Loading...
CM-2019-0099 - 4/12/2019SUPPLEMENTAL AGREEMENT NO. I TO "CITY OF ROUND ROCK AGREEMENT FOR PROFESSIONAL CONSULTING SERVICES FOR CONSTRUCTION MATERIALS TESTING SERVICES WITH ROCK ENGINEERING & TESTING LABORATORY, INC." CITY OF ROUND ROCK § STATE OF TEXAS § COUNTY OF TRAVIS § COUNTY OF WILLIAMSON § KNOW ALL BY THESE PRESENTS: THIS SUPPLEMENTAL AGREEMENT NO. I to "City of Round Rock Agreement for Professional Consulting Services for Construction Materials Testing Services with Rock Engineering & Testing Laboratory, Inc.," hereinafter called "Supplemental Agreement No. l," is made by and between the City of Round Rock, Texas, a home -rule municipality, hereinafter called the "City" and Rock Engineering & Testing Laboratory, Inc., hereinafter called the "Consultant." WHEREAS, the City and Consultant executed the referenced "city of Round Rock Agreement for Professional Consulting Services for Construction Materials Testing Services," hereinafter called the "Agreement," on March 22, 2018 by Resolution No. R-2018-5269; and WHEREAS, the City desires to amend the Scope of Services to add additional services related to construction materials testing for the Luther Peterson Service Center Project; and WHEREAS, it is necessary to amend the Scope of Services, the Fee and the Term of services provided in the Agreement; NOW THEREFORE, in consideration of the mutual promises and obligations in the Agreement and this Supplemental Agreement No. I, the City and Consultant agree that said Agreement is amended and supplemented as follows: I. Section 1.01 of the A reement is hereby amended to read as follows: 1.01 EFFECTIVE DATE, DURATION, AND TERM This Agreement shall be effective on the date this Agreement has been signed by each party hereto, and shall remain in full force and effect until it expires by operation of the term indicated herein, or is terminated or extended as provided herein. 00421391ss2 The term of this Agreement shall be until full and satisfactory completion of the work specified herein is achieved which is not estimated to exceed tie -(12 fourteen (14) months. H. Section 3.01 of the Agreement is hereby amended to read as follows: 3.01 SCOPE OF SERVICES Consultant shall satisfactorily provide all services described herein and as set forth in Exhibit "A" and the Addendum to Exhibit "A," which document is incorporated herein for all purposes. Consultant's undertaking shall be limited to performing services for the City and/or advising City concerning those matters on which Consultant has been specifically engaged. Consultant hall perform services in accordance with this Agreement, in accordance with the appended proposal for services and addendum to Proposal for services Addendum to Exhibit "A"), and in a professional and workmanlike manner. Section 5.0I of the Agreement is hereby amended to read as follows: 5.01 CONTRACT AMOUNT In consideration for professional consulting services to be performed by Consultant, City agrees to pay Consultant in Accordance with Exhibit "B" entitled "Fee Schedule," and the Addendum to Exhibit "A," which documents is are attached hereto and incorporated herein for all purposes, in payment for services and the Scope of Services deliverables as delineated in Exhibit "A" and the Addendum to Exhibit "A." Not -to -Exceed Total Payment for Services: Consultant's total compensation for consulting services hereunder shall not exceed Four- and 40/100 Dallar-s (555,884.40) Sixty -Four Thousand Two Hundred Ninety -Three and No/100 Dollars ($64.293.00). IV. This Supplemental Agreement No. 1 shall amend the original Agreement only as set forth herein with no other changes in terms or conditions of the original Agreement. [Signatures on the following page.) IN WITNESS WHEREOF, the City and Consultant have executed this Supplemental Agreement to be effective as of the Iast date of due execution by both parties. CITY OF ROUND ROCK, TEXAS ATTEST: By: Sara L. White, City Clerk FOR CITY, APPROVED AS TO FORi1l: By: , --, i . . L - �, Step Ian L, Sheets, City Attorney 3 ROCK ENGINEERING & TESTING LABORA,/T}O Y, INC By: -, Printed N Title: ;V1 Date Signed: March 28, 2019 City of Round Rock — General Services 212 Commerce Cove Round Rock, Texas 78664 Attn: Richard Will dchardwill(a)roundrocktexas.aov • GEOTECHNICAL ENGINEERING • CONSTRUCTION MATERIALS ENGINEERING & TESTING • SOILS • ASPHALT. CONCRETE SUBJECT: CONSTRUCTION MATERIALS ENGINEERING SERVICES CHANGE ORDER NO. 9 REQUEST LUTHER PETERSON SERVICE CENTER 3400 SUNRISE ROAD ROUND ROCK, TEXAS RETL PROPOSAL NO.: C318090 Dear Mr. Will; Introduction Rock Engineering & Testing Laboratory, Inc. (RETL) was selected by the City of Round Rock to provide Construction Materials Engineering Services for the Luther Peterson Service Center project. RETL received an executed copy of Resolution No. R-2018-5269 dated March 22, 2018. The total compensation for the Construction Materials Engineering Services provided for this project was set at $55,884.00. Budget Review As of February 28, 2019, our records indicate the following: 2,562.9 • Contract amount $55,884.00 • Services provided through March 26, 2019 $53,839.00 • Remaining contract amount $2,045.00 Scope of Services Remaining to Project Completion RETL representative Mr. Bryan Angelo met with Lee Lewis Project Personnel and has determined that the following type and amount of Construction Materials Engineering Services remain to complete this project. • Earthwork Inspection and Testing Perform field moisture content and density testing on lime stabilized subgrade soils and aggregates placed as base course materials. Perform laboratory testing of soils to include: ROCK ENGINEERING & TESTING LABORATORY, INC. No. 1 Roundville Lane • Round Rock, Texas 78664 OFFICE: (512) 284-8022 • FAX: (512) 284-7764 • www.mcktesting.com Addendum to Exhibit "A" City of Round Rock — General Services March 28, 2019 RETL Nob No. C318090 Luther Peterson Service Center 3400 Sunrise Road Round Rock, Texas • Atterberg Limit (ASTM D4318) ■ Sieve Analysis (ASTM C136) • Percent Finer than No. 200 Sieve (ASTM D1140) ■ Moisture Density Relationship (ASTM D1557) • Foundation Inspection Periodic observation of shallow foundation excavations for confirmation of bearing materials and removal of loose soils. Observe placement of reinforcing steel (bar size/spacing/lap) • Concrete Inspection and Testing_: Continuous inspection of the placement of structural concrete by personnel certified as ACI Concrete Field Testing Tech, Grade 1. ■ Obtain representative samples of concrete (ASTM C172) ■ Measurement of slump (ASTM C143) • Determination of air content (ASTM C231) ■ Measurement of temperature (ASTM C1064) • Preparation of compressive strength test specimens (ASTM C31) Periodic inspection of the placement of concrete for paved areas. Laboratory compressive strength testing of test specimens (ASTM C39) Mason Inspection and Testing Inspection of concrete masonry unit construction.. ■ Observe mortar and grout mixing portions for compliance with mix design and placement operations. ■ Obtain representative samples of grout. ■ Measure grout slump (ASTM C143)_ ■ Measure grout temperature (ASTM C1064). • Prepare grout compressive strength test specimens (ASTM C1019). Laboratory compressive strength testing of grout specimens (ASTM C39). Hot Mix Asphaltic Concrete Testing, Periodic inspection and sampling of hot mix asphaltic concrete Field and laboratory testing of hot mix asphaltic concrete ■ Obtain cored test specimens • Extraction and gradation • Molded Laboratory Density Specimens ■ Theoretical maximum density and stability • Engineering Review of material testing reports. Page 2 of 4 Addendum to Exhibit "A" City of Round Rock -General Services March 28, 2019 RETL Nob No. C318090 Luther Peterson Service Center 3400 Sunrise Road Round Rock, Texas Change Order No. 1 Budget Rectuest RETL anticipates that the following quantities of testing will be required for this project: Soils Engineering Technician, hr Engineering Technician SR, hr Atterberg Limits, ea Moisture/Density Relationship, ea Sieve Analysis, ea Field Gradation Analysis, ea Field Density Testing - Nuclear Gauge, daily Project Manager, hr Reinforcing Steel Engineering Technician SR, hr Concrete/Masonry Engineering Technician, hr Concrete Test Cylinder, ea Mortar Cubes, each Grout Prism, each Project Manager, hr Asphaltic Concrete Engineering Technician SR, hr HMAC Extraction/Gradation, each Molding HMAC specimens, set of 3 each HMAC Stability/Flow, each HMAC Density, set of 3 each HMAC Thickness, set of 3 each Coring Equipment Charge, per day t_r Quantity Amount Total 30 $40.00 $1,200.00 4 $46.00 $194.00 2 $65.00 $130.00 2 $225.00 $450.00 1 $60.00 $60.00 4 $55.00 $220.00 8 $175.00 $1,400.00 1 $95.00 $95.00 Sub Total $3,739.00 14 $46.00 $644.00 3 Sub Total $644.00 40 $40.00 $1,600.00 80 $ 20.00 $1,600.00 6 $20.00 $120.00 6 $25.00 $150.00 1 $95.00 $95.00 Sub Total $3,565.00 20 $47.00 $940.00 3 $275.00 $825.00 3 $155.00 $465.00 3 $185.00 $555.00 3 $55.00 $165.00 3 $25.00 $75.00 1 $125.00 $125.00 Sub Total $3,150.00 Change Order No.1 Total $10,454.00 Page 3 of 4 Addendum to Exhibit "A" City of Round Rock — General Services March 28, 2019 RETL Nob No C318090 Luther Peterson Service Center 3400 Sunrise Road Round Rock, Texas RETL suggests that an amount of $8,409,00 be issued for Change Order No. 1 to increase the Total Contract Amount to $64,293.00 to complete the Construction Materials Inspection and Testing Services for the Luther Peterson Service Center project. Closing RETL looks forward to our continued participation of providing Construction Materials Inspection and Testing Services for this project_ If there are any questions, or if we can be of assistance, please contact our office. Sincerely, Bryan Angelo, CET CMT Project Manager— Round Rock Arnie K Hammock, P.E. Vice President — Round Rock Page 4 of 4 •�o r Addendum to Exhibit "A" City of Round Rock JR0UZ � Agenda Item Summary Agenda Number: Title: Consider executing Supplemental Agreement No. 1 with Rock Engineering & Testing Laboratory, Inc. for construction material testing services for the Luther Peterson Service Center Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 4/12/2019 Dept Director: Chad McDowell, General Services Director Cost: $8,409.00 Indexes: Self -Financed Water Construction Attachments: Change Order, LAF - Supplemental Agreement No. 1 with RETL Inc. (00421614xA08F8), Agreement Department: General Services Department Text of Legislative File CM -2019-0099 Additional construction testing is required for the Luther Peterson Service Center project. Throughout the duration of the project, failed or rescheduled construction testing has been back charged to the General Contractor. Additional testing is required for soil analysis, reinforcing steel, concrete, masonry, and asphalt to ensure compliance with the contract documents. It is the responsibility of the Owner, per contract to provide additional testing. Cost. $8,409.00 Source of Funds: Self -Financed Water Construction CJfy a/ Round Rock Page f Prfnfed on 4/1112019