CM-2019-0024 - 1/25/2019 Page 1 of 4 Contract Quantity Adjustment/Change Order ROUNO ROCK TEXAS rev,01/16 Department: TRANSPORTATION Project Name: ROUNDVILLE LANE Date: 1/8/19 City Project Change Order/Quantity ID Number Adjustment No. 4 Vendor SMITH CONTRACTING CO. INC. 15308 GINGER ST AUSTIN TX 78728 512-990-7640 Company Name Address Phone No. Justification Project level up and close out items. SUMMARY Amount %Change Original Contract Price: $2,699,825.69 Previous Quantity Adjustment(s): $3,134.00 This Quantity Adjustment: $43,649.60 Total Quantity Adjustment(s): $46,783.60 Total Contract Price with Quantity Adjustment(s): $2,746,609.29 Previous Change Order(s): $63,374.50 2% This Change Order: $5,362.20 0% Total Change Order(s)To Date: $68,736.70 3% Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s)Plus Change Order(s)]: $21815,345.99 Difference between Original and Adjusted Contract Prices: $115,520.30 Original Contract Time: 270 Time Adjustment by previous Quan.Adj./Change Order: 36 Time Adjustment by this Quan.Adj./Change Order: 0 New Contract Time: 306 Submitted for Approval Prepared By: C,& Oo/( Signature Orinted Name, Tide, Co pany bate Approvals /r c _ Contractor. ] �V` �- l1 1 S�`t�`�.� th 9 Signature Printed Name,Ti le,C mpany Date City Project111 ii __ II Manager:. � 1 S�`K, �-— dgnature Printed Name,Title Date Mayor/City Manager , , �- Signature ;� Printed Name,Title Date N,200 6b2-4 Page 2 of 4 Contract Quantity Adjustment/Change Order �OUNDK I EXAM, rev,01/16 Project Name: ROUNDVILLE LANE Quan.Adj./Change Order No.: 4 Change Order Data Contract Time Adjustment Item # Item Description Unit Qty. Unit Price Amount Adjusus(Das CO 4-1 Temporary Wooden Handrail LS 1 $1,162.20 $1,162.20 CO 4-2 New Survey Control Points w/Data LS 1 $1,210.00 $1,210.00 Re-connect Chainlink Fence Across new CO 4-3 Headwall LS 1 $2,990.00 $2,990.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: 5,362.20 0 Page 3 of 4 Contract Quantity Adjustment/Change Order ROUND ROCK TEXAS rev,01/16 Project Name: ROUNDVILLE LANE Quan.Adj./Change Order No.: 4 Quantity Adjustment Data Contract Time Adjustment Bid Item # Item Description Unit Qty. Unit Price Amount (Days) 9 420-6074 CL C CONC(MISC) CY 3 $800.00 $2,400.00- 10 2,400.00-10 423-6008 RETAINING WALL CIP SF -24.1 5 -T-11253.20 432-6031 RIPRAP(STONE 12 PROTECTION)(12 IN) CY 2 $125.00 $250.00 13 450-6052 PEDESTRIAN HAND RAIL LF 355.23 $135.00 $47,956.05 430 P.C. CONCRETE TY II CURB 22 (MONOLITHIC) LF -129 $9.25 -$1,193.25 ' 432 NEW P.C. CONCRETE SIDEWALKS(5 23 IN) SF -514.5 $5.25 -$2,701.13 ✓ 506-6001 ROCK FILTER DAMS(INSTALL) 30 (TY II) LF -142 $24.00 -$3,408.00,- 31 $3,408.00,- 31 506-6011 ROCK FILTER DAMS(REMOVE) LF -142 $7.00 -$994.00,,- 506-6040 BIODEG EROSN CONT LOGS 32 (INSTALL) (8 IN) LF -640 $3.25 -$2,080.00 506-6043 BIODEG EROSN CONT LOGS 33 (REMOVE) LF -640 $0.54 -$345.60 43 642 SILT FENCE FOR EROSION CONTROL LF -1380 $1.90 -$2,622.00 644-6001 IN SM RD SN SUP&AM 45 TYIOBWG(1)SA(P) EA 1 $400.00 $400.00✓ 662-6069 WK ZN PAV MRK REMOV(W) 46 8" (DOT) LF -135 $2.75 -$371.25 662-6075 WK ZN PAV MRK REMOV(W) 47 24"(SLD) LF -47 $8.75 -$411.25 ./ 662-6095 WK ZN PAV MRK REMOV(Y)4" 48 (SLD) LF -7948 $1.35 -$10,729.80 666-6214 REFL PAV MRK TY II(Y)24" 58 (SLD) LF -45 $3.25 -$146.25✓ 77 310-6009 PRIME COAT(MC-30) GAL 36 $18.00 $648.00.-/ 340-0 HOT MIX ASPH CONC PAVEMENT 78 (TY B) TON 68 $90.00 $6,120.00 91 642 SILT FENCE FOR EROSION CONTROL LF -315 $2.00 -$630.00 ✓ 96 210 FLEXIBLE BASE CY 24.64 $50.00 $1,232.00 430 P.C. CONCRETE CURB AND GUTTER 99 (FINE GRADING) LF 555 $20.00 $11,100.00 108 636-6001 ALUMINUM SIGNS(TY A) SF 27 $24.00 $648.00 666-6205 REFL PAV MRK TY II(Y)4" 121 (BRK) LF -40 $0.40 -$16.00 r 666-6207 REFL PAV MRK TY II(Y)4" 122 (SLD) LF -267 $0.40 -$106.80' A Page 4 of 4 Contract Quantity Adjustment/Change Order ROUND ROCK TEXAS rev,01/16 128 678-6001 PAV SURF PREP FOR MRK(4") LF -705 $0.16 -$112.80 129 678-6004 PAV SURF PREP FOR MRK(8") LF -569 $0.32 -$182.08 130 678-6006 PAV SURF PREP FOR MRK(12") LF -420 $0.65 -$273.00 ✓ 131 678-6008 PAV SURF PREP FOR MRK(24") LF -111 $1.45 -$160.95 f 678-6009 PAV SURF PREP FOR MRK 132 (ARROW) EA -5 $35.00 -$175.00 678-6016 PAV SURF PREP FOR MRK 133 (WORD) EA -5 $40.00 -$200.00/ 684-6008 TRF SIG CBL(TY A) (12 AWG) 155 (3 CONDR) LF -124 $2.15 -$266.60 684-6033 TRF SIG CBL(TY A) (14 AWG) 157 (7 CONDR) LF -63 $3.75 -$236.25 684-6046 TRF SIG CBL(TY A) (14 AWG) 158 (20 CONDR) LF -67 $4.25 -$284.75 166 6002-6002 VIVDS CAMERA ASSEMBLY EA 1 $1,600.00 $1,600.00 6002-6005 VIVDS COMMUNICATION 168 CABLE(COAXIAL) LF 46 $4.25 $195.50,-, $0.00 TOTALS: $43,649.60 0 City of Round Rock IF ROUND TEXAS AS Agenda Item Summary r Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 4 with Smith Contracting Company, Inc. for the Roundville Lane Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 1/25/2019 Dept Director: Gary Hudder Cost: $49,011.80 Indexes: RR Transportation and Economic Development Corporation (Type B) Attachments: Partially executed QA-CO#4 - Roundville Ln Department: Transportation Department Text of Legislative File CM-2019-0024 This project is to improve the egress for the new UPS Location. This change order is for temporary wooden handrails, new survey control points, and to install chain link fence across a new headwall. The quantity adjustment portion of this is to add or reduce the values of the contract amounts so we can zero out the contract items. The change order portion is $5,362.20. The quantity adjustment portion is $43,649.60 for a total amount of$49,011.80. Staff recommends approval. Cost:$49,011.80 Source of Funds: RR Transportation and Economic Development Corporation (Type B) City of Round Rock Page 1 Printed on 1/2412019