CM-2019-0079 - 3/22/2019Page i of Contract Quantity Adjustment/ Change Order Department: UES Project Name: Lisa Rae Drive Improvements Date: 3/7/2019 City Project Change Order/Quantity ID Number LSRAE Adjustment No. 2 Vendor Austin Engineering Company, Inc. P.O. Box 342349 - Austin, TX 78734 512-324-1464 Company Name Address Phone No. Justification Change Order No. 2 is needed for quantity adjustments and unforeseen change order items. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Differer-ce between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Prepared By: ,,die Contractor: Zze City Proj Manager: ature Mayor/City Signature Amount % Change $386,639.00 $0.00 -$4,146.00 -$4,146.00 $382,493.00 $30,965.00 80/0 $10,642.10 3% $41,607.10 11% E- g424,11nn_tn $37,461.10 120 5 5 130 Submitted, for AqW.roval Eddie Zapata, Senior Pro ect Manager, City of Round Rock 317/2019 Printed Name, Title, Company Date Jiir�ats John Fenle , PmAect Manager, Austin Engineering Co., Inc. Printed Name, Title, Company a Eddie Zapata, Senior Project Manager, City of Round Rock 3/7/2019 Printed Name, Title Date Printed Name, Title J Date - Contract Quantity Adjustment/Change Order Project Name: Lisa Rae Drive Improvements Quan. Adj./Change Order No.: Chane Order Data Page 2 of 3 �r Contract Time Item # Item Description Unit Qty. Unit Price Amount Adjustment (Davs) Remove and Plug 6 -Inch wastewater CO#2 - 1 Service Lateral LS 1 1 $862.50 $862.50 CO#2 - 2 install 18 -inch RCP storm Sewer Pipe LF 48 $98.00 $4,704.00 Precast WW Manhole w/Ring& Cover CO#2 - 3 (material only) EA 1 $2,537.90 $2,537.90 CO#2 - 4 Remove and Replace Concrete Spillway LS 1 $2,537.70 $2,537.70 CO#2 - 5 Time Extension $0.00 5 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00, $0.00 $0.00 $0.00 $0.00 T TkLS: _ i ,cam .1 s �r Pagc 3 o(3 Contract Quantity Adjustment/ Change Order RMNO HOPE 1 L a>'. re ,!!!!llffffff01j16 Project Name: Lisa Rae Drive Improvements Quan. Adj./Change Order No.: quantity 6diuctmant hate Bid Item # Item Description Unit qty. Unit Price Amount Contract Time Adjustment CO#1 - 5 Install 24 -inch RCP LF -40 $105.00 -$4,200.00 $0.00 #2 Remove PC Concrete Sidewalk & Driveways SF 794 $2.00 $1,588.00 #11 PC Ribbon Curb LF -265 $20.00 -$5,300.00 #12 PC Concrete Sidewalks SY 10.8 $170.00 $1,836.00 #13 PD Concrete Driveways SY 77.5 $72.00 $5,580.00 #14 New Manhole Construction, 4 FT Dia. Ea -1 $4,500.00 -$4,500.00 #17 6 -inch SDR 35 PVC WW Service LF -15 $70.00 -$1,050.00 #21 Install Single Service - Water Fro 1 $1,300.00 $1,300.00 #23 Install Single Service - Wastewater EA 1 $1,100.00 $1,100.00 #32 Stabilized Construction Entrance TON -1 $500.00 -$500.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.oa TOTALS: - a sa6.00 0 City of Round Rock ROUND ROCK TMX Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 2 with Austin Engineering Company, Inc. for the Lisa Rae Improvements Projects Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 3/22/2019 Dept Director: Michael Thane, Director of Utilities and Environmental Services Cost: $6,496.10 Indexes: General Self -Financed Construction Attachments: LAF, Map, Lisa Rae - CORR Change Order No. 2 Department: Utilities and Environmental Services Text of legislative File CM -2019-0079 In 1984, the streets Lisa Rae Drive, Joyce Lane, and Ray Berglund were involuntary annexed into the City of Round Rock. In the early 2000's, bonds were passed to perform improvements on these three streets, but during construction funding ran short and only Joyce Lane and Ray Berglund were constructed. Per the annexation agreement, Lisa Rae Drive remained a private drive. In October 2012, residents along Lisa Rae Drive approached the City concerning maintenance to Lisa Rae Drive. Residents asked the City if a maintenance agreement could be entered into in order to construct a new street similar to Ray Berglund and Joyce Lane. The city determined that the construction of a new street could only be possible if all property owners donated the required Right -of -Way (ROW) needed to construct Lisa Rae Drive. After several discussions with the six residents along Lisa Rae Drive, they all agreed to donate the required 25 -feet of property for the necessary ROW. On May 11, 2018, the City executed the documents needed to acquire the donated ROW necessary to construct Lisa Rae Drive. The Lisa Rae Drive Improvements project consists of approximately 700 linear feet of new 20 -foot wide asphalt pavement with ribbon curb; approximately 500 linear feet of new 8 -inch waterline; and approximately 1,000 linear feet of new 8 -inch wastewater line. In June 2016, Halff and Associates performed the preliminary engineering design for the proposed street, water, and wastewater infrastructure. In May 2018, Halff and Associates were City o1 Round Rock page i Printed an W2112019 A ends Nem Summary Continued CM -2019-0079 selected for final design and construction phase services needed to construct the improvements to Lisa Rae Drive. On October 31, 2018, ten bids were submitted and the lowest bid in the amount of $386,639.00 was submitted by Austin Engineering Company, Inc. Change Order/Quantity Adjustment No. 1 was needed to construct a new storm sewer inlet as well as a curb and gutter section in order to collect stormwater drainage along Lisa Rae Drive. Collecting this runoff will eliminate stormwater from flowing onto Double Creek Drive and causing a potential driving hazard. Change Order/Quantity Adjustment No. 1 was for $30,965.00 which increased the contract to $417,604.00 Change Order/Quantity Adjustment No. 2 is needed to adjust bid item quantities, amend cost of storm sewer pipe from 24 -inch to 18 -inch, and for other unforeseen construction items. Change Order/Quantity Adjustment No. 2 is for $6,496.10 which increases contract to $424,100.10 Staff recommends approval of Change Order No. 2 with Austin Engineering. Cost. $6,496.10 Source of Funds: General Self -Financed Construction Cify of Round Rock Page 2 Printed on 312112019