Loading...
CM-2019-0095 - 4/5/2019Page I of 3 Contract Quantity Adjustment/ Change Order RquNn�4p[ eius rcv, cure Department: Project Name: 2017 SMP University Blvd Surface Treatment Date: 4 3/19 City Project Change Order/Quantity ID Number Adjustment No. 1 Vendor Texas Materials 13.2.0 Arrow Point Dr., Ste 600 _ 512-571-6072 Company Name Address Phone No. Justification ;tripping items needed and were not part of original contract. Tutt joints are needed to transition In the project without a bump and edgemill was needed to tie Into curb and gutter section tha was added int( he project. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: 21 0 0 21 $0.00 0% $46,815.01 13% $46,815.01 13% $420,315.D1 $46,815.01 Prepared By: Pedro Alonso, Project Manager, Texas Materials 4/3/19 Signature Printed Narne, Title, Company Date Contractor: /1-1 � � _ Pedro Alonso, Project Manager, Texas Materials 4/3/19 Signature Printed Name, Title, Company _ _ Date City Project _ Manager: s or. ,(N���. �« :r,..r P 4-3-A e Printed Name, Date Manager r7ia�yl ame, dlq-2oCq- to gqS Contract Quantity Adjustment/Change Order wduNn iwa�, r,,.. � LN S Project Name: 2017 SMP University Blvd Surface Treatment Quan. Adj.Xhange Order No.: Change Order Data Page 2 of 3 Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment as 1 REFL PAV MRK TY I (W) 4" (BRK) (100 MIL) LF 190 $0.37 $70.30 0 2 REFL PAV MRK TY i (W) 4" (DOT) (100 MIL) LF 426 $0.74 $315.24 0 3 REFL PAV MRK TY I (W) 4" (SLD) (100 MIL) LF 23497 $0.35 $8,223.95 0 4 REFL PAV MRK TY I (W) B" (SLD) (100 MIL) LF 1937 $0.74 $1,433.38 0 5 REFL PAV MRK TY I (W) 24" (SLD) (100 MIL) LF 105 $18.90 $1,984.50 0 6 REFL PAV MRK TY I (W) 24" (ARROW) (100 MIL) EA 7 $105.00 $735.00 0 7 REFL PAV MRK TY I (W) 24" (WORD) (100 MIL) EA 6 $110.25 $661.50 0 8 REFL PAV MRK TY I (Y) 4" (SLD) (100 MIL) LF 26440 $0.35 $9,254.00 0 9 REFL PAV MRK TY I (Y) 4" (BRK) (100 MIL) LF 1100 $0.37 $407.00 0 10 REFL PAV MRK TY II -A -A EA 748 $8.40 $6,283.20 0 11 REFL PAV MRK TY I -C EA 103 $8.40 $865.20 0 12 TABS TY Y-2 LF 1505 $1.37 $2,061.85 0 13 TABS TY Y LF 86 $1.37 $117.82 0 14 TABS TY W LF 111 $1.37 $152.07 0 15 0"-2" MILLING SY 1500 $9.50 $14,250.00 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.001 1 Page 3 of 3 Contract Quantity Adjustment/Change Order �dwNdIIOEM l f YF'. ^e'r. C 4`16 Project Name: 2017 SMP University Blvd Surface Treatment Quan. Adj./Change Order No.: Quantity Adiustment Data Contract Time Sid Item # Item Description unit Qty, Unit Price Amount Adjustment 1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 D.LJ, CONSTRUCTION, INC DaBy Production Report Job No, 1845 Project: Unlversity Blvd Overlay__ Lecatlon: Round Rock Prime: Texas Materials Super Justin Date: 4.1-19 Index' Road. Univeraity Blvd Is Index Complete? Yes or No I 1 Remarks. Inspecloft Name Inspeclors Emall or Fax Number 20 0 Ir DOT ITEM DESCRIPTION UNIT QUANTITY 1 1 REFL PAV MRK TY I 4' (BRK) (100 MIL LF 190 1 2 2 REFL PAV MRK TY I 4" OOT 1OOMIL LF 428 3 REFL PAV MRK TY I W 4" JSM 100MIL LF 23,497 4 4 REFL PAV MRK TY I 8' SLD IOOMIL LF 1 854 4 5 5 REFL PAV MRK TY I a 24" SLD 100MIL LF 5 0 B REFL PAV MRK TY I (AR OM 1OOMIL EA e 7 7 REFL PAV MRK TY 10 MRI)i100MIL EA 7 8 8 IREFIL PAV MRK TY I 4' SLD 100MLL LF 20,440 e 9 9 REFL PAV MRK TY I 4' (13Rn 100MIL LF 1.100 B 10 10 REFL PAV MRK TY I1 -A -A EA 1O 11 11 REFL PAV MRK TY I -C EA 11 12 12 19 REMOVE TABS EA 1.700 13 14 14 15 15 10 10 17 17 18 10 i9 19 20 2D 21 21 22 22 23 23 24 24 25 25 26 20 27 27 28 20 29 29 30 30 Is Index Complete? Yes or No I 1 Remarks. Inspecloft Name Inspeclors Emall or Fax Number 20 0 Ir DOT .lob No. Project Location: Prime: 1845 University Blvd Overlay Round Rock Texas Materials D.I.J CONSTRUCTION, INC Daily Production Report Super: John Barnes Dale: 4.2-10 Index; Road: University Is Index Cornplele7 Yes or No 0 0 Remarks. Inspector's Name Inspector's Email or Fax Number ITEM DESCRIPTION UNIT QUANTITY 1 1 REFL PAV MRK TY I 4" (BRK) (100 MIL LF 1 2 2 REFL PAV MRK TY I 4" DO 100MIL) LF 3 REFL PAV MRK TY I 4" SLD t00MIL LF 4 1 41 REFL PAV MRK TY I 8" SLD 100MIL LF 83 4 5 5 REFL PAV MRK TY I 24" SLD 100M(L) LF 105 5 6 e REFL PAV MRK TY I ARRO 100MIL EA 7 e 7 7 REFL PAV MRK TY I WORD 100MIL Fro 6 7 al 81 REFL PAV MRK TY I 4" SLD 100MIL LF 8 9 8 REFL PAV MRK TY I M 4" BRK 100MIL LF 9 10 10 REFL PAV MRK TY II -A -A EA 748 10 11 11 REFL PAV MRK TY I -C EA 103 11 121 1 12 13 13 14 14 15 15 1e 1e 17 17 18 18 19 19 20 20 211 1 1 21 22 22 23 23 24 24 251 1 25 26 26 27 27 28 211 291 29 30 1 30 Is Index Cornplele7 Yes or No 0 0 Remarks. Inspector's Name Inspector's Email or Fax Number City of Round Rock ROUNITEXAS Rocx Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 1 with Texas Materials Group for the 2017 SMP University Boulevard Surface Treatment Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 4/5/2019 Dept Director: Gary Hudder Cost: $46,815.01 Indexes: RR Transportation and Economic Development Corporation (Type B) Attachments: Change Order #1 w- Texas Materials - 2017 SMP Univ Blvd - corrected Department: Transportation Department Text of Legislative File CM -2019-0095 The Transportation Department requests that the City Manager consider a resolution to approve Change Order/Quantity Adjustment #1 for the 2017 Street Maintenance Project (SMP) -University Blvd Surface Treatment. This project was bid as a previous contractor was finishing up the milling of the roadway, and as a result of that overlap, we did not include surface preparation (milling) as a necessary line item in the new bid. However, after several more weeks of traffic and weather, there were sections of the roadway that were not of good standing to simply be overlayed with the new material. To ensure a good bond of the new material, it became necessary for Texas Materials to better prepare (mill) the intersection areas of A.W. Grimes and CR 110. Additionally, the Transportation Department excluded striping from the bid items on this project to use our on-call contract for striping. However, after comparing price and availability between our on-call contract for striping and Texas Materials prices and availability, we decided to add the striping for this project to the contract with Texas Materials, which would allow us a quicker product placement at roughly the same cost. The initial contract price was $373,500.00; the new proposed contract price with CO/QA #1 will be $420,315.01. The Transportation Department recommends approval of Change Order/Quantity Adjustment #1, for a total difference between Original and Adjusted contract price of $46,815.01. Citye1 Round Rock Page f Printed on 41412019 Agenda Item Summary Condnued CM-2019-oo95 Cost: $46,815.01 Source of Funds: Round Rock Transportation and Economic Development Corporation (Type B) City of Round Rock Page 2 Printed on 41412049