R-2019-0146 - 3/28/2019RESOLUTION NO. R-2019-0146 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with T. Gray Utility & Rehab Co., LLC for the 2016 Wastewater Collection System Rehabilitation — Manhole Rehabilitation, Open Cut, and Point Repairs Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 4, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 4 to the Contract with T. Gray Utility & Rehab Co., LLC for the 2016 Wastewater Collection System Rehabilitation — Manhole Rehabilitation, Open Cut, and Point Repairs Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 28th day of March, 2019. X //)v CRAIG MhRGAVMayor City of Round R ck, Texas ATTEST: WIL SARA L. WHITE, City Clerk 0112.1902;00420323 00 EXHIBIT Plage I of .4 „A» Contract Quantity Adjustment/ Change Order • ROUND ROU( ICXA% rev, 01/16 Department: Utilities and Environmental Services Project 2016Wastewater Collection System Rehabilitation - Manhole Rehabilitation, Open Name: Cut, and Point Repairs Date: 2/25/19 City Project Change Order/Quantity ID Number RHB16 Adjustment No, 4 Vendor T Gray Utility & Rehab Co., LLC P. O. Box 2176 - Cypress, Texas 77410 281-455-0899 Company Name Address Phone No. Justification Quantity Adjustment / Change Order #4 is needed for final Quantity Adjustment items in Bid list. SUMMARY Amount % Change Original Contract Price: $1,362,800.00 Previous Quantity Adjustment(s): $95,151.00 This Quantity Adjustment: -$91,028.23 Total Quantity Adjustment(s): $4,122.77 Total Contract Price with Quantity Adjustment(s): $1,366,922.77 Previous Change Order(s): $72,250.00 5% This Change Order: $0.00 0% Total Change Order(s) To Date: $72,250.00 5% Adjusted Contract Price (Original Contract Price Plus Quantity Adjustments) Plus Change Order(s)]: $1,439,172.77 Difference between Original and Adjusted Contract Prices: $76,372,77 Original Contract Time: 180 Time Adjustment by previous Quan. Adj./Change Order: 30 Time Adjustment by this Quan. Adj./Change Order: 0 New Contract Time: 210 Submitted for Approval � Prepared By: -� Eddie Zapata, Senior Project Manager Signature Printed Name, Title, Company _ _2/_27/19 Date Approvals Contractor:�'�;�� �.--� Gerald Hoffpauir, Project Manager 7_/7-7 11cj Si nature Printed Narne, Title, Company City Project Date ' Manager:�WdkL /' Eddie Zapata, Senior Project Manager 2/27/19 Signe Printed Name, Title Date Mayor/City Manager Craig Morgan, Mayor Signature Printed Name, Title Date Page 2 11f'•4 Contract Quantity Adjustment/Change Order ROUNOROCK MXAS rev, 01,116 2016Wastewater Collection System Rehabilitation - Manhole Rehabilitation, Open Cut, Project Name: and Point Repairs Quan. Adj./Change Order No.: Chance Order Data Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment (Days) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: Page 3 ol' I Contract Quantity Adjustment/ Change Order ROUNOROCR IL%AS lev, 01i 16 2016Wastewater Collection System Rehabilitation - Manhole Rehabilitation, Open Cut, Project Name: and Point Repairs Quan. Adj./Change Order No. Quantity Adjustment Data Bid Item # Item Description p Unit Qty. Unit Price Amount Contract Time Adjustment 6 Vacuum Testing of Manholes EA -93 $165.00 -$15,345.00 7 Repair Manhole Cone Section EA -9 $380.00 -$3,420.00 8 Repair Manhole Bench and Trough EA -15.00 $700.00 -$10,500.00 10 Replace, Adjust, & Realign Manhole Frame EA -1 $1,500.00 -$1,500.00 12 Install External Chimney Seal for Manhole EA -3 $1,900.00 -$5,700.00 13 Install External Chimney Seal for Manhole - Asphalt Surface EA -1 $3,100.00 -$3,100.00 14 Replace Manhole Cover, Frame, Frame Seal - Lawn Surface EA -2 $975.00 -$1,950.00 15 Replace Manhole Cover, Frame, Frame Seal - Asphalt Surface EA -7 $2,100.00 -$14,700.00 16 Replace Manhole Cover, Frame, Frame Seal - Concrete Surface EA -2 $1,250.00 -$2,500.00 17 Cementitious Coating of Manhole VF -207.11 $93.00 -$19,261.23 18 Grout Lower 18" of Manhole EA -6 $320.00 11,920.00 19 Complete Manhole Rehabilitation VF -95 $255.00 -$24,225.00 20 Remove and Replace 6 -inch Service Line LF 300.5 $78.00 $23,439.00 21 Install 6 -inch Service Cleanout EA 11 $1,685.00 $18,535.00 22 Install 6 -inch Wastewater Line by Open cut LF -35 $78.00 -$2,730.00 23 Remove and Replace 6 -inch Wastewater Line by Open Cut LF -80 $82.00 -$6,560.00 24 Remove 6 -inch Wastewater Line and Replace with 8 -inch Wastewater Line LF -140 $149.00 -$20,860.00 25 Remove & Replace 8 -inch Wastewater Line by Open Cut LF -49 $126.00 -$6,174.00 26 Remove 8 -inch Wastewater Line & Replace with 10 -inch Wastewater Line LF -37 $148.00 -$5,476.00 27 Remove 10 -inch Wastewater Line & Replace with 12 -inch Wastewater Line LF -108 $166.00 -$17,928.00 28 Replace/Install Internal Drop Assembly for Manhole EA -2 $1,800.00 -$3,600.00 30 Point Repairs EA 7 $4,921.00 $34,447.00 $0.00 $0.00 $0.00 $0.00 $0001 Page -4 111' I Contract Quantity Adjustment/ Change Order ROUNO ROCK IPXAb rev, 01;16 $0.00 $0.00 $0.00 $0.00 $0.00 $0.001 TOTAL -$91,028.231 0