CM-2019-0191 - 6/21/2019STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: HALFF ASSOCIATES INC. ("Engineer") ADDRESS: 9500 Amber len Boulevard Building F Suite 125 Austin TX 78729 PROJECT: Kenney Fort Boulevard Intersection Improvements This Supplemental Contract No. 1 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Halff Associates, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 26th day of April, 2018 for the Kenney Fort Boulevard Intersection Improvements Project in the amount of $182,942.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $5,578.00 to a total of $188,520.00; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 1, City Services and Exhibit A. City Services shall be amended as set forth in the attached Addendum to Exhibit A. II. Article 2. -Engineering Services and Exhibit B. Engineering Services shall be amended as set forth in the attached Addendum to Exhibit B. Exhibit C. Work Schedule shall be amended as set forth in the attached Addendum to Exhibit C. Article 4 Com enation and Exhibit D, Fee Schedule shall be amended by increasing by $5,578.00 the lump sum amount payable under the Contract for a total of $188,520.00, as shown by the attached Addendum to Exhibit D. Supplemental Contract Rev.06/16 199.1812;00425958 84275 &44,z DI q-0 IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. [signature pages follow] Supplemental Contract Rev.06/16 0199.1612.00425958 84275 HALFF IATES, INC. C By: 4rio F Date Supplemental Contract Rev.06/16 0199.1812;00425958 84275 CITY OF ROUND ROCK By: -46ntrieHndiax, 4rity Manager Date Supplamcntal Contract 0199 1812,00425958 APPROVED AS TO FORM: iv;�" It. Attorney Rcv.06? 16 84275 ADDENDUM TO EXHIBIT A City Services 1.0 SERVICES TO BE PROVIDED BY CLIENT i) Provide the Engineer with timely reviews and decisions to enable Engineer to maintain the project schedule. ii) Meet with the Engineer on an as -needed basis. iii) Provide Engineer existing City traffic signal phasing and timing information. ADDENDUM TO EXHIBIT B Engineering Services Halff Associates, Inc. (Halff) will produce water main relocation construction plans, consistent with the City of Round Rock (City) guidelines and specifications, for City to bid and construction the necessary water main relocation affiliated with roadway improvements required within current and proposed City Rights of Way for the proposed Kalahari Resort development by KR Acquisitions LLC (Developer) in Round Rock, Texas. The proposed watermain relocation improvements consist of approximately 786 -If of 16 - in DI water main, new valves and appurtenances, demo of existing sidewalk, and replacement of pedestrian facilities. The previously prepared water main relocation plans associated with the Kenney Fort turn lane improvements will be broken out separately as part of an individual construction package. It is assumed City will initiate formal construction for the referenced watermain improvements. TASK 2.0 PROJECT MANAGEMENT Project Management and Administration • Time has been included for general project coordination with the City. • Time for Invoice and Progress Report creation has been included in the fee. • Direct Expenses for travel and copies is included in the fee. TASK 2.0 CONSTRUCTION DOCUMENTS A. Design Services 1. The proposed watermain relocation improvements consist of approximately 786 -If of 16 -in DI water main, new valves and appurtenances, demo of existing sidewalk, and replacement of pedestrian facilities. The public improvements are anticipated to occur within existing public Right of Way. Halff will prepare 100% Bid Construction Documents for the required public waterline infrastructure (herein known as the "PROJECT") necessary to service the initial Phase of development. Construction plans will be prepared in accordance with City of Round Rock and TCEQ standards and consist of the following drawings: a. Cover Sheet b. General Notes c. Water Main Plan & Profile d. Traffic Control Plan e. Erosion Control Plan f. Standard Details I - 2. Halff will provide technical specifications for the water infrastructure. 3. Halff will prepare an updated 100% preliminary opinions of probable construction costs (OPCC) for the water infrastructure improvements. TASK 3.0 CONSTRUCTION PHASE SERVICES Construction Administration 1. Submittal Review a. Review, and provide written responses to contractor submittals and RFI's on construction drawings and specifications prepared under this proposal. 2. On -Site Meetings a. Halff Associates will provide periodic observation and attend meetings during the site work phase of construction for the project. Up to two (2) site visits/site meetings including the preconstruction meeting are budgeted for this task. Additional requested attendance over this number can be provided for an additional scope and fee. b. Assist the City in determining whether work conforms to the contract documents or should be rejected. SERVICES NOT COVERED The services stipulated below are specifically excluded from the scope of this contract. In the event additional services are required, an addendum to this contract will be required before work can proceed. Additional services include but are not limited to the following: Cultural Resources Survey and Permitting. 2. Construction Materials Testing Services. 3. Construction Phase survey services. 4. Property acquisition services including appraisal and condemnation services or Easement preparation. 5. Drafting, preparation or submittal of formal agreements between the Owner and City or other outside agencies. 6. Design and Utility coordination of private utilities such as electrical, gas, or communications facilities. 7. Any Environmental Analysis including investigation and permitting. -2 - Obtaining 24 -hr or peak period turning movement traffic counts. 9. Onsite construction inspection. 10. Contract dispute resolution on behalf of City with the general contractor. H. Coordinated signal timing plans along Kenney bort Blvd or other signal communication systems. 12. Coordination with TxDOT or other approving agencies. 13. Utility System modeling 14. SWPPP preparation for the project. SW PPP to be requirement of contractor. 15. Attendance at public meetings or City Council, Planning & Zoning meetings. -3 - ADDENDUM TO EXHIBIT C Work Schedule Attached Behind This Page EXHIBIT C - TENTATIVE DEVELOPMENT SCHEDULE '.f: HALFF My f rl�n. J J* AWM I s.vame.r 00WW 11121314111213141112131411121314 1 2 3 4 11121314 Task Task I Description 1 Project Management I Coordination Notice to Proceed 2 Construction Documents 100% Construction Documents 100% City Review Biddina Assistance' - Bid Dates to be determined 5 6 Construction Phase Services' -T Notes: This schedule is tentative and general design and review time may adjust ADDENDUM TO EXHIBIT D Fee Schedule Compensation for design services shall be paid by the City to Halff for all services required for work stated under the following Tasks in the following lump sum amounts: TASK I PROJECT MANAGEMENT $ 805 TASK II. CONSTRUCTION DOCUMENTS $ 2,540 TASK III. - CONSTRUCTION PHASE SERVICES $ 2,233 TOTAL PROJECT DESIGN SERVICES TASKS $ 5,578 ENGINEER shall submit monthly invoices for Lump Sum Services rendered, based upon the actual percentage of work complete at the time the invoice is prepared for each individual task listed. Eaklkk O • Faaa ar akdewn m 44" ! sarrrawM lraw nnaur Fan kp...arkta Ory of RouM nock ............. ...... .... illiiiiiiiiiii!!�■�liii!!!1' isiieiiiiiiii�■�!!liii PiW'.IINIWe"ImIY.e].u.lY 41.dlw=MC City of Round Rock J.-OUND ROpC Agenda Item Summary Agenda Number: Title: Consider executing Supplemental Contract No. 1 with Halff Associates, Inc. for the Kenney Fort Boulevard Intersection Improvements Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 6/21/2019 Dept Director: Michael Thane, Utilities and Environmental Services Director Cost: $5,578.00 Indexes: RR Transportation and Economic Development Corporation (Type B) Attachments: SC No. 1_Halff Executed, LAF, MAP Department: Utilities and Environmental Services Text of Legislative File CM -2019.0191 On April 26, 2018, City Council awarded an Engineering contract to provide a set of full roadway construction plans to address the off-site roadway improvements for the proposed Kalahari Resort Development. The proposed roadway improvements consist of three northbound Kenney Fort Boulevard right turn lanes, one southbound Kenney Fort Boulevard hooded left turn within the existing median, a traffic signal design for the proposed intersection of Kenney Fort Boulevard and Kalahari Boulevard. Also included is the water main relocation design and to investigate the pavement failures on a portion of Kenney Fort Boulevard. The engineering contract is in the amount of $182,942. The required timeline for the construction of the roadway improvements and the waterline relocation have changed. It would be more advantageous for the waterline relocation to be constructed prior to roadway improvements. Supplemental Agreement No. 1 is needed for additional engineering services associated with creating the waterline relocation as a separate project. Supplemental Agreement No. 1 includes both the additional engineering and construction phase services and is in the amount of $5,578. The Utility and Environmental Services Department recommends approval of this supplemental. Cost: $5,578.00 Source of Funds: RR Transportation and Economic Development Corporation City of Round Rohr Page f Printed on 62WO19