R-2018-6157 - 12/6/2018 RESOLUTION NO. R-2018-6157 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Smith Contracting Company, Inc. for the Roundville Lane Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 3,Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 3 to the Contract with Smith Contracting Company, Inc. for the Roundville Lane Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit"A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 6th day of December, 2018. CRAICyMORO,4N, Mayor City of Round Rock, Texas ATTEST: L-, d1k SARA L. WHITE, City Clerk 0112.1804;00413736 EXHIBIT 11A AP Page 1 of 3 Contract Quantity Adjustment/Change Order ROUND NOCK 3tYA'a v rev,01116 Department: TRANSPORTATION Project Name: ROUNDVILLE LANE Date: 11/15/18 City Project Change Order/Quantity ID Number Adjustment No. 3 Vendor SMITH CONTRACTING CO.INC. 15308 GINGER ST AUSTIN TX 78728 512-990-7640 Company Name Address Phone No. Justification CO/QA#3 will remove the Bonded Concrete Overlay from the project and introduce the reguar mill and overlay costs,Additionally,CO/QA#3 add,and removes,items that were not required due to the discovery of a solid rock subgrade in several locations. SUMMARY Amount %Change Original Contract Price: $2,699,825.59 _ Previous Quantity Adjustment(s): $106,763.75 This Quantity Adjustment: f -$103,629.75' Total Quantity Adjustment(s): $3,134.00 Total Contract Price with Quantity Adjustment(s): F-$2,702,959.69 Previous Change Order(s): $38,692,50 1% This Change Order: $24,682.00 1% Total Change Order(s)To Date: $63,374.50 2% Adjusted Contract Price [Original Contract Price Plus -_ Quantity Adjustment(s)Plus Change Order(s)]: $2,766,334.19 Difference between Original and Adjusted Contract Prices: $66,508.50 Original Contract Time: 270 Time Adjustment by previous Quan.Adj./Change Order: 36 Time Adjustment by this Quan.Adj./Change Order: 0 New Contract Time: 306 Submitted for Approval Prepared By: Hardin amn 1T Y2 Smith ntracting Co. Inc. 11-15-18 Signature__ ._ Printed Name,Title,CompanyDate Approvals Contractor: 5?,*4 nature , Printed Name,Title,Company Date City Project Manager: Lf� . ( S ,a° Signature Printed Name,Title a e Mayor/City Manager Signature Printed Name,Title Date Page 2 of 3 Contract Quantity Adjustment/Change Order LIUND RRCfC 7'¢<i1.�j irl I ev,OL 16 Project Name: ROUNDVILLE LANE Quan.Adj./Change Order No.: 3 Change Order Data Contract Time Item# item Description Unit Adjustment Qty. Unit Price Amount (Days) A TACK COAT FOR 2" PAVING GAL 885 $7.80 $6,903.00 B TRAFFIC CONTROLS LS 1 $9,039.00 $9,039.00 C TEMPORARY TABS LS 1 $1,840.00 $1,840.00 D ADDITIONAL MOBILIZATIONS EA 2 $3,450.00 $6,900.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Page 3 of 3 Contract Quantity Adjustment/Change Order pnuHn poor r t xn; rev,Uk15 Project Name: ROUNDVILLE LANE Quan.Adj./Change Order No.: 3 u Muir— Adjustment Data Contract Time Bid Item# Item Description Unit Adjustment Qty. Unit Price Amount (Days) 54 'lYPE B LIME SLURRY- -I.. Boo.M95 LIME TRENFED SUBGRADE -162 $12-.0B -$1,9q4.00, 96 FLEXIBLE BASE CY 164 $50.00 $8,200.00 97 PLAN&TEXT ASPH CONC PAV 0-3 IN SY 120 $3.75 $450.00 98 4 IN CONCRETE PAVEMENT BCO SY -7498 $34.00 -$254,932.00 99 PC CONCRETE CURB&GUTTER LF 5 $20.00 $100.00 79 HMAC TYPE C TON 825 $140.00 $115,500.00 7 LIME TREATED SUBGRADE (8 IN. SY -675 $4.25 -$2,868.75 8 10 IN.CONCRETE PAVEMENT SY 119 $66.00 $7,854.00 9 CL C CONC(MISC) CY 8.89 $800.00 $7,112.00 71 REMOVE P.C.CONCRETE SIDEWALK SF 292 $20.00 $5,840.00 74 TYPE B LIME SLURRY TON 14.4 $350.00 $5,040.00 75 LIME TREATED SUBGRADE (6 IN, SY 922 $9.50 $8,759.00 P.C. CONCRETE CURB AND GUTTER 80 (FINE GRADING) LF 53 $20.00 $1,060.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $o.oa $0.00 $0.00 10 TALS: -t1011-629-795; 0