Loading...
R-2018-6064 - 11/8/2018 RESOLUTION NO. R-2018-6064 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Smith Contracting Company, Inc. for the Roundville Lane Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 2,Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 2 to the Contract with Smith Contracting Company, Inc. for the Roundville Lane Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit"A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 8th day of November, 2018. CRAIG OR4�cck, Texas, Mayor City o Round ATTEST: SARA L. WHITE, City Clerk 0112.1804;00412258 EXHIBIT Page 1 of 3 kDUNORCCKTEiKYi Contract Quantity Adjustment/Change Order ...... I i L rev,01/16 Department: TRANSPORTATION Project Name: ROUNDVILLE LANE Date: 10/1.9/18 City Project Change Order/Quantity ID Number Adjustment No. 2 Vendor SMITH CONTRACTING CO.INC. 15308 GINGER ST AUSTIN TX 78728 512-990-7640 Company Name Address Phone No. Justification Quantity adjustments were made based upon existing conditions not foreseen during design.The project encountered hard rock instead of the expected clay material.An on-site meeting with the geotech resulted in removing sections of lime treatment and adding 6"of base material to areas where the lime treatment was not required.A waterline had to be relocated,as it was not located where our GIS had it called out. Additional headwalls were required due to offsite developments. SUMMARY Amount %Change Original Contract Price: $2,699,82-5.691' Previous Quantity Adjustment(s): $35,439.25 This Quantity Adjustment: $71,324.50 Total Quantity Adjustment(s): $106,763.75 Total Contract Price with Quantity Adjustment(s): $2,806,589.44 Previous Change Order(s): $18,170.00 10/0 This Change Order: $20,522.50 1% Total Change Order(s)To Date: $38,692.50 1% Adjusted Contract Price [Original Contract Price Plus , Quantity Adjustment(s)Plus Change Order(s)]: $2,845,281.941. __ Difference between Original and Adjusted Contract Prices: $145,456.25 Original Contract Time: 270 Time Adjustment by previous Quan.Adj./Change Order: 13 Time Adjustment by this Quan.Adj./Change Order: 23 New Contract Time: 306 Submitted for _ __. w....:.:......... _ _ W... ... � �...__._.._. _Ap�rovat _ _ K y.. 1 .. 0L Prepared By: � t, ✓ � Signature Printed Nar e,TMe,Company Date Approvals Contractor: Hardin m I V mi n in Co. - - 18 ignature Printed Name,Title,Company Date City Project ,� ,.�-- �f / ,,- Manager: t �t� ? f c�7� 4 �. 1("h Cills SignatLAe Pri ted Name,Title ate Mayor/City Manager Signature Printed Name,Title Date Page 2 of 3 Contract Quantity Adjustment/Change Order fiCStlMS7 ROCK 3EX:'5 rev,01116 Project Name: ROUNDVILLE LANE Quan.Adj./Change Order No.: 2 Change Order Data Contract Time Adjustment Item# Item Description Unit Qty, Unit Price Amount Adjusus(Das CO 2-1 RAIL TYPE T631 (STEEL RAIL ONLY) LF 149 $109.25 $16,278.25 1 CO 2-2 WATERLINE RELOCATION LS 1 $4,244.25 $4,244.25 5 $0.00 $0.00 .$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Page 3 of 3 Contract Quantity Adjustment/Change Order y ROUND R0IXTEXAS Mv,01/16 Project Name: ROUNDVILLE LANE Quan.Adj./Change Order No.: 2 Quantity Adjustment Data Contract Time Adjustment Sid Item# Item Description Unit Qty, Unit Price Amount Adjusus(Das ZMAR17WE END TREA I pi En r cry 13 EA , , 8 1J 050.09— 1 6 203-0 TYPE B LIME SLURRY TON 2.1 $165.00 $346.50 9 CL C COW(MISC) CY 58.15 $800.00 $46,520.00 10 24 PC CONCRETE DRIVEWAY SF 5 $8.001 $40.00 37 MTL W-BEAM GD FEN(TIM POST) LF -40 $64.00 -$2,560.00 39 CHAIN LINK FENCE REMOVAL LF 542 $9,00 $4,878,00 2 76 FLEXIBLE BASE CY 250 $45.00 $11,250.00 5 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.001 _. �_..................._........ ........... $0.00 _.. $0.00 TOTA "._ X71;37 .50 17