Loading...
CM-2018-1986 - 12/18/2018SUPPLEMENTAL AGREEMENT NO.4 TO "CITY OF ROUND ROCK AGREEMENT FOR ARCHITECTURAL SERVICES" FOR THE LUTHER PETERSON SERVICE CENTER WITH JACOBS ENGINEERING GROUP INC. CITY OF ROUND ROCK ) STATE OF TEXAS ) COUNTY OF WILLIAMSON ) COUNTY OF TRAVIS ) KNOW ALL BY THESE PRESENTS: FIRM: Jacobs Engineering Group Inc. ADDRESS: 1999 Bryan Street, Suite 1200, Dallas, TX 75201 PROJECT: Luther Peterson Service Center This Supplemental Agreement No. 4 to "City of Round Rock Agreement for Architectural Services" for the Luther Peterson Service Center is made by and between the City of Round Rock, Texas (hereinafter referred to as the "City"), and Jacobs Engineering Group Inc. (hereinafter referred to as "Architect"). WHEREAS, the City and Architect executed an Agreement (hereinafter referred to as the "Agreement") on the 241h day of the month of March, 2016, for provision of professional architectural services and design services related to the new construction of the Luther Peterson Service Center; and WHEREAS, the City and Architect also executed Supplemental Agreement No. 1 on the same date; and WHEREAS, the City and Architect also executed Supplemental Agreement No. 2 on September 8, 2016; and WHEREAS, the City and Architect also executed Supplemental Agreement No. 3 on December 1, 2016; and WHEREAS, it has now become necessary to amend the Agreement to increase the not - to -exceed fee as a result of the City's request to increase in the scope of services, specifically architectural and engineering design changes; NOW, THEREFORE, premises considered, the City and Architect agree that said Agreement is amended as follows: 1. Section 1.1.2.3 of the Agreement shall be amended by addition of the following: 00413604: ss2 - r201t-1--/P(10 The program of development shall be amended to include the additional tasks set forth in the attached Exhibit "A" to this Supplemental Agreement No. 4, incorporated herein for all purposes. II. Section 1.1.2.4 of the Agreement shall be amended by addition of the following: The Fee Schedule relative to this Agreement shall amended by an increase in the amount of Twenty -One Thousand Seven Hundred Forty -Seven and No1100 Dollars ($21,747.00) to the previous not -to exceed amount of One Million Twenty -Seven Thousand Eight Hundred Sixty -Three and No/100 Dollars ($1,027,863.00), for an amended not -to -exceed amount of One Million Forty -Nine Thousand Six Hundred Ten and No1100 Dollars ($1,049,610.00), as described in the attached Exhibit `B" to this Supplemental Agreement No. 4, which shall be incorporated herein for all purposes. With the exception of the terms set forth herein, there shall be no other changes in the terms or conditions of the original Agreement, Supplemental Agreement No. 1, or Supplementa[ Agreement No. 2, or Supplemental Agreement No. 3 to the original Agreement and those such terms and conditions shall remain effective. [Signatures on the following page.] 2 IN WITNESS WHEREOF, the City and Architect have executed this Supplemental Agreement No. 4 in duplicate originals. CITY OF ROUND ROCK, TEXAS By: - t Printed Nae•. , Title: . F-`� L)�- -4 Date Signed: 12 – 1 FOR CITY, ATTEST: I By: Sara L. ite, City Clerk FOR CITY, APPROVED AS TO FORM: By: �A L.— ^' L -41A - Stepha L. gheets, City Attorney 3 JACOBS ENGINEERING GROUP INC. By Printed 'ame: Title: Date Sign --• i City of Round Rock Luther Peterson Service Center JACOBS EXHIBIT A SCOPE OF SERVICE CITY OF ROUND ROCK — LUTHER PETERSON SERVICE CENTER ADDITIONAL SERVICES #6 — SUPPLEMENTAL AGREEMENT NO.4 The City of Round Rock (CORR) has published a Master Plan for rebuilding and renovating the existing Luther Peterson Service Center Complex (LPSCC) into a single campus thatcontains Administrative O#lice and Departmental Shop functions for Utility Engineering (EU), Transportation (T), and General Services Fleet Maintenance (GS) departments. The Master Plan envisions a 20 year growth plan accomplished in three phases. Phase 1 of the Master Plan describes Near Term New Construction for Offices, Exterior Structures, and yard requirements. The CORR commissioned a nationally recognized architecture firm to prepare the Master Plan document, which included Facility Area Requirements by Department and by Phase. Needs were described as Near Term (2020) and Long Term (2035) and included a breakout of Department, Future Building, Building Type, and Space Type, as well as a tabulation of the number of spaces (Units), Area calculation per space (SF/Unit), a total Area (USF), Efficiency Factor (EF), and total Gross Square Footage (TGSF). Our proposal is based on the tabulation of Near Term Calculations for Area Type J — Utility + Environmental Services and Type I -- Transportation. The document Phase Ib was used as the basis for the original project scope. ADDITIONAL SCOPE OF SERVICES #6 Jacobs proposes the following Additional Scope of Service; 1. Incorporation of the city comments on the IFC set a) 88 comments have been provided to Jacobs by Aneil Naik with the City of Found Rock after all documents were issued for construction. Many of these items were minor cleanup that Jacobs addressed. 25 comments are scope changes, including adding trees, changing underground piping types and moving fre hydrants, these changes will require additional fees to complete. b) Removing and re -adding construction clouds to create updated permit exhibits. 2. Revise the DAM 11 Exhibits and all calculations a) The DAM 11 exhibits were originally reviewed and approved by Alysha Girard March 2017 b) The DAM 11 Exhibits and calculations were revised to include adjacent properties, rev'ewed and approved by Anejl Naik October 2017 c) Third revision to remove adjacent properties July 2018. 3. Incorporation of POE (Point of Entryl hardware and software changes per Owners direction The following items will be changed with the vendor input a) The lock sets will be change to a POE power and with the hardware mounted on the door verse on the wall b) Vendor will provide a red line division 28 with both the hardware for door and the hardware mounted in rack for the programming and controls. Jacobs will review, edit and update division 28 specifications to verify no conflicts with other building systems. c) Vendor to provide cut sheet with details on installation which Jacobs will revise the design document installation details for each of the door type. Page 1 of 2 City of Round Rock Luther Peterson Service Center JACOBI d) Vendor to provide updated door hardware schedule to match to new POE system. This schedule will be incorporated into the design documents and specifications e) Architectural finish schedules and door schedules will be updated to incorporate the POE Systems. f) Architectural design details will be updated to correctly represent the POE systems g) All Document changes will be clouded and issued in an ASI. Incorporation of the city comments on the issued for construction set. This will result in the issuance of ASI No. 1 for grading, ASI No. 2 for all City comments and DAM 11 changes and ASI 4 for POE Changes. 2018 Jacobs Authorization Date City of Round Rock Authorization Date Page 2 of 2 City of Round Rock Luther Peterson Service Center Supplemental No. 4 (Amendment #6) Fee Matrix Design Civil Structural Architectural Interiors Mechanical Plumbing Electrical Fire Protection Landscape Quality Control Program Cost Estimating $0.00 $3,029 $0.00 $648.00 $1,075.20 $0.00 $576.00 $710.40 $0.00 $1,028.16 $523.20 $0.00 Subtotal Amendment #6 Fee F --"-T" —j Contengency $0.00 Subfotal en menFie $9,072 ASI No. i and 2 - DAM 11 Exhibit IDISCIPUrle Project Management 1 Administration $160.80 Design Civil Structural Architectural Interiors Mechanical Plumbing Electrical Fire Protection Landscape Quality Control Program Cost Estimating $0.00 $2,580 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $343.20 $0.00 Subtotal Amendment #6 Fee =7, m Contengency $0.00 u o a en men Fee , ASI No. 4 - POE Construction Document Changes Project Management/ Administration 90.20 Design $0.00 Civil $0.00 Structural $0.00 Architectural $1,728.00 Interiors $1,075.20 Mechanical $0.00 Plumbing $0.00 Electrical $6,585.60 Fire Protection $0.00 1 nf9 Landscape $0.00 Quality Control Program $559.20 Cost Estimating $0.00 Subtotal Amendment #5 Fee $10,591 Contengency $0.00 Su fofafAmendment 16 Fee ,591 Relmbursables $0.00 Total Amendment #6 Fee $21,74 PM PP PM'R City of Round Rock OU 5 Roac Agenda Item Summary Agenda Number: Title: Consider executing Supplemental Agreement No. 4 for Architectural Services with Jacobs Engineering, Inc. for the Luther Peterson Service Center. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 12/14/2018 Dept Director: Chad McDowell, General Services Director Cost: $21,747.00 Indexes: Self -Financed Wastewater Construction Attachments: Agreement, LAF Department: General Services Department 'text of Legislative File CM -2018-1986 Supplemental Agreement No. 4 includes cost changes incurred by the Jacobs Engineering for changes including; updating plans for permitting, Regional Dam 11 Detention calculations, and access control system specification and design updates. Cost. $21,474.00 Source of Funds: Self -Financed Wastewater Construction City of Round Rock Page i Pdnted on 1211412018