Loading...
CM-2019-0123 - 5/10/2019STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO.8 TO CONTRACT FOR ENGINEERING SERVICES FIRM: ATKINS NORTH AMERICA, INC. ("Engineer") ADDRESS: 11801 Domain Boulevard, Suite 500, Austin, TX 78758 PROJECT: E. Bagdad Avenue Extension This Supplemental Contract No. 8 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Atkins North America, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 24th day of September, 2015 for the E. Bagdad Avenue Extension Project in the amount of $104,700.41; and WHEREAS, the City and Engineer executed Supplemental Contract No. 1 on March 10, 2016 to amend the scope of services and to increase the compensation by $326,360.94 to a total of $431,061.35; and WHEREAS, the City and Engineer executed Supplemental Contract No. 2 on September 8, 2016 to amend the scope of services and to increase the compensation by $85,675.85 to a total of $516,737.20; and WHEREAS, the City and Engineer executed Supplemental Contract No. 3 on April 3, 2017 to amend the work schedule; and WHEREAS, the City and Engineer executed Supplemental Contract No. 4 on August 24, 2017 to amend the scope of services and to increase the compensation by $199,281.31 to a total of $716,018.51; and WHEREAS, the City and Engineer executed Supplemental Contract No. 5 on March 22, 2018, to amend the scope of services and to increase the compensation by $100,929.81 to a total of $816,948.32; and WHEREAS, the City and Engineer executed Supplemental Contract No. 6 on July 12, 2018, to amend the scope of services and to increase the compensation by $68,879.10 to a total of $885,827.42; and Supplemental Contract Rev.06/16 0199 1539;00422735 84275 WHEREAS, the City and Engineer executed Supplemental Contract No. 7 on November 20, 2018, to modify the provisions for the scope of services and to increase the compensation by $97,471.52 to a total of $983,298.94; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $47,084.63 to a total of $1,030,383.57; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: Article 2 Engineering Services and Exhibit B. Engineerinp, Services shall be amended as set forth in the attached Addendum to Exhibit B. Exhibit C. Work Schedule shall be amended as set forth in the attached Addendum to Exhibit C. Article 4. Compensation and Exhibit D. Fee Schedule shall be amended by increasing by $47,084.63 the lump sum amount payable under the Contract for a total of $1,030,383.57, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. [signature pages fo11om] Supplemental Contract Rev.06116 0199.1539;00422735 84275 ATKINS NORTH AMERICA, INC. Date Supplemental Contract Rev.06/16 0199 1539,00422735 84275 CITY OF ROUND ROCK By: Laurie Hadley, City anager 'jL Date Supplemental Contract 0199 1539;00422735 FORM: Pmorney i� Rev.06/16 84275 ADDENDUM TO EXHIBIT B Engineering Services PROJECT DESCRIPTION The proposed project will include a new location 3 -lane extension of McNeiI Rd between Mays St and S Black St as well as the widening of S Georgetown St to 3 -lanes between S Black St and E Main St. Lampasas St will be extended from its current termini at Bagdad Ave to the new McNeil Rd extension. Lewis St will be extended to connect to McNeil Rd. Stone St will be improved and extended to connect Main St and McNeil Rd. An alley will be included from Georgetown St west towards Black St. The existing City owned parking lot between Sheppard St and Burnet St will be reconstructed to provide improved drainage. The approximate length of the project is 0.54 miles. The project will be constructed in two phases. The first phase will include all the improvements west of and including the intersection at Burnet St. The second phase will include the proposed improvements east of Burnet St. This supplemental includes hydrologic and hydraulic analysis of the existing and proposed drainage structures at the railroad crossings, and surveying services to support these efforts. TASK 1: PROJECT MANAGEMENT No changes with this supplemental. TASK 2: SURVEYING • Mark the existing ROW • Provide flow line/material data for two existing railroad culverts • Additional services as directed if budget is available TASK 3: ENVIRONMENTAL STUDIES No changes with this supplemental. TASK 4: PRELIMINARY DESIGN/30% PLANS No changes with this supplemental. TASK 5: DIRECT EXPENSES No changes with this supplemental. TASK 6: GEOTECHNICAL DESIGN No changes with this supplemental. TASK 7: 60% PLANS No changes with this supplemental. TASK 8:95% PLANS No changes with this supplemental. Page I of3 TASK 9: 100% PLANS/FINAL SUBMITTAL Phase 2 of the McNeil Rd Extension project is being modified to include additional railroad culverts at two crossing locations immediately downstream of the proposed storm sewer system along McNeil Road. The first crossing is a 42" CMF downstream of Outfall MNI and second crossing is a 36" CMA downstream of Outfall MN2. The new analysis will size the appropriate drainage culvert structures required to decrease the railroad crossing headwater elevation for the proposed storm sewer system to function properly. The culvert headwater for the 25 -year and 100 -year is to be determined for understanding of the culvert impact on the storm sewer system. Atkins will update the hydrology and hydraulics as needed. This new culvert analysis will also evaluate the future removal of the detention pond east of Georgetown Street and future increases to impervious cover. The detention pond removal is not part of this project design, but the culvert design will include excess capacity to accommodate future flow increase. A new hydrology analysis for the 25 -year and 100 -year existing and post detention pond removal will be completed. This hydrology will address all area tributary to the culverts and will not be a reevaluation of the completed storm sewer design along McNeil Road. The hydrology will be done outside and independent of the hydrology completed within the stone sewer design. The culvert hydrology will be completed in HEC -HMS or similar software. This scope includes hydraulic analysis of the culverts with the new total flows from the hydrology. The culvert modeling will be completed in HY-8 or similar software. The calculated headwater at the culverts will be checked in the current models of the storm sewer design. The proposed culverts will be designed to ensure that the designed storm sewer works in the 25 -year event. The headwater for the 100 -year will also be calculated. Survey of the existing culverts under the railroad and the outlet structure of the existing detention pond is included with this scope. Hydraulic Analysis will also include a summary of the downstream effects at Lake Creek Flood Zone. The Effective FEMA model will be updated with new or unaccounted flows within the Lake Creek Flood Zone. The intent of this analysis is to show that the proposed culverts will have minimal effect on the flood zone downstream of the culverts. No issues are anticipated because the changes in flows at this location with the removal of the pond is very small compared to the Effective FEMA flow. This scope does not include any FEMA submittal. Atkins will analyze up to 2 different scenarios to incorporate assumptions for future impervious cover and the disposition of the existing detention pond east of the project as directed by the city. A Drainage Memo will be provided to summarize the new hydrology and hydraulic design of the railroad culverts described in this scope. The plan revisions anticipated to be included are: Drainage I. Revise the project HGL to reflect the proposed changes in headwater at the culverts with the additional modeling proposed. 2. Add plan and profile sheets for the new proposed culverts under the railroad. Page 2 of 3 TASK 10: WATER QUALITY PLANS AND WATER POLLUTION ABATEMENT PLANS (WPAP) No changes with this supplemental. TASK 11: LANDSCAPING AND IRRIGATION PLANS No changes with this supplemental. TASK 12: BARRIER WITH FENCE No changes with this supplemental. TASK 13: CONSTRUCTION PHASE SERVICES (Add Phase 2) No changes with this supplemental. NOT INCLUDED WITHIN THIS SCOPE The following items are not included with this scope. These items, if necessary, would be added to the scope through a supplemental agreement. I . Any FEMA related submittals 2. FEMA related hydrology. DELIVERABLES 100% Submittal (Phase 2 Only.) 1. An updated set of the 100% drainage plans and Drainage Memo discussing the future removal of the detention basin and the proposed design of the railroad culverts will be submitted for review. Page 3 of 3 ADDENDUM TO EXHIBIT C Work Schedule Attached Behind This Page s .. W d LO Wn m n n h m m m 0 p� .�. O N 0 m rl .r N QI N n O� O \ ! N N N O M \ ! ! 6 Al ! \ N N N �o \ \ •+ N m .H ap ! \ O .-� ! O \ a% O 1L Ol PI Ol Q m T T N 01 N N h \O b 4� T n h r1 .y .ti w .r •r M Q Q < M .ti w .r .r .r .r N w .ti .r M w1 rt1 HI N'1 Q M IO T m m N M M M� Y1 Ip Ip �p ti ti H 4p 10 10 h h T T !� H ID H n n � m O1 m .n ai en m Q m m n .� ac m .r .• � .o .o m h m m m .+ .� .. .� .. .� m E � a � � F to �e ` Y Y V n c c cc m W_ O O O m o a E O W d a m u ~ a 15 E Nca N e3 En ° m - a LTi u ypF w y J X J m¢ g of d a N u a a a a n ►�' o a M $� E a an d o Z a a E a a m m v7i .4 ysx� e3 # u ti x 1- X# 3 °�i E }& t In # E 6 a u mina mom. �++ s m a a a a a m fir= z �jn�j n m a �j�j �ff� .7n O o vim, O pa rc �i O u e v, A a ggaQ �sj * N N M h V� N Ul Q 4n W A w N rtf O M b T m m H w w .Ni .�1 � .fir w sl A ry N N N n M n N r N� T�� m m M rtY m T a v e v a O 6 u IL = % �N W '.. !Y Q � M Q W LO Wn m n n h m m m 0 p� .�. O N 0 m rl .r N QI N n O� O \ ! N N N O M \ ! ! 6 Al ! \ N N N �o \ \ •+ N m .H ap ! \ O .-� ! O \ a% O 1L Ol PI Ol Q m T T N 01 N N h \O b 4� T n h r1 .y .ti w .r •r M Q Q < M .ti w .r .r .r .r N w .ti .r M w1 rt1 HI N'1 Q M IO T m m N M M M� Y1 Ip Ip �p ti ti H 4p 10 10 h h T T !� H ID H n n � m O1 m .n ai en m Q m m n .� ac m .r .• � .o .o m h m m m .+ .� .. .� .. .� m E � a � � F to �e ` Y Y V n c c cc m W_ O O O m o a E O W d a m u ~ a 15 E Nca N e3 En ° m - a LTi u ypF w y J X J m¢ g of d a N u a a a a n ►�' o a M $� E a an d o Z a a E a a m m v7i .4 ysx� e3 # u ti x 1- X# 3 °�i E }& t In # E 6 a u mina mom. �++ s m a a a a a m fir= z �jn�j n m a �j�j �ff� .7n O o vim, O pa rc �i O u e v, A a ggaQ �sj * N N M h V� N Ul Q 4n W A w N rtf O M b T m m H w w .Ni .�1 � .fir w sl A ry N N N n M n N r N� T�� m m M rtY m T a v e v a O 44 49 49 49 .� -E gt 9 u Y U �� C m q | oN 40 �£ CM Q 44 44 ■ a 2 3 �a ■. o Ae §■ EE ■ �)■ § , � ■- =7�2 X77@ =ULLM E �w¥� �2TL k J �2 City of Round Rock IRMOUNO ROC1 Agenda Item Summary Agenda Number: Title: Consider executing Supplemental Contract No. 8 with Atkins North America, Inc. for the E. Bagdad Avenue Extension Project. Type: City Manager item Governing Body: City Manager Approval Agenda Date: 5/10/2019 Dept Director: Gary Hudder Cost: $47,084.63 Indexes: RR Transportation and Economic Development Corporation (Type B) Attachments: SC#8 w -Atkins North America - E. Bagdad Ave Extension (0042312OxA08F8) Department: Transportation Department Text of legislative File CM -2019-0123 This proposed project will include a 3 -lane extension of McNeil Rd. in a new location between Mays Street and South Black Street as well as the widening of South Georgetown Street to 3 -lanes between Black Street and East Main Street. Lampasas Street will be extended from its current termini at Bagdad Ave. to the new McNeil Road Extension. Lewis Street will be extended to connect to McNeil Road as well. An alley will be included from Georgetown Street west towards Black Street. This second phase will include all improvements east of Burnet Street. This Supplemental Agreement # 8 with Atkins Engineering includes the hydrologic and hydraulic analysis of the existing and proposed drainage structures at the Union Pacific Railroad crossings and the surveying services to support those efforts. This supplemental agreement in the amount of $47,084.63 bringing the total contract amount to $1,030,383.57. Staff recommends approval. Cost: $47,084.63 Source of Funds: RR Transportation and Economic Development Corporation - Type B City olRoundRock Page Y PrMfed on 6/ O19