Contract Quantity Adjustment/Change Order
Utilities and Environmental Services
2016Wastewater Collection System Rehabilitation - CIPP Liner and Pipe Burst Date: 11/20/18
Change Order/Quantity
RHB16 Adjustment No. 3
T Gray Utility & Rehab Co, LLC P. 0, Box 2176 - Cypress, Texas 77410 2:81-455-0899
Company Name Address Phone No.
3ustification
Quantity Adjustment /
SUMMARY
Original Contract Price:
Order # is needed for final quantity adjustments for bid items unused.
Previous Quantity Adjustment(s)-
This Quantity Adjustment:
Total Quantity Adjustment(s):
Total Contract Pnce with Quantity Adjustment(s)-
Previous Change Order(s):
This Change Order:
Total Change Order(s) To Date:
Adjusted Contract Price [Original Contract Price Plus
Quantity Adjustment(s) Plus Change Order(s)]:
Difference between Original and Adjusted Contract Prices:
Original Contract Time:
Time Adjustment by previous Quan. Adj./Change Order:
Time Adjustment by this Quan. Ad),/Change Order:
New Contract Time:
Prepared By: d�u
Signature
Contract.:
City Project
Manager: A�yu
Signature
Mayor/City
OA, '�,2a(T - ALe
Submitted for Approval
Eddie Zapata, Senior Project P
Printed Name, Title, Company
Approvals
Gerald Moffpaulr, Project Manager
Printed Name, Title, Company
Name,
Amount % Change
$536,350.00
$3,164.00
-$69,782.71
-$66,618.71
$469,731.29
$32,200.00 7%
$0.00 0%
$32,200.00 7%
$501,931.29
-$34,418.71
180
0
0
180
r 11/21/2018
zr zap
Date
11/21/2018
Page 2 (51 3
Contract Quantity Adjustment/Change Order
Project Name: 2016Wastewater Collection System Rehabilitation - CIPP Liner and Pipe Burst
Quan. Adj./Change Order No.:
Change Order Data
Item # Item Description Unit qty., Unit Price Amount
Contract
Time
Adjustment
-
$0.00
$0.00
$0.00
$0.00
- - $0.00
$0.00
$0.00
$0.00
_ - $0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Page 3 of 3
Contract Quantity Adjustment/ Change Order
Project Name: 2016Wastewater Collection System Rehabilitation - CIPP Liner and Pipe Burst
Quan. Adj./Change Order No.;
Quantity Adjustment Data
Bid Item #
Item Description
Unit
Qty.
Unit Price
Amount
contract
Time
Adjustment
#6
Vacuum Testing
EA
-6
$150.00
-$900.00
#7
Pipe Burst 6" - B"
LF
-52
$60.00
-$3,120.00
#8
Pipe Burst 8" - 8"
LF
-180.00
$68.00
-$12,240.00
#9
Pipe Burst 8" - 10"
LF
-30.00
$75.00
-$2,250.00
#11
10" Cured in Place Pipe
LF
-33
$29.00
-$957.00
#12
42" Cured in Place Pipe
LF
-17.17
$263.00
-$4,515.71
#13
Replace External Drop Stack in manhole
EA
-1
$1,800.00
-$1,800.00
#14
Remove and replace wooden fence
LF
-100
$5.00
-$500.00
#15
Install Manhole
Ea
-6
$7,250.00
-$43,500.00
$0.00
$0.00
$0.00
$0-
$0.00
$
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
-$69,782.711
0
i
r�
7
LINER REPAIR
0
W
a W
W
d co
v
L
i
a
a
U
c
e
0
U)
ng
3�
m
u
N
LY'
d'. U*MDELar
LO
N -
Y
a
24 INCH CIPP
r LINER REPAIR
a
c
d
E
9
0
Date- 811412018
City of Round Rock
r ROUNORoac Agenda Item Summary
Agenda Number:
Title: Consider executing Quantity AdjustmenttChange Order No. 3 with T. Gray
Utility & Rehab Co., LLC for the 2016 Wastewater Collection System
Rehabilitation - CIPP Liner and Pipe Burst Project.
Type: City Manager Item
Governing Body: City Manager Approval
Agenda Date: 11/30/2018
Dept Director: Michael Thane, Director of Utilities and Environmental Services
Cost: $69,782.71
Indexes: Self -Financed Wastewater Construction
Attachments: QA -CO No. 3.pdf, LAF.pdf, Map.pdf
Department: Utilities and Environmental Services
Text of Legislative File CM -2018-1961
The City is required to continue our Wastewater Collection System Rehabilitation program in
order to comply with the Texas Commission on Environmental Quality's (TCEQ) Edwards
Aquifer Recharge Zone Protection Program which requires that wastewater collection systems
located over the Edwards Aquifer be inspected and rehabilitated every five years. The
elimination of defects will not only help to protect the Edwards Aquifer, but will also reduce
inflow and infiltration entering the City's wastewater collection system, thereby reducing the
City's treatment cost. The City has completed the inspection of 12 sub -basins to determine
areas that require rehabilitation for this project.
The work being performed under this contract includes sub -basins BC -01, BC20-Z, CC32-Z,
CC34-Z, CC35-Z, CC37-Z, LC09-Z, LC15-Z, LC16-Z, LC17-Z, LCI 8-Z & LC19-Z. The project
includes 2,450 LF of new 8 -inch through 10 -inch pipe installed by pipe bursting, 2,650 LF of
8 -inch through 42 -inch CIPP liner, and construction of six manholes.
T. Gray Utility Company was awarded this contract in the amount of $536,350.00.
Quantity Adjustment/Change Order No. 1 (QAICO No. 1) was approved on May 25, 2018 in the
amount of $6,364 which brought the total construction contract to $542,714.
Quantity Adjustment/Change Order No. 2 (QAICO No. 2) was approved on August 24, 2018 in
the amount of $29,000 and brought the total construction contract to $571,714.
City o! Round Rock page 1 Printed on 11/29/2078
Agenda item Summary Condnued (CM -2048-49e47
Quantity Adjustment/Change Order No. 3 {QAICO No. 3} is needed for final bid item quantities
adjustments not used during construction. QA/CO No. 3 is for a reduction of $69,782.71 which
reduces the total construction contract to $501,931.29. With this QA/CO No. 3, the final contract
amount is $34,481.71 below the originally awarded contract.
Cost: -$69,782.71
Source of Funds: Self -Financed Wastewater Construction
City of Round Rock page 2 Printed on 41/29/2018