Loading...
CM-2019-0049 - 2/8/2019Contract Quantity Adjustment/Change Order my, QB/12 Department: Transportation Department Project Rocking 3 Road & Did Settlers Blvd Turn Name: Lane City Project ID Number Justification 3alancing Project Quantities SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s) This Change Order: Total Change Order(s) To Date. Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Submitted for Approval Page I of 3 Date: 1/11/19 Change Order/Quantity Adjustment No. 1 0 21 21 Amount $260,967.50 -$6,788.79. $254,178.71 $0.00 $254,178.71 -$6,788.79 Prepared By: —;�I Lam/"' Dale Detten PM Aaron Concrete Contractors LP. 1/11/19 Signature Printed Name, Title, Company Date f , Approvals Contractor: I'V Aaron Cabaza, Gen Partner, Aaron Concrete_ Contractors, LP. 1/11/19 Signature Printed Name, Title, Company Date City Project Manager: Z A - �J ` ,, �, 1—.29 Signature Printed Name, Title Date Mayor/City Manaiier eM-zo,q-oozy Change 0.00 0.00 0.00 Date Page 3 of 3 Contract Quantity Adjustment/ Change Order rev. OV12 Project Name: Rocking I Road & Old Settlers Blvd Turn Lane Quan. Adj./Change Order No.: niinntity arlirretmnnt Data Bid Item # Item Description Unit Qty. Unit Price Amount Contract Tame Adjustment 3 REMOVING CONC (SDWLK OR RAMP) SY 1 10.00 $24.00 $240.00 7 FURNISHING & PLACING TOPSOIL (4") SY 230.60 $5.00 $1,153.00 8 CELL FBR MLCH SY 230.60 $1.60 $368.96 9 CELL FBR MLCH SEED(TEMP)(WARM) SY (355.00) $1.60 -$968.00 10 VEGETATIVE WATERING MG (10.00) $35.00 -$350.00 11 D -GR HMA(SQ)TY B PG64-22 TON 41.90 $140.00 $5,866.00 13 D -GR HMA(SQ)TY C PG70-22 TON (5.45) $205.00 -$1,117.25 21 CONSTRUCTION EXITS (INSfALL)(TY 1) SY (110.00) $13.00 -$1,430.00 22 CONSTRUCTION EXITS (REMOVE) SY (110.00) $10.00 -$1,100.00 23 TEMP SDMT CONT FENCE (INSTALL) LF 9.00 $3.00 $27.00 24 TEMP SDMT CONT FENCE (REM) LF (71.00) $1.10 -$78.10 25 CONC CURB & GUTTER (TY II) LF 31.50 $20.00 $630.00 28 PIPE UNDERDRAINS (TY 7)(6") LF (100.00) $45.00 -$4,500.00 31 ELEC CONDR (NO 6) BARE LF 33.00 $4.00 $132.00 32 ELEC CONDR (NO 6) INSUL LF 66.00 $4.00 $264.00 36 REFL PAV MRK TY 1(W)(8")(SLD) LF (110.00) $6.00 -$660.00 37 REFL PAV MRK TY 1(W)(12")(SLD) LF (22.00) $12.00 -$264.00 38 REFL PAV MRK TY 1 (W)(24")(SLD) LF (21.00) $28.00 -$588.00 39 REFL PAV MRK TY 1 (W)(ARROW) EA (1.00) $375.00 -$375.00 40 REFL PAV MRK TY i (W)(WORD) EA (1.00) $430.00 -$430.00 41 REFL PAV MRK TY fI (W)(8")(SLD) LF (5.00) $4.00 -$20.00 42 REFL PAV MRK TY II (W)(12")(SLD) LF (22.00) $9.00 -$198.00 43 REFL PAV MRK TY II (W)(24 -)(SLD) LF (21.00) $20.00 4420.00 46 REFL PAV MRKR TY II -C-R EA (1.00) $8.00 -$8.00 #REF! $0.00 TUTI LS - - 3,425.39i 0 Pugc 3 of 3 Contract Quantity Adjustment/Change Order Mv, Qpl% Project Name: City of Round Rock Sidewalk Gaps project Quan. Adj.Xhange Order No.: Ouantitv Adiustment Data Bid Item # Item Description p Unit Qty. Unit Price Amount Contract Time Adjustment 47 D -GR HMA(SQ)TY B PG64-22 TON (57.64) $100.00 -$5,764.00 48 D -GR HMA(SQ)TY C SAC -A PG70-22 TON 5.16 $110.00 $567.60 49 PLANE ASPH CONC PAV (0-4") SY 34.00 $6.00 $204.00 53 REFL PAV MRK TY II (W)(24")(SLD) LF (13.00) $20.00 -$260.00 54 REFL PAV MRK TY II (Y)(4")(SLD) LF (30.00) $1.00 -$30.00 55 REFL PAV MRKR TY II -A -A EA 11.00 $9.00 $99.00 57 MESSAGE BOARDS DAY 28.00 $65.00 $1,820.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0,00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: - 3,363.40 0 City of Round Rock d r ROUND ROCK rr-XA, . Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 1 with Aaron Concrete Contractors, LP for the Rocking J Road Rehabilitation & Old Settlers Boulevard Turn Lane Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 2/8/2019 Dept Director: Gary Hudder Cost: $6,788.79 Indexes: RR Transportation and Economic Development Corporation (Type B) Attachments: QA-CO#1 with Aaron Concrete Department: Transportation Department Text of Legislative File CM -2019-0049 On May 8th at 2:00 PM a public bid was held for the Old Settlers Boulevard Tum Lane and Rocking J Rehabilitation Project. The successful low bidder was Aaron Concrete LP at $260,967.50. This Quantity Adjustment #1 is for all the items that either were not used in constructing this project or were over runs of existing items in the contract. The reduced Quantity Adjustment is <$6,788.79>. This will bring the total adjusted contract amount to $254,178.71. Staff recommends approval. Cost: $-6,788.79 Source of Funds: RR Transportation and Economic Development Corporation (Type B) City of Round Rock Page 1 Pdnted on 7(7/2019