Contract - DeNucci Constructors, LLC - 7/25/2019 Pagc t of 3 Contract Quantity Adjustment/Change Order acuroa ac:x .. rev 01 In Department: PARD Project Name: Brushy Creek Trail-Veterans to Rabb Date: 6/27119 001 Project Change Order/Quantity ID Number Adjustment No, 1 Vendor DeNucci Constructors, LLC 8310.1 Crap Texas Hwy.N. #275,Austin,TX 78731 512-335-0600 Company Name Address Phone No. Justification Work associated with the attached Change Directive #1--Rev. See attached Summary Sheet. Items associated with a quantity adjustment(see summary sheet for details)are estimated quantities. Actual quantites, if varying from these estimates,will be reconciled with a future Quantity Adjustment. SUMMARY Amount a/o Change Original Contract Pr ce: 1,929,348.00 Previous Quantity Ad)ustment(s). This Quantity Adjustment: $9,232.00 Total Quantity Adjustment(s): $9,232.00; Total Contract Price with Quantity Adjustment(s): $1,938,5$0,00 Previous Change Order(s): $0.00 0% This Change Order: $56,662.77 3% Total Change Order(s)To Date: $56,662.77 3% Adjusted Contract Price [Original Contract Price Plus Quant.ly Adjustment(s)Plus Change Order(s)]: $1,995,242.77 Difference between Original and Adjusted Contract Prices $65,899.77 Or gina,Contract Time, 270 Time Adjustment by previous Quan..Ad1,/Change Order: 0 Time Adjustment by th?s Quan.Adj./Change Order: 39 New Contract Time 309 Submitted for Approval Prepared By- PKEAL EC-)) _7 ) � �' Signature Printed Name,Title,Com any Date Approvals Co r PV Contractor: " #�_VL.___T•_. � �-�+ �� JT?J e City Project Signature Printed Name,Title,Conpan � y Date?$ f 4? Manager: Azz.- - vkna S&FA r ' !l Siglure Printed Name, tle Date RlayorJCity Manager Sign more Printer Name,Titi Date Page 2 c(3 --- Contract Quantity Adjustment/Change Order rr+DI 16 Project Name: Brushy Creek Trail-Veterans to Rabb Quan. Adj./Change Order No. 1 Change Order Data Contract Time Item # Item Description UnitAdjustment QtY. Unit Price Amount -(Days) 1 Labor LS 1 $13,441.60 $13,441.60 39 2 Concrete form rental LS 1 $6,090.00 $6,040.00 3 Drill and set W12 beams for shoring LS 1 $2,760.00 $2,760.00 9 Shoring material rental LS 1 $8,641.01 $8,641.01 5 Engineered shoring plan LS 1 $1,750.00 $1,750.00 6 Equipment LS 1 $16,518.00 $16,518.00 7 Labor Burden,Profit, Overhead $11,959.43 $13,379.93 8 Adjustment LS 1 -$5,867.77 -$5,867.77 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 T T $56,662,771 39 Page 3 of ln� Contract Quantity Adjustment/Change Order f :It� me 01 35 Project Name: Brushy Creek Trail-Veterans to Rabb Quan.Adj./Change Order No.: 1 uantity Adjustment Data Contract Time Bid Item# Item Description UnitAdjustment Qty. Unit Price Amount 16 Box Culvert Extension LF 85 $800.00 $68,000.00 17 Parallel Wing Wall EA 1 $6,500.00 $6,500.00 19 Deduct Concrete Trail SF 850 $6.00 -$5,100.00 55 Deduct 16' Retaining Wail LF -50 $640.00 54 Deduct 14'Retaining Wall LF -36 -$30,000.00 $560.00 -$20,160.00 40 Deduct Flagstone Paving SF -170 $22.00 -$3,740.00 38 Deduct Chainiink Fence LS -97 $44.00 -$4,268.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $a.o0 $O.00 $0.00 $0.00 $0.00 $0.00 —TuffL 9 232.00 0 Brushy Creek Regional Trail -Veterans to Rabb Change Order#1 Summary Date:06/27/19 This Change Order shall constitute a final settlement of any claims that Contractor may have based upon any delays to the Project that occurred through June 14, 2019 and based upon the adjustment to the Contract Time that is the subject of this Change Order. Contractor, by executing this Change Order, hereby waives and releases any claims that the Contractor may have for additional compensation resulting from any delays to the Project that have occurred through lune 14, 2019 and as a result of any extensions of the Contract Time included in this Change Order including, but not limited to, any claims for extended general condition costs. The execution of this Change Order by the City of Round Rock, Texas or the Contractor shall not constitute a release or waiver of any claim that Contractor may have under Contractor's Change Proposal 3 REV 2,which has been and continues to be disputed by the City of Round Rock,Texas.These changes include: Labor: This item addresses additional excavation, hauling and backfill operations associated with the Change Directive. The Change Directive includes extending the box culvert to limit need for excessive excavation associated with original walls. Cost: $13,441.60 Concrete Form Rental: Cost for concrete forms needed to build the culvert extension. Cost: $6,040.00 Drill for W12 beams:To install additional shoring system necessary to support culvert extension, W12 beams needed to be drilled and set. Cost: $2,760.00 Shoring Material Rental: Cost to rent W12 beams and steel shoring plates needed to provide shoring for the culvert extension. Cost: $8,641.00 Engineered Shorting Plan: Cost for the engineering of the shoring plan. Cost: $1,750.00 Equipment: Mobilization,demobilization, and operating costs associated with equipment needed to perform the work associated with the Change Directive. Cost: $16,518.00 Box Culvert Extension: It was determined that extending the box culvert would be the best solution to decrease excessive excavation adjacent property. Additionally,the extension will allow for better slope stabilization post-construction and offer a safer trail corridor in the future. This item is an estimated quantity based on plan revision. If actual quantities vary from this estimate,quantities will be reconciled after construction with a future CO/QA. Cost: $68,000.00 Parallel Wing Wall:The wing wall associated with the base bid box culvert was formed up with footings poured. An additional wing wall will be needed at the end of the extended box culvert Cost:$6,500.00 Deduct Concrete Trail:Since the culvert was extended, the trail section that would have been constructed in this area is not needed. This item is an estimated quantity based on plan revision. If actual quantities vary from this estimate, quantities will be reconciled after construction with a future CO/QA. Cost: ($5,100.00) Deduct 16'Retaining Wall: Walls have been eliminated due to the extension of the box culvert. The purpose of the wall was to permanently stabilize the uphill slope at the trail location. Since the box culvert will replace the trail in this location and allow for backfill over the top,the walls are no longer necessary. Cost: ($32,000.00) Deduct 14'Retaining Wall: Walls have been eliminated due to the extension of the box culvert. The purpose of the wall was to permanently stabilize the uphill slope at the trail location. Since the box culvert will replace the trail in this location and allow for backfill over the top,the walls are no longer necessary This item is an estimated quantity based on plan revision. If actual quantities vary from this estimate,quantities will be reconciled after construction with a future CO/QA. Cost: ($20,160.00) Deduct Flagstone Paving:The plans called for flagstone paving at the exit of the base bid culvert to provide a transition to the walls. This is no longer necessary. This item is an estimated quantity based on plan revision. If actual quantities vary from this estimate, quantities will be reconciled after construction with a future CO/QA. Cost: ($3,740.00) Deduct Chainlink Fence: Plans called for the chainlink fence to be installed on top of the walls. Since the walls are deleted, the chainlink fence is no longer necessary.This item is an estimated quantity based on plan revision. If actual quantities vary from this estimate,quantities will be reconciled after construction with a future CO/QA. Cost: ($4,268.00) Negotiated Adjustment: Cost: ($5,867.77) Subtotal this Change Order: $52514.84 OH/P: $13,379.93 TOTAL:$65,894.77 No Text