CM-2019-0288 - 9/27/2019STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO.3 TO CONTRACT FOR ENGINEERING SERVICES FIRM: FREESE AND NICHOLS, INC. ("Engineer") ADDRESS: 10431 Morado Circle, BuiIdiR 5, Suite 300, Austin, TX 787_59 PROJECT: Dry Branch Tributaries This Supplemental Contract No. 3 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Freese and Nichols, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 8th day of August, 2014 for the Dry Branch Tributaries Project in the amount of $48,572.00; and WHEREAS, the City and Engineer executed Supplemental Contract No. 1 on August 27, 2015 to amend the scope of services and to increase the compensation by $228,637.00 to a total of $277,209.00; and WHEREAS, the City and Engineer executed Supplemental Contract No. 2 on May 18, 2018, to amend the scope of services and to increase the compensation by $9,000.00 to a total of $286,209.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $23,986.00 to a total of $310,195.00; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2. Engineering Services and Exhibit B. Engineering Services shall be amended as set forth in the attached Addendum to Exhibit B. II. Article 4. Compensation and Exhibit D, Fee Schedule shall be amended by increasing by 523,986.00 the maximum amount payable under the Contract for a total of $310,195.00, as shown by the attached Addendum to Exhibit D. Supplemental Contract Rev.06.16 0149 1443;00431881 94275 IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. [signature pages follow] Supplemental Contract Rev.06. 16 0199 1443,00431881 84275 FREESE AND NICHOLS, INC. By: G[/ Date Supplemental Contract Rev.06 16 0199.1443,004318$1 84275 CITY OF ROUND ROC APP 'ED AS TO ORM: By: 0,-, r Laurie Hadley, dify ManageiV Stepha L. Sheets, City Attorney ()12,- Date Supplemental Contract Rev.06 16 0199 1443,00431881 84275 ADDENDUM TO EXHIBIT B Engineering Services Exhibit B "Engineering Services" in the Contract for Engineering Services between the City of Round Rock and Freese and Nichols, Inc. dated August 8, 2014 and the Addendum to Exhibit B "Engineering Services" in Supplemental Contract No. 1 to Contract for Engineering Services dated August 27, 2015 is amended by Supplemental Contract No. 3 as follows: 2.1.9 Task 9: Bid and Construction Phase Services Add the following: b. Construction Phase Services: • Evaluating gravity wall calculations provided by Engineered Earth Solutions, LLC (EES), • Attending meetings to coordinate geotechnical analysis, • Site visits (2) to observe the geotechnical drilling, and • Additional general construction representation, field visits, additional walk-throughs, environmental memo, and providing remedies to the storm event damage. ADDENDUM TO EXHIBIT D Fee Schedule Attached Behind This Page City of Round Rock Contract for Engineering Services Addendum 2 to EXHIBIT D Fee Schedule Dry Branch Tributaries Exhibit D "Fee Schedule" in the Contract for Engineering Services between the City of Round Rock and Freese and Nichols, Inc. dated August 8, 2014 2014 and the Addendum to Exhibit D "Fee Schedule" in Supplemental Contract No. 1 to Contract for Engineering Services dated August 27, 2015 is amended by Supplemental Contract No 3 as follows: DRY BRANCH TRIBUTARIES AMENDED FEE SCHEDULE Task Total Labor Hours Total Loaded Labor Cost Other Direct Costs Sub - consultants TOTALS Original Contract 1. Project Management 29 $4,843.00 $20.00 $0.00 $4,863.00 2. Data Review and Field Recon. 54 $7,303.00 $40.00 $0.00 $7,343.00 3. Update H&H Analysis 82 $9,890.00 $20.00 $0.00 $9,910.00 4. Recommendations 145 $18,256.00 $20.00 $0.00 $18,276.00 5. Prepare Letter Report 63 $8,160.00 $20.00 $0.00 L$8,180.00 Original Contract Totals 373 $48,452.00 $120.00 $0.00 1 $48,572.00 Supplemental Contract No.1 1. Project Management 60 $10,540.00 $0.00 $0.00 $10,540.00 6. Survey, Geotech, Site Visits 20 $3,052.00 $0.00 $38,020.00 $41,072.00 7. Final Design 958 $124,118.00 $0.00 $0.00 $124,118.00 8. Environmental Permitting 296 $38,638.00 $0.00 $0.00 $38,638.00 9. Bid and Construction Phase 107 $13,769.00 $500.00 $0.00 $14,269.00 Supplemental Contract No. i Totals 1441 $190,117.00 $500.00 $38,020.00 $228,637.00 Supplemental Contract No. 2 6. Survey, Geotech, Site Visits 12 $1,764.50 $0.00 ($4,829.50) ($3,065.00) 7. Final Design 339 $43,889.00 $0.00 $0.00 $43,889.00 B. Environmental Permitting (244) ($31,824.00) $0.00 $0.00 ($31,824.00) Supplemental Contract No. 2 Totals 107 $13,829.50 $0.00 ($4,829.50) $9,000.00 Supplemental Contract No. 3 9. Bid and Construction Phase Services 138 $23,986.00 $0.00 $0.00 $23,986.00 Supplemental Contract No. 3 Totals 138 $23,986.00 $0.00 $0.00 $23,986.00 TOTAL CONTRACT AMOUNT 1. Project Management 89 $15,383.00 $20.00 $0.00 $15,403.00 2. Data Review and Field Recon. 54 $7,303.00 $40.00 $0.00 $7,343.00 3. Update H&H Analysis 82 $9,890.00 $20.00 $0.00 $9,910.00 4. Recommendations 145 $18,256.00 $20.00 $0.00 $18,276.00 5. Prepare Letter Report 63 $8,160.00 $20.00 $0.00 $8,180.00 6. Survey, Geotech, Site Visits 20 $4,816.50 $0.00 $33,190.50 $38,007.00 7. Final Design 1297 $168,007.00 $0.00 $0.00 $168,007.00 8. Environmental Permitting 52 $6,814.00 $0.00 $0.00 $6,814.00 9. Bid and Construction Phase 245 $37,755.00 $500.00 $0.00 $38,255.00 CONTRACT TOTALS 2047 $276.384.50 $620.00 r$33,190.50 $310,195.00 ae cyF, tin�nti�'d� o q 0 � 1 r MANO Sr 7• ASS S7 iS SJVW S U CUSHING OR x Q OGECRES er = S c 19 o 0 a g N OS v z A 0 � S 300 HA p O S O 3 m z m -+ 1 y ON C .n O,o 1:ip0 O m roF ? SASS R K CV _ 't. ro a m to o r d S00N13 Y J,YM �y 0 {3 CR DR 0 m O in S O �v PAm DRYSRANCH = l 0A P g AVL an P P H1 SSOWNS� r 0 5 ci Q a rA m dOO d c a A0 S SUN 0 Ac 0 City of Round Rock ? ROUND ROCK P Agenda Item Summary Agenda Number: Title: Consider executing Supplemental Contract No. 3 with Freese and Nichols, lnc. for the Dry Branch Tributaries Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 912712019 Dept Director: Michael Thane, Utilities and Environmental Services Director Cost: $23,986.00 Indexes: 2014 Drainage Revenue Bonds Attachments: SC No. 3.pdf, MAP.pdf Department: Utilities and Environmental Services Text of Legislative File CM -2019-0288 The Dry Branch Tributaries Channel Improvements project is located north of Gattis School Road near the Joyce Lane and Ray Berglund Boulevard residential neighborhoods. The Dry Branch Tributaries Channel Improvements project will provide improvements for a portion of Dry Branch and an unnamed tributary to Dry Branch. The project will provide conveyance improvements for flood control and will correct erosion and protect City wastewater infrastructure. Supplemental Contract No. 3 includes additional cost for professional engineering services encountered during the construction of the project. Additional construction phase services were required from the engineer due to changes in the original design and the addition of extra geo-technical explorations for the proposed retaining wall during construction. The additional services added during the construction of the project included support to the City by evaluating the geotechnical results that were conducted for the gravity block wall due to changes in field conditions encountered for the subgrade material during excavation of the foundation. Other services included additional general construction representation, site visits, and inspection meetings during the construction of the project. These additional services were beyond the previously established scope. The current contract amount is $286,209; with this Supplement Contract No. 3, the new total will be $310,195. The construction of this project has been completed. Cost: $23,986 Clty otRound Rock Page 1 Printed an 912&2019 Agenda Item Summary Continued CM•2019.0288 Source of Funds: 2014 Drainage Revenue Bonds Cityof Round Rock Page 2 Pdnted on 9/26/2019