CM-2019-0063 - 3/1/2019' Page I. of 3 �oe�+RRo4e rrna nrv, 41/16 Department: Project Name: City Project ID Number Vendor Justification Contract Quantity Adjustment/Change Order Transportation Traffic Signal - Sunrise Rd. at Double File TH. _ , Date: 1/25/19 Change Order/Quantity TRFSG-600-0ON-SNDFT Adjustment No. 2 Austin Traffic Signal Construction Com n+ PO Box 130, Roundrock TX 78680 Company Name Address Phone No. �UANTrTY ADJUSTMENT FOR FINAL OVER RUN AND UNDER RUN UNITS SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order. Total Change Order(s) To Date: Adjusted Contract Price (Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)j: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Submitted for Approval Amount % Change $339,149.35 $5.35 $5.35 $339,154.70 $4,800.00 1% $4,033.37 1% $8,833.37 3% $347,988.07 $8,838.72 90 35 125 Prepared By: (� -�� ", ' � Collette Phillips, Assistant Controller 1125/19 Signature Printed Name, Title, Company Date Approvals Contractor. Shcroeder, Vice -Pres - Austin Traffic Signal Const. Co., Inc. 1/25/19 SI nature Printed Name, Title, Company Date City Project �5 ." L eA � 2—G4-1 9 Manager. , rolect Manager, City of Round Rode _74MM Signature Printed Name, Titre Date Mayor/City Manager A,,q, &H -y 1�� Contract Quantity Adjustment/ Change Order rev, 01/16 Project Name: Traffic Signal - Sunrise Rd. at Double File TH. Quan. Adj./Change Order No.: Chanqe Order Data Page 2 of 3 Item # item Description Unit Qty. Unit Price Amount Conbract Time Adjustment Da 1 Retaining Wall LS 1 $0.00 1 Sod Replacement LS 2 $1,043.30 $2,086.60 1 Electrical Components LS 1 $1,496.77 $1,946.77 $0.00 0.00 $0.001 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 $0.00 0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Page 3 of 3 Contract Quantity Adjustment/Change Order NW 0010=TLx-h =Cv, QVIS Project Name: Traffic Signal - Sunrise Rd. at Double File Td. Quan. Adj./Change Order No.: nuantity Adiustment Data Bid Item # Item Description Unit Qty. Unit Price Contract Time Amount Adjustment 12 CONDUIT (SCH 80) 2 in LF -34 $20.00 -$680.00 13 CONDUIT (SCH 80) 2 in W/PRESSURE LF 50 6.00 $2,490.00 14 CONDUIT (SCH 80) 3 in LF 3 $25.00 $75.00 15 CONDUIT (SCH 80) 3 in W/PRESSURE LF 75 $50.00 $3,750.00 16 CONDUIT (SCR 80) 4 in LF -38 $30.00 -$1,140.00 17 ELC NO (8) BARE LF 73 1.001 $73.00 18 ELC NO (8) INSULATED LF 366 2.00 $732.00 19 ELC NO 6 BARE LF -108 $3.00 -$324.00 20 ELC NO (6) INSULATED LF -216 $4.00 -$864.00 21 GROUND BOX (TY D) W/APRON EA 1 $1,600.00 $1,600.00 24 REF PVMRK (TY -1-W) Bin SLD LF -58 6.00 -$348.00 25 REF PVMRK (TY -1- 12in SLD LF 17 $10.00 $170.00 26 REF PVMRK (TY -1-W) 24in SLD LF 2 $20.00 $40.00 30 REF PVMRK (TY -1-Y) 24in SOLID EA -2 $20.00 -$40.00 31 REF PVMRK (TY -2-W) Bin SLD EA -235 $0.80 -$188.00 32 REF PVMRK (TY -2-W) 12in SLD LF 17 1.001 $17.00 33 REF PVMK (TY -2-W) 24in SLD LF 2 $2.001 $4.00 37 REF PVMK (TY -2-Y) 4in SLD LF -794 $0.50 -$397.00 38 REF PVMK (N -2-Y) 24in SLD LF -52 $2.00 -$104.00 39 RE PM W/RET REQ (TY -1-W) 4in SLD LF -120 $3.00 -$360.00 40 RE PM W/RET REQ (TY -1 Y) 4in SLD LF -42 $3.00 -$126.00 41 ELIM EXIST PVMKS (4 in) LF -305 1.50 - 57.50 42 ELIM EXIST PVMKS (8 in) LF -259 $3.00 -$777.00 43 ELIM EXIST PVMKS (12 in) LF -135 $4.00 -$540.00 44 FLIM EXIST PVMKS (24 in) LF -68 $8.00 -$544.00 45 ELIM EXIST PVMKS (ARROW) EA -2 $233.00 -$466.00 46 ELIM EXIST PVMKS (DBL ARROW) EA -1 285.00 -$285.00 48 PAVE SURF PREP (4 in) LF -162 $0.10 -$16.20 49 PAVE SURF PREP (8 in) LF -203 $0.15 -$30.45 50 PAVE SURF PREP (12 in) LF 17 $0.20 $3.40 65 TS CABLE (TYA)12 AWG/ 3 COND LF 63 $1.30 $81.90 66 TS CABLE (TYA) 12 AWG/ 5 COND LF -118 $2.00 -$236.00 67 TS CABLE (lYA) 12 AWGI 7 COND LF 316 $2.00 $632.00 68 TS CABLE C) 14 AWG/ 20 COND LF 183 $5.00 $915.00 69 TS CABLE (fYC) 14 AWG/ 2 COND LF 317 1.60 $507.20 74 PED DETECT (PUSH BUTTON) APS EA -2 $2,000.00 -$4,000.00 78 VIVDS COMM CABLE LF 101 $4.00 $404.00 79 ETHERNET CABLE (GAT 5) FOR RADIOS LF 105 $4.00 $420.00 85 OPTICOM CABLE LF 26 $4.00 $104.00 $0.00 $0.00 TOTAMI t5.351 0 City of Round Rock 1to OUND ROCK TEXAS Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 2 with Austin Traffic Signal Construction Co., Inc. for the Signal Construction at Sunrise Road and Double File Trail Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 3/1/2019 Dept Director: Gary Hudder Cost: $4,038.72 Indexes. RR Transportation and Economic Development Corporation (Type i3) Attachments: QA-CO#2 Sunrise @ Double File - partially executed Department: Transportation Department Text of Legislative File CM -2019-0063 On November 30, 2016 HDR Engineering assisted the City in opening bids for the traffic signal construction at Sunrise Rd. @ Double File Tri. One (1) responsive bid proposal was submitted by Austin Traffic Signal Construction Company, Inc. The project was awarded to ATS. This Change Order/Quantity Adjustment #2 is for sod replacement and electrical components in the amount of $4,033.37 and quantity adjustment of $5.35. The total for this change order/quantity adjustment is $4,038.72. Staff recommends approval. Cost: $4,038.72 Source of Funds: RR Transportation and Economic Development Corporation City a4Round Rock Page 7 Printed on 2/28/2049