Loading...
CM-2019-0306 - 10/11/2019Contract Quantity Adjustment/ Change Order f�INR R(yO(. 1"3=1G Department: PARD Project Name: Brushy Creek Trail - Veterans to Rabb Date: 9/17/19 City Project Change Order/Quantity ID Number Adjustment No. 2 Vendor DeNucci Constructors, LLC 8310-1 Cap Texas Hwy. N. #275, Austin, TX 78731 512-335-0600 Company Name Address Phone No. Justification See attached Summary Sheet, SUMMARY Or ginal Contract Price: Prev ous Quantity Adjustment(s). This Quantity Adjustment` Total Quantity Adjustment(s): Total Contract Prue with Quantity AdjustmenLl;s): Prevmus Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Or'ginal Contract Price Plus Quant ty Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj /Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Signature Submitted for Approval _IL V 111.1\. Rif' n �Xy • ! Printed Name, Title, Company Approvals Contractor: d� ! A u t. I Efixcir City Project Signature Printed Name, Title, Manager.kuam,_Jf ME: &Veer fttl PF 5 ture Printed Name, Title Mayor/City Manager Aq MUM Printed Name, Ttle 6A4, 2, o 14 6 �0 (w Amount % Change $1,929,348.00 $9,232.00 $8,235.00 $17,467.00, $1,496,$15.00 $56,662.77 3% $4,770.00 0% $61,432.77 3% $2,008,247.77 $78,899.77 270 39 6 315 (fit'2 1. it ?�f tY ate Date VI7 I Contract Quantity Adjustment/ Change order PCIl� POCw Project Narne- Brushy Geek Trail - Veterans to Rabb Quan. Adj./Change Order No.: Contract Quantity Adjustment/ Change Order 1ep11hp p0[R o � . , •e•. CI 1� Project Name: Brushy Creek Trail - Veterans to Rabb Quan. Adj./Change Order No. Brushy Creek Regional Trail - Veterans to Rabb Change order #2 Summary Date. 09/17/2019 Conversion of irrigation controller to solar: After numerous delays with Oncor, it was decided that solar power would be the best option to power the irrigation controller in this application. This was a cost savings to the project, as well as a future cost savings on electrical bills. Cost: ($14,400.00) Change Driveway to concrete: The City decided to upgrade the Creek Apartments driveway from asphalt to grooved concrete. Ultimately, this is a better, safer surface type for the apartment driveway. Cost: $19,170.00 10' wall Quantity Adjustment: Engineer and contractor verified quantity adjustments of as -built wails associated with the box culvert extension. Cost: $5,600.00 8' wail Quantity Adjustment: Engineer and contractor verified quantity adjustments of as -built walls associated with the box culvert extension. Cost: $5,200.00 6' wall Quantity Adjustment: Engineer and contractor verified quantity adjustments of as -built walls associated with the box culvert extension. Cost: $2,160.00 4' wall Quantity Adjustment: Engineer and contractor verified quantity adjustments of as -built walls associated with the box culvert extension. Cost: $2,430.00 Curlex II Quantity Adjustment: Additional Curlex II slope stabilization was required associated with the revised grading at the box culvert. Cost: $600.00 Mortared Rock Wall Deduction: This mortared rock wall was intended to wrap and exposed waste water manhole beneath Georgetown St. However, there are exposed manholes along the trail (both this section of trail and existing sections of trail) that are exposed, so this item was removed from the scope to remain consistent along the trail. Cost: ($7,755.00) TOTAL: $13,OOS.00 City of Round Rock ROUND ROCK TIXAk Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 2 with DeNucci Constructors, LLC for the Brushy Creek Trail Veterans Park to Rabb Park Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 10/11/2019 Dept Director: Rick Atkins, Director Cost: $13,005.00 Indexes: 2014 General Obligation Bonds Attachments: LAF - Quantity Adjustment -Change Order #2 w- DeNucci Constructors, LLC (00432591xA08F8), Backup_Contract Department: Parks and Recreation Department Text of Legislative File CM -2019-0306 This item includes all work associated with Change Order #2. This work includes converting the irrigation controller to solar power and conversion of the Creek Apartment Drive surface material to concrete from asphalt. Additionally, this includes final wall and curlex material quantity adjustments associated with Change Directive #1. Finally, it includes deducting a decorative mortared rock wall from a manhole under Georgetown Street since no other manholes along the trail have this rock treatment. This project includes approximately one mile of a 10' wide concrete trail starting at Georgetown St. and connecting to the existing trail near A.W. Grimes Blvd. This portion of the trail will include a pedestrian underpass at Lance Ln. near the Creek Apartments and a pedestrian bridge over the drainage ditch feeding Brushy Creek. Cost: $13,005.00 Source of Funds: 2014 General Obligation Bonds City of Round Rock Page i Printed on 10/10/2019