Loading...
CM-2019-0072 - 3/15/2019Ir Page i of 3 ` Contract Quantity Adjustment/ Change Order Department: Utl dies and Environmental Sery ces Project Name: Dry Branch Tributaries Channel Improvements Date; 2/191I9 City Project Change Order/Quantity ID Number DRYER Adjustment No, 4 Vendor Chasco Constructors P.O. Box 1457 Round Rock, TX 78680 512-244-0600 Company Name Address Phone N4, Justification 1.) Additional Cost for Gravity Wal: Foundation 2.) (Ity. Adjustement for PTRM at Gravity Wall Toe 3. )Extension of Gravity Wall French Drain 4.) Reach One addition of Soil Retention Blanket and re-hydromulch SUMMARY Original Contract Price Previous Quantity Adjustment(s)- This Quantity Adjustment. Total Quantity Adjustment(s), Total Contract Price with Quantity Adjustrnen4s). Previous Change Order(s). This Change Order: Total Change Order(s) To pate: Adjusted Contract Price (Origna) Contract Price FusQuant+tyAdjustment(s)Rus Change Order(s)): Difference between or ginal and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: S bmltlt90_JqI-;ApFr9v4I: Change -$15,559,DO $960.00 $1,313,453.00 I $71,819.00 5.47% $20,079.00 1.53% $91898, DO 7.00% $1,405,351.0D1", - t ;77,299.00 240 48 Substantial Due @ 30 End of March 2019 Flan) Due 01) End of 318 Anrti PrIta Manager, CORR 2/19119 Signature Printed Name, Title, Company Date .. _ Approvals — Contractor: r f r 6 Signature Printed Name, Title. Company bate City Project Manager: _ I�, Federico Sanchez Project Mana r CORR _. 21 Up Date nture Printed Name, Title III' / y1r Y /FrfiL L 1r 7 %S —n Mayor/Mayor/Cityy ManaaerJ�[(/!'f(� fif - if .7 v6 -7 Z Parc 2 or 3 Contract Quantity Adjustment/ Change Order Project Name. Ary Branch Tributaries Channel Improvements Quan, Adj.JChange Order No,,. Change Order Data Item Description Unit Unit Price Amount Contract Time Adjustment (Days)Item Gravity Wali Foundation - Boz Filter Fabric Wrap 5Y 448 $1.69 $757.50 Gravity Wall Foundation - Georgrid Cd 12" Vertical Altemating Spacing SY 1 768 $2.50 $1,922.50 OV&P (Far Items Above) LS 1 $402.00 $402.00 14 Extension of Wali French Drain, Add Set LS 1 $1,361.00 $1,361.00 2 $0.00 Reach 1 - Soil Retention Blanket Gass 2 - Type E "Flexible 22 Channel Liner" 5Y 6515 51.50 $9,772.50 14 24 Reach 1 - Native Seeding SY 6515 $0.90 $5,863.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 -- — - - - � $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 T A I Contract Quantity Adjustment/Change Order .. mum ROCK Project Name; Dry Branch Tributaries Channel Improvements Quan, Adj./Change Order No duantity Adjustment Data Contract Time Adjustment Bid Item # Item Description Unit qty- Unit Price Amount (Days) 31 Permanent Turf Reinforcement Mattin2 5Y 120 $8.00 $960.00 $0.00 $0.00 S0.00 $0.00 $0.00 50.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $13.00 $0.00 $0.00 $13.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 4; �S�JQO LOGAN SS v UpON TR ETERSON ST � �p3 TRL n REDWIN AYkc G < 1ASM� y00 yAYDEH M mo v r z •AFAR L° osa�' v� u, v o FERNDALE DR tv �� Y OH SCHOOL DAYS Oo 0 N Z n m y z 0 5 N N Z GppSOR RD VN G� � Own �y�N GEDR � y� �o r� �►E G'� � PMNR,D triN� GJ► O gRE Z RACHEL Cl. (P S�NIINS�RR DR Or��y �� ,GH pLLj G1 y� ' DY FP' y Dy,c y0'P '9iyj �� r O O R PAR FIELD IR ' o 500 Feet NNP.... VD utaries Channel Improvements c�� `°`'� City of Round Rock 'd ROUND ROCK � '<A'-- Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 4 with Chasco Constructors for the Dry Branch Tributaries Channel Improvements Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 3/15/2019 Dept Director: Michael Thane, Director of Utilities and Environmental Services Cost: $21,039.00 Indexes: 2014 Drainage Revenue Bonds Attachments: QA -CO No. 4.pdf, LAF.pdf, MAP.pdf Department: Utilities and Environmental Services Text of Legislative File CM -2019-0072 The Dry Branch Tributaries Channel Improvements project is located north of Gattis School Road near the Joyce Lane and Ray Berglund Boulevard residential neighborhoods. The Dry Branch Tributaries Channel Improvements project will provide improvements for a portion of Dry Branch and an unnamed tributary to Dry Branch. The project will provide conveyance improvements for flood control and will correct erosion and protect City wastewater infrastructure. Quantity Adjustment/Change Order No. 4 includes the cost for additional work and materials for the proposed gravity block wall, due to an addendum to the original design. This change order also includes the addition of soil retention blanket for additional armoring of the Reach 1 channel section of the project, along with native seeding for erosion control and a quantity adjustment for item #31 PTRM. Change Order No. 4 is for $20,079, plus a quantity adjustment cost of $960 for a total cost of $21,039. This change order includes the cost of labor, additional materials, and equipment for the work. The total contract amount will be adjusted to $1,405,351. Staff recommends approval. Cosi: $21,039 Source of Funds: 2014 Drainage Revenue Bonds. City olRound Rock Page Z Pdnted on JH&2of9