Loading...
CM-2019-0297 - 10/4/2019t rev, a1/15 Department: Project Name: _- University Blvd at Bartz Driveway - New Traffic Signal Date: 8/19/19 City Project Change Order/Quantity ID Number Adjustment No. QTY CO 1 Vendor AUSTIN TRAFFIC SIGNAL CONST. CO., IN( PO BOX 130 ROUND ROCK, TX 78680 512-255-9951 Company Name Address Phone No. Contract Quantity Adjustment/ Change Order TRANSPORTATION ADMINISTRATION Page I of 3 lustifiication Wer Run and Under Runs on Line Items throughout the contract SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Osier: New Contract Time: Prepared By: ' za y1 Signature '7e Amount % Change $189,910.35 $2,056.75 $2,056.75 . $191,967.101. 0% $0.00 0% $0.00 0% $191,967.10 $2,056.75 0 Submitted for Approval Collette Phillips, Asst Controller Austin Traffic Signal Const Co., Inc. 8/19/19 Printed Name, Title, Company Date Approvals ContractorO� 1 Ed Schroeder, Vice -Pres Austin Traffic Signal Const. Co., Inc. 8/19/19 Signature Printed Name, Tide, Company Date City Project Manager: � �C{h., q-23 -1y n tune Printed Name, Title Date Mayor/CityManager �" L 1C i 1:64 J.1) / 6&4,2-014,02—q-7 Page 2 of 3 _ Contract Quantity Adjustment/Change Order +tv.03 "1 S Project Name: University Blvd at Bartz Driveway - New Traffic Signal Quan. Adj.Xhange Order No.: 2TY CO 1 Chance Order Data Item # Item Description Unit p Qty. Unit Price Amount Contract Time Adjustment Da 0.00 0.00 $0.00 $0.00 0.00 $0.00 $0.00 $0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 $0.00 $0.00 .05 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Page 3 of 3 Contract Quantity Adjustment/Change Order ROYNLI QOGt re xw5 +c*e: Oii Project Name: University Blvd at Bartz Driveway - New Traffic Signal Quan. Adj./Change Order No.: 2 Y CO 1 Quantfir Adjustment Data Bid Item # Item Description Unit Qty. Unit Price Contract Time Amount Adjustment 4-0000 BLOCK SODDING SY -100 22.00 -$2,200.00 9-0000 CONCRETE SIDEWALK (5 IN) SY 4.97 $150.00 745.50 11-0000 COND (PVC SCF! 80) 2 IN LF -23 $12.00 -$276.00 12-0000 COND (PVC SCH 80) 3 IN LF -40 $14.00 -$56b.00 13-0000 COND (PVC 501 80) 4 IN LF -34 $18.00, -$612.00 14-0000 ELECTRIC COND (NO 8) BARE LF 1506 $1.00 $1,506.00 15-6 00 ELECTRIC COND (NO 8) INSULATED LF -46 $i. 0 -$46.00 16-0000 ELECTRIC COND (NO 6) BARE LF -2 $5.00 - 10.00 17-0000 ELECTRIC GOND (NO 6) INSULATED LF 24 $6.00 $144.00 19-0000 GROUND BOX D) W/APRON EA -1 $1,5 0.00 -$1,500.00 22-0000 REF PVMKS (TY I -W) 8 IN SLD 100M LF 46 $4.00 $184.00 23-0000 REF PVMKS I -W) 12 IN SLD 100M LF 6 $8.00 $48.00 2+0000 REF PVMKS (TY I -W) 24 IN SLD 100M LF 1 $13.00 $13.00 25-0000 REF PVMKS I -W) ARROW 100M EA 1 $161.00 $161.00 26-0000 REF PVMKS I -W WORD 100M EA -1 $178.00 -$178.00 27-0000 REF PVMKS (TY II -W) 4 IN BRK 100M LF 90 0.30 $27.00 2"000 REF PVMKS (TY II -W) 8 IN SLD 100M LF 46 $0.45 $20.70 29-0000 REF PVMKS II -W) 12 IN SLD 100M LF 6 $0.65 $3.90 30-0000 REF PVMKS (TY II -W) 24 IN SLD 100M LF 1 $1.20 $1.20 31-0000 REF PVMKS II -W) ARROW EA 1 $34.00 $34.00 32-0000 REF PVMKS (TY 1I -W) WORD EA -f $44.00 - 33-0000 REF PVMKS UY II -Y) 4 IN SLD 100M LF 447 $o.25 $111.75 340000 RE -PMS (TY II -Y) 4 IN SLD 100M LF -30 $1.90 -$57.00 35-0000 RE -PMS (TY I -Y) 4 IN BRK LF 20 1.901 $38.00 36-0000 RE -PMS (TY I -Y) 4 IN SLD LF 167 $1.80 $300.60 37-0000 ELIMINATE EXISTING PVMKS (4 IN) LF -366 $1.40 -$512.40 38-0000 PREP PVMKS 4 IN LF 157 $1.00 $157.00 39-0000 PREP PVMKS 8 IN LF 46 $2.00 $92.00 40-0000 PREP PVMKS 12 IN LF 6 $3.00 $18.00 41-0000 PREP PVMKS 24 IN LF 1 $4.00 $4.00 42-0000 PREP PVMKS ARROW EA 1 $5.00 $5.00 43-0000 PREP PVMKS WORD EA 2 $10.00 $20.00 540000 TS CBL A) 14AWG/ 5 COND LF 318 $1.60 $508.80 55-0000 TS CBL (TYA) 14AWG/ 5 COND LF 53 $1.90 $100.70 56-0000 TS CBL (TYA) 14AWG/ 5 COND LF 133 4.00 $532.00 57-0000 TS CBL (TYA) 14AWG/ 5 COND LF 141 $1.00 $141.00 61-0000 PED POLE ASMBLY EA 1 $2,426.00 $2,426.0 67-0000 VIVDS COMM CABLE LF 153 $3.00'-$459.00 68-0000 ETHERNET CABLE (CAT 5) RADIO LF 50 $5.001 $250.00 $0.00 City of Round Rock RGUNIT-XN, ROCK Agenda Item Summary 1'CXA:4 Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 1 with Austin Traffic Signal Construction Co., Inc. for the Signal Construction at University Boulevard at Bartz Driveway Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 10/4/2019 Dept Director: Gary Nudder, Transportation Director Cost: $2,056.75 Indexes: RR Transportation and Economic Development Corporation (Type B) Attachments: QA -CO #1 with ATS - Univer-Bartz Department: Transportation Department Text of Legislative File CM -2019-0297 This Quantity Adjustment resolves outstanding items to close out the contract. Items/quantities bid but not needed are being deleted and a required pedestrian pole assembly is being added to be compliant with current safety standards. This quantity adjustment is in the amount of $2,056.75. Cost: $2,056.75 Source of Funds: RR Transportation and Economic Development Corporation (Type B) City offtund Rack Page i Printed on 1014/2019