R-2018-6160 - 12/6/2018 RESOLUTION NO. R-2018-6160 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Cash Construction for the Southwest Downtown District Infrastructure Improvements Phase 513 Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 4,Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 4 to the Contract with Cash Construction for the Southwest Downtown District Infrastructure Improvements Phase 513 Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 6th day of December, 2018. CRAIGA4ORq,IXN, Mayor City of Round Rock, Texas ATTEST: SARA L. WHITE, City Clerk 0112.1804;00413737 EXHIBIT Pao,e I of 3 Contract Quantity Adjustment/Change Order r rev,08.12 Department: Transportation Project Name: CORR SWDT Ph 5B Date: 11/5/18 City Project Change Order/Quantity ID Number SWDT5 Adjustment No. 4 Justification Additional work for alley paving, parking lot,and other mist items SUMMARY Amount filo Change Original Contract Price: $4,315,214 00 Previous Quantity Adjustment(s): $139,298.00 This Quantity Adjustment: $35,535.00 Total Quantity Adjustment(s): $174,833.00 Total Contract Price with Quantity Adjustment(s): _$4,490,047.00 Previous Change Order(s): $102,132.00 270 This Change Order: $43,910.00 1% Total Change Order(s)To Date: $146,042.00 3% Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) 1-7- 7 Plus Change Order(s)]: 4,636,089.00 Difference between Original and Adjusted Contract Prices: $320,875.00 Original Contract Time: 360 Calendar Days Time Adjustment by previous Quan.Adj./Change Order: 0 Calendar Days Time Adjustment by this Quan.Adj./Change Order: 0 Calendar Days New Contract Time: 360 Calendar Days Submitted for Approval Prepared By: B.J. Cash,Cash Construction ............. .. Sig ture Printed Name,Title,Company Date Approvals Contractor: B.J.Cash,Cash Construction City Project s Lure Printed Name,Title,Company Date Manager: q�-'r� Bill Stablein,Pro'ect Manager,CORR Ill Signature Printed Name,Title ate Mayor/City �.�� Manager ,Mayor,CORR Signature Printed Name,Title Date Page 2 of 3 __.. Contract Quantity Adjustment/Change Order S 4L'Y,OAS 11 Project Name: CORR SWDT Ph 513 Quan.Adj./Change Order No.: 4 Change Order Data Contract Time Adjustment Item# Item Description Unit Qty. Unit price Amount Adjusus(Das TxDOT TY-D with RAP with spot grading,and milling for Alley Work Ton 100 $300.00 $30,000.00 Additional Handrail at Spanish Academy(18LF at side entrance&10 LF at front entrance LS 1 $3,055.00 $3,055.00 Tree removal at McNeil Bridge for Oncor Pole Relocation LS 1 $2,000.00 $2,000.00 Trickle Channel Additional Concrete at AT&T Building LF 130 62 $8,060.00 Handrail at TavarnLS 1 795 $795.00 $0.00 X0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: 43,910.00 0 Page 3 of 3 Contract Quantity Adjustment/Change Order rev,i)8i12 Project Name: CARR SWDT Ph 5B Quan.Adj./Change Order No.: 4 Quantity Adjustment Data Contract Time Adjustment Bid Item# Item Description Unit City. Unit Price Amount (Days) Contract Adds Barricades,Signs and Traffic Handling,For Contractor Traffic Control Plan for all phasing throughout the 43 project MO 6 $3,000.00 $18,000.00 Concrete PaveFUnits for Sidewalk(Paver Section): Sidewalk Unit(2-3/8"thick)with 1"Sand,6"min.2 sack Cement Stabilized Crushed Limestone Flexible Base,and 6"Re-Compacted Moisture Conditioned Subgrade(for 5-528-6004 209 Bagdad) SY 20 $58.00 $1,160.00 P.C.Reinforced Concrete Retainer Curb,Type A, 9-529-6033 Including Tree Wells(for 209 Bagdad) LF 46 $75.00 $3,450,00 Asphalt Stabilized Base: Hot Mix Asp a tic Concrete Base (10.5"Thick),TXDOT Item 340,Type B(Black Base) (Method A)under,and 1.5 feet behind roadway curbs 37 (Small Parking Lot) SY 325 $49.00 $15,925.00 20-506-6020 Stabilized Construction Entrance,maintained thoughout project per each EA -1 $3,000.00 -$3,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 .$0.00 $0.00 $0.00 $0.00 TOTAL 35 535.00