R-2019-0195 - 5/9/2019
RESOLUTION NO. R-2019-0195 WHEREAS, the City of Round Rock ("City") has deemed it necessary to make certain highway improvements to RM 620 from Deepwood Drive to IH -35 ("Project"); and WHEREAS, the Project will necessitate the adjustment, removal, and/or relocation of certain facilities of Charter Communications; and WHEREAS, the City and Charter Communications desire to enter into a Standard Utility Agreement to memorialize respective obligations regarding the Project, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City a Standard Utility Agreement with Charter Communications, a copy of same being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 9th day of May, 2019. CRAI� MOAVock, , Mayor City of Rou Texas ATTEST: �UI�� � • vl�� SARA L. WHITE, City Clerk 0112.1902;00422876 EXHIBIT „A„ ROUND ROCK City of Round Rock RM 620 Agreement Page 1 STANDARD UTILITY AGREEMENT County: Williamson U -Number: U15717 Federal Project No.: N/A Highway: RM 620 ROW CSJ: 0683-01-092 From: Deepwood Drive Highway Project Letting Date: April 2019 To: IH -35 This Agreement by and between the City of Round Rock, acting by and through its City Council, ("City"), and Charter Communications, ("Utility"), acting by and through its duly authorized representative, shall be effective on the date of approval and execution by and on behalf of the City. WHEREAS, the City has deemed it necessary to make certain highway improvements as designated by the State and approved by the Federal Highway Administration within the limits of the highway as indicated above; WHEREAS, the proposed highway improvements will necessitate the adjustment, removal, and/or relocation of certain facilities of Utility as indicated in the following statement of work: Relocate 4509 LF of existing Charter overhead facilities from STA (456+00) to STA (506+00) to proposed pole line to accommodate the proposed widening of RM 620 and more specifically shown in Utility's plans, specifications and estimated costs, which are attached hereto as Attachment "A". WHEREAS, the City will participate in the costs of the adjustment, removal, and/or relocation of certain facilities to the extent as may be eligible for City participation. WHEREAS, the City, upon receipt of evidence it deems sufficient, acknowledges Utility's interest in certain lands and/or facilities that entitle it to reimbursement for the adjustment, removal, and relocation of certain of its facilities located upon the lands as indicated in the statement of work above. NOW, THEREFORE, BE IT AGREED: The City will pay to Utility the costs incurred in adjustment, removal, and/or relocation of Utility's facilities up to the amount said costs may be eligible for City participation. All conduct under this agreement, including but not limited to the adjustment, removal and relocation of the facility, the development and reimbursement of costs, any environmental requirements, and retention of records will be in accordance with all applicable federal and state laws, rules and regulations, including, without limitation, the Federal Uniform Relocation Assistance and Real Property Acquisition Policies Act, 42 U.S.C, §§ 4601, et seq., the National Environmental Policy Act, 42 U.S.C. §§ 4231, et seq., the Buy America provisions of 23 U.S.C. § 313 and 23 CFR 635.410, the Utility Relocations, Adjustments, and Reimbursements provisions of 23 CFR 645, Subpart A, and with the Utility Accommodation provisions of 23 CFR 645, Subpart B. Utility shall supply, upon request by the City, proof of compliance with the aforementioned laws, rules and regulations prior to the commencement of construction. The Utility agrees to develop relocation or adjustment costs by accumulating actual direct and related indirect costs in accordance with a work order accounting procedure prescribed by the City, or may, with the City's approval, accumulate actual direct and related indirect costs in accordance with an established accounting procedure developed by Utility. Bills for work hereunder will be submitted to the City not later than 90 days after completion of the work. When requested, the City will make intermediate payments at not less than monthly intervals to Utility when properly billed and such payments will not exceed 90 percent (90%) of the eligible cost as shown in each such billing. Intermediate payments shall not be construed as final payment for any items included inPe i ermediate Initial Date Initial Date City Utility City of Round Rock RM 620 Agreement Page 2 payment. Alternatively, City agrees to pay Utility an agreed lump sum of $N/A as supported by the attached estimated costs. The State will, upon satisfactory completion of the adjustments, removals, and/or relocations and upon receipt of a final billing, make payment to Utility in the agreed amount. Upon execution of this agreement by both parties hereto, the City will, by written notice, authorize the Utility to perform such work diligently, and to conclude said adjustment, removal, or relocation by the stated completion date. The completion date shall be extended for delays caused by events outside Utility's control, including an event of Force Majeure, which shall include a strike, war or act of war (whether an actual declaration of war is made or not), insurrection, riot, act of public enemy, accident, fire, flood or other act of God, sabotage, or other events, interference by the City or any other party with Utility's ability to proceed with the relocation, or any other event in which Utility has exercised all due care in the prevention thereof so that the causes or other events are beyond the control and without the fault or negligence of Utility. The City will, upon satisfactory completion of the relocation or adjustment and upon receipt of final billing prepared in an approved form and manner, make payment in the amount of 90 percent (90%) of the eligible costs as shown in the final billing prior to audit and after such audit shall make an additional final payment totaling the reimbursement amount found eligible for City reimbursement. This agreement in its entirety consists of the following elements: 1. Standard Utility Agreement; 2. Plans, Specifications, and Estimated Costs (Attachment "A"); 3. Utility's Accounting Method (Attachment "B"); 4. Utility's Schedule of Work and Estimated Date of Completion (Attachment "C"); 5. Statement Covering Contract Work — ROW -U-48 (Attachment "D"); 6. Eligibility Ratio (Attachment "F"); 7. Betterment Calculation and Estimates (Attachment "G"); 8. Proof of Property Interest — ROW -U -1A, ROW -U-1 B, or ROW -U-1 C (Attachment "H"); and 9. Utility Joint Use Acknowledgment - ROW-U-JUA and/or Utility Installation Request - Form 1082 (Attachment "E"). All attachments are included herein as if fully set forth. In the event it is determined that a substantial change from the statement of work contained in this agreement is required, reimbursement therefore shall be limited to costs covered by a modification or amendment of this agreement or a written change or extra work order approved by the City and Utility. This agreement is subject to cancellation by the City at any time up to the date that work under this agreement has been authorized and that such cancellation will not create any liability on the part of the City. However, the City will review and reimburse the Utility for eligible costs incurred by the Utility in preparation of this Agreement. The State and/or City Auditor may conduct an audit or investigation of any entity receiving funds from the City directly under this contract or indirectly through a subcontract under this contract. Acceptance of funds directly under this contract or indirectly through a subcontract under this contract acts as acceptance of the authority of the State Auditor, under the direction of the Legislative Audit Committee, to conduct an audit or investigation in connection with those funds. An entity that is the subject of an audit or investigation must provide the state auditor with access to any information the state auditor considers relevant to the investigation or audit. The Utility by execution of this agreement does not waive any of the rights which Utility may have within the limits of the law. It is expressly understood that the Utility conducts the adjustment, removal, or relocation at its own risk, and that the City makes no warranties or representations regarding the existence or location of utilities currently within its right of way. The signatories to this agreement warrant that each has the authority to enter into this agreement on behalf of the party represented. City of Round Rock RM 620 Agreement Page 3 UTILITY Utility: Charter Communications Name of Utility By: utharized Sign un Gordon Harp Print or Type Name CITY OF ROUND ROCK By: Authorized Signature Print or Type Name Title: Title: AVP, Field Operations, Field Ops Date: Date: 01/22/2019 Form ROW -U-35 (Rev. 09/18) Page 4 Attachment "A" Plans, Specifications, and Estimated Costs All material items that must meet Buy America or Steel and Iron Preference Provision requirements must be indicated with an asterisk (*). Initial Date TxDQT Initial Date Utility Description Contract Labor Summary of Cost Estimate $ 39,032.00 Materials $ 11,471.00 Estimated Total Cost of Relocation: $ 50,503.00 LESS Betterment 0.00% % $ 0.00 SUB TOTAL $ 50,503.00 Salvage $ 0.00 SUB TOTAL $ 50,503.00 Eligibility Ratio 41.67% Adjusted Amount of Estimated Reimbursement: $ 21,044.60 Buy America Provisions Statement * Materials indicated with asterisk -*- are to be "Buy America" compliant. Otherwise, materials with no asterisk are exempt from "Buy America" provisions. LJA Engineering, Inc. GENERAL ENGINEERING & PERMITTING TELECOMMUNICATIONS RELOCATION COORDINATION & DESIGN SERVICES SUMMARY OF SERVICES 1. Project Management $160/hr x 7 hrs $ 1120.00 2. Conflict Assessment $160/hr x 8.50 hrs $ 1360.00 3. Relocation Design $160/hr x 69 hrs $ 11,040.00 4. Relocation Cost Estimate $160/hr x 8 hrs $ 1280.00 5. Agreement Assembly $160/hr x 8 hrs $ 1280.00 6. Construction Services $160/hr x 69 hrs $ 11,040.00 7. Reimbursement Submittal $160/hr x 6 hrs $ 960.00 Total $28,080.00 CONFIDENTIAL AND PROPRIETARY Texas Market 2016 Capital Project Request (CPR) Plant Construction (All Types) Revised 10.17-2016 Origination Date: 3/6/2019 Start Date: 9/1/2018 Completion Date: 4/1/2019 Location Name: CTX - Austin Function Area: Construction Mlles Cost Per Project Name: RLO B TX CTX FM 620 AND HWY 35 RR FIELD Aerial 0.00 CPR Group: Blanket Job/ DOCK JJ: Underground 000 Line of Business: Residential Line Extensfor Project Driver: Replacement - Identified Total Project Type: Forced Relocate BW/Fiber Activity: 750 MHz Passings Cost Per 2 O CPR Type: New Existing Bandwidth: < 750 MHz Aerial H Underground M wslco a LU 3Yss ins ftLLI. Subc —53_ K O Installation This will be assigned by BP Group 31 922 FRELD Multiple Total G W O ProlectJustification o' FORCED HELD, Funds are requested for this reiocatlon project Y Z g m W > a W J Contract FRELD Labor In -House Labor Materials Freight Reimbursement Total not required Make Ready - Aerial All 922 28,580 28,580 Strand&Hardware - Aerial A1Z 972 1,335 1,069 2,404 Splicing & Electronics -Aerial A13 922 866 1,284 2,149 Fiber New Construction - Aerial A14 922 Coaxial New Construction - Aerial A15 922 6,241 7,494 13,735 Z D Fiber Overlash -Aerial All 922 F- a Coaxial Overlash- Aerial A18 922 2,010 1,624 3,634 0 O LL ? Make Ready - UG Ull 922 W 2 Hardware - UG U12. 922 X Splicing & Electronics - UG U13 922 ¢ a Fiber New Construction - UG U14 922 Coaxial New Construction - UG U15 922 Fiber Overtrench - UG U17 922 Coaxial Overtrench - UG U18 922 INSTL NO INSTALL 922 Total 39,032 11,471 50,503 Requester Information Required Approvals Date QName: O Title: PROJECT MANAGER CL GPhone,. Date Signature: 3/6/2019 CLIENT: PROJECT SUPERVISOR CTX Contract Labor Estimate Charter Communications - Spectrum PROJECT MANAGER: PROJECT NUMBER ID: 0000000This will be assigned by BP Group. PROJECT NAME: RLOBTX CTX FM 620 AND HWY 35 RR RELO Cilia A11 A11 _- Ratio ENG101 ENG100 Desc# " n Make Road Inspection pole ermits ROW/CI Permits en services �9� % 1 $3,500.00 1 525,080,00 $3,500.00 $25,080.00 Al2 .-.-_ .�... 1 .... :M._ ... ..... Install Sidewalk Gus -; h i4 . .. ,-,AMftitlz $28,5a0.00 Al2 2 Install Gu Guard Each $35.00 $0.00 Al2 3 Install Guy S Guy Guard Each $6.00 $0.00 Al2 4 Replace Down GuyEach Each $15.00 $0.00 Al2 5 Replace Gu Guard f1S.00 $0.00 Al2 6 Remove Down Guy 6 Anchor Each $6.00 50.00 Al2 7 Place Insulator In Existing Down Guy Each Each $28.00 50.00 Al2 8 Install Rock Anchor -36" Each $26.00 40.00 Al2 9 Install Rock Anchor .48" Each 6 .00 $5 $65 $0.00 Al2 10 Install Rock Anchor -50" 8 $.00 $688.00 Al2 12 Install Bust Anchor Each 86.00 80.00 Al2 13 Install Screw Anchor Each $72.00 $0.00 Al2 1s Install Vertical Ground From Strand To Base Of Pole Each54$.00 Each $0.00 Al2 16 Place Bond 518.00 $0.00 Al2 18 Install Ground Rod Aerial Each $3.50 $0.00 Al2 20 Tres Trlmmin Each $$3.00 $0.00 Al2 21 Install Tree Guard Per Ft $0.26 $0.00 Al2 22 Band Concrete/Steel Pole Per n $0.15 $0.00 Al2 23 Install Strand Each $45.00 80.00 Al2 24 Chan eout Pole Hardware Per Ft 40.40 $0.00 $0.00 Al2 25 Strand S lice Each $$0.00 Al2 26 Install OrRo IaceRiserGuard Each $38.00 $0.00 Al2 27 Install Riser With Guard Per riser $35.00 $0.00 Al2 28 Relocate Riser Cable And Guard Within 3' On Now Or Existing Pole Per riser Each $35.00 $0.00 Al2 29 Remove Old Riser 1 $147.00 $147.00 Al2 30 Resag Each $25.00 $0.00 Al2 233 Pole Transfer. Straight Pers an $48.75 $0.00 Al2 234 Pole Make Read - Straight Each $37.67 $37.67 $0.00 $0.00 Al2 235 Pole Transfer- Curved 7o Include Down Gu Each Al2 236 Pala Make Read - Curved Each $47.67 $0.00 A72 237 Pole Transfer- Dead End To Include Down Gu Each $47.67 $0.00 Al2 238 Pole Make Read -Dead End Each Each $52.00 $0.00 Al2 239 Pole Transfer• Multi le 546.00 $0.00 Al2 240 Pole Make Read - Multiple Each $65.00 $0.00 Al2 241 Set Pole- Dirt Each $85.00 $0.00 Al2 242 Set Pole -Rock Each $300.00 $0.00 Ail 243 Remove Pole Each $350.0050.00 Al2 244 To Pole Each I5175.00 $0.00 Each $38.001 0.00 Al2 =T=CTX 1 Com esite Install'/." EHS Strand 1PsrFt $0.781 $0.00 260 !Trip Char a Each 4 $125.00 5500A0 180 ICoaxial Splicing Aerial. With Activation ....__ .._ .. , a .. Per Ft .... ....,, 51,335.00 A13 183 Activation After Splice Aerial Per Ft $0.43 $0.13 ;0.00 ;0.00 A13 184 Coaxial Splicing Aerial- Without Activation Park $0.35 $1.D1 A13 165 Chan a Face Plate Each $15.94 $0.00 A13 165 Swap RF Active Module Each $48.00 $0.00 A13 167 Rebalance Each 4 $32.67 $130.68 A13 186 Coax Splice Now Node Each 1 $140.00 $140.00 A13 189 Splice Trunk/Brld er Am - U lAerial , Inc. Activation EachM440 $170.00 A13 190 Splice Line Extender Each $0.00 A13 191 Slice Llne Extender, Inc Activation Each $ 50.00 A13 192 S Ilcln S IitterlCou ler/Power Inserter Each 50.00 A13 193 Splicing Single Ta Each $0.00 A13 A13 194 S IICIn Double Ta Each $425.00 195 5 licin Tri le Ta Each50.00 A13 Ise S licin Quad Ta Each $0.00 A73 197 S Iicin Exlstin Ta Each $0.00 A13 198 5 lice Brid er Am U /Aerlal • BuildingAttachment Each A13 199 Straight Splice - Coax Each $4250 $4250 $0.00 $0.00 A13 200 Retro/ re -s Ilce coax ., .. ..... _ Per Ft $OAS $0.00 .. _ A14 ..... ,_ ... .. 19 _.. ._ .. Lash Storage Loo _.. "Nalt7. $865.86Each A14 34 Lash 0Cable -Fiber Per Ft $65.00 $0.00 A14 35 Lash Each Additional Cable - Fiber Per Ft 0,85 $ $0.35 ;0.00 ;0.00 A14 CTX 2 Composite Aerial Fiber Per Ft $1.37 ;0.00 A14 155 Fiber Ring Cut Each $165.00 $0.00 A14 156 Set Cwdm Filter in 5 lice Case Each ;14200 $0.00 A14 157 Place Fiber Enclosurelincludes Storage Loop Each A14 158 Replace/Upgrade Splice Enclosure Each $135.00 $235.00 $0.00 $0.00 A14 159 1 Re -Enter Enclosure Each $135.00 $0.00 A14 160 Optimize Existing Node Each ;165.00 $0.00 A14 fi1O 16122 'ZO tiize New Node Each $166.00 $D.10 A14 163 Otdr/Fiber T.; in Per Fiber A14 164 Node Re -Entry For Coax Extension Each ;85.00 50.00 A14 166 Fiber Splice 1-12 Per Fiber $24.50 $0.00 A74 169 Fibers lice 13 48 Per Fiber $20.00 ;0.00 A14 170 Fiber S lice 49-72 Per Fiber $20.(10 $0.00 414 171 Fiber Splice 73.144 Per Fiber $20.00 $0.00 414 172 Fibers lice 145-288 Per Fiber ;17.00 $0.00 A14 173 FlberS lice 289+ Per Fiber $17.00 $0.00 _ 415 14 Wreckout-Aerial Ibdc rx. bta $ OD A15 31 Install Self Su Ft ort Cable ure 8 Per Ft Per Ft ;0.22 ;0.00 A15 32 Lash (I Cable) -Coax Per Ft 51.15 $1.57 50.00 ;0.00 A15 33 Lash Each Additional Cable - Coax Per Ft 1 $0.16 $D.DO A15 40 Delash And Remove 1 Cable Per Ft $0.60 $0.00 A15 41 Delash And Remove Editionall Per Ft $0.15 $0.00 A15 44 Aerial DropTransfer Each ;9.00 ;0.00 A15246 Hourly Rate- Lineman - IncludingVehicle And All E ui ment Per Hour 8 ;40.00 $320.00 A15 250 [Hourly Rate. Lineman -. Per Hour 8 $40.001 $320.00 A16 CTX 7 lComposite Aerial Coax Per Ft 2680 $1.871 $5,011.60 A15 CTX 5 lComposite Wreck out Aerial , -. .. _... Per Ft 2680 $0.22 $589.50 A17 J8 _ ._......_.. ..- .,_. . Overlash 1 Cable - ber .' � Per Ft - •' -'1 50.68 $6,241.20 $0.00 A17 39 ....... .__. 0verlash Each Additional Donal Cabie •fiber ._.. ... Per Ft $11.37 $0.00 A18 36 .. . Overlash 1 Cable -Coax ..... l5wimidion Per Ft AA... _7f'. .. $0.62 $0.00 $0,00 A18 37 Overlash Each Additional Cable - Coax Per Ft $0.1 $0.00 Ala 42 Delash1Relash Per Ft 2660 $0.60 $1,6a6.00 At5 __ 43 Delash/Relash Additional wires _ Per Ft 2660 $0.15 $402.00 U11 ENGiOJ _ U/G Profile And Aerial rail road permit Each 0 $13.500.00 $2,01 D.00 $0.00 Utt ENG102 ENG WORK and eastman Each $3,500.00 $0.00 U12 90 Place Conduit or Cable In Trench Opened B Others Per Ft -V&w'LXV"V 41a Tow $0.59 $0.00 $0.00 U12 91 Place Conduit or Cable In Trench Opened By Others Each Additional Per Ft $0.25 50.00 U12 76 Install Inner Duct In New Or Existing mpty Conduit Per Ft $0.85 $0.00 U12 78 Install Inner Duct In Occupied Conduit Per Ft $1.25 $0.00 U12 94 Install Lockbox An Size Each $35.00 $0.00 U12 95 Remove/Re IacerRe air Lockbox Lid (Any Size Each $26.00 $0.00 U12 96 Remove/Re lace Lock Box An Size Each $55.00 $0.00 U12 103 Installation Of 4" Emt Bumpers Each $48.00 $0.00 U12 128 Install Ground Rod- Underground Each $18.001 $0.00 U12 129 Install Ground Rod. Underground - Rock Each 520.38 $0.011 U12 143 Install Small Pedestal- Tap/Splitter Each $20.00 $0.00 U12 144 Install Med Pedestal- Line Extender Each $32.00 50.00 U12 145 install Lar a Pedestal-Am Each $47.75 $0.00 U12 148 11n5tall Extra Lame Pedestal Each $47.75 $0.00 U12 147 Replacement Small Pedestal - Ta IS litter Each $24.00 $0.00 U12 148 Replacement Med Pedestal - Line Extender Each $41.00 $0.00 U12 149 Replacement Large Pedestal - Amp Each $47.75 $0.00 U12 150 Re lacement Extra Large PedestalEaeh $47,75 $0.00 U12 151 Remove Small Pedestal - Tap/Splitter Each $15.00 $0.00 U12 152 Remove Mad Pedestal - Line Extender Each $3200 $0.00 U12 153 Romovo Lar a Pedestal • Am Each $42.00 $0.00 U12 154 Remove Extra Lar a Pedestal Each $47.75 $0.00 U12 220 Install Vault- Any Size Each $196.00 $0.00 U12 221 Replace Vault -AnSize Each $275.00 $0.00 U12 260 Trip Charcie Each $125.00 $0.00 U 1 2 _ CTX 41 lInstall Load-Bearing TX-Dot Vault Each $687.50 $0.00 U13 181 Coaxial Splicing Ug- With Activation Per Ft $0.451 $0.00 $0.00 U13 182 Activation After Splice U Per Ft $0.13 $0.00 U13 185 Coaxial Splicing Ug- Without Activation Per Ft $0,35 $0.00 U13 165 Change Face Plate Each $16.94 $0.00 U13 166 Swa RF Active Module Each $48.00 f0.0o U13 167 Rebalance -Node Each $32.67 $0.00 U13 188 Coax Splice New Each $140.00 $11.110 U13 186 S lice Trunk/Bridger er Am - U /Aerial Each $42.50 $0.00 U13 189 5 lice Trunk/Bridger Am - U (Aerial , Inc. Activation Each $42.601 $0.00 U13 190 iSplice Line Extender Each $42.60 $0.40 U13 191 S lice Line Extender, Inc Activation Each 542.50 50.00 U13 U13 U13 U13 U13 U13 U13 U13 U13 U13 192 193 194 195 196 197 198 199 200 I CTX 21 Splicing 5 litter/Cou IerlPowerInserter S licin Sin le Ta S Ilcin Double Ta Splicing Triple Tap 5 IicIn Ouad Ta S Ilcin Exlstln Ta ISElice Brid er Amp U9/Aerial - Building Attachment Stral ht S lice -Coax Retro/ re-splice coax 113ower Supply installation U/G- dirt Each Each Each Each Each Each Each Each Per Ft c Each $42.50 $42,50 $42.50 $42,50 $42.50 $42.50 $42.50 $42.50 1 $0,45 55,000.00 f0A0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.001 $0.00 $0.00 U14 .. 66 Pull Cables. New Or Existing Em t Conduit• Fiber Per Ft $0.64 $O.OD $0.00 U14 124 Install/Replace Network Markers Each $36.00 $0.00 U14 155 Fiber Rin Cut Each $165,00 $D.oD U14 156 Set Cwdm Filter In S 0ea Case Each $142.00 $0.00 U14 157 Place Fiber Enclosurelincludes Storage Loo Each $135.00 $0.00 U14 158 Replace/Upgrade S Ilce Enclosure Each $235.00 $D.DD U14 159 Re-Enter Enclosure Each $135.00 $0.00 U14 160 Optimize ExistingNode Each $165.00 $0.00 U14 161 O tlmize New Node Each 5165.00 50.00 U14 163 Otdr/Fiber TestingPer Fiber 53.50 50,00 U14 164 Node Re-EntryFor Coax Extension Each $$3.50 50.00 U14 166 IFiber Splice 1-12 Per Fiber $24.50 $0.00 U14 169 Fiber Splice 13.48 Per Fiber $20.00 $0.00 U14 170 Fiber Splice 49.72 Per Fiber $20.00 $0.00 U14 171 Fiber Splice 73-144 Per Fiber $20.00 $0.00 U14 172 Fiber Splice 146.288 Per Fiber $17.00$0.00 U14 173 Fiber Splice 289 Per Fiber $17.00 $0.00 U14 CTX 22 Composite UG Trench Fiber er toot 36"-dlrt Per Ft $8.20 $0.00 U14 CTX 23 Com osite UG Trench Fiber er foot 4a"- dirt Per Ft $8.59 $0,00 U14 CTX 24 Com osite UG Trench Fiber(per foot fill"- dirt Per Ft $2.33 $0.00 U14 CTX JO 129mposite UG Trench Fiber 1per foot 36"• ROCK Per Ft $9.00 $0.00 U14 CTX 31 Composite UG Trench Fiber(per foot 48"• ROCK Per Ft $10.001, $0.00 U14 65 Utility Exposure Pothole- Ashalt Each $165.00 $0.00 U14 8o 019 UR Cable/Conduit, Including Repairing Conduit- Dirt Each $200.00 $0.00 U14 81 pl U CablelCondulLlncludin Re airin Conduit-As halt Each $210.00 $D,00 U14 82 DI U Cable/Conduit Includin Re airin Conduit- Birt -Each Additional 6" below 48" depth Each $20.00 U14 83 Dig.Up Cable/Conduit Including Repairing Conduit- As halt •Each Additional 6" below 48" depth Each $20.00 $0.00 U74 94 Di U CablelConduit, Includin Re airin Conduit- Concrete - Up to 48" Each $365.00 $0.00 $D.00 U14 85 Dig Up Cable/Conduit, Including Repairing Conduit- Concrete - Each Additional 8" below 48" depth Each $20,00 $0.00 U14 113 Piece Rolled Conduit 2" In Trench Per Ft $D.2a $0.00 54 114 Place Rolled Conduit 4" In Trench Per Ft $0.55 $0,00 4 115 Place 4" Steel Conduit Per Ft $1.15 $0.00 U14 125 Rod And Rope. Vacant Duct Per Ft $D.31 $0.00 U14 126 Rod And Rope. Occupied Duct Per Ft $0.45 $0.00 U14 134 Directional Bore For 2" Conduit per Ft $12.00 $0.00 U14 135 Directional Bore For 3" Conduit Per Ft $14,50 $0.00 U14 136 Directional Bore For 4" Conduit Per Ft $17.00 $0.00 U14 140 Rock Adder- 2" Directional Bore Per Ft $15.00 $Q.QQ U14 141 Rock Adder • 3" Directional Bore Per Ft 517.50 56.00 U14 142 Rack Adder-4" Directional Bora Per Ft 518.00 $0.00 U14 201 Hand Trench 24" per Ft $6.26 So.Q0 U14 202 Hand Trench 36" Per Ft 6.751 $0.00 U14 203 Hand Trench 48" Per Ft $7.50 $0.00 U14 204 Machine Trench - 24" Par Ft 54.60 ;0,00 U14 205 Machine Trench- 36" Per Ft $5.00 $o.00 U14 206 Machine Trench -46" Per Ft $5,50 $0.00 U14 207 Trench -Backhoe 24" Per Ft 5.00 U14 208 Trench. Backhoe 36" Per Ft $ $5.00 $0.00 $0.00 U14 209 Trench- Backhoe 48" Per Ft $ $0,00 U14 210 Trench- Backhoe 60" Per Ft $66,0.00 0 ;0.00 U14 CTX 13 Cut streets/driveways/sidewalks (concrete). dirt Per Ft $36.25 $0.00 U14 CTX 14 Cut streets/driveways/sidewalks concrete • rock Per Ft $38.25 $0.00 U14 CTX is Concrete Cut 0-100 Feet Par Sq. Ft $1,15 $0.00 U14 CTX 16 Concrete Cut 101-300 Feet Per S , Ft $1.15 $0.00 U14 CTX 17 Concrete Cut 301-500 Feet PerSq. Ft 11.15 ;0.00 U14 CTX 18 Concrete Cut 501.700 Feet Par Sq. Ft $1.15 $0.00 U14 CTX 19 1Concrete Cut 701 lus Feet Pers Ft $1,15 $0.00 U14 CTX 38 Conventional Bore 2" Per Ft S15,00 10.00 U14 CTX 39 Conventional Bore 3" Per Ft 116.00 $0.00 U14 CTX 40 Conventional Bore 4" Per Ft $100.110 $0.00 U14 CTX 8 Cut streetsldrivewa s/sidewalks as halt - dirt Per Ft $31.50 $0.00 U14 CTX 7 1Cut streets/driveways/sidewalks asphalt). rock Per Ft $35.25 $0.00 U15 65 Utllit Ex osure Pothole• As halt Each $165.00 $0.00 $0.00 U15 67 Pull Cables- New Or Existing Empty Conduit- Coax Per Ft 10,64 50.00 U15 80 Dig Up Cable/Conduit, Including Repairing Conduit. Dirt Each $200.00 $0.00 U15 81 DI Up Cable/Conduit, Including Repairing Conduit - As halt Each $210.00 $0.00 U15 62 D.12 Up Cable/Conduit, Including Repairing Conduit. Dirt • Each Additional 6" below 48" depth Each $20.00 $0.00 U15 83 Dig Up Cable/Conduit, Including Reealring Conduit. Asphalt - Each Additional 6" below 48" depth Each $20.00 $0,00 U15 84 Dig Up Cable/Conduit, Includin Re airin Conduit -Concrete - Up to 48" Each $365.00 50.00 U15 85 Dia Up Cable/Conduit, Including Repairing Conduit- Concrete - Each Additional 6" below 48" de th Each 1 $20,00 f0.00 U15 92 Place Coax In Trench Opened By Others Per Ft $0.35 $0.00 Uts 93 Place Coax In Trench Opened By Others Each Additional Per Ft $0.25 $0.00 U15 113 Place Rolled Conduit 2" In Trench Per Ft U15 114 Place Rolled Conduit 4" In Trench Per Ft $0.28 .55 $0.00 $0.00 U1s 115 Placa 4" Steel Conduit Per Ft $1.15 $1 $0.00 U15 125 Rod And Rope. Vacant Duct Per Ft 0.38 $0.00 U1s 126 Rod And Rope. Occu led Duct Per Ft $0,45 $ $0.00 U15 134 Directional Bore For 2" Conduit Per Ft $12.00 $0.00 U15 135 Directional Bore For 3" Conduit Per Ft $14 50 ;O.DO U15 136 Directional Bore For 4" Conduit Per Ft $17.00 U15 140 Rock Adder - 2" Directional Bore Per Ft $0.00 $O,D0 U15 141 Rock Adder - 3" Directional Bore Per Fl $16.00 $17.50 $0,00 U15 142 Rock Adder- 4" Directional Bore Per Ft $100.00 $0.00 U15 201 Hand Trench 24" Per Ft $6.26 ;0.00 U15 202 Hand Trench JB" Per Ft $6.75 $0.00 U15 203 Nand Trench 48" Per Ft $7.50 $0.00 U75 204 Machine Trench • 24" Per Ft $4.50 $0,00 U15 205 Machine Trench -36" Per Fl 5.001 10.00 Uts 206 Machine Trench -48" Per Ft $5.50 0.00 U15 207 Trench- Backhoe 24" Per Ft $5.00 $0.00 $ U15 208 Trench- Backhoe 36" Per Fl $5.00 10.00 U15 -------- 209 ---- Trench- Backhoe 48" Per Ft $5 rml 50.00 U15 210 Trench- Backhoe 60" Per Ft $6.00 $0.00 U15 245 Hourly Rate- Supervisor Or Foreman - Including Vehicle And All Equipment. Par Hour $40.00 $0.05 U16 247 Hou rl Rate- Ground Person - Including Vehicle And All Equipment Per Hour $40.00 $0.00 U15 248 Hourl Rate- Underground Laborer - Includin Vehicle And All E of menL Per Hour $40.00 $0.00 U15 249 Hourly Rate-Supervisor Or Foreman Per Hour $40,00 $0.00 UIS CTX 13 Cut streets/driveways/sidewalks concrete-dirt Per ft $36.26 $0.00 U15 CTX 14 Cut streets/drlvewn s/sidewalks (concrete). rock Per Ft $38.25 $0,00 U15 CTX 15 Conerolo Cut 0.10D Feat Pers . Ft 1.15 $0.00 U15 CTX 16 Concrete Cut IDI.300 Feet Per Sq. Ft 1 $1.15 $0.00 U15 CTX 17 Concrete Cut 301-500 Feet Per Sq. Ft $1.15 $0.00 U15 CTX 18 Concrete Cut 501.700 Feel Per Sq. Ft 51.15 50.00 U15 CTX 19 Concrete Cut 701 plus Feet Per Sq. Ft $1.15 $0.00 U1s CTX 20 Composite UG Trench Coax. dirt Per Ft $8.68 $0.00 U15 CTX 25 Composite UG Maintenance/Replacement Coax. 0 to 500 Par Ft $9.00 $0.00 U15 CTX 26 Composite UG Maintenance/Replacement Coax- 501 to 999 Per Ft $8.58 $0.00 U15 CTX 27 Composite UG Maintenance/Replacement Coax. 1000 plus Per Ft $8.56 $0.00 1.115 CTX 38 Conventional Bore 2" Per Ft $15.00 $0.00 U15 CTX 39 Conventional Bore 3" Per Ft $18.00 $0,00 U15 CTX 40 Conventional Bore 4" Per Ft $21.00 $0.00 U15 CTX 6 Cut streetsldrivewa s/sidewatks as halt •dirt Per ft $31.50 $0.00 U75 CTX 7 Cut streetsldrivewa s/sidewalks as halt -rock Per ft $35.25 $0.00 U17 69 -- Pull Fiber Cables. Occupied Conduit Par Ft - -1 $0.86 $0.00 $0.00 U17 1 71 IPull Additional Fiber In Conduit Per Ft $0.38 $0.00 1118 -._.. 66 ._ .. Pull Coax Cables- Occu led Conduit kI Per Ft Qt1Y $0.85 $0.00 $0.00 1118 70 Pull Additional Coax In Conduit Por Ft $0.38 $0.00 U18 CTX 36 Pull, Splice, & Activate w/out Return Per Ft $1.79 $0.00 1118 CTX 37 Pull, Splice, & Activate w/ Return Per Ft $1.79 S0.00 IN100 Home Run Cable PREWIRE Each;;$23.00 ToUi $0.00 $0.00 Install and ID dropcables usingexistingEMT conduits includingfiresto , tone, la Each $23.00 $0.00 Install and ID drop cables using existing EMT conduits , EXCLUDING home run feeds Each $23.00 O.DD Wall Plate re-work separate from new build Each $7.00 $0.00 Rework Existing Wiring Each $17.50 $0.00 Wreck out existing wiring Including drops, hardware, and sealing holes Each $20.00 $0.00 Solid Core Bore up to 2" Each $82.00 f0.00 Solid Core Bore over 2" Each $ $0.00 Hollow Core Bore u to 2" Each $41.00 (41.00 $0.00 Hollow Core Boreover 2" Each $50.00 $0.00 insta con uit in drop ceiling FT $7.00 $0.00 Installin cableindropceiing- without conduit FT $3.00 $0.00 InstalUwra PVC on outside of building,includes installingcables FT $7.00 50.00 Buildin Entries/Condult Riser Each $70.00 $0.00 Commercial DropPlaced FT $0.05 $0.00 . - - z CohneetsT " $0.00 d T 539,031.88 i aMr WP • ww. vnm rtrn CHARTER COMMUNICATIONS 658366 RM 620 RELO AERIAL IMPROVEMENTS q-rrssn uKino. Tv Eo 1 ............. ai•u f Z eEsrovx ..• v (,q�u a]EeENtt a - ]n1 sr I CcHrAQR .tai lcom� eaLswee.owam owngs wsrx�ro� ueBn�nrc wwEowuo us e]w srrr]m raE usem N1IN R JOm MOIT(T!( )Ob 5MATTAL MEWED Bh LJEA Engineering, Inc. 3116 Nwv m w. sw :w 1erE rwu ottl3M.npv r Ile$ Be .w ]gINC nC auE ,131]1 .30-.111 roe RM r raves iz. a mc Im k1l !6,AA,Enqlnw*rinq, Inc. LA CHARTER -'COMMUNICATIONS 658366 RM 620 RELO LAN etser o. .s uut na;Cr Ya INa-faC 0.`L A., 2 Md STING h IOU A K xNS.tT h rSL t0 SL px01(O rar M2 d rq} N rryav w r[atL NSI Aa? Lm9 ��arte LdA Engineering, Inc. MI a[IMAL I�aXSEYENTS Y u �Y s• IrTTca n 1 0Y Sr [x[[l } a7[ 3 / PE.9MpS19 pY4fl1 Bx 111 :• C( rat' r•a sia c.'xrz� w �suli : c Iac 4[1 acaY raY[ •o-os[o eYrrts a � ., � nrt!N l EnlMB IM Y B!Y 0•y VE!r (lEC! P[y !a!Yla [, [!R•x1 fa [f xIYaNJ �i Py[ 'a e< xCYaHa •aP P0.[ C>J ?Ila/ LK'r iMr! N ally 11111 Ona R4 M / CBY xr.•u +• ar rx av v .. . ........ ;Charter W4 Englneering, Inc. CHARTIER COMMUNICATIONS 558365 RM 520 RELO 1 fLaIAL aPi!YVCYCN ry' Or•r. By P! rl1o1!xe.,„ of ons 2 Br u K•rcn. %• aYC( 16 1 .BVr( P•CL xC+ aKn PaE rv^"�•"" ... r•CPRfIa n11rt[B W i'i ,....... .. L—:•: f4:• n roc �uB cYBru, tY `"""---�__ • �rw o+[ir :ai— PC rOMS[B CYB![9 nl ` f ¢Ij f• C( taf: ~�~-`�— �1 r•a sia c.'xrz� w �suli : c Iac 4[1 acaY raY[ •o-os[o eYrrts a � ., � nrt!N l EnlMB IM Y B!Y 0•y VE!r (lEC! P[y !a!Yla [, [!R•x1 fa [f xIYaNJ �i Py[ 'a e< xCYaHa •aP P0.[ C>J ?Ila/ LK'r iMr! N ally 11111 Ona R4 M / CBY xr.•u +• ar rx av v .. . ........ ;Charter W4 Englneering, Inc. CHARTIER COMMUNICATIONS 558365 RM 520 RELO 1 fLaIAL aPi!YVCYCN ry' Or•r. By P! rl1o1!xe.,„ of ons 2 Br u K•rcn. %• aYC( 16 1 .BVr( P•CL (Attachment "B") Utility's Accounting Method XO Actual Cost Method of Accounting The utility accumulates cost under a work order accounting procedure prescribed by the Federal or State regulatory body; and The utility proposes to request reimbursement for actual direct and related indirect costs. ❑ Lump Sum Method of Accounting Utility proposed to request reimbursement based on an agreed lump sum amount supported by a detailed cost analysis. (Attachment "C") Utility's Schedule of Work and Estimated Date of Completion Start Date: 02/04/2019 Estimated Duration (days): 60 Completion Date: 04/05/2019 (Attachment "D") Statement Covering Contract Work ROW—U-48 U -Number: U14696 ROW CSJ Number: 0683-01-092 District: Austin County: Williamson Highway No.: RM 620 Federal Project NO,: N/A I, Gordon Charter Communications , a duly authorized and qualified representative of , hereinafter referred to as Owner, am fully cognizant of the facts and make the following statements in respect to work which will or may be done on a contract basis as it appears in the estimate to which this statement is attached. It is more economical and/or expedient for Owner to contract this adjustment, or Owner is not adequately staffed or equipped to perform the necessary work on this project with its own forces to the extent as indicate on the estimate. Procedure to be Used in Contracting Work F] A. Solicitation for bids is to be accomplished through open advertising and contract is to be awarded to the lowest qualified bidder who submits a proposal in conformity with the requirements and specifications for the work to be performed. Associated bid tabulations will be provided to the State. El B. Solicitation for bids is to be accomplished by circulating to a list of pre -qualified contractors or known qualified contractors and such contract is to be awarded to the lowest qualified bidder who submits a proposal in conformity with the requirements and specifications for the work to be performed. Associated bid tabulations will be provided to the State. Such presently known contractors are listed below: 2. 3, 4. S. C. The work is to be performed under an existing continuing contract under which certain work is regularly performed for Owner and under which the lowest available costs are developed. A copy of the existing contract will be provided to the State. If only part of the contract work is to be done under an existing contract, give detailed information by attachment hereto. ® D The utility proposes to contract outside the foregoing requirements and therefore evidence in support of its proposal is attached to the estimate in order to obtain the concurrence of the State, and the Federal Highway Administration Division Engineer where applicable, prior to taking action thereon (approval of the agreement shall be considered as approval of such proposal). E. The utility plans and specifications, with the consent of the State, will be included in the construction contract awarded by the State. In the best interest of both the State and the Owner, the Owner requests the State to include the plans and specifications for this work in the general contract for construction of Highway RM 620 in this area, so that the work can be coordinated with the other construction operations; and the construction contract is to be awarded by the State to the lowest qualified bidder who submits a proposal in conformity with the requirements and specific ions for the work to be performed. If this option is chosen, attach form ROW -U-48-1, the terms of is re into orated herein by reference. __t2t2t/20T -. Signature Date AVP, Field Operations, Field OPS Title .M Attachment "E" Utility Joint Use Acknowledgment ❑ ROW — U — JUAA 0 UIR Permit: AUS20190115143955 (Attachment "F") Eligibility Ratio Eligibility is established at 41.67916 % The key determining factors for eligibility ratio are: • line length for underground pipelines and cables, and • main line pole location for power and overhead communication facilities. Guy poles, push braces, and down guys must be excluded from the ratio as these items are considered as supporting structures. If a facility is outside of existing right of way, in conflict, and within an easement (PUE or private); then that facility is eligible. Any facilities in existing right of way, in conflict; would not be elgibile. To determine eligibility; total the line length or number of locations eligible for reimbursement and divide by the total number of required relocations. Please include a breakdown sheet showing each location and whether they are considered eligible or not (inside ROW or outside ROW). Oncor_RM620_2greement calculations -03.06.19 Existing Pole Analysis sheet # Pole # Station # Reimbursable Non -Reimbursable Comments 1 1 459+50 X In ROW 2 460+10 X In ROW 1 466+65 X In ROW 2 468+95 X In ROW 3 470+90 X In ROW 2 4 471+90 X Out of ROW 5 473+00 X In ROW 6 480+00 X Out of ROW 7 480+10 X Out of ROW 8 480+10 1 X Out of ROW 3 1 492+10 X Out of ROW 2 506+10 X In ROW TOTAL: 1 5 7 TOTAL: 12 Eligibility: 1 41.67% Form ROW -U-35 (Rev. 09/18) Page 10 Attachment "G" Betterment Calculation and Estimate ❑ Elective Betterment Ratio established: % (Calculation attached) ❑ Forced Betterment (Provide supporting documentation) X❑ Not Applicable Initial Date 4C., 4 Date TxDOT Utility Form ROW -U-35 (Rev. 09118) Page 11 Attachment "H" Proof of Property Interest X❑ Supporting documentation of compensable property interest that establishes reimbursement eligibility as referenced in Texas Transportation Code §203.092. X❑ Property interest documented through applicable affidavits and required attachments. © ROW -U -1A and ❑ ROW -U-1 B Or ❑ ROW -U-1 C ❑ The roadway improvement project is designated as an Interstate Highway project; therefore, no supporting documentation of compensable interest is required. et o)T al Date Initial TOOT Utility Form ROW -U -1A Rev. 312004 Replaces Form 0-15-U1 GSD -EPC Page 1 of 2 AFFIDAVIT (for Utility Owner) U -No. 15717 THE STATE OF TEXAS § District: Austin § County: Williamson COUNTY OF WILLIAMSON § Federal Project No.: N/A ROW CSJ No.: 0683-01-092 Highway No.: RM 620 From: Deepwood Dr To: IH -35 BEFORE ME, THE UNDERSIGNED AUTHORITY, on this day personally appeared Gordon Harp of the Charter Communications, ("Utility") who after being by me duly sworn upon his/her oath deposes and says as follows: 1, Gordon Harp am over the age of 18 years and am fully competent to testify to the matters set forth in this Affidavit. I have personal knowledge of all facts and swear that such facts are true and correct. The following easements and Public Utility Easements named for the City of Austin apply to Charter Communications by attachment agreement with Austin Energy, 1. Hammock Restaurants, R347942, Williamson County, Texas. 2. Krause Holdings LLC, R051466, Williamson County, Texas. 3. CCS Asset Management, R061886, Williamson County, Texas [legal description of land] Listing of poles with Charter Communications attachments can be found attached to this document [facts indicating affiant's familiarity with subject land, including inspection and surveys] 1. Easement filed in Williamson County Deed Records office, Document No. 9511587; Cabinet L, Slide 326 2. Easement filed in Williamson County Deed Records office, Document No. 8501068; Cabinet F, Slide 290 3. Easement filed in Williamson County Deed Records office, Volume 446, Page 26; Cabinet E, Slide 226 [facts attesting to ownership, including claims through deeds, etc.] Charter Communications is attached to Austin Energy poles by agreement; [facts showing use of property] Current operational facilities will be removed and relocated; [facts showing nature and state of repair of enclosures or fencing] 1, Easement has been in use since filing in Williamson County Deed Records on March 27, 1995; 2. Easement has been in use since filing in Williamson County Deed Records on January 11, 1985; 3. Easement has been in use since filing in Williamson County Deed Records on April 28, 1983; [facts showing continuous possession for statutory period]. / "Further affiant sayeth not." Signatu Gordon Harp / ` / AVP, Field Operations, Field Ops. Gordon. Harp@charter.cam Office: 1 512-485-6218 Corporate Acknowledgment Form ROW -U -1A Rev. 3/2004 Page 2 of 2 Before me, the undersigned authority, a notary public for the State of Texas, on this day personally appeared C::'Of-oOn 1 `a' j2 known to me to be the person whose name is subscribed to the foregoing instrument and acknowledge to me that he executed the same for the purpose and consideration therein expressed. Given under my hand and seal of office, this the jairk day of AQr 20 A Notary Public's Signature ------- - -- ERENEE LOPEZ My Notary 10 # 11910015 xpires Op mbar 17, 2020 LLIAMSON COUNTY CLERK OFFICIAL PUBLIC RECORDS DOCUMENT NUMBER - WAS ASSIGNED TO A SUB.I IY SIGN AND CAN BE FOUND IN T -P, C�'- - CORDS IN CABINET -k�IDE(S) `J RM 620 EASEMENT AGREEMENT POLE @ STA 480+00 LT POLE @ STA 480+10 LT POLE @ STA 480+10 LT OWNER: KRAUSE HOLDINGS LLC, SITE ADDRESS: 1300 ROUND ROCK AVE, ROUND ROCK, TX 78681 17 47j LJA Engineering, Inc. &,;Q am TOWN ANOCOUNTRY SOUARE sl°cia 1 a715 %C. of tile J M HAPRE!! SURVEY A-284 r.,.`'a r na .', •'i. r !dN It•n::Y. .... ........ ,. I. • ; r , ` 069 � � :.x.rr .. rarna x.en m:n:a •, r:: ,, «� •: .�;„ frtY.\[: f.+i %'pts" i:va•r:� ,';. r•u t•ue u,oz,r. •<i:•: •, • :=• "- ` c[ <.. t t,.:ae i ♦ 4 tun, nr o f.::. !I: •,:1 Iw.. Irr♦, 1• , ._._.._..,[ �. , ' �..' w a•fl' IM.�,h•. ,:: :ti i • ) • :.. .r s:l1l..... 1 ., f t 1 Sub ..yam 1 yi`-•,�`' .. ". '�. _ t,. i t i 1 w<' •;:d ?: s. ,... I. w:1 �'t;I:;r .♦t ♦1^,•..arY .... ♦ ' r < ,zjl • c.ea, AL j �t�cll `<�. K - ( a , 204 y ~i 4y� "_•+.._ - jry' FH A�se<L0..0• .:�. :con•, ,u•,•o, [... [cot m% t tl: t I . f:�r rrr:;r:^.:e r.:e . e }'I 11�j"i ::.rl.• •Y •'•.�^"•`. •.. _� ...rr...r ..h c:. ,......... '• ' - r �I 2. 7 sY_,u , ,....w., ,` • •I ..<\. .t. ". Iv _ 11 t ..: ' I•'�•.w (�r� •v,• :,rt I ...•. .... r Y:. :,H a t ria <'. ♦>< 1 w ..: .� !•,! _ ^ _-�4 _.`y�..'.���...:i:. L...�•...I:..r.+• f .,.... ° ......,. ,.,ter :[riot, I. I .s..... _•� u..... nt»It[n:rx K.^.yAr•. [uR(t[2 Pf:M•nr'.W ' ; ° ..' 0Lt•+�Rn ►' ,. ( .,: ;a :. , . ' , •'r,,�, ' .........:::.::: ri: � nirwr4U _ ..��.._ �,)`v .: ,,> ....''•'' -•< .x.,r„i Y `TTT'� 1e" 6Aff'_ARl11T*N+i*;..,♦�,t'>. a ... ,..:., •G.�:e�a,,�igt,mf ...... .�?.?:ac♦♦.:... , ;r , ;, ..,.. �Ya • ..,. ,,.:.... r"•..• >,.> Gl". �ft i. ,. .•: „ I, ,.., e..., ...... i..... "..rr,. `—t:N:i it 'N:,,. — '.�._ .I�:t•:!''U • w•..a. '[,.-< • • .aa. r• • • n,nn: t.e , r,Y r ai • %".1�4t'2.[ae.:l.. { I, . . `� , 'Y.3i r„ 1 r..: I:tr „t. rii��' �$.l�L♦, .rr I RM 620 :<;< „ ,.b�: r •r ...l , o,�.:r ^a EASEMENT AGREEMENT POLE @ STA 480+00 LT POLE @ STA 480+10 LT ; ::; ::;... [ . s .:.. POLE @ STA 480+10 LT .[ . ... :..:::. :..•.x...Y OWNER. KRAUSE HOLDINGS LLC. ,::":,„V . • s: : �,•.:.,,r. , ,>. < ... r.l _... °1 < _, SITE ADDRESS }r 1300 ROUND ROCK AVE. ROUND l =m '-•�{ :,,..[,r':M�r ” ROCK, TX 78681 ••�`." -[::• ' ' :,.-.-:, r` � A ' LJA Engineering, Inc. ASIS `�r`y Doc* 9511t;?-tAZ M" FtMMPJ3mG; 53�F�T t ssttsa7 6.08 r'�i= OL — PsMe a e. 4 603- 620 AUta Or VIU e 7r�e. aEi AE Uilfit.� � Ix. EUB — will Callan Subdivision 'A2 BrmME" nr (MEIN= L-.,2-, SLIDE 326 PROPERTY FORMERLY KNOWN AS: 5.632 acres J.M. I z 11 ZV., A 284 Wl 2568-891 OR ZNSTRw4mv DATZI- F_LLE MN- /24/95 2/6/.95 RM 620 EASEMENT AGREEMENT POLE @ STA 480+00 LT OWNER: HAMMOCK RESTAURANTS SITE ADDRESS: 1410 ROUND ROCK AVE, ROUND ROCK, TX 78681 LJA Engineering, Inc.A tsx c. &.A E I DO' ajl --o 0.1-tt a sat IM . •..... ........ Aall room, � TL -L� 3140 fowl AV tQ'JAM C 61.1tv F. at 103 k Z;;C. z Rol.— 14 00. AtYl' 090Q I At At -0 AIN MOO RM 620 EASEMENT AGREEMENT POLE 4 Sheet 2 @ STA 471+g0 LT OWNER: HAMMOCK RESTAURANTS SITE ADDRESS. 1410 ROUND ROCK AVE, ROUND ROCK, TX 78681 UA Engineering, Inc. It— Ei= 0 9.5 f 1 .5 q-,? kaf:M. r n o2o iW4lth"I.-i-.11 .... . ...... . .... . . W1.11 1-1 '=7 . .. . . ...... . rINAL PLAT WILL CALLER SUBDIVISION A.3 A— &,*up I Maul r. flue $I. I Ul Ane, SM 71, DATE;STRUM 1"5 SUAVY'voll: I'SGO'Em AWN. tVXI MPESTIA A slm4114-j WWI) CREEKSIDE PLAZA tiap,,JCJ 6696 Acr65 .=T. L Cremher, 1982 Anl7W fNYIrr ACUra Luuftwa+lr •oYrn r; :)t W�M+a r uU 64[X[e aYU[et t ;c.<,m C I cflrxt v [r,or,w Sfnut atlrx,a t,n � `iY i, [un nr.l Yu) Im pr +V M: I'•Vi7' .Ira rn• v[Inrr -,Ilur I,,:, t ,..,wcv , 4f EP6 il:j;r;�ry ul ,. riiC.� ,•11•I rr4 : � w�at .n xr � P wlx[r sma:,a, 7 F ,t. are{•GY ! , W `[ ��.a.• 47,tt Rte••` x�' [nV•.,N:ar '� YFrI [s •{Ct ^;.. F` ;p ,,, Ti, <'.v.}r pu;s 1 - 1 �"i{ a n..err i s �%r'`s,".,•r� ,• '��i^ ^.r�' � �.` :�."� 11x." ra, � l t�;� Jw r„r•[41.1 �' 1 RM 620 EASEMENT AGREEMENT POLE 1 Sheet 3 @ STA 492+10 LT OWNER: CCS ASSET MANAGEMENT SITE ADDRESS: 910 ROUND ROCK AVE, ROUND ROCK. TX 78681 LJA Enginee►ing, Inc.��� t•i41 , 1 un[r aes L'w:+sc�i q(\ u:x.0 t,w•[•e , :.,,a xu)F ..•5 t• t Inro eitL�:;a ra .._[[:f:a ;f[u +rw•. Y\ t "�f xw,uc r. ;m:.a :. fr,a r itrf •,:Ce .. •'ab,•�rr rt' rrtt. CIREEIAMIDE PLAI ZIA 6,G96 Acaj Voorts" 1,982 RM 620 EASEMENT AGREEMENT POLE @ STA 480+00 LT OWNER: CCS ASSET MANAGEMENT SITE ADDRESS: 910 ROUND ROCK AVE, ROUND ROCK, TX 78681 LJA En ineerin Inc. siisep JL el _2