Loading...
CM-2019-0044 - 2/1/2019pcw. G�.Ie Department: Project Name: City Project ID Number Vendor Page I of 3 Contract Quantity Adjustment/Change Order PARD Adult Recreation Pro ect Date: 1/24/19 Change Order/Quantity Adjustment No. 1 Prime Construction Company, Inc. 20907 Martin L Pflugerville, TX 78660 S12.244.7799 Company Name Address Phone No. 3ustificztion Due to Front end negotiations and subcontractor delays, additional days associated with sod installation extending the date for installation of sod to February 1, 2019. Total contract date remains at 240 days to completion. To decrease subcontractor cost after change of subcontractor, the City offered stockpiled material for use. in order to access this stockpile, a temporary road had to be built. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustnent(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contact nme: Prepared Contractor. Amount % Change $2,870,8Z0.o0 i 6 $0.00 $0 00 ' $2,870,820.00 0% $16,500.00 1% $16,500.00 1% $2,887,320.00 $16,5DD.00 sod Install date of ]an. 18th, 2019 sod install date of Feb. 1st, 2019 Sufi d for�pil�roitah Brian Ritter, President, Prime Construction Company Inc. City Project Signature Printed Name, Title, Company Date Manager: / J-1- Vsay c S r nhou nom, as _ A— A. r n , }— WAiWWI c MayorlCity Manager Sidiature 6LQtMl-,W� kr L?J. i7, i Contract Quantity AdjustFnent/Change Order WOUNU mom M.O7.15 Project Name: Adult Recreation Project Quan. Adj./Change Order No.: Chane Ardar mala Page 2 of 3 i� Contract Time Item # Item Description Unit Qty. knit Price Amount Adjustment p 1 Build temporary road to stockpile LS 1 9 $16,500.00 r $16,500.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 i� Page 3 of 3 TM-- Contract Quantity Adjustment/Change Order we, 03. IF Project Name; Adult Recreation Project Quan. Adj./Change Order No.: Ouantity Adiustment Data RM Bid Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment _ _ .. - - _ $0.00 $0.00 $0.00 $0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.D0 $0.00 $0.00 $0.00 $0.00 $000 $O.OD $0.00 $0.00 $0.00 $0.00 $O.DO $0.D0 $0.0D $0.DD $0,001 0 RM City of Round Rock R�:u"5 Racx Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 1 with Prime Construction Company, Inc. for the Adult Recreation Complex Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 2/1/2019 Dept Director: Rick Atkins Cost: $16,500.00 Indexes: 2017 General Obligation Bonds Attachments: Adult Complex Contract 01252019 1521, LAF - QA-CO#1 w- Prime Construction Co - Adult Recreation (00417372xA08F8) Department: Parks and Recreation Department Text of Legislative File CM -2019-4044 This Change Order to the contract with Ritter, Botkin Prime Construction Company, Inc. (PCCI) includes an extension to the sod installation date in the contract. Originally, sod on the playing fields was to be installed by no later than January 18th, 2019. However, after subcontractor delays and negotiations surrounding those delays, the City agreed to extend that date to February 1, 2019. Additional rain delays are not included in this Change Order, but are expected in the future due to the abnormally wet December/January. Additionally, this Change Order includes the added cost for the contractor to build a haul road to access the stockpiled material provided by the City. After a change in subcontractor, the City offered the stockpiled material to the new subcontractor to offset the increased cost for their services. The Adult Recreation Complex at Old Settlers Park includes construction of two (2) lighted recreational softball fields, a small restroom facility, spectator seating and shade, flexible field space, and parking. This project will serve as the first phase of the Recreation Complex and will replace the two softball fields currently located in McNeil Park which will be removed as part of the Nutty Brown Development. Cost: 16,500.00 Source of Funds: 2017 General Obligation Bonds City 01 Round Rock Page 1 Printed on 1/30/2019