Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
CM-2019-0164 - 5/31/2019
rp, OL It Department: Project Name: _ Kervg oton Detention Improvements Date• 522/19 Change Order/Quantity KENSG Adjustment No. 2 D85 Concrete Contractors 515 Sheffield Rd, Seguin TX 78155 930-556-8794 Company Name Address Phone No. Contract Quantity Adjusbnent/Change Order Utilities and Environmental Services City Project ID Number Vendor ]usmcation Page I of 3 Title Is a quantity adjustment to Bit item No. 414 "M C CONC (RETAINING WALL), N0RTH POND WALL' Additional concrete was used at the north wall footing due to finding different field conditions then what was expected during excavation of the footings. OWNrUMIF Original Contract Price: MMM Quantity Adjusiment(s): This Quantity Adjustment.• Total Quantity Ad)istrnent(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Pkis Quantity Adjustment(s) Plus Charge Order(s)]: Difference between Original and Adjusted Contract Prices: Amount % Chane $29,100.00 $12,600.00 $41700.00 $980,245.25" $41,700.00 3% Original Contract 71me: 210 Days Time Adjustment by previous Quan. Adj./Change Order: 0 Days Time Adjustment by this Quan. Adj /Change Order. 34 Additional Rain Days New Contract Time: 244 Days city Proliect A Mayor/City Signature / " – - U — eAl- 2-01e7- 61 to c/ r ■ =-'1ftlrftd Name, Tide, Company -- -- Date n. z► S J Td el Printed Name, Title, Company Date Federlco Sande4 ftMana4er 5 19 nted Name, Tide Date iv- eih�I-- Contract Quantity Adjustment/Change Order 01 Ls Project Name: Kensington Detention Improvements Quan. Adj.IChange Order No.: Ghana nrdar naha 1 11 1 11 I I1 1 11 I ITI 1 11 I I f 1 11 1 11 1 11 1 ITi 1 11 1L— Page 2 of 3 Page 3 o£3 Contract Quantity Adjusbnent/Change Order r.T,ol �6 Project Name: KuLdngWn Detention Improvements Quan. Adj./change Order No.: 2 Ouantlty Adiusbnent bats ��CONDLCETUWC-MErAJ.IIG'i;'AL),-i;ORfA ©� 11 III .11 I11 _- 1 1 1 1 IT1 ! IT1 i ITI 71 1 1 CI _. ` v OR 10 5,1 .35 goo - Age IV OR 10 5,1 .35 goo City of Round Rock As RT°° R°"` `Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 2 with D&S Concrete Contractors for the Kensington Detention Improvements Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 5/31/2019 Dept Director: Michael Thane, Director of Utilities and Environmental Services Cost: $12,600.00 Indexes: 2014 Drainage Revenue Bonds Attachments: QA-CO#2.pdf, LAF.pdf, MAP.pdf Department: Utilities and Environmental Services Text of Legislative File CM -2019-0164 The Kensington Detention Improvements project is located just south of Dell Way, adjacent to Dell's Building 1 at 401 Dell Way. The project consists of two inline detention ponds. Two concrete walls are being constructed to form the two ponds. An existing berm is being renovated to accommodate one of the walls and increase pond capacity. Quantity Adjustment/Change Order No. 2 includes the cost of additional concrete that was used for the North Wall Footings. Quantity Adjustment/Change Order No. 2 is for $12,600. This includes the cost of labor, additional materials and equipment for the work. The total contract amount will be adjusted to $980,245.25. Staff recommends approval. Cost. $12,600 Source of Funds: 2014 Drainage Revenue Bonds Cityof Round Rack Page i Printed on WO)2019