CM-2019-0297 - 10/4/2019t
rev, a1/15
Department:
Project
Name: _- University Blvd at Bartz Driveway - New Traffic Signal Date: 8/19/19
City Project Change Order/Quantity
ID Number Adjustment No. QTY CO 1
Vendor AUSTIN TRAFFIC SIGNAL CONST. CO., IN( PO BOX 130 ROUND ROCK, TX 78680 512-255-9951
Company Name Address Phone No.
Contract Quantity Adjustment/ Change Order
TRANSPORTATION ADMINISTRATION
Page I of 3
lustifiication
Wer Run and Under Runs on Line Items throughout the contract
SUMMARY
Original Contract Price:
Previous Quantity Adjustment(s):
This Quantity Adjustment:
Total Quantity Adjustment(s):
Total Contract Price with Quantity Adjustment(s):
Previous Change Order(s):
This Change Order:
Total Change Order(s) To Date:
Adjusted Contract Price [Original Contract Price Plus
Quantity Adjustment(s) Plus Change Order(s)]:
Difference between Original and Adjusted Contract Prices:
Original Contract Time:
Time Adjustment by previous Quan. Adj./Change Order:
Time Adjustment by this Quan. Adj./Change Osier:
New Contract Time:
Prepared By: ' za y1
Signature '7e
Amount % Change
$189,910.35
$2,056.75
$2,056.75 .
$191,967.101.
0%
$0.00 0%
$0.00 0%
$191,967.10
$2,056.75
0
Submitted for Approval
Collette Phillips, Asst Controller Austin Traffic Signal Const Co.,
Inc. 8/19/19
Printed Name, Title, Company Date
Approvals
ContractorO� 1 Ed Schroeder, Vice -Pres Austin Traffic Signal Const. Co., Inc. 8/19/19
Signature Printed Name, Tide, Company Date
City Project
Manager: � �C{h., q-23 -1y
n tune Printed Name, Title Date
Mayor/CityManager �" L 1C i 1:64 J.1) /
6&4,2-014,02—q-7
Page 2 of 3
_ Contract Quantity Adjustment/Change Order
+tv.03 "1 S
Project Name: University Blvd at Bartz Driveway - New Traffic Signal
Quan. Adj.Xhange Order No.: 2TY CO 1
Chance Order Data
Item # Item Description Unit
p Qty. Unit Price Amount
Contract
Time
Adjustment
Da
0.00
0.00
$0.00
$0.00
0.00
$0.00
$0.00
$0.00
0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
0.00
$0.00
$0.00
.05
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Page 3 of 3
Contract Quantity Adjustment/Change Order
ROYNLI QOGt re xw5
+c*e: Oii
Project Name: University Blvd at Bartz Driveway - New Traffic Signal
Quan. Adj./Change Order No.: 2 Y CO 1
Quantfir Adjustment Data
Bid Item #
Item Description
Unit
Qty.
Unit Price
Contract
Time
Amount Adjustment
4-0000
BLOCK SODDING
SY
-100
22.00
-$2,200.00
9-0000
CONCRETE SIDEWALK (5 IN)
SY
4.97
$150.00
745.50
11-0000
COND (PVC SCF! 80) 2 IN
LF
-23
$12.00
-$276.00
12-0000
COND (PVC SCH 80) 3 IN
LF
-40
$14.00
-$56b.00
13-0000
COND (PVC 501 80) 4 IN
LF
-34
$18.00,
-$612.00
14-0000
ELECTRIC COND (NO 8) BARE
LF
1506
$1.00
$1,506.00
15-6 00
ELECTRIC COND (NO 8) INSULATED
LF
-46
$i. 0
-$46.00
16-0000
ELECTRIC COND (NO 6) BARE
LF
-2
$5.00
- 10.00
17-0000
ELECTRIC GOND (NO 6) INSULATED
LF
24
$6.00
$144.00
19-0000
GROUND BOX D) W/APRON
EA
-1
$1,5 0.00
-$1,500.00
22-0000
REF PVMKS (TY I -W) 8 IN SLD 100M
LF
46
$4.00
$184.00
23-0000
REF PVMKS I -W) 12 IN SLD 100M
LF
6
$8.00
$48.00
2+0000
REF PVMKS (TY I -W) 24 IN SLD 100M
LF
1
$13.00
$13.00
25-0000
REF PVMKS I -W) ARROW 100M
EA
1
$161.00
$161.00
26-0000
REF PVMKS I -W WORD 100M
EA
-1
$178.00
-$178.00
27-0000
REF PVMKS (TY II -W) 4 IN BRK 100M
LF
90
0.30
$27.00
2"000
REF PVMKS (TY II -W) 8 IN SLD 100M
LF
46
$0.45
$20.70
29-0000
REF PVMKS II -W) 12 IN SLD 100M
LF
6
$0.65
$3.90
30-0000
REF PVMKS (TY II -W) 24 IN SLD 100M
LF
1
$1.20
$1.20
31-0000
REF PVMKS II -W) ARROW
EA
1
$34.00
$34.00
32-0000
REF PVMKS (TY 1I -W) WORD
EA
-f
$44.00
-
33-0000
REF PVMKS UY II -Y) 4 IN SLD 100M
LF
447
$o.25
$111.75
340000
RE -PMS (TY II -Y) 4 IN SLD 100M
LF
-30
$1.90
-$57.00
35-0000
RE -PMS (TY I -Y) 4 IN BRK
LF
20
1.901
$38.00
36-0000
RE -PMS (TY I -Y) 4 IN SLD
LF
167
$1.80
$300.60
37-0000
ELIMINATE EXISTING PVMKS (4 IN)
LF
-366
$1.40
-$512.40
38-0000
PREP PVMKS 4 IN
LF
157
$1.00
$157.00
39-0000
PREP PVMKS 8 IN
LF
46
$2.00
$92.00
40-0000
PREP PVMKS 12 IN
LF
6
$3.00
$18.00
41-0000
PREP PVMKS 24 IN
LF
1
$4.00
$4.00
42-0000
PREP PVMKS ARROW
EA
1
$5.00
$5.00
43-0000
PREP PVMKS WORD
EA
2
$10.00
$20.00
540000
TS CBL A) 14AWG/ 5 COND
LF
318
$1.60
$508.80
55-0000
TS CBL (TYA) 14AWG/ 5 COND
LF
53
$1.90
$100.70
56-0000
TS CBL (TYA) 14AWG/ 5 COND
LF
133
4.00
$532.00
57-0000
TS CBL (TYA) 14AWG/ 5 COND
LF
141
$1.00
$141.00
61-0000
PED POLE ASMBLY
EA
1
$2,426.00
$2,426.0
67-0000
VIVDS COMM CABLE
LF
153
$3.00'-$459.00
68-0000
ETHERNET CABLE (CAT 5) RADIO
LF
50
$5.001
$250.00
$0.00
City of Round Rock
RGUNIT-XN, ROCK Agenda Item Summary
1'CXA:4
Agenda Number:
Title: Consider executing Quantity Adjustment/Change Order No. 1 with Austin
Traffic Signal Construction Co., Inc. for the Signal Construction at University
Boulevard at Bartz Driveway Project.
Type: City Manager Item
Governing Body: City Manager Approval
Agenda Date: 10/4/2019
Dept Director: Gary Nudder, Transportation Director
Cost: $2,056.75
Indexes: RR Transportation and Economic Development Corporation (Type B)
Attachments: QA -CO #1 with ATS - Univer-Bartz
Department: Transportation Department
Text of Legislative File CM -2019-0297
This Quantity Adjustment resolves outstanding items to close out the contract. Items/quantities
bid but not needed are being deleted and a required pedestrian pole assembly is being added
to be compliant with current safety standards. This quantity adjustment is in the amount of
$2,056.75.
Cost: $2,056.75
Source of Funds: RR Transportation and Economic Development Corporation (Type B)
City offtund Rack Page i Printed on 1014/2019