Loading...
CM-2019-0090 - 4/5/2019Page 100 3 In— Imss Contract Quantity Adjustrnent/Change Order ti,, ours Department: Utilities and Environmental Services Project Name: Kensington Detention Improvements Date: 3120/19 City Project Change Order/Quantity ID Number KENSG Adjustment No. 1 Vendor AS Concrete Contractors 515 Sheffield Rd, Seguin TX 78155 830-556-8799 Company Name - Address _ Phone No. lustiflcation rhe City Initially did not believe that Native Seeding for Erosion Control would be needed due to the use of other erosion control methods. It is now apparent that Native Seeding Is necessary after construction to provide permanent erosion control. During construction an 18" RCP was ilscovered outfailing Into the channel from an adjacent pond. The channel bank is being regraded In the area of the outfall so It Is necessary to ihorten the pipe and build a new headwall. SUMMARY Original Contract Price: Previous Quantity AdJustment(s): This Quantity Adjustment: Total Quanbty Adjusftwt(s): Total Contract Price with Quantity Adjus&m*s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustrwt(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract lime: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Omer: New Contract Time: Signature Amount $938,545.25 $0.00 $0.00 $0.00 $938,545.25 $29,100.00 $29,100.00 $967,645.25 $29,100.00 210 Days 0 Days 0 Days 210 Da % Change Sti W"Hied for Approval Dillon Johns, Project Manager. City of Round Rock 3.2512019 Printed Name, Title, Approvals 0% 3% 3% Contractor: ak A po•-.n t I"M; 0'15 Cont City Protect `g Printed Name, Title, Company Date Manger: _ Dillon Johns, Project Manager 3+25°2019 Mayor/City Manager7�.i e-/ 4i VV[- 20(q-Dbjo 5W7 r ` Y - Manager Date Contract Quantity Adjustment/ Change Order Project Name: Kensington Detention Improvements quan. Adj./Change Order No.: Chancre Order Data Page 2 of 3 Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment (DAYS) 604 Native Seeding for Erosion Control SY 21,296 $1.17 $25,000.00 0 1 Headwall for 18" RCP LS 1 $4,100.00 $4,100.00 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.001 $0.00 $0.00 $0.00 $0.00 $0.00 Page 3 of Contract Quantity Adjustment/ Change Order �gUHpflOGlir:w Project Name: Kensington Detention Improvements Quan. Adj./Change Order No.: Auantily Arlinctman! 11x1 w Bid Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 o.00 a M7, -I,-- City of Round Rock JORoUND ROCK x-, Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 1 with D&S Concrete Contractors for the Kensington Detention Improvements Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 4/5/2019 Dept Director: Michael Thane, Director of Utilities and Environmental Services Cost: $29,100.00 Indexes: 2014 Drainage Revenue Bonds Attachments: QA-CO#1.pdf, LAF.pdf, MAP.pdf Department: Utilities and Environmental Services Text of Legislative File CM -2019-0090 The Kensington Detention Improvements project is located just south of Dell Way, adjacent to Dell's Building 1 at 401 Dell Way. The project consists of two inline detention ponds. Two concrete walls are being constructed to form the two ponds. An existing berm is being renovated to accommodate one of the walls and increase pond capacity. Quantity Adjustment/Change Order No. 1 includes the cost of constructing a concrete headwall and safety end treatment for the pipe. It also includes the cost of applying native seed for erosion control. The headwall needs to be added to the project after we discovered a previously unknown 18" RCP that will need to be moved. The native seeding is necessary because after thinning out the trees in the project area we determined that permanent vegetation is needed to fully stabilize the project site. Change Order No. 1 is for $29,100.00. This includes the cost of labor, additional materials and equipment for the work. The total contract amount will be adjusted to $967,645.25. Staff recommends approval. Cost: $29,100 Source of Funds: 2014 Drainage Revenue Bonds City of Round Rock page 7 Printed on 4/4/7079