Loading...
CM-2019-0078 - 3/22/2019My, 0116 Department: Project Name: City Project ID Number Vendor Page 1 of3 Contract Quantity Adjustment/Change Order Utilities & Environmental Services DB Wood / SM 29 CoRR 30" Raw Water Line Relocation Date: 2/21/19 Change Order/quantity Adjustment No. i Santa Clara Construction Ltd. 9811 Anderson Mill Rd Ste 201 Austin TX 78750-2246 512-250-8310 Company Name Address Picone No. ]ustificaUon Relocation of AEC guy wires due to radiuses at DB Wood / HWY 29 In launch bare pit for 30" RWL {48" rasing) across SH 29. SUMMARY Original Contract Pricer Previous Quantity Adjustrnent(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s); Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time; Time Adjustment by previous Quan. Adj./Change Order. Time Adjustment by this Quan, Adj./Change Order: New Contract Time: Submitted for Approval ISO 0 0 180 of water Amount $1,437,294.00 $0.00 $0.00 $0.00 $1,437,794.00 $0.00 $22,358.56 $22,358.56 $1,459,652.56 $22,358.56 around the % Change Prepared By- Lance Parisher, Propect Manager, Co_bbFendlew 2/210119 Signature Printed Name, Title, Company - Date 4 Approvals Contractor City Project Mayor/City Signature I -T- Jacob Printed Name, Tlde, Company Jeff Bell, Sr. Project Manner C.uur is Santa Clara Constru Z12 -71t( Date 03/12/2019 0723 0% 1.56% 1.56% Page 2 of 3 Contract Quantity Adjustment/Change Order ,rr., oYil.S Project Name: DB Wood / SW 29 CORR 30" Raw Water Line Relocation Quan. Adj./Change Order No.: Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment Da CIA - NE EXTEN Total Construction -Line Extensions EA 1 $1,984.75 $1,984.75 0 Sub P & 0 $496.19 $496.19 Bond {1%) 1 $24.81 $24.81 Water Barriers EA 37 $425.00 $15,725.00 Sub P & 0 (25%) Bon (19/0) 1 1 $3,931.25 $196.56 $3,931.25 $196.59 $0.00 $0.00 $0.06-- $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0. $0.00 $0.00 $0.00 City of Round Rock ROUND eocK Agenda Item Summary Agenda Number: Title: Consider executing Quantity AdjustmentlChange Order No. 1 with Santa Clara Construction, Ltd. for the DB Wood/SH 29 30" Raw Water Line Relocation Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 3122/2019 Dept Director: Michael Thane, Director of Utilities and Environmental Services Cost: $22,358.56 Indexes: Self -Financed Water Construction Attachments: LAF, CO No.1_CM_3.22.19, MAP Department: Utilities and Environmental Services Text of Legislative File CM -2019-0078 The DB Wood 1 SH29 30 -inch Raw Water Line Relocation project consists of replacement of approximately 2,400 L.F. of the 30 -inch raw waterline. The existing raw waterline is currently located within the TxDOT Right -of -Way (ROW) and is being relocated into a City of Round Rock easement outside the recently acquired new TxDOT ROW. The project is currently in the construction phase. During the placement of the Traffic Control Plan, it became evident that additional traffic control measures would be needed in addition to what was included with the construction contract. Based on the recommendations of TxDOT, thirty-seven (37) shorter water -filled barriers will be placed at all the roadway radii. The addition of the extra traffic control measures helps to ensure worker and commuter safety. The new raw water line is required to be installed under SH29 at the intersection of DB Wood Road. A guy wire for a Pedernales Electric Company (PEC) power pole conflicts with the contractor's boring pit needed for the installation of the raw water line. This change provides for the cost associated with PEC relocating the guy wire so it is no longer in conflict with the raw water line installation. The Utility Staff recommends the City Manager to authorize change order no. 1 for $22,358.56 for this additional work. City of Round Rock Page 1 Prfnted on 3/21/2019