Loading...
CM-2018-1961 - 12/5/2018In -I. - r'', 01 16 Department: Project Name: City Project ID Number Vendor Page 1 01'3 Contract Quantity Adjustment/Change Order Utilities and Environmental Services 2016Wastewater Collection System Rehabilitation - CIPP Liner and Pipe Burst Date: 11/20/18 Change Order/Quantity RHB16 Adjustment No. 3 T Gray Utility & Rehab Co, LLC P. 0, Box 2176 - Cypress, Texas 77410 2:81-455-0899 Company Name Address Phone No. 3ustification Quantity Adjustment / SUMMARY Original Contract Price: Order # is needed for final quantity adjustments for bid items unused. Previous Quantity Adjustment(s)- This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Pnce with Quantity Adjustment(s)- Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Ad),/Change Order: New Contract Time: Prepared By: d�u Signature Contract.: City Project Manager: A�yu Signature Mayor/City OA, '�,2a(T - ALe Submitted for Approval Eddie Zapata, Senior Project P Printed Name, Title, Company Approvals Gerald Moffpaulr, Project Manager Printed Name, Title, Company Name, Amount % Change $536,350.00 $3,164.00 -$69,782.71 -$66,618.71 $469,731.29 $32,200.00 7% $0.00 0% $32,200.00 7% $501,931.29 -$34,418.71 180 0 0 180 r 11/21/2018 zr zap Date 11/21/2018 Page 2 (51 3 Contract Quantity Adjustment/Change Order Project Name: 2016Wastewater Collection System Rehabilitation - CIPP Liner and Pipe Burst Quan. Adj./Change Order No.: Change Order Data Item # Item Description Unit qty., Unit Price Amount Contract Time Adjustment - $0.00 $0.00 $0.00 $0.00 - - $0.00 $0.00 $0.00 $0.00 _ - $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Page 3 of 3 Contract Quantity Adjustment/ Change Order Project Name: 2016Wastewater Collection System Rehabilitation - CIPP Liner and Pipe Burst Quan. Adj./Change Order No.; Quantity Adjustment Data Bid Item # Item Description Unit Qty. Unit Price Amount contract Time Adjustment #6 Vacuum Testing EA -6 $150.00 -$900.00 #7 Pipe Burst 6" - B" LF -52 $60.00 -$3,120.00 #8 Pipe Burst 8" - 8" LF -180.00 $68.00 -$12,240.00 #9 Pipe Burst 8" - 10" LF -30.00 $75.00 -$2,250.00 #11 10" Cured in Place Pipe LF -33 $29.00 -$957.00 #12 42" Cured in Place Pipe LF -17.17 $263.00 -$4,515.71 #13 Replace External Drop Stack in manhole EA -1 $1,800.00 -$1,800.00 #14 Remove and replace wooden fence LF -100 $5.00 -$500.00 #15 Install Manhole Ea -6 $7,250.00 -$43,500.00 $0.00 $0.00 $0.00 $0- $0.00 $ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 -$69,782.711 0 i r� 7 LINER REPAIR 0 W a W W d co v L i a a U c e 0 U) ng 3� m u N LY' d'. U*MDELar LO N - Y a 24 INCH CIPP r LINER REPAIR a c d E 9 0 Date- 811412018 City of Round Rock r ROUNORoac Agenda Item Summary Agenda Number: Title: Consider executing Quantity AdjustmenttChange Order No. 3 with T. Gray Utility & Rehab Co., LLC for the 2016 Wastewater Collection System Rehabilitation - CIPP Liner and Pipe Burst Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 11/30/2018 Dept Director: Michael Thane, Director of Utilities and Environmental Services Cost: $69,782.71 Indexes: Self -Financed Wastewater Construction Attachments: QA -CO No. 3.pdf, LAF.pdf, Map.pdf Department: Utilities and Environmental Services Text of Legislative File CM -2018-1961 The City is required to continue our Wastewater Collection System Rehabilitation program in order to comply with the Texas Commission on Environmental Quality's (TCEQ) Edwards Aquifer Recharge Zone Protection Program which requires that wastewater collection systems located over the Edwards Aquifer be inspected and rehabilitated every five years. The elimination of defects will not only help to protect the Edwards Aquifer, but will also reduce inflow and infiltration entering the City's wastewater collection system, thereby reducing the City's treatment cost. The City has completed the inspection of 12 sub -basins to determine areas that require rehabilitation for this project. The work being performed under this contract includes sub -basins BC -01, BC20-Z, CC32-Z, CC34-Z, CC35-Z, CC37-Z, LC09-Z, LC15-Z, LC16-Z, LC17-Z, LCI 8-Z & LC19-Z. The project includes 2,450 LF of new 8 -inch through 10 -inch pipe installed by pipe bursting, 2,650 LF of 8 -inch through 42 -inch CIPP liner, and construction of six manholes. T. Gray Utility Company was awarded this contract in the amount of $536,350.00. Quantity Adjustment/Change Order No. 1 (QAICO No. 1) was approved on May 25, 2018 in the amount of $6,364 which brought the total construction contract to $542,714. Quantity Adjustment/Change Order No. 2 (QAICO No. 2) was approved on August 24, 2018 in the amount of $29,000 and brought the total construction contract to $571,714. City o! Round Rock page 1 Printed on 11/29/2078 Agenda item Summary Condnued (CM -2048-49e47 Quantity Adjustment/Change Order No. 3 {QAICO No. 3} is needed for final bid item quantities adjustments not used during construction. QA/CO No. 3 is for a reduction of $69,782.71 which reduces the total construction contract to $501,931.29. With this QA/CO No. 3, the final contract amount is $34,481.71 below the originally awarded contract. Cost: -$69,782.71 Source of Funds: Self -Financed Wastewater Construction City of Round Rock page 2 Printed on 41/29/2018