Loading...
Contract - Rodriguez Transportation Group, Inc. - 8/22/2019 STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO. 2 TO CONTRACT FOR ENGINEERING SERVICES FIRM: RODRIGUEZ TRANSPORTATION GROUP, INC. ("Engineer") ADDRESS: 11211 Taylor Draper Lane, Suite 100,Austin, TX 78759 PROJECT: Gattis School Road (Segment 3) This Supplemental Contract No. 2 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Rodriguez Transportation Group, Inc., hereinafter called the"Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 22nd day of March, 2018 for the Gattis School Road (Segment 3) Project in the amount of$1,013,037.45; and WHEREAS,the City and Engineer executed Supplemental Contract No. 1 on February 14, 2019 to amend the scope of services and to increase the compensation by $117,447.94 to a total of $1,130,485.39; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by$89,780.42 to a total of$1,220,265.81; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum to Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum to Exhibit C. II. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $895780.42 the lump sum amount payable under the Contract for a total of $1,220,265.81, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. Supplemental Contract Rev.06/16 0199.1770;00427993 84275 1z-2o«-v3 1 RODRIGUEZ TRANSPORTATION GROUP, INC. By: / <, %" J,--" RK E.07-30 - 12,0119 Date Supplemental Contract Rev.06/16 0199.1770;00427993 84275 2 CITY OF ROUND ROCK APPR ED AS T FORM: By: Craig AForan, or Stephan . Sheets, City Attorney C;. Date Supplemental Contract Rev.06/16 0199.1770;00427993 84275 3 ADDENDUM TO EXHIBIT B Engineering Services The additional Scope of Work to be performed by the Engineer under this Supplemental Contract is described as follows: • Extend ROW data research and parcel preparation approximately 500 feet south along Windy Park. • Extend SUE services (QL-B) approximately 400 feet south along Windy Park. • Extend field surveys approximately 500 feet south along Windy Park. • Additional Roadway Design Services to update plan sheets at the western project limits and to include added Plan and Profile sheets for Windy Park and Cottonwood Ct. • Additional Roadway Design Services for five (5) driveways along Windy Park • Additional Drainage Design Services to update plan sheets at the western project limits and to capture revised Windy Park alignment • Additional Drainage Design Services to include a cast-in-place retaining wall at the drainage channel at the corner of Gattis School Road and Double Creek. • Additional Miscellaneous Design Services to include the development of additional traffic control phases for the construction of the revised Windy Park intersection and phasing of Windy Park construction. • Additional Miscellaneous Design Services to include revisions to the Clay Madsen Recreation Center driveway access and associated parking lot striping modifications. FC 130—Right-of-Way Data/Utilities A. Right of Way Maps 1. The Engineer shall obtain information on existing ROW and property information, as defined in the Contract, for the revisions to Windy Park 2. Generate ROW plans and reconcile to parcels for the additional ROW acquisition for the revisions to Windy Park. B. Utility Locations 1. The Engineer shall gather QL-B data, as defined in the Contract, for the revisions to Windy Park. C. Boundary Surveying and Parcel Preparation 1. The Engineer shall perform the tasks, as defined in the Contract, for the revisions to Windy Park. The total number of ROW parcels for acquisition will be increased by 1 for a total of 38 parcels. Two (2) existing parcels documents, identified as Parcels 1 and 2 in the preliminary ROW maps will have to be updated. FC 150—Field Surveying and Photogrammetry A. Field Surveying 1. The Engineer shall gather design survey data, as defined in the Contract, for the revisions to Windy Park. B. Digital Planimetric Mapping (DGN) and Digital Terrain Modeling (DTM) 1. The Engineer shall prepare DGN and DTM files, as defined in the Contract, for the revisions to Windy Park. 1 FC 160—Roadway Design A. Roadway Plans 1. Various Plan Sheets: The Engineer shall update 60%plan sheets impacted by the Gattis School Road alignment revision at the western project limits. 2. Plan and Profile: The Engineer shall develop additional plan sheets and associated cross sections for Windy Park and Cottonwood Ct. 3. Driveways: The Engineer shall develop additional plan sheets for five (5) additional driveways along Windy Park. FC 161 —Drainage A. Drainage Plans 1. Various Plan Sheets: The Engineer shall update 60%plan sheet impacted by the Gattis School Road alignment revision at the west project limits. 2. Gattis School Road: The Engineer shall develop additional sheets for revised storm sewer line along Gattis School Road in front of the Clay Madsen Rec Center. 3. Windy Park/Cottonwood Ct: The Engineer shall develop drainage sheets to tie new inlet and storm sewer lines to existing storm sewer system along Cottonwood Ct. Engineer shall analyze the existing system to ensure adequate design. No improvements to the existing system are proposed. 4. Clay Madsen Recreation Center: Engineer shall develop grading plan sheet for site plan revisions. Engineer shall analyze existing water quality basin and outfall culvert to determine if additional improvements are required. 5. Double Creek Rd. retaining wall design—Engineer shall design and detail a cast-in- place cantilevered retaining wall at the corner of Gattis School and Double Creek to contain the design storm in the drainage channel. Approximate size of retaining wall —45' long x 9' high. The Engineer shall develop: retaining wall layout showing plan and elevation; 4 develop details, cross sections, and notes; quantities and estimate. FC 163—Miscellaneous A. Traffic Control Plan 1. Traffic Control Plan: The Engineer shall develop additional details required for the construction for Windy Park, Cottonwood Ct., and the revised intersection of Windy Park at Gattis School Road. 2. Clay Madsen Recreation Center: The Engineer shall develop additional details required for the access modifications to the recreation center and associated parking lot striping revisions. 2 ID Task Task Name Duration Aug 25,'19 Sep 29,'19 Nov 3,19 Dec 8,'19 Jan 12,'20 Feb 16,'20 Mar 22,'20 Mode 7 25 9 24 9 24 8 23 8 23 7 22 6 21 7 22 6 1 8% Initial Submittal(Geometric Schematic) 100 days 2 All Notice to Proceed 1 day 3 o+ Data Collection&Field Reconnaissance 15 days 4 !. Right of Entry Coordination 15 days 5 :+ Design Concept Conference(w/DSF) 3 days 6 W1+ Initiate Project Control 5 days 7 o+ H&H Studies 27 days 8 W+ Environment Data Collection 15 days 9 •+ Geotechnical Investigation 45 days 10 , Survey(Design Surveys) 25 days 11 W-`+ Preliminary Roadway Geometry/Design Cross Sections 15 days 12 W+1 Preliminary Storm Drain Design 20 days 13 •'+ Preliminary Utility Conflict Determination 5 days 14 !+ Develop Sequence of Construction Layout 10 days 15 ®'+ Preliminary Geometric Schematic 10 days 16 or+ Initital Submittal(QAQC) 5 days 17 r. Initial Submittal 0 days 18 W+ City of Round Rock Review Period 10 days 19 W-1 +1 30%Submittal(Geometric Schematic/ROW Limits) 71 days zo >f 41 Property Owners Meeting#1 5 days 21 W41 Review/Address Review Comments 10 days 22 •'+ Environmental Document/Technical Reports 20 days 23 Update Geometric Schematic/Design XS 10 days 24 IZZ, Update Sequence of Construction Layout 5 days 25 ', Update Storm Drain Design 10 days 26 Update Drainage Report 5 days 27 QTS Update Geotech Report 5 days 282, Update Utility Conflicts 5 days 29 -"N Pre-Final Geometric Schematic 5 days 30 K:�4 Public Meeting#1 5 days 31 �' 30%Submittal(QAQC) 5 days 32 F'Z, 30%Submittal 0 days 33 =_Z City of Round Rock Review Period 10 days 34 1171160%Submittal(PS&E) 65 days 35 Property Owners Meeting#2(If Applicable) 5 days 36 � Review/Address Review Comments 5 days 37 Final Reports(Env.,Drng,Geo.) 5 days 38 1+ Utility Coordination Meetings 30 days 39 !� Final Geometric Schematic 5 days 40 Begin 60%Detailed Design(Plan Sheets) 45 days 41 /4. Public Meeting#2(If Applicable) 5 days 42 M+ 60%Submittal(QAQC) 5 days 43 W+ 60%Submittal 0 days 44 N% City of Round Rock Review Period 10 days 45 N+ 90%Submittal(PS&E) 221 days 90%Submittal(PS&E) 46 Wl+ A.W.Grimes Supplemental Survey and SUE(SWA#1) 30 days 47 Mr, Supplement Work Authorization No.2(SWA#2) 0 days ament Work Authorization No.2(SWA#2) 48 r!. Windy Park Supplemental Survey and SUE(SWA#2) 30 days Windy Park Supplemental Survey and SUE(SWA#2) 49 or Review/Address Review Comments 5 days 50 R'+ Continue 90%Detailed Design(Plan Sheets) 50 days ,Continue 90%Detailed Design(Plan Sheets) 51 f W. Utility Coordination Meetings 75 days ISI Utility Coordination Meetings 52 aril Supporting Documents(Estimate,GN,Construction 15 days WAMNW4Supporting Documents(Estimate,GN,Construction Schedule) Schedule) 53 !+ 90%Submittal(QAQC) 10 days p 90%Submittal(QAQC) 54 ■r+ 90%Submittal 0 days 10/22 90%Submittal 55 •+ City of Round Rock Review Period 10 days City of Round Rock Review Period 56 W"+ Final Submittal(PS&E) 46 days 1 Final Submittal(PS&E) 57 � Review/Address Review Comments 5 days D Review/Address Review Comments 58 >�+ Finalize Detailed Design(Plan Sheets) 30 days F Finalize Detailed Design(Plan Sheets) S9 +p+ Finalize Supporting Documents(Estimate,GN, 5 days IFinalize Supporting Documents(Estimate,G Construction Schedule) 60 W). Final Submittal(QAQC) 5 days Final Submittal(QAQC) 61 MP+ Final Submittal 0 days 1/8p# Final Submittal Rodriguez Transportion Group,Inc. Task Summary Gattis School Road(Segment 3) Date:Sun 7/14/19 RODRIGUEZ TRANSPORTATIO Estimate of Engineering Serviciment 3) 'Y LEDBETTER TASK SSOCIATES TOTAL INC. COST FC 110 Route and Design Studies;Geo $0.00 $1,892.36 FC 120 Environmental Documentation $0.00 $0.00 FC 130 ROW Data/Utilities $0.00 $15,766.76 FC 140 Project Management and Admir $0.00 $3,392.88 FC 150 Field Surveying and Photograrr $0.00 $11,307.83 FC 160 Roadway Design $0.00 $17,914.88 FC 161 Drainage $0.00 $27,301.71 FC 162 Signing,Pavement Markings,S $0.00 $0.00 FC 163 Miscellaneous $0.00 $12,204.00 - $ 89,780.42 Subtotal-Other I - $0.00 - $ 89,780.42 CERTIFICATE OF INTERESTED PARTIES FORM 1295 10f1 Complete Nos.1-4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. 2019-527440 Rodriguez Transportation Group, Inc. Austin,TX United States Date Filed: 2 Name of governmental entity or state agency that is a party to the contract for which the form is 08/09/2019 being filed. City of Round Rock,Texas Date Acknowledged: 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a description of the services,goods,or other property to be provided under the contract. 0199.1770; 00395816 Gattis School Road(Segment 3) Professional Services in the Form of Roadway Design Services 4 Nature of interest Name of Interested Party City,State,Country(place of business) (check applicable) Controlling I Intermediary Rodriguez, Mark Austin,TX United States X 5 Check only if there is NO Interested Party. ❑ 6 UNSWORN DECLARATION My name is Steve F Davidson and my date of birth is My address is 1404 Bay Hill Dr Austin TX 78746 USA (street) (city) (state) (zip code) (country) declare under penalty of perjury that the foregoing is true and correct. Executed in Travis County, State of Texas on the 9th day of August 20 19 (month) (year) f• � Signature of authorized agent of contracting business entity (Declarant) Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.1.39f8039c CERTIFICATE OF INTERESTED PARTIES FORM 1295 1 of 1 Complete Nos.1-4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos. 1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. 2019-527440 Rodriguez Transportation Group, Inc. Austin,TX United States Date Filed: 2 Name of governmental entity or state agency that is a party to the contract for which the form is 08/09/2019 being filed. City of Round Rock,Texas Date Acknowledged: 08/19/2019 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a description of the services,goods,or other property to be provided under the contract. 0199.1770; 00395816 Gattis School Road (Segment 3) Professional Services in the Form of Roadway Design Services 4 Nature of interest Name of Interested Party City,State,Country(place of business) (check applicable) Controlling Intermediary Rodriguez, Mark Austin,TX United States X 5 Check only if there is NO Interested Party. ❑ 6 UNSWORN DECLARATION My name is and my date of birth is My address is (street) (city) (state) (zip code) (country) I declare under penalty of perjury that the foregoing is true and correct. Executed in County, State of on the day of 20 (month) (year) Signature of authorized agent of contracting business entity (Declarant) Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.1.39f8039c