CM-2019-0173 - 6/7/2019lar, MIS Department: Project Name: City Project ID Number Justification Contract Quantity Adjustment/ Change Order General Services Luther Peterson Service Center Pagc I of 3 Hate: 5/15/19 Change Order/Quantity Adjustment No. 1 )oor access hardware and system changes represented in Architect's Supplemental Instructions #5 to update access system to most current ;tandard. Changes include switching door access system to City of Round Rock operated and maintained system for future service. Also, thirty lay time extension request for rain delays and associated additional util ty work. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price (Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Pr zes- Original Contract Time: Time Adjustment by previous Quan. Adj,/Change Order; Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Prepared By: �L✓�itil Signature Submitted for Approval Will, Construction Mar Name, Title, Company Approvals Amount % Change $15,493,Oo0.0o $0.00 $0.00 $15,483,000,00 0.00 $33,471.00 0.00 $33,471.00 0.00 $15,516,471.00 $33,471.00 405/435 0 30/30 435/465 CORR Y Drov Ccrgft<.n, Yro7n:: M.,na:j::r_ Lao Lew 3 C4n9tructLar, in:_ Printed Name, Title, Company Date '/ -f- Date City Project{,AM/ C.,Manager: Chad McDowell General Services Director CORR / Mayor/City 6"-2- f47--017.3 Contract Quantity Adjustment/Change Order RP�1NP11PC1t �! r,s,: x�. 74,95 Project Name: Luther Peterson Service Center Quan. Adj./Change Order No.: Chanae Order Data Page 2 of 3 Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment (Days) 1 CORR CO #1, OBA #18, ASI #5 1 $33,471.00 $33,471.00 1 Time Extension $0.00 30 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $o.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $o.ao TALS: 33471. Luther Peterson Service Center Change Order #1 Summary Date: 4/30/2019 Change Order # 1 to contract with Lee Lewis Construction Cost: $33,471.00 Overview: 1. Door access hardware and system changes represented in Architect's Supplemental Instructions #5 to update access system to most current standard. Changes include switching door access system to City of Round Rock operated and maintained system for future service. This new system has been titled POE, which stands for Power Over Ethernet. The traditional door access system was a proprietary system controlled by low voltage and maintained by an outside vendor. The new POE system will be non- proprietary which means project to project the system can be bid to security integrators for installation. Also, the POE system is open license, so the system can be operated and maintained by the City of Round Rock IT Department. 2. Thirty -day time extension request for rain delays and associated additional utility work. Per the City of Round Rock agreement with Lee Lewis, the contractor is due thirteen days for rain delays over the allowable contract amount. Also, the contractor is requesting additional days for added utility work associated with the project for a total of thirty -day time extension. Contingency Reserve (not encumbered in contract) Original Remaining to Date (not including Change Order) $346,161.74 $312,690.74 Betterment (encumbered in contract) Original Remaining to Date $355,329.00 $27,737.42 April 25, 2019 212 Commence Blvd Round Rock, Texas 78664 RE: Project CoRR Luther Peterson Service Center — Change Order No. 18 Background The new Luther Peterson Service Center Complex will consolidate Round Rock's Utilities and Environmental Services, Transportation, and General Services Departments within one facility. Phase 1 of the project includes design of 30,000 square feet of building structures and 20,000 square feet of premanufactured buildings on 8.96 acres f sh ds, open storage, and heavy truck parking situated on approximately 12 acres of land inrth'ast Round Rock. During the project various changes to the project will be required. They will include City, and Contractor generated items. These items will generally modify functional considerations, add or delete materials and systems, and clarify design intent. Purpose The purpose of this change order is to add or modify items to the project scope requirements. Detailed information on each item is included in the item descriptions. Justification This change order is necessary to formally incorporate the recommended scope of work modifications into the construction contract. More detailed information on each item is included in the item descriptions. Cost The total cost for adding or deleting labor and/or materials are summarized below. The complete cost breakdown is included on the attached pricing proposals. Summary of Change order Costs Item No. 1: RFP No. 37 Purpose: Changes to Door Hardware and Electrical Security for POE system and Data infrastructure Justification: Reflects the changes to the Door Hardware and Electrical -Security Changes for the POE System and Data Infrastructure. Description: The total cost increase is $33,471.00 Total Cost: $ 33,471.00 Time There is no change in contract time. The above and foregoing is hereby reviewed this 25th day of April, 2019 and the undersigned agree to perform the work at the price indicated_ ATTEST: Secretary Lee Lewis Construction, Inc. President The prices shown for Change Order No. 6 were established by negotiation and appear fair and reasonable. Robert C. Manley Project Architect Lee Lewis Construction, Inc. DALLAS I LUBBOCK I AUSTIN April 9,2019 Mr. Ali Mojdehi Jacobs Engineering RE: CORR Luther Peterson Service Center- FBZ94300 Owner Change Order #001.OBA #018 — ASI #S- Door Hardware and Electrical -Security Changes Ali - Please find the attached pricing and support documentation comprising the above-mentioned change order request. This request reflects the changes brought to the project by ASI #5- Door Hardware and Electrical -Security Changes for the POE System and Data Infrastructure. The quantities and areas of the noted material are outlined in the attached documents. Included herewith is a detailed breakdown of costs associated with this work, quotations, and hardware schedule for reference. These revisions result in a total cost of Thirty Three Thousand Four Hundred and Seventy,One Dollars ($33,471 .00to be added to Contract through Change Order. Please issue a formal change order adding this change to the project at your earliest convenience if approved. Best Regards, oieq rm Drew Gregston Project Manager — Lee Lewis Construction, Inc. Alt: Owner Change Order #001— Cost Summary Owner Change Order #001— Cost Detail RK Bass Quote Hidell Hardware Quote Cc: Matt Vitek — Lee Lewis Construction, Inc. 19 Lee Lewis Construction, Inc. DALLAS f LUBBOCK I AUSTIN Owner Change Order # 001 CORR Luhter Peterson Service Center Round Rock, Texas Ouote By: Drew Gre stun - Lee Lewis Construction Inc. LLCI Job # DATE REV., 4,912019 SUMMARY: Owner Change Order #001- OBA # 18 - ASI #5- Technology and Security Changes ITEM DESCRIPTION QTY UNIT LABOR U.P. TOTAL EOUIPMENTIMATERIAL U.P TOTAL SUBCONTR TOTAL TOTAL 1 GENERAL CONDIT ONS 1.00 LS 0-00 000 0.00 000 0 0 2 S TEWORK 1.00 LS 000 0,00 0.00 000 0 0 3 CONCRETE 100 LS 0.00 0,00 0.00 000 0 0 4 MASONRY 1.00 LS 000 0,00 0.00 0.00 0 0 5 METALS 1.00 LS 0 00 000 0.00 000 0 0 6 WOOD & PLASTICS 1.00 LS 0.00 000 0.001 000 0 0 7 THERMAL & MOISTURE PROT 1.00 LS 000 0 D 0.00 000 0 0 8 DOORS & WINDOWS 1.00 LS 000 0,00 1032200 10 322.00 0 10,322 9 FINISHES 1.00 LS 1 0.00 000 0.00 000 0 0 10 SPECIALTIES 100 LS 000 0.00 7179.00 7179.00 0 0 11 EQUIPMENT 100 LS 0.00 0.00 0.00 0.00 0 0 12 FURNISHINGS 100 LS 0.00 0.00 0.00 0.00 0 0 13 SPECIAL CONSTRUCTION 100 LS 0.00 0.00 0.00 0.00 0 0 14 CONVEYING SYSTEMS 1.00 LS 0-00 0.00 0.00 0-00 0 0 15 MECHANICAL 1,001 LS 0.00 0.00 0.00 0.00 0 0 16 JELECTRICAL 1,001 LS 1 000 0.00 21555.00 21,555.00 0 21.555 SUBTOTAL SUB WORK 0.00 39.056.00 EE] 0 31,877 NOTES: 1, The Contract Time will extend 0 days to incorporate above changes. SUB -TOTALS ALL WORK SUB OVERHEAD @ 10% SUB PROFIT @ 5% LEE LEWIS CONSTRUCTION, INC. OVERHEAD & PROFIT C 15% LEE LEWIS CONSTRUCTION, INC. BOND PREMIUM @ I% 0 0 0 39,056 0 0 0 31,877 included above included above 1,594 0 included in OH&P TOTAL COST, $33,471 ®Lee Lewis Construction, Inc. DALLAS i LUBBOCK I AUSTIN Owner Change Order #001.OBA #18 - ASI #5- Technology and Security Changes Description Protect Coordination and Labor Ons to Door Hardware Modifications Aluminum Storefront Modifications Electrical Modificaitons and Rough for DataiAV Security Change Subtotal Subcontractor Overhead (10%) & Profit (511,l Contractor Overhead & Profit (15%) Bond Premium (included in OH&P) Requested Time Extension: Cost Detail 0 days Page 2 Subcontractor Amount LLCI $ - Hldell Hardware $ 10,322 Bell County Glass $ - RK Bass $ 21,555 $ 31,877 incuded above Lee Lewis Construction, Inc. $ 1,594 Lee Lewis Construction, Inc. $ - TOTAL $ 33,471 Lee Lewis Construction, Inc. January 16,2019 Mr. Richard Will City of Round Rock 221 East Main Street Round Rock, Texas 78664 Re: CORR Luther Peterson Service Center Onsite Utility Changes per Utility Department and Rain Day Extension Dear Richard: During our Site Utility install, Denbow Company, Inc. and Lee Lewis Construction, Inc. were instructed to make changes to Storm, Waste and Water Lines per the Utility Inspectors directive at various locations. These changes not only brought added cost to the project but added time that collectively affected multiple scopes of work due to material lead times, installs, inspections and weather. Lee Lewis Constriction, Inc. respectfully request to wave the cost associated with the added work and in return receive additional days to be added to the project. In this request we find that fifteen (15) days would cover the time lost in relation to cost and if acceptable to the City of Round Rock would provide adequate time to perform the work lost previously and,.►ith greater result in quality. Furthermore, as part of the time management for the project we are to keep records for the number of days that are lost to inclement weather on a monthly basis. We record the days that the project received rain along with mud days resulting in a loss of overall production for the project during that time. We compare this information with the average data for lost days. We are requesting a total of fifteen (15) days be added to the contract due to lost days through December 2018. In total, we are requesting the project be extended to a total thirty(30) days, which would then show the Substantial Completion to be August 23,2019 and Overall Completion to be September 23,2019. Respectfully Submitted, Lee Lewis Construction, Inc. Drew Gregston Project Manager Pc 1 p9. ROUND ROCK TEXAS 13ENERAL SERVICES DEPARTMENT May 1, 2019 Mayor Craig Morgan Mayor Pro -Tem Writ Baese Matt Vitek Lee Lewis Construction, Inc. 8302 N. Mopac Expressway, Suite A215 Austin, TX 87859 Cooncilmembers Tammy Young Rene Flores Matthew Baker Will Peckham Hilda Montgomery RE: Luther Peterson Service Center — Time Extension Dear Matt: City Manager Laurie Hadley City Attorney Stephan L. Sheets This letter shall serve as a time extension on the above referenced project. The effective date of the notice shall be the approval date of Change Order #1 to the agreement approved by the City of Round Rock City Council on April 3, 2018. Following the Notice to Proceed letter issued on June 8, 2018, the approved contract time is four hundred and five (405) calendar days, which corresponds to a contract substantial completion date of July 29, 2019. The contract time is four hundred and thirty-five (435) calendar days, which correspond to a contract final completion date of August 27, 2019. After the approval of Change Order #1, the contract time is four hundred and thirty-five (435) days to substantial completion, which corresponds to a contract substantial completion date of August 27, 2019. The contract time for final completion is four hundred and sixty-five (465) days, which corresponds to a final completion date of September 26, 2019. Sincerely, Richard Will, Building Construction Manager cc: Project File Chad McDowell, Director General Services Erica Solis, CIP Accountant Manager CITY OF ROUND ROCK 212 Commerce Blvd, Round Rock, Texas 78664 [P] 512.671.2890 • [F] 512.218.575 ° roundrocktexas.gov City of Round Rock ROUND ROCK Agenda Item Summary Agenda Number: Title: Consider executing Quantity/Change Order No. 1 with Lee Lewis Construction, Inc. for the Luther Peterson Service Center Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 6/7/2019 Dept Director: Chad McDowell, General Services Director Cost: $33,471.00 Indexes: 2019 Certificates of Obligation; Self -Financed Water Construction Attachments: Change order Department: General Services Department Text of Legislative Fite CM -2019-0173 Changes to door access hardware and system were made to current scope per Architects recommendation. Changes include switching door access system to City of Round Rock operated and maintained system for future service. Also, thirty day time extension request for rain delays and associated additional utility work. Cost. $33,471.00 Source of Funds: Self -Financed Water Construction and 2019 Certificates of Obligation City o1Round Rock Page i Printed on &7/2019