Loading...
CM-2019-0147 - 5/24/2019Pap! I ora Contract Quantity Adjustment/Change Order �, aur6 Department: UES Project Name: Llsa Rae Drive IE2=ents Date: 5/8/19 City Project Change Order/Quantity ID Number LSRAE Adjustment No. 3 Vendor Austin Engineering Company, Inc. P.O. Box 342349 - Austin TX 78734 512-324-1464 Company Name Address Phone No. 3ustificatlon Change Order / Quantity Adjustment No. 3 is needed for final bid items quantity adjustment for dose out of project. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Not [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)): Difference between Original and Adjusted contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Prepared By: Aoyu— Contractor %9 City Project Qd& Manager: Signa re Mayor/City C A- I-- 2d et- c ( q--7 $41,507.10 11% $0.00 0% $41,607.10 11% $430,01fi.10 $43,377.10 120 10 5 135 Submitted f tLr Apl Eddie Zapata, Senior Pro ect Mana r City of Round Rock 5/a/19 Printed Name, Title, Company Date Awrovals — a John Fenley, ProJect Mana r Austin Printed Name, Title, Company Name, F0 Inc. of Round Rode 5I2 4 Page ? of 3 Contract Quantity Adjustment/Change Order Project Name: Lisa Rae Drive Improvements Quan. Adj./Change Order No.: - Contract Quantity Adjustment/Change Order Project Name: Lisa Rae Drive Improvements Quan. Adj./Change Order No.: 3 Data Bid Item # Idem Description Unit Qty. Unit Price Amount REMOVE P.C. CONCRETE SIDEWALK & #2 DRIVEWAYS SF 457 $2.00 $914.00 HOT MIX ASPHALTIC CONCRETE #9 PAVEMENT Ton 26 $105.00 $2,730.00 #13 P.C. CONCRETE DRIVEWAY SY 17.5 $72.00 $1,260.00 #25 DUCTILE IRON FITTINGS Ton 0.01 $10,000.00 $100.00 #28 TOPSOIL 4") & SEEDBED PREP. SY 706 $1.00 $706.00 NATIVE GRASSLAND SEEDING & #29 PLANTING SY 706 $1.001 $706.00 BARRICADES, SIGNS AND TRAFFIC #36 HANDLING MO -2 1 S25n.nn _imnn nn Page 3 of Contract Time Adjustment FA ti -f �OL f� �.:- ■l1li( i N rib. F k a � r � 1, i y w ,i IL 71$o- ilk , a Ot Y a y y i `` ,=sum City of Round Rock ,f ! ROUND ROCK TEAS Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 3 with Austin Engineering Company, Inc. for the Lisa Rae Improvements Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 5/24/2019 Dept Director: Michael Thane, Director of Utilities and Environmental Services Cost: $5,916.00 Indexes: General Self -Financed Construction Attachments: LAF, Lisa Rae - Change Order No. 3, Map Department: Utilities and Environmental Services Text of Legislative File CM -2019-0147 In 1984, Lisa Rae Drive, Joyce Lane, and Ray Berglund were involuntary annexed into the City of Round Rock. In the early 2000's, bonds were passed to perform improvements on these three streets, but during construction funding ran short and only Joyce Lane and Ray Berglund were constructed. Per the annexation agreement, Lisa Rae Drive remained a private drive. In October 2012, residents along Lisa Rae Drive approached the City concerning maintenance to Lisa Rae Drive. Residents asked the City if a maintenance agreement could be entered into in order to construct a new street similar to Ray Berglund and Joyce Lane. The city determined that the construction of a new street could only be possible if all property owners donated the required Right -of -Way (ROW) needed to construct Lisa Rae Drive. After several discussions with the six residents along Lisa Rae Drive, they all agreed to donate the required 25 -feet of property for the necessary ROW. On May 11, 2018, the City executed the documents needed to acquire the donated ROW necessary to construct Lisa Rae Drive. The Lisa Rae Street Improvements project consists of approximately 700 linear feet of new 20 -foot wide asphalt pavement with ribbon curb; approximately 500 linear feet of new 8 -inch water line; and approximately 1,000 linear feet of new 8 -inch wastewater line. In June 2016, Halff and Associates performed the preliminary engineering design for the proposed street, water, and wastewater infrastructure. In May 2018, Halff and Associates were selected for final design and construction phase services needed to construct the City a1 Raund Rack Page 1 Printed on 512412018 Agenda )tem Summary Continued (CM -2019.0147) improvements to Lisa Rae Drive. On October 31, 2018, ten bids were submitted and the lowest bid in the amount of $386,639.00 was submitted by Austin Engineering Company, Inc. Change Order/Quantity Adjustment No. 1 was needed to construct a new storm sewer inlet as well as a curb and gutter section in order to collect storm water drainage along Lisa Rae Drive. Collecting this runoff will eliminate storm water from flowing onto Double Creek Drive and causing a potential driving hazard. Change Order/Quantity Adjustment No. i was for $30,965.00 which increased the contract to $417,604.00 Change Order/Quantity Adjustment No. 2 was needed to adjust bid item quantities, amend cost of storm sewer pipe from 24 -inch to 18 -inch, and for other unforeseen construction items. Change Order/Quantity Adjustment No. 2 was for $6,496.10 which increased contract to $424,100.10 Change Order/Quantity Adjustment No. 3 is needed for final bid item quantity adjustments for project close-out. Change Order/Quantity Adjustment No. 3 is for $5,916.00 which increases contract amount to $430,016.10. The City of Round Rock Utilities and Environmental Service Department recommends approval of Change Order No. 3 with Austin Engineering Company, Inc. Cost: $5,916.00 Source of Funds: General Self -Financed Construction City o(Round Rock page 2 Printed on 8(24/2019