CM-2019-0074 - 3/22/2019STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO.4 TO CONTRACT FOR ENGINEERING SERVICES FIRM: HALFF ASSOCIATES INC. ("Engineer") ADDRESS: 9500 Ammer len Boulevard Building F Suite 125 Austin TX 78729 PROJECT: RM 620 Safety Imp,rovements Pro aect — Design Phase This Supplemental Contract No. 4 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Halfi Associates, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 27th day of June, 2013 for the RM 620 Safety Improvements Project Design Phase Project in the amount of $955,823.00; and WHEREAS, the City and Engineer executed Supplemental Contract No. 1 on May 8, 2014 to amend the scope of services and to increase the compensation by $698,445.00 to a total of $1,654,268.00; and WHEREAS, the City and Engineer executed Supplemental Contract No. 2 on May 14, 2015 to amend the scope of services and to increase the compensation by $682,232.00 to a total of $2,336,500.00; and WHEREAS, the City and Engineer executed Supplemental Contract No. 3 on May 24, 2018 to amend the scope of services and to increase the compensation by $118,265.00 to a total of $2,454,765.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $49,940.00 to a total of $2,504,705.00; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 1 Ci1y Services and Exhibit A Ci Services shall be amended as set forth in the attached Addendum To Exhibit A. Supplemental Contract Rev.06 i 6 0199.1315;00420012 94275 II. Article 2 Engineering Services and Exhibit B Engineering Services shall be amended as set forth in the attached Addendum to Exhibit B. Exhibit C Work Schedule shall be amended as set forth in the attached Addendum to Exhibit C. Article 4 Compensation and Exhibit D. Fee Schedule shall be amended by increasing by $49,940.00 the lump sum amount payable under the Contract for a total of $2,504,705.00, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. [signature pages follow] Supplemental Contract Rev.06/16 0199.1315;00420012 94275 HALFF AS, TES, INC. By: O;L Date Supplemental Contract Rcv.06r 16 0199.1315;00420012 84275 CITY OF ROUND ROC APP WED AS TO ORM: By:,C Laurie Hadley, eitj Manager---7— anager Stepha L. Sheets, City Attorney Date Supplemental Contract Rev.06A6 0199.1315;00420012 94275 ADDENDUM TO EXHIBIT A City Services The City will furnish to the Engineer the following information and/or perform the following tasks: • Review Engineer's plan and submittals, and cost estimates. • Assist the Engineer in obtaining property right -of -entry from Round Rock ISD. • Coordinate and communicate project items and progress to other city departments, as appropriate. ADDENDUM TO EXHIBIT B Engineering Services The scope of services for this contract is a Traffic Study of Round Rock High School (RRHS). The engineer will evaluate the egress traffic flow patterns and make recommendations in a technical memorandum for improving efficiency and/or safety of cars, buses, and pedestrians leaving campus at the end of the school day. Engineer will provide services described in further detail as follows: 1) Project Administration a. Project Manager shall communicate with the city project manager. b. Prepare project meeting summaries for applicable meetings during the project development process. 2) Monthly Progress and Invoice a. Create and submit monthly invoices in required city format. b. Prepare monthly progress reports for submission with the invoices to provide a written account of the progress made to date on the project 3) Sub -consultant Management a. Prepare and execute contracts with sub -consultants, monitor sub - consultants work, review and approve of sub -consultant invoices 4) Data Collection a. Conduct field reconnaissance to observe traffic circulation pattern during school egress. b. Obtain manual turning movement traffic counts on a weekday at the below Round Rock High School (RRHS) driveways. These counts shall be obtained from approx. 2:20 pm to 3:15 pm: i. Deep Wood Dr. / RRHS Main Entrance ii. Deep Wood Dr. / RRHS Driveway south of Main Entrance iii. N Lake Creek Dr. / RRHS Building 700 Driveways iv. Pedestrian counts at N Lake Creek Dr. / Existing Mid -block Crosswalk c. Observe traffic conditions at the below signalized intersections during school egress period. Exhibit B RRHS Traffic Study Page l of 3 d. Obtain existing signal timing plans at: i. RM 6201 Deep Wood Dr. ii. RM 6201 N Lake Creek Dr 5) Site Circulation and Egress Traffic Analysis a. Identify bottlenecks in site circulation during egress period. b. Identify up to three (3) alternative options for site circulation and access modifications that may be implemented to reduce school egress times. Conduct a qualitative estimate of time savings for school egress for each proposed alternative. c. Prepare exhibits for each of the proposed alternative. d. Develop construction cost estimates for each of the proposed alternative. e. Analyze existing signal timing plans at below intersections to evaluate modified signal phasing and timings that may be implemented during school egress period to improve overall egress traffic flow. i. RM 6201 Deep Wood Dr. ii. RM 6201 N Lake Creek Dr. f. Review mid -block crosswalk and propose options for improving safety. g. Review traffic control plans for RM 620 roadway widening project to identify any potential impact to the school egress traffic. 3) Technical Memorandum a. Summarize findings of the above analysis in a technical memorandum including existing conditions, assumptions, different alternatives, exhibits for each alternative, cost estimates, benefits of each alternative. i. Submit a PDF copy of the draft technical memorandum for review ii. Attend one (1) review meeting with the City and RRHS staff m. Submit a final Technical Memorandum with comments addressed 1) Utility coordination April through August 2) Utility management plan preparation 3) Utility agreement package preparation for city water & wastewater 1) Chisholm Trail storm sewer outfall bid package preparation 2) Parcel 1 (Robinson) acquisition effort; coordination with city attorney and staff 3) Field surveying 1 staking of Parcel 1 PUE, parcel 22-25 ROW, and parcel edits requested by title company at closing 4) TCP revisions to 100% plans per GTAO Exhibit B RRHS Traffic Study Page 2 of 3 The Engineer will perform the services to be provided under this agreement out of Engineer's office(s) as listed below: Office Location Halff Associates, Inc. 9500 Amberglen Blvd Bldg F, Suite 125 Austin, TX 78729 Sub -Consultants: CP$Y, Inc. (CPY) Inland Geodetics, L.P. (Inland) Kimley Horn and Associates, Inc. (KHA) Exhibit B RRHS Traffic Study Page 3 of 3 ADDENDUM TO EXHIBIT C Work Schedule Halff Associates Inc. is prepared to begin work upon notice -to -proceed from the City of Round Rock. The proposed contract schedule is as follows: • Supplemental Contract Approval/ Notice to Proceed: February 25, 2019 • Traffic counting: March 2019 (not during school holidays) • Submittal of draft memorandum: April 5, 2019 (or six weeks from NTP) • Address comments: May 3, 2019 (or two weeks from comments) • RM 620 Final PS&E and WPAP to be submitted: March 2019 • RM 620 Utility Coordination: through letting in June 2019 ADDENDUM TO EXHIBIT D Fee Schedule Attached Behind This Page City of Round ROO ADDENDUM to EXHI81T 0 o■t,n..1 p■. Rn1uA..1. HW Aaapuatn. MG 3'91'21111 pr*a 6011lw 34610, Pr " Junw Orduab CAOO Cordyct AdmWa TRAM LABOR $us DIRECT RM 620 6Cf14 Principal Project En=Inaar En=I.war Ervinvar E,01l.o4r 1615 Admin Asht■nt Hour C051'7 COSTS COSTS TOTAL. r Tach lippalaw HOURLY RATES7 00.00 T DO 3185.00 $133-00 SnDo .m TASK DESCRIP71ON1 1 PmpW Adlnwh tdM 4 4 ST60. 5760.00 2 MCC" PAWM and Mvera / 4 ! f 1.310. 51.]i0.m 3 Sub-mmtdnnt 114na0pt.oM 2 2 1300.00 (1300 561100 $0.00 1 mm TASK ISUMTOTAL 0 a 4 0 0 0 0 4 0 f4 ?6a0ar 7000 71500 I 116 if H rank study 1 Ow COkKbW O $0,00 12.610. $2.610.00 2 ''wit Cualathn and FQf M Trac Ana", 8 10 a 20 12.310,00 $0.90 50.150D0 3 Tachteal MwnWsndwn 1 2 2 1 6 11033. $5,470.00 (2600 16.43.00 �. S0.00 ,ASR 2 st76roru a 1 2 a 6 fo 4 0 ! 2e 673 ar i 02000 26ar r T.\SK OD0 U t ut1Hy wadinaim24 $3.240.00 $60 13" 700,00 2 Ut ft manapament pLm /4 4 :340.00 .00 smw 3 UL" pra/nlr4 6 4 t2 0 11.660.00 37,21m m rASlTastmTaru 0 0 0 6 X90.00 0 a 0 40 7 6400 1000 76000 7'\1K 14 Incl PSiE 1 C. "hoh t TnWl outfall pari/0/ 2 20 24 12 66 17'7m.00 f7.700A0 2 Paleal l acipmaNn tuppon 2 4 6 $1,160.0 (2500 St.166A0 3 FW4 0 0,0 11.217.00 37117.0 TCNitwgaa par TxDOT I GTAO 4 16 20 SI,S00,00 51C.U000ftafM0.00 TJLlIII SUBTOTAL 0 4 0 26 0 40 12 0 0 64 if 66000 $170700 125430 TOTAL Eatimard Hour 0 11 6 0 L m 16 / t 164 TOTAL Faa f i 2.70000 f 1.t70.00 f (.270.00 1 51130,001 f 1.7513.0111 1 I,0000 f 34000 1 1 6600 I I S2a.M5A0 06.617.00 !12=00 HW Aaapuatn. MG 3'91'21111 City of Round Rock 'a ROUND ROCK XA5 Agenda Item Summary Agenda Number: Title: Consider executing Supplemental Contract No. 4 with HalffAssociates, Inc. for the RM 620 Safety Improvements Project - Design Phase Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 3/22/2019 Dept Director: Gary Hudder Cost: $49,940.00 Indexes: RR Transportation and Economic Development Corporation (Type 13) Attachments: SC#4 w-Halff Associates - RM 620 Safety Improvements Project - Design Phase (00420077xA08F8) Department: Transportation Department Text of Legislative File CM -2019-0074 The purpose of the proposed RM 620 Safety Improvements project from Deep Wood Drive to 1H 35 is to improve safety and enhance mobility in the project area. The project includes a bridge to carry RM 620 traffic over the Union Pacific Railroad (UPRR) and Chisholm Trail Road. In order to maintain access to businesses and residences in the vicinity of the proposed bridge, at -grade local access roads will be constructed between Lake Creek Drive and Chisholm Trail Road. A second bridge is proposed to carry RM 620 traffic over Lake Creek Drive. The project area is within the Edwards Aquifer Recharge Zone. On June 27, 2013, an engineering services contract for $955,823.00 with Halff Associates, Inc. was approved by the City Council. Services covered in this contract were geometric schematic and 30% Plans, Specifications, and Estimate (PS&E). Supplemental Agreement No. 1, approved May 8, 2014, provided for professional services to develop 60% PS&E in accordance with the approved preliminary design schematic and 30% PS&E developed for this project. The cost of these services was $698,445.00 and brought the total contract amount with HalffAssociates, Inc. to $1,654,268.00. Supplemental Agreement No. 2, approved May 14, 2015, provided for engineering, surveying, and other professional services to develop and finalize 100% PS&E, utility coordination and water/wastewater relocation design, water quality, environmental site remediation, public involvement, and right-of-way (ROW) and easement parcels for this project. The work performed under this supplemental delivered the final design in accordance with the approved CityofRoundRack page 7 Printed on-Wiaof9 Agenda Item SummarY Continued ICM -2019.0074) preliminary design schematic, 30% and 60% PS&E developed for this project and additionally rendered the project "shovel ready". The cost of these services was $682,232.00 and brought the total contract amount with Halff Associates, Inc. to $2,336,500.00. TOOT recently programmed and funded this project for FY2019 letting. Supplemental Agreement No. 3 provides additional engineering services and utility coordination through relocation, permits, pre -letting support, and other items required for TOOT to approve and let the project in 2019. The cost of these services is $118,265.00 and brings the total contract amount with Halff Associates, Inc. to $2,454,765.00. This Supplemental Agreement #4 has become necessary for the following items. This office met with Round Rock High School Administration and as a result of that meeting a traffic study to research how to mitigate traffic during construction was agreed to be developed. This SWA also includes the PS&E work to let a section of storm sewer line on Chisholm Trail prior to the RM 620 project being let by TxDOT. This is to provide a connection for the storm sewer system that will be advanced from the RM 620 project. The initial plan was to let in a Parks project but they have delayed their project. The cost of this SWA is $49,940.00. Staff recommends approval. Cost: $49,940.00 Source of Funds: Round Rock Transportation and Economic Development Corporation (Type B) City o/Round Rock Page 2 Pdnted on 3/21)2019