Loading...
CM-2019-0036 - 2/1/2019STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: IUMLEY-HORN AND ASSOCIATES. INC. ("Engineer") ADDRESS: 2600 Via Fortuna Terrace I Suite 300 Austin TX 78746 PROJECT: Lake Creek 10 & Lake Creek 11 Wastewater Imorovements This Supplemental Contract No. I to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Kimley-Horn and Associates, Inc., hereinafter called the "Engineer'. WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 9th day of August, 2018 for the Lake Creek 10 & Lake Creek I 1 Wastewater Improvements Project in the amount of $87,500.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $21,300.00 to a total of $108,800.00; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: 1. Article 2. Engineering Services and Exhibit B. Engineering Services shall be amended as set forth in the attached Addendum to Exhibit B. Exhibit C. Work Schedule shall be amended as set forth in the attached Addendum to Exhibit C. Article 4, _Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $21,300.00 the maximum amount payable under the Contract for a total of $I08,800.00, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. [signature pages follow] Ciel-gal-C2C� Supplemental Contract 0199 1830.00416899 Rev.0616 84275 KIMLEY-HORN AND ASSOCIATES, INC. By: G'' I/a.- 444, S x 04 6cW 1// - VOW LCZUWe-v1 23 /201 `i Date Supplemental Contract Rev.06A6 Cl 1991830 00416899 8427~ CITY OF ROUND ROCK APR VED AS O FORM: By: t k2 eek;e 441. , - L cz�w Laurie Badley, City Manager Stephe L. Sheets, City Attorney "�;_ /J II Date Supplemental Contract Rev.062'16 0199 1830 00416899 84275 ADDENDUM TO EXHIBIT B Engineering Services Based on a field meeting with the City for the Lake Creek, Segment 10 project the Engineer is proposing to design a separate alignment parallel to the existing Lake Creek 10 segment to address constructabiiity concerns and private property impacts. This design will include about 700 linear feet of open cut installation and require the following additional services: Task 1— Design Management, Project Meetings, and Data Collection Design Management The Engineer will manage the design and work associated with the work described in subsequent sections and provide the following communication and reporting: • Progress Report one per month Communication and reporting for an additional two (2) months for a total of six (6). Task 2 —Design • Design and Boundary Survey - (Sub -Consultant - Gorrondona & Associates, Inc. - S3, 500) o Design Survey ■ On the ground survey ($3,500): • Additional topo survey along the new alignments for a width up to 50'. Existing manholes, valves, inlets, road poles, driveway connections, and other observable above ground existing structures will be located within the project area. c. Including 5 additional manholes between Lake Creek 10 and 11 • Establish control points along the route. Geotechnical Analysis - (Sub -Consultant Arias - S2,800) The Consultant will perform a geotechnical analysis of the proposed new alignment utilizing a geotechnical laboratory to determine subsurface conditions and make recommendations regarding embedment, backfill and excavation parameters. The geotechnical analysis will include the following: Subsurface exploration including up to one (1) sample bores up of 20 feet along the proposed line. Laboratory tests for classification purposes and strength characteristics. Engineering services that address soil and ground conditions for proposed boring location. Prepare a geotechnical report that presents the results of the field and laboratory data as well as analysis and recommendations. The data contained in the geotechnical report will be made available to contractors during the bidding process for information purposes. • Plans The Engineer will prepare the following additional plans for the wastewater line. These plans will be prepared on 22"04". Plans will consist of- ,--) fo Traffic Control Details (1 Detail - Purple Sage Drive) .D Erosion Control Plans and Details (3 Plan Sheets) for inclusion in SCS Permit. • Task Deliverables: ID Three (3) hard copies and a PDF of the 50% plans, specification table of content, and OPCC o Three (3) hard copies and a PDF of the 100'''o plans, specifications, and OPCC Task 5 —Permitting TCEQ SCS Engineer will prepare and submit one (1) Sewage Collection System (SCS) to include as follows: • Application Cover Page ins accordance with TCEQ Form 20705 • General Information in accordance with TCEQ Form 0587, including: o Attachment A Road Map Exhibit o Attachment B USGS i Edwards Recharge Zone Map • Request for Geologic Assessment Exemption • Organized Sewage Collection Plan Application in accordance with TCEQ Form 0582, including: Attachment A Engineering Design Report the following are required per TCEQ 217. 10 Subchapter A: ■ Project Description ■ Pipe Design • Design flow and service area information to be provided by the City. • Criteria for Laying Pipe • Manholes and Related Structures ■ Pipe Installation ■ Testing Requirements for Gravity Pipes • Testing Requirements for Manholes Temporary Stormwater Section in accordance with TCEQ Form 0602 ■ Attachment A Spill Response Actions ■ Attachment B Potential Sources of Contamination 2 ■ Attachment C ._ Sequence of Major Activities • Attachment D - Temporary Best Management Practices and Measures • Attachment F -- Structural Practices ■ Attachment G Drainage Area Map ■ Attachment I -- Inspection and Maintenance for BMPs ■ Attachment J Schedule of Interim and Permanent Soil Stabilization Practices Core Data Form in accordance with TCEQ 10400 Client responsibilities: Provide data, exhibits, and information as needed for completion of SCS application. Client is also responsible for application fees and associated permitting costs. • Assumptions: One( I) submittal o One (l) set of TCEQ comments to address 3 ADDENDUM TO EXHIBIT C Work Schedule Attached Behind This Page 1 $1 A RR R It 5R R R' A A it j. ■7 4 1 p i i ; � � � '$�� � � fny 3 � � � � # # � � � : 3 1 t ��S�ii 1$`,� pw a� FL may` l� 5 a ♦ yCt F� �S�{ b= � P C S E t 5 6[ S S k C 8 6 S E 6 S E S f 6 S G E G E E S S S C! E S 6 7 -, ._ ., .. • .. . ^_ - ! - _ _ 9 ..' '# 2 A :f. .R ?; it !r .. 0 H En = m l O m I -- C3 --O ti z w 0 0 a Date. 1/2412019 N LAKE CREEK 10 A WASTEWATER IMPROVEMENTS SUPPLEMENTAL AGREEMENT No. 1 - r ROUND ROCK f E- XA 5 City of Round Rock ?"ROUND aorK Agenda Item Summary Agenda Number: Title: Consider executing Supplemental Contract No. 1 with Kimley-Horn and Associates, Inc. for the Lake Creek 10 & Lake Creek 11 Wastewater Improvements Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 2/1/2019 Dept Director: Michael Thane, Director of Utilities and Environmental Services Cost: $21,300.00 Indexes: Self -Financed Wastewater Construction Attachments: SA#1.pdf, MAP.pdf, LAF.pdf Department: Utilities and Environmental Services Text of Legislative File CM -2019-0036 In the City's Wastewater Master Plan, it identified two line sections of the Lake Creek 10 and Lake Creek 11 wastewater interceptors which need to be upsized to meet the needs for this interceptor at buildout. The construction of a few higher density developments have resulted in the need to upsize these line sections of the interceptor at this time. The Lake Creek 10 wastewater line improvements will upsize approximately 1,400 linear feet of existing 10 -inch wastewater line to 12 -inches in diameter and Lake Creek 11 wastewater line upsize approximately 2,700 linear feet of existing 8 -inch wastewater line to 10 -inches in diameter. Supplemental No. 1 is needed to re-route approximately 700 linear feet of the proposed 1,400 linear feet of 12 -inch wastewater line identified as Lake Creek 10. It has been determined that enlargement of a portion of the existing wastewater line could potentially cause damage to existing nearby structures. The associated cost includes surveying, geotechnical, design, and TCEQ permitting. Cost. $21,300 Source of Funds: Self -Financed Wastewater Construction City o/Round Rock Page 1 Pdnfed on 1/30/2019