Loading...
CM-2019-0138 - 5/17/2019City of Round Rock nOUND ROCK rExA,., Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 1 with Partners Remodeling, Waterproofing, and Restoration for the Frontier Park Improvement Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 5/17/2019 Dept Director: Rick Atkins, Director Cost: $32,000.00 Indexes: CDBG HUD Entitlement Grants Attachments: Signed - Change Order 1, Change Order Quote 1-c Frontier- Partners, t.AF - QA-CO#1 w- Partners Remodeling, Waterproofing, and Restoration - Frontier Park Improvement (00423560xA08F8) Department: Parks and Recreation Department Text of Legislative File CM -2019-0138 This item will authorize the City Manager to execute a change order with Partners Remodeling, Waterproofing, and Restoration for the Frontier Park Improvement Project. During the construction of the Frontier Park Improvement Project, field modifications were made to install features correctly. Field observations and opportunities were identified that would benefit the future maintenance of the park. Field modifications were made to allow for easier installation of tennis posts while providing a clean dge to the tennis courts and making the area easier to maintain. Relocation of water mainline and wires was deemed necessary to remove them from under a concrete pad. A field decision to install a turndown curb to minimize erosion and undercutting of looping trail. Existing concrete pad at bridge fails to meet ADA standards, replacement is necessary to comply with all standards. Structure of the larger pedestrian bridge is in worse condition than previously accessed, demolition and rebuild by contractor with sturdier material. The Frontier Park Improvement Project 2018 contract will include the demolition of some existing park amenities, site preparation, construction of concrete flatwork, construction of pavilion, installation of new tennis fence and screen, installation of backstop, installation of a walking loop, installation of various site amenities, and ADA improvements. City of Round Rock Page 1 Printed on 5/16/2019 Agenda Item Summary Condnued (CM -2o19-0138) Cost: $32,000.00 Source of Funds: CDBG HUD Entitlement Grants City 0f Round Rock Page 2 Pdnted on 5/16/2018 I'aec I of 3 00Contract Quantity Adjustment/Change Order nurc Department: 2-300 Project Name: Frontier Park Improvement Project - Date: 512119 City Project Change Order/Quantity ID Number Adjustment No. 1 Partners Remodeling, Restoration & Vendor Waterproofing, LLC 3219 Harpers Ferry Lane Austin, TX 78745 512-244-0600 Company Name Address Phone No. 3ustification Field modifications to allow for easier installation of tennis posts while providing a clean and aesthetic edge. Relocation of water mainline away from under a concrete pad. Field decision to install a turndown curb to minimize erosion and undercutting of sidewalk. Existing concrete at bridge fails to meet ADA standards, replacement is necessary. Structure of bridge in worse condition than previously accessed, demo and rebuild by contractor with sturdier material. MurqrgAeer Original Contract Price: Previaus Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To date: Adjusted Contract Price (Original Contract Price Plus Quantity Adjustments) Plus Change Order(s)j: Difference between Onginai and Adjusted Contract Prices: Amount % Change 00,10 $32,000.00 13% $32,000.00 13% $275,075.00 $32,000.00 Original Contract Time: _ 90 days Tune Adjustment by previous Quan. Adj./Change Order. none Time Adjustment by this Quan. Adj./Change Order: none New Contract Time: 90 days -------------- C_ ontractar: ~ v_ Signatures - Printed Name, Title, Company �k4-7vp�-0/3,f , Page 3 of 3 Contract Quantity Adjustment/Change Order I Project Name; Frontier Park Improvement Project Quan. Adj./Change Order Na.; Page 3 of 3 Contract Quantity Adjustment/ Change Order Project Name: Frontier Park Improvement Project Quan. Adj./Change Order No,: /)Partners Rcmodeltn+. Restormion and Waterproofing in Partners Remodeling, Restoration and Waterproofing Frontier Park Change Order l Partners Remodeling Restoration and Waterproofing is proposing the following change orders for Frontier Park Saw cut the existing tennis court asphalt to make a new concrete curb for fence install. All labor and material are included. New curb 6" depth $9,300.00 New curb 6" Depth Relocate approximately 135' of irrigation line (possible valve replacement) Build approximately 20' of down curb near the small bridge to prevent undermining Remove and replace approximately 46 LF of concrete sidewalk out of compliance Rebuild old bridge out of 1pe Decking and rails. All post to be treated. Materials for bridge Labor to demolish old bridge and rebuild $3,900.00 $1,000.00 $2,500.00 $7,000.00 $8,300.00 Total $32,000.00 3219 Harpers Ferry Lane Austin, Texas 78745 Phone: 512-825-3950 Fax: 512-291-5451