CM-2018-1942 - 11/9/2018Page I ora
Contract Quantity Adjustment/ Change Order
MY, al. 15
Department: Utilities and Environmental Services
Project
Name: DEY Branch Tributaries Channel Imprwements Date: iflf31Ji8
city Project Change Order/Quantity T
ID Humber DRYBR Adjustment No. 3
Vendor Chasm Congnxlurs P.O. Box 1057 Round Rock TX 78680 512-214-0600
Company Name Address Phone No.
3ustiRcation
1. Replacement of 60 If of existing wood fence at 5015weetgum Cave M"conflict with the proposed work 2.) Removal of an existing tree In
conflict with the proposed work.
5UMMAKT
Original Contract Price:
Previous Quantity Adjustment(s):
This Quantity Adjustment:
Total Quantity Adjustment(s).
Total Contract Price with Quantity Adjustment(s);
Previous Change Order(s):
This Change Order:
Total Change Order(s) To Date:
Adjusted Contract Price [Original Contract Price flus
Quantity Adjustment(s) Plus Change Order(s)]:
Difference between Original and Adjusted Contract Prices:
Original Contract Time:
Time Adjustment by previous Quan. Adj./Change Order:
Time Adjustment by this Quan. Adj./Change order:
Amount %
.$15,559.00
$0,00
$67,258.00 5.12%
$4,561.00 0.35%
$71,819.00 5.4794
$1384 312.04
$56,260.00
240
35
Additional Sept. &
13 Oct. Rain Days
New Contract Time: 288
S
PreG BY; m, + ,t_ Federico Sanchez, Project Manaaer. CORR 1Of31118
Name, Tlk Company Date
/�/
Contractor:! _.,f1d r cor 5 .—, ,YA 6- `
Qty Project SIgnaTure Printed Name, Tick, Company Date
_
Manager: Federico Sanchez Pro ect Mana2m CORR 1OV31118
Name, Title �j Date
Mane r
Signahlre Printed Name, Title Da
CM-told-i�`f�.
r Contract Quantity Adjustment/ Change Orderam
Project Mame: bry Branch Tributaries Channel Improvements
Quan. Adj./Change Order No.:
Channe Order Data
Page i on
A._..__ -11
Contmet
Time
1: [ I M 1 M -M
I
�,Remaval, 1 I I I I
-- ��HUI
it I'1
71 4 1
MEMEMEEM, II
1 1.1
11
71 r
■- 71 I*1
SI ITi
_- 71 Irl
I Irl
1 ITI
�R
Page 3 of 3
Contract quantity Adjustment/Change order
h41!l1611odt : : -
Irw OV 16
Project Name: Dry Branch Tributarles Channel Improvements
Quan. Adj./Change Order No.:
uanUty Adiustment Data
1 1'I
I � 1
I 11
__-_-�■� 1 ITR
71 ITi
1 IFI --
_- 1 11
71 1 1
141
oil
111
oil1
71 !rl
�1 i R
a�n1H1p� .,p
°+ MAND19
St -07y
Ci ^ti A55 ST
'~ ! 1S SAVW s
A � DUSHING DR
DGE CRESG) crT
C - Gp G D
mEIyCT i G
1 n 4 A
o C=im
M x D p
O
Z y Ls 300MAN 4
prn
m t0� p �� �0 y� is sNow3�u GI
100
0 OD
.t 5 mo
r m D
O i
19
C ma �a
3 tD yoo
- 03 o a
.(DO•r Cn�� i�"s��'►� y oN°S°N
Zyd `yu. - N` FCi
O
M ST ROCK CV
m Ito
-sawr�
as a
'r >•si3 vr+�
A
N So C I 70 uC Do VIA
Y 4 r Am
S 20
Y.
d �++
HO N1 < a
0 PATH Z
RrGR4NCH
� i Nl oAOf �
z
o 1p
�9 AIRS .
` r Y
fiy — al ssow+;s` ' +�
a #A M a°Oj
_ , nD�oNnS SUNDRo p�
n 1,,r ,_
City of Round Rock
ROUND ROCK
,T: Agenda Item Summary
Agenda Number:
Title: Consider executing Quantity Adjustment/Change Order No. 3 with Chasco
Constructors for the Dry Branch Tributaries Channel Improvements Project.
Type: City Manager Item
Governing Body: City Manager Approval
Agenda Date: 11/9/2018
Dept Director: Michael Thane, Director of Utilities and Environmental Services
Cost: $4,561.00
Indexes: 2014 Drainage Revenue Bonds
Attachments: 18077 - OCO 03 - Signed.pdf, LAF - Quantity Adjustment -Change Order #3
with Chasco Constructors for Dry Branch Tributaries Channel
(00412735xA08F8).pdf, MAP.pdf
Department: Utilities and Environmental Services
Text of Legislative File CM -2018-1942
Consider executing Quantity Adjustment/Change Order No. 3 with Chasco Constructors for
the Dry Branch Tributaries Channel Improvements Project.
The Dry Branch Tributaries Channel Improvements project is located north of Gattis School
Road near the Joyce Lane and Ray Berglund Boulevard residential neighborhoods. The
Dry Branch Tributaries Channel Improvements project will provide conveyance
improvements for flood control and will correct erosion and protect City wastewater
infrastructure.
Change Order No.3 includes the replacement of 60 linear feet of existing property fence
and the removal of an existing tree that is in conflict with the proposed project. This
Change Order No. 3 is for $4,561 and includes the cost of labor, additional materials and
equipment for the work. With this change order, the total contract amount will be adjusted
to $1,384,312.
Cost: $4,561
Source of Funds: 2014 Drainage Revenue Bonds
City of Round Rock Page i Printed on 111812018