CM-2019-0066 - 3/8/2019Page 1 or -, Contract Quantity Adjustment/ Change Order f00L� .mc trxs MV. at 16 Department: UES Project Name: Lisa Rae Drive Improvements Date: 2/222/2019 City Project Change Order/Quantity ID Number LSRAE Adjustment No. 1 Vendor Austin Engineering Company, Inc. P.O. Box 347349 - Austin TX 78734 512-324-1464 Company Name Address Phone No. Justification Change Order No, 1 is needed for connecting storm sewer run-off along Lisa Rae Drive into and existing 24" storm sewer at the intersection of Lisa Rae Drive / Double Creek. SUMMARY Amount % Change Original Contract Pnce: $386,639.00 r �z Previous Quantity Adjustmenqs: $0.00 This Quantity Adjustment: $0.00 Total Quantity Adjustment(s) $0.00 Total Contract Price with Quantity Adjustmengs): $386,639.00 Previous Change Order(s): $000 0% This Change Order. $30,965.00 80k Total Change Order(s) To Date: $30,965.00 8% Adjusted Contract Price [Original Contract Price Plus __.—__ Quantity Adjustmengs) Plus Change Order(s)]: $417,604.00 Difference between Original and Adjusted Contract Prices: $30,965.00 Original Contract Time: 120 Time Adjustment by previous Quan. Adj./Change Order. 0 Time Adjustment by this Quart. Adj./Change Order: 5 New Contract Time: a 125 -- - Prepared By: Eddie Zapata, Senior Proje= Mana r, City of Round Rock 2/22/19 SI pure Printed Name, Title, Company Date Contractor John Fenley, Project Manager, Austin Engineering Co., Inc. sL4lure Printed Name, Title, Company ate City Project Manager:ie Eddie Zapata, Senior Project Manager, City of Round Rock 2/22/19 s(adature U Printed Name, Title Date Mayor/City+ Manager Ai r' rr;1 Signature Printed Name, Title Date �J "I :?c 4q^V��\P AM Contract Quantity Adjustment/Change Order �RdMM 1106E rr x+S Project Name: Lisa Rae Drive Improvements Quan. AdjJChange Order No.: rhannn Arris. Hurls Page 2 0173 Ir Contract Time Item # Ibem Description Unit Qty. Unit Price AmountAdjustment Da CO - 1 Identify Storm Sewer Fiowline LS 1 $1,725.00 $1,725.00 OD - 2 Remobilization LS 1 $7,000.00 $7,000.00 CO - 3 Storm Sewer Staking LS 1 $900.00 $900.00 CO - 4 Connect to Existing 24" RCP EA 1 $1,000.00 $1,000.00 EO-- 5 Install 24" RCP LF 40 $105.00 $4,200.00 CO - 6 Trench Safety LF 40 $1.00 $40.00 CO - 7 10' Curb Inlet EA 1 $8,000.00 $8,000,00 CO - 8 Install Curb and Gutter LF 270 $30.00 $8,100.00 CO - 9 Time Extension $0.00 5 $0.00 $0.00 $0.00 $0.00 $O.DO $0.D0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 i.. Page 3 of 3 Contract Quantity Adjustment/Change Order ' �auaa �ooc •.. ,.. n7. C]nn Project Name: Lisa Rae Drive Improvements Quan. Adj..,-'Change order No.: 1 Ounntily Adiu-O.. -nf- na1m Y '1 11 1 11 1 11 1 f 1 Ili _MEMEMMUff M., 1 11 1 I! 1! '111 ! 11 1 11 I 1 1 Y City of Round Rock ROUND ROCK TExA. Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 1 with Austin Engineering Company, Inc. for the Lisa Rae Improvements Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 3/8/2019 Dept Director: Michael Thane, Director of Utilities and Environmental Services Cost: $30,965.00 Indexes: General Self -Financed Construction Attachments: CO No. 1, LAF, Map Department: Utilities and Environmental Services Text of Legislative File CM -2019-0066 This agenda item is for the approval of Change Order No.1 with Austin Engineering Company for the construction of additional stormwater improvements on the Lisa Rae Street Improvement project. In 1984, the streets Lisa Rae Drive, Joyce Lane, and Ray Berglund Boulevard were involuntary annexed into the City of Round Rock. In the early 2000's, bonds were passed to perform improvements on these three streets, but during construction funding ran short and only Joyce Lane and Ray Berglund Boulevard were constructed. Per the annexation agreement, Lisa Rae Drive remained a private drive. In October 2012, residents along Lisa Rae Drive approached the City concerning maintenance to Lisa Rae Drive. Residents asked the City if a maintenance agreement could be entered into in order to construct a new street similar to Ray Berglund Boulevard and Joyce Lane. The City determined that the construction of a new street could only be possible if all property owners donated the required Right -of -Way (ROW) needed to construct Lisa Rae Drive. After several discussions with the six residents along Lisa Rae Drive, they all agreed to donate the required 25 -feet of property for the necessary ROW. On May 11, 2018, the City executed the documents needed to acquire the donated ROW necessary to construct Lisa Rae Drive. The Lisa Rae Street Improvements project consists of approximately 700 linear feet of new 20 -foot wide asphalt pavement with ribbon curb; approximately 500 linear feet of new 8 -inch City of Round Rock Page i Printed on =2019 Agenda Item Summary Continued (CM-20mooe6} water line; and approximately 1,000 linear feet of new 8 -inch wastewater line. In June 2016, Halff and Associates performed the preliminary engineering design for the proposed street, water, and wastewater infrastructure. In May 2018, Halff and Associates were selected for final design and construction phase services needed to construct the improvements to Lisa Rae Drive. On October 31, 2018, ten bids were submitted and the lowest bid in the amount of $386,639 was submitted by Austin Engineering Company, Inc. Change Order No. 1 is needed to construct a new storm sewer inlet, and curb and gutter section in order to collect storm water drainage along Lisa Rae Drive. Collecting this runoff will eliminate storm water from flowing onto Double Creek Drive and causing a potential driving hazard. Staff recommends approval of Change Order No. 1 with Austin Engineering in the amount of $30,965. Cost: $30,965.00 Source of Funds: General Self -Financed Construction City of Round Rock Page 2 Printed on 317/2079