CM-2019-0122 - 5/10/2019May 2, 2019
Oncor Electric Delivery
Lauren Simpson
350 Texas Ave
Round Rock, TX 78664
Office: (512) 244 5618
Cell (512) 592.8334
City of Round Rock Parks and Recreation
AT N: Katie Baker
301 Bagdad Avenue
Round Rock, Texas 78664
RE: Line Relocation at Old Settlers Park - 3300 E Palm Valley Blvd., Round Rock 78665
Ms. Baker,
The cost to provide this service will be approximately $17,500.00.
WR Number: 3448457
If this plan is agreeable, please sign in the indicated section below and complete the attached Easement Information Form so I can
begin the formal billing and easement process.
If any additional information is required, please feel free to contact me.
Customer
Install new 4" PVC primary conduit, per specs, from the switchgear to pull box.
Call for and pass all required inspections of primary conduit, concrete pad and secondary conduit.
■ Please allow a minimum of 24 hour advance notice for scheduling.
• Please contact the project manager, Lauren Simpson, prior to arranging first inspection.
Oncor
f-. Install 31p primary conductor from switchgear to pull box, inside customer installed primary conduit.
C Remove existing 39 primary conductor from switchgear to pull box.
Sincerely,
COmugiorad t1r,
(54AAtA, Si,r►"�
81051DAWCM45
Lauren Simpson
Project Manager I Utility Design Associate
Oncor I Project Management & Design Services
Please sign below indicating that the proposed design and cost, if ap licable, are agreeable.
city of Round Rock - Parks and Recreation
Name: Title: Signa r ate:
6,0(q_ 012,2.
City of Round Rock
, i XkN RACK Agenda Item Summary
Agenda Number:
Title: Consider authorizing payment of $17,500 to Oncor for a utility line relocation
at Old Settlers Park for the Adult Recreation Complex Project.
Type: City Manager Item
Governing Body: City Manager Approval
Agenda Date: 5/10/2019
Dept Director: Rick Atkins, Director
Cost: $17,500.00
Indexes: 2017 General Obligation Bonds
Attachments: WR-3448457—Old—Settlers—Park—Line—Relocation, LAF - Oncor Line
Relocation at OSP for Adult Recreation Complex (00423151xA08178)
Department: Parks and Recreation Department
Text of Legislative File CM -2019-0122
This item authorizes Oncor to relocate a primary utility line that was discovered when
excavating the parking lot for the project. This line is in conflict with the parking lot and needs to
be lowered to provide the proper cover post construction. Prime Construction, the general
contractor, will be installing conduit for the line relocation and Oncor will be pulling new wire
from the existing transformer to the existing pull box.
The Adult Recreation Complex at Old Settlers Park includes construction of two (2) lighted
recreational softball fields, a small restroom facility, spectator seating and shade, flexible field
space, and parking. This project will serve as the first phase of the Recreation Complex and will
replace the two softball fields currently located in McNeil Park which will be removed as part of
the Nutty Brown Development.
Cost: $17,500.00
Source of Funds: 2017 General Obligation Bonds
Cityof Round Rock Page 1 Printed on 5/13/2014