Loading...
CM-2018-1942 - 11/9/2018Page I ora Contract Quantity Adjustment/ Change Order MY, al. 15 Department: Utilities and Environmental Services Project Name: DEY Branch Tributaries Channel Imprwements Date: iflf31Ji8 city Project Change Order/Quantity T ID Humber DRYBR Adjustment No. 3 Vendor Chasm Congnxlurs P.O. Box 1057 Round Rock TX 78680 512-214-0600 Company Name Address Phone No. 3ustiRcation 1. Replacement of 60 If of existing wood fence at 5015weetgum Cave M"conflict with the proposed work 2.) Removal of an existing tree In conflict with the proposed work. 5UMMAKT Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s). Total Contract Price with Quantity Adjustment(s); Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price flus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change order: Amount % .$15,559.00 $0,00 $67,258.00 5.12% $4,561.00 0.35% $71,819.00 5.4794 $1384 312.04 $56,260.00 240 35 Additional Sept. & 13 Oct. Rain Days New Contract Time: 288 S PreG BY; m, + ,t_ Federico Sanchez, Project Manaaer. CORR 1Of31118 Name, Tlk Company Date /�/ Contractor:! _.,f1d r cor 5 .—, ,YA 6- ` Qty Project SIgnaTure Printed Name, Tick, Company Date _ Manager: Federico Sanchez Pro ect Mana2m CORR 1OV31118 Name, Title �j Date Mane r Signahlre Printed Name, Title Da CM-told-i�`f�. r Contract Quantity Adjustment/ Change Orderam Project Mame: bry Branch Tributaries Channel Improvements Quan. Adj./Change Order No.: Channe Order Data Page i on A._..__ -11 Contmet Time 1: [ I M 1 M -M I �,Remaval, 1 I I I I -- ��HUI it I'1 71 4 1 MEMEMEEM, II 1 1.1 11 71 r ■- 71 I*1 SI ITi _- 71 Irl I Irl 1 ITI �R Page 3 of 3 Contract quantity Adjustment/Change order h41!l1611odt : : - Irw OV 16 Project Name: Dry Branch Tributarles Channel Improvements Quan. Adj./Change Order No.: uanUty Adiustment Data 1 1'I I � 1 I 11 __-_-�■� 1 ITR 71 ITi 1 IFI -- _- 1 11 71 1 1 141 oil 111 oil1 71 !rl �1 i R a�n1H1p� .,p °+ MAND19 St -07y Ci ^ti A55 ST '~ ! 1S SAVW s A � DUSHING DR DGE CRESG) crT C - Gp G D mEIyCT i G 1 n 4 A o C=im M x D p O Z y Ls 300MAN 4 prn m t0� p �� �0 y� is sNow3�u GI 100 0 OD .t 5 mo r m D O i 19 C ma �a 3 tD yoo - 03 o a .(DO•r Cn�� i�"s��'►� y oN°S°N Zyd `yu. - N` FCi O M ST ROCK CV m Ito -sawr� as a 'r >•si3 vr+� A N So C I 70 uC Do VIA Y 4 r Am S 20 Y. d �++ HO N1 < a 0 PATH Z RrGR4NCH � i Nl oAOf � z o 1p �9 AIRS . ` r Y fiy — al ssow+;s` ' +� a #A M a°Oj _ , nD�oNnS SUNDRo p� n 1,,r ,_ City of Round Rock ROUND ROCK ,T: Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 3 with Chasco Constructors for the Dry Branch Tributaries Channel Improvements Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 11/9/2018 Dept Director: Michael Thane, Director of Utilities and Environmental Services Cost: $4,561.00 Indexes: 2014 Drainage Revenue Bonds Attachments: 18077 - OCO 03 - Signed.pdf, LAF - Quantity Adjustment -Change Order #3 with Chasco Constructors for Dry Branch Tributaries Channel (00412735xA08F8).pdf, MAP.pdf Department: Utilities and Environmental Services Text of Legislative File CM -2018-1942 Consider executing Quantity Adjustment/Change Order No. 3 with Chasco Constructors for the Dry Branch Tributaries Channel Improvements Project. The Dry Branch Tributaries Channel Improvements project is located north of Gattis School Road near the Joyce Lane and Ray Berglund Boulevard residential neighborhoods. The Dry Branch Tributaries Channel Improvements project will provide conveyance improvements for flood control and will correct erosion and protect City wastewater infrastructure. Change Order No.3 includes the replacement of 60 linear feet of existing property fence and the removal of an existing tree that is in conflict with the proposed project. This Change Order No. 3 is for $4,561 and includes the cost of labor, additional materials and equipment for the work. With this change order, the total contract amount will be adjusted to $1,384,312. Cost: $4,561 Source of Funds: 2014 Drainage Revenue Bonds City of Round Rock Page i Printed on 111812018