CM-2019-0084 - 3/29/2019
Page I or 3 P—O-- Contract Quantity Adjustment/Change order ,,e,CL 16 Department: PARD Project Name: Adult Recreation Project Date: 3/19/19 City Project Change Order/Quantity ID Number Adjustment No. 3 Vendor Prime Construction Company, Inc. 20907 Martin L Pflugerville, TX 78660 512.244.7799 Company Name Address Phone No Justification See attached Change Order Summary Report and backup documentation SUMMARY Amount %Change Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price (Original Contract Prfce Plus Quantity Adjustment(s) Plus Mange Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. AdJ4Change Order. Time Adjustment by this Quan. Adj./Change Order. $402,293.34 14% $43,593.00 2% $445,886.34 16% ¢3,316,706.34 $445,886.34 240 days 10 da s sod Install date Feb 11, 2019) 0 New Contract Time: 250 days 1 Printed Name, Contacmr / f Brian Ritter, President, Prime Construction Company, Inc 320119 Signature Printed Name, Title, Company Date City Project I // . Mayor/City Signature f } 7A : r /7 Contract Quantity Adjustment/Change Order Ilarinlloae Project Name: Adult Recreation Project Quan. Adj-Xhange Order No.: Chance Order Data Page 2 of 3 1 a 1 1 MDays) --- a Time AdJustment Imo-- •- 1 1 ©� ::i 11 ::I it � ©� � � ©© '. 11 •. it 1 11 I I! I 1 11 oil 1 11 I 1 11 ■ 1 11 1 I I 1 11 1 11 1 I 1 1 I I 1 11 1 11 pp $-f -- Contract Quantity Adjustment/Change Order m i -L 15 Project Name: Adult ideation Project Quan. Adj./Change Order No.: uantity Adimbnent Data Page 3 o!3 - BOTKIN PRIME CONSTRUCTION COMPANY, INC. iMVPCCIUSA.COAt 20907 Martin Ln Pfiugerville, TX 78660 (office) 512.244.7799 (rax) 512.990.9886 CHANGE ESTIMATE NO. 3 Project: OSP ADULT RECREATION COMPLEX PHASE 1 Contract No.: NONE Date: 3-13-19 This Change Order includes the following modifications to the scopes of work originally contracted for the subject project between Ritter — Botkin Prime Construction Company Inc. (Contractor) City of Round Rock, TX (Owner): SCOPE: Furnish and install all materials, tools, and labor required for the following scopes of work 1. Scoreboard Power - Increase conduit size from 1" to 1-114" - Increase wire size from #4 to 110 - Change (2) original 20amp single pole breakers to (2) 30 amp two pole breakers 2. Underground Electric - Run 4" SCH40 conduit with pull tape under proposed parking lot - Up to 3601f at 4' Depth included - Red Tinted Concrete Included - Tie into Junction Box - Tie into Transformer Pad Subtotal: $2,750.00 $36,880.00 $ 39,630.00 OHP: $ 3,963.00 Change Estimate 03 Total: $ 43,593.00 'tRITTL-BOTKIN PRIME CONSTRUCTION COMPANY, INC. WF"PPMUSACOA1 20907 Martin Ln Pfingerville, TX 78660 (office) 512.244.7799 (fax) 512.990.9886 Prime Construction Company Inc. Brian Ritter 3-13-2019 Signature 1 Date Printed Name City of Round Rock + ROUND ROCIC T� Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 3 with Prime Construction Company, Inc. for the Adult Recreation Complex Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 3/29/2019 Dept Director: Rick Atkins, Director Cost: $43,593.00 Indexes: 2017 General Obligation Bonds Attachments: Contract - Adult Rec Complex Chg Ord 3, Change Order #3 Summary, COE 03, IAF - QA-CO#3 w- Prime Construction Co - Adult Recreation (0042079OxAO8F8) Department: Parks and Recreation Department Text of Legislative File CM -2019-0084 This Change Order to the contract with Prime Construction Company, Inc. (PCCI) includes the following items outside of the original scope of work. The specified scoreboard required more power than originally designed for. In order to eliminate voltage drop to the scoreboard and to ensure proper functionality, larger gauge wire was required at an added cost. Additionally, during excavation of the parking lot, the contractor encountered a large electrical conduit. After exploration and discussions with Oncor, it was determined that this conduit is a primary service line serving the Cy Young Baseball Complex. In order to assure proper cover above the power line, the contractor will need to lower the line. Several options were explored, but the best value to the City is to install a line adjacent to the existing line and repull the wire. This will decrease the downtime at the Cy Young Complex, as well as be the most cost-efficient option. The Adult Recreation Complex at Old Settlers Park includes construction of two (2) lighted recreational softball fields, a small restroom facility, spectator seating and shade, flexible Feld space, and parking. This project will serve as the first phase of the Recreation Complex and will replace the two softball fields currently located in McNeil Park which will be removed as part of the Nutty Brown Development. Cost: $43,593.00 Source of Funds: 2017 General Obligation Bonds C►ty of Round Rock Paget Printed on 3129/20l9