CM-2019-0248 - 8/16/2019Pagc I of 3 Contract Quantity Adjustment/Change Order rev, 01 16 Department: PARD Project Name: Adult Recreation Project_ Date: 8/2/19 City Project Change Order/Quantity ID Number Adjustment No. 4 Vendor Prime Construction Company, Inc. 20907 Martin L. Pflu ervil_le, TX 78660 512.244.7799 _ Company Name Address Phone No. Justification See attached Change Order Summary Report and backup documentation SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)j: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: - e#itr>nittediforlApp. 1 Siinature „o« Printed Name, Title, Company ' Amount °/a Chanae $445,886.34 16% $24,518.61 1% $470,404.95 16% $3,341,224.95[ $470,404.95 240 days 10 days (sod install date Feb 11, 2019) 0 250 days Brian Ritter, President, Prime Construction Inc. 8-2-19 Signature Printed Name. Title. Comnanv n> q- &V-206-02,4 Item # 2 Contract Quantity Adjustment/Change Order Project Name: Adult Recreation Project Quan. Adj./Change Order No.: 4 Change Order Data Item De ?Id at Gat Ided area page 2 of3 Contract Time Adjustment Unit Price I Amount — FF 1,006 Page 3 of 3 Contract Quantity Adjustment/ Change Order � nauw n� Project Name: Adult Recreation Project Quan. Adj./Change Order No.: 4 uanti Adjustment Data Contract Time Bid Item # Item Description Unit Qty. Unit Price Amount Adjustment ;i! -F' - - y s -- Old Settlers Park Adult Recreation Complex Change Order#4 Summary Date: 08/02/2019 Change Order #4 to the contract with PCCI includes changes to the current phase of construction. These changes include. Extend Infield at Gates: The plans call for sod at the main entrances to the field. This sod will be subjected to constant wear and tear and will subsequently die back_ This item removes the sod from this area and extends the infield surface to this entrance gate. This will be easier to maintain and will create a more attractive appearance at the fields. Cost: $2,112.00 Convert Sodded area to Decomposed Granite: This area is located outside the playing fields and is directly adjacent to the dugouts. This area will be converted into a warm up area, with artificial turf. Converting this area to decomposed granite now will allow PARD team members to install artificial turf prior to the complex opening. Cost: $1,006.00 Raise Manhole: There was a discrepancy with the plans showing final grading in this area. The manhole was installed 6" too low and needs to be raised to make the flex space level. Cost: $4,810.76 Revised Pond Grading: While excavating the detention pond, an Oncor line was located. Rather than spend the extra money to relocate the Oncor line, it was determined to be more feasible to regrade the detention pond. Cost: $13,907.85 Trench Drain Revision: A revised grade beam detail caused the trench drain to be deep than originally shown in the plans. This caused a conflict with the wet utilities and they had to be lowered. TOTAL: $24,518.61 City of Round Dock ROUND ROCK . X -'N; Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 4 with Prime Construction Company, Inc. for the Adult Recreation Complex Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 8/16/2019 Dept Director: Rick Atkins, Director Cost: $24,518.61 Indexes: 2017 General Obligation Bonds Attachments: Contract Change Order 4, LAF - OA-CO#4 w- Prime Construction Co - Adult Recreation (00429090xA08F8) Department: Parks and Recreation Department Text of Legislative File CM -2099-0248 This Change Order to the contract with Prime Construction Company, Inc. (PCCI) includes extending the infield material at the field entry gates to decrease future maintenance problems and converting a sodded area into decomposed granite to provide a warm up area. Additionally, this change order includes raising a manhole due to conflicting grade lines in the plans, as well as modifying the detention pond grading to avoid an underground Oncor line. Finally, this change order includes modifications to the trench drain inside the building and relocating utilities to accommodate that modification. The Adult Recreation Complex at Old Settlers Park includes construction of two (2) lighted recreational softball fields, a small restroom facility, spectator seating and shade, flexible field space, and parking. This project will serve as the first phase of the Recreation Complex and will replace the two softball fields currently located in McNeil Park which will be removed as part of the Nutty Brown Development. Cost: $24,518.61 Source of Funds: 2017 General Obligation Bonds City of Round Rack Page 1 Printed on AH012019