CM-2019-0074 - 3/22/2019STATE OF TEXAS §
COUNTY OF WILLIAMSON §
SUPPLEMENTAL CONTRACT NO.4
TO CONTRACT FOR ENGINEERING SERVICES
FIRM: HALFF ASSOCIATES INC. ("Engineer")
ADDRESS: 9500 Ammer len Boulevard Building F Suite 125 Austin TX 78729
PROJECT: RM 620 Safety Imp,rovements Pro aect — Design Phase
This Supplemental Contract No. 4 to Contract for Engineering Services is made by and between
the City of Round Rock, Texas, hereinafter called the "City" and Halfi Associates, Inc.,
hereinafter called the "Engineer".
WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter
called the "Contract", on the 27th day of June, 2013 for the RM 620 Safety Improvements
Project Design Phase Project in the amount of $955,823.00; and
WHEREAS, the City and Engineer executed Supplemental Contract No. 1 on May 8, 2014 to
amend the scope of services and to increase the compensation by $698,445.00 to a total of
$1,654,268.00; and
WHEREAS, the City and Engineer executed Supplemental Contract No. 2 on May 14, 2015 to
amend the scope of services and to increase the compensation by $682,232.00 to a total of
$2,336,500.00; and
WHEREAS, the City and Engineer executed Supplemental Contract No. 3 on May 24, 2018 to
amend the scope of services and to increase the compensation by $118,265.00 to a total of
$2,454,765.00; and
WHEREAS, it has become necessary to amend the Contract to modify the provisions for the
scope of services and to increase the compensation by $49,940.00 to a total of $2,504,705.00;
NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract
is amended as follows:
I.
Article 1 Ci1y Services and Exhibit A Ci Services shall be amended as set forth in the
attached Addendum To Exhibit A.
Supplemental Contract Rev.06 i 6
0199.1315;00420012 94275
II.
Article 2 Engineering Services and Exhibit B Engineering Services shall be amended as set
forth in the attached Addendum to Exhibit B. Exhibit C Work Schedule shall be amended as set
forth in the attached Addendum to Exhibit C.
Article 4 Compensation and Exhibit D. Fee Schedule shall be amended by increasing by
$49,940.00 the lump sum amount payable under the Contract for a total of $2,504,705.00, as
shown by the attached Addendum to Exhibit D.
IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental
Contract in duplicate.
[signature pages follow]
Supplemental Contract Rev.06/16
0199.1315;00420012 94275
HALFF AS, TES, INC.
By: O;L
Date
Supplemental Contract Rcv.06r 16
0199.1315;00420012 84275
CITY OF ROUND ROC APP WED AS TO ORM:
By:,C
Laurie Hadley, eitj Manager---7—
anager Stepha L. Sheets, City Attorney
Date
Supplemental Contract Rev.06A6
0199.1315;00420012
94275
ADDENDUM TO EXHIBIT A
City Services
The City will furnish to the Engineer the following information and/or perform the
following tasks:
• Review Engineer's plan and submittals, and cost estimates.
• Assist the Engineer in obtaining property right -of -entry from Round Rock ISD.
• Coordinate and communicate project items and progress to other city
departments, as appropriate.
ADDENDUM TO EXHIBIT B
Engineering Services
The scope of services for this contract is a Traffic Study of Round Rock High School
(RRHS). The engineer will evaluate the egress traffic flow patterns and make
recommendations in a technical memorandum for improving efficiency and/or safety of
cars, buses, and pedestrians leaving campus at the end of the school day. Engineer will
provide services described in further detail as follows:
1) Project Administration
a. Project Manager shall communicate with the city project manager.
b. Prepare project meeting summaries for applicable meetings during the
project development process.
2) Monthly Progress and Invoice
a. Create and submit monthly invoices in required city format.
b. Prepare monthly progress reports for submission with the invoices to
provide a written account of the progress made to date on the project
3) Sub -consultant Management
a. Prepare and execute contracts with sub -consultants, monitor sub -
consultants work, review and approve of sub -consultant invoices
4) Data Collection
a. Conduct field reconnaissance to observe traffic circulation pattern during
school egress.
b. Obtain manual turning movement traffic counts on a weekday at the below
Round Rock High School (RRHS) driveways. These counts shall be
obtained from approx. 2:20 pm to 3:15 pm:
i. Deep Wood Dr. / RRHS Main Entrance
ii. Deep Wood Dr. / RRHS Driveway south of Main Entrance
iii. N Lake Creek Dr. / RRHS Building 700 Driveways
iv. Pedestrian counts at N Lake Creek Dr. / Existing Mid -block
Crosswalk
c. Observe traffic conditions at the below signalized intersections during
school egress period.
Exhibit B
RRHS Traffic Study Page l of 3
d. Obtain existing signal timing plans at:
i. RM 6201 Deep Wood Dr.
ii. RM 6201 N Lake Creek Dr
5) Site Circulation and Egress Traffic Analysis
a. Identify bottlenecks in site circulation during egress period.
b. Identify up to three (3) alternative options for site circulation and access
modifications that may be implemented to reduce school egress times.
Conduct a qualitative estimate of time savings for school egress for each
proposed alternative.
c. Prepare exhibits for each of the proposed alternative.
d. Develop construction cost estimates for each of the proposed alternative.
e. Analyze existing signal timing plans at below intersections to evaluate
modified signal phasing and timings that may be implemented during
school egress period to improve overall egress traffic flow.
i. RM 6201 Deep Wood Dr.
ii. RM 6201 N Lake Creek Dr.
f. Review mid -block crosswalk and propose options for improving safety.
g. Review traffic control plans for RM 620 roadway widening project to
identify any potential impact to the school egress traffic.
3) Technical Memorandum
a. Summarize findings of the above analysis in a technical memorandum
including existing conditions, assumptions, different alternatives, exhibits
for each alternative, cost estimates, benefits of each alternative.
i. Submit a PDF copy of the draft technical memorandum for review
ii. Attend one (1) review meeting with the City and RRHS staff
m. Submit a final Technical Memorandum with comments addressed
1) Utility coordination April through August
2) Utility management plan preparation
3) Utility agreement package preparation for city water & wastewater
1) Chisholm Trail storm sewer outfall bid package preparation
2) Parcel 1 (Robinson) acquisition effort; coordination with city attorney and staff
3) Field surveying 1 staking of Parcel 1 PUE, parcel 22-25 ROW, and parcel edits
requested by title company at closing
4) TCP revisions to 100% plans per GTAO
Exhibit B
RRHS Traffic Study Page 2 of 3
The Engineer will perform the services to be provided under this agreement out of
Engineer's office(s) as listed below:
Office Location
Halff Associates, Inc.
9500 Amberglen Blvd
Bldg F, Suite 125
Austin, TX 78729
Sub -Consultants:
CP$Y, Inc. (CPY)
Inland Geodetics, L.P. (Inland)
Kimley Horn and Associates, Inc. (KHA)
Exhibit B
RRHS Traffic Study Page 3 of 3
ADDENDUM TO EXHIBIT C
Work Schedule
Halff Associates Inc. is prepared to begin work upon notice -to -proceed from the
City of Round Rock. The proposed contract schedule is as follows:
• Supplemental Contract Approval/ Notice to Proceed: February 25, 2019
• Traffic counting: March 2019 (not during school holidays)
• Submittal of draft memorandum: April 5, 2019 (or six weeks from NTP)
• Address comments: May 3, 2019 (or two weeks from comments)
• RM 620 Final PS&E and WPAP to be submitted: March 2019
• RM 620 Utility Coordination: through letting in June 2019
ADDENDUM TO EXHIBIT D
Fee Schedule
Attached Behind This Page
City of Round ROO
ADDENDUM to EXHI81T 0
o■t,n..1 p■. Rn1uA..1.
HW Aaapuatn. MG 3'91'21111
pr*a
6011lw
34610,
Pr "
Junw
Orduab
CAOO
Cordyct
AdmWa
TRAM
LABOR
$us
DIRECT
RM 620 6Cf14
Principal
Project
En=Inaar
En=I.war
Ervinvar
E,01l.o4r
1615
Admin Asht■nt
Hour
C051'7
COSTS
COSTS
TOTAL.
r
Tach
lippalaw
HOURLY RATES7
00.00
T DO
3185.00
$133-00
SnDo
.m
TASK DESCRIP71ON1
1
PmpW Adlnwh tdM
4
4
ST60.
5760.00
2
MCC" PAWM and Mvera
/
4
!
f 1.310.
51.]i0.m
3
Sub-mmtdnnt 114na0pt.oM
2
2
1300.00
(1300
561100
$0.00
1
mm
TASK ISUMTOTAL
0
a
4
0
0
0
0
4
0
f4
?6a0ar
7000
71500
I 116 if
H rank study
1
Ow COkKbW
O
$0,00
12.610.
$2.610.00
2
''wit Cualathn and FQf M Trac Ana",
8
10
a
20
12.310,00
$0.90
50.150D0
3
Tachteal MwnWsndwn
1
2
2
1
6
11033.
$5,470.00
(2600
16.43.00
�.
S0.00
,ASR 2 st76roru
a
1
2
a
6
fo
4
0
!
2e
673 ar
i 02000
26ar
r
T.\SK OD0
U
t
ut1Hy wadinaim24
$3.240.00
$60
13" 700,00
2
Ut ft manapament pLm
/4
4
:340.00
.00
smw
3
UL" pra/nlr4
6
4
t2
0
11.660.00
37,21m m
rASlTastmTaru
0
0
0
6
X90.00
0
a
0
40
7 6400
1000
76000
7'\1K 14
Incl PSiE
1
C. "hoh t TnWl outfall pari/0/
2
20
24
12
66
17'7m.00
f7.700A0
2
Paleal l acipmaNn tuppon
2
4
6
$1,160.0
(2500
St.166A0
3
FW4
0
0,0
11.217.00
37117.0
TCNitwgaa par TxDOT I GTAO
4
16
20
SI,S00,00
51C.U000ftafM0.00
TJLlIII SUBTOTAL
0
4
0
26
0
40
12
0
0
64
if 66000
$170700
125430
TOTAL Eatimard Hour
0
11
6
0
L
m
16
/
t
164
TOTAL Faa
f
i 2.70000 f 1.t70.00 f (.270.00 1 51130,001 f 1.7513.0111 1 I,0000 f 34000 1 1
6600 I
I S2a.M5A0 06.617.00
!12=00
HW Aaapuatn. MG 3'91'21111
City of Round Rock
'a ROUND ROCK
XA5 Agenda Item Summary
Agenda Number:
Title: Consider executing Supplemental Contract No. 4 with HalffAssociates, Inc.
for the RM 620 Safety Improvements Project - Design Phase
Type: City Manager Item
Governing Body: City Manager Approval
Agenda Date: 3/22/2019
Dept Director: Gary Hudder
Cost: $49,940.00
Indexes: RR Transportation and Economic Development Corporation (Type 13)
Attachments: SC#4 w-Halff Associates - RM 620 Safety Improvements Project - Design
Phase (00420077xA08F8)
Department: Transportation Department
Text of Legislative File CM -2019-0074
The purpose of the proposed RM 620 Safety Improvements project from Deep Wood Drive to
1H 35 is to improve safety and enhance mobility in the project area. The project includes a
bridge to carry RM 620 traffic over the Union Pacific Railroad (UPRR) and Chisholm Trail
Road. In order to maintain access to businesses and residences in the vicinity of the proposed
bridge, at -grade local access roads will be constructed between Lake Creek Drive and
Chisholm Trail Road. A second bridge is proposed to carry RM 620 traffic over Lake Creek
Drive. The project area is within the Edwards Aquifer Recharge Zone.
On June 27, 2013, an engineering services contract for $955,823.00 with Halff Associates, Inc.
was approved by the City Council. Services covered in this contract were geometric schematic
and 30% Plans, Specifications, and Estimate (PS&E).
Supplemental Agreement No. 1, approved May 8, 2014, provided for professional services to
develop 60% PS&E in accordance with the approved preliminary design schematic and 30%
PS&E developed for this project. The cost of these services was $698,445.00 and brought the
total contract amount with HalffAssociates, Inc. to $1,654,268.00.
Supplemental Agreement No. 2, approved May 14, 2015, provided for engineering, surveying,
and other professional services to develop and finalize 100% PS&E, utility coordination and
water/wastewater relocation design, water quality, environmental site remediation, public
involvement, and right-of-way (ROW) and easement parcels for this project. The work
performed under this supplemental delivered the final design in accordance with the approved
CityofRoundRack page 7 Printed on-Wiaof9
Agenda Item SummarY Continued ICM -2019.0074)
preliminary design schematic, 30% and 60% PS&E developed for this project and additionally
rendered the project "shovel ready". The cost of these services was $682,232.00 and brought
the total contract amount with Halff Associates, Inc. to $2,336,500.00.
TOOT recently programmed and funded this project for FY2019 letting. Supplemental
Agreement No. 3 provides additional engineering services and utility coordination through
relocation, permits, pre -letting support, and other items required for TOOT to approve and let
the project in 2019. The cost of these services is $118,265.00 and brings the total contract
amount with Halff Associates, Inc. to $2,454,765.00.
This Supplemental Agreement #4 has become necessary for the following items. This office
met with Round Rock High School Administration and as a result of that meeting a traffic study
to research how to mitigate traffic during construction was agreed to be developed. This SWA
also includes the PS&E work to let a section of storm sewer line on Chisholm Trail prior to the
RM 620 project being let by TxDOT. This is to provide a connection for the storm sewer system
that will be advanced from the RM 620 project. The initial plan was to let in a Parks project but
they have delayed their project. The cost of this SWA is $49,940.00.
Staff recommends approval.
Cost: $49,940.00
Source of Funds: Round Rock Transportation and Economic Development Corporation (Type
B)