was awarded this contract in the amount of $1,362,800.00. Quantity Adjustment/Change Order (QAICO) No. 1 was needed for rehabilitation of five existing wastewater manholes along Dell Way and 30 -day contract time adjustment due to unforeseen items during construction. QAICO No. 1 is for $57,950.00 which brings the total construction contract to $1,420,750.00. QAICO No. 2 is needed for change order items unforeseen during construction. The additional C11y of hound Rock Page 1 Printed on 11/1/2018 Agenda Item Summary Continued GN-2016-7828 work required includes removal of existing 2 -inch waterline and replacement with 8 -inch waterline along Spring Street. QA/CO No. 2 is for $14,300.00 which brings the total Construction contract to $1,435,050.00. Cost: $14,300 Source of Funds: Self -Financed Wastewater Construction City of Round Rock Page 2 Printed on 11/112016