Loading...
CM-2019-0333 - 10/25/2019II M, 01=16 Department: Project Name: City Project ID Number Vendor ]ustWication Page l of 3 Contract Quantity Adjustment/Change Order uEs Kenney Fort Intersection Improvements Date: 10/17/19 Change Order/Quantity KAtAH Adjustment No. 1 Coyote Construction Services, LLC P. 0. Box 398 - McDade, TX 78650 512 563-0103 Company Name Address Phone No. "hange Order / Quantity Adjustment #1 is needed for final quantity adjustment for project bid items. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s). Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Prepared Submitted for AWroval Eddie Zata, Senior Printed Name, Title, Approvals Amount % Change $291,870.00 $0.00 $31,809.00 $31,809.00 $323,679.00 $0.00 0% $2,600.00 1% $2,600.00 1% $326,279.00 $34,409.00 45 35 80 of Round Rock 10/1 Date Contractor: I - Jennifer Reynolds, Office Manager, Coyote Const Services, I -LC 10117119 n Printed Name, Title, Company Date City Project It Manager: �c/ Eddie Zapata, Senior Project Manager, City of Round Rock 10/17/19 Mayor/City Signature Printed flame, Title J r J Date Contract Quantity Adjustment/ Change Order r�ureo aocx x rev. 01'16 Project Name: Kenney Fort Intersection Improvements Quan. Adj./Change Order No. Chanae Order Data Page 2 of 3 Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment Da CO - 1 Additonal Water Service EA 1 $2,600.00 $2,600.00 $0.00 Additional Days to Complete Project $0.00 35 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 T A L 9F , Page 3 of 3 Contract Quantity Adjustment/ Change Order HOt/N®RDIX's rev, 01/16 Project Name: Kenney Fort Intersection Improvements Quan. Adj./Change Order No.: Guantity Adjustment Data Bid Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment 1 Remove Concrete Sidewalk SY 29 $5.00 $145.00 2 Remove Stabalized Base & Asphalt Pavement SY 5 $5.00 $25.00 4 Remove & Salvage Valve BA 4 $300.00 $1,200.00 5 Remove & Salvage Air Valve E4 -1 $500.00 -$500.00 6 Remove Existing 16" Water Pipe LF 42 $15.00 $630.00 7 Concrete Sidewalk 6" SF 180 $6.00 $1,080.00 12 Remove Concrete (Curb & Gutter) LF 52 $10.00 $520.00 13 Flexible Pavement Structure Repair SY 1 8 $210.00 $1,680.00 14 Concrete Curb & Gutter LF 52 $150.00 $7,800.00 15 Trench Safety LF -3 $2.00 -$6.00 16 Pipe 6" Class 250 - All Depths LF -3 $71.00 -$213.00 17 Pipe 12" Class 25- All Depths LF 2 $84.00 $168.00 20 Ductile Iron Fittings TON 0.14 $14,500.00 $2,030.00 26 Wet Connection 12" X 12" EA 1 $5,500.00 $5,500.00 28 Adjust Water Valve EA 1 $750.00 $750.00 29 Barricades, Signs, & Traffic Handling MO 1 $11,000.00 $11,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: 31809.00 0 N City of Round Rock ROUNOROQC Agenda Item Summary TEXAS Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 1 with Coyote Construction Services, LLC for the Kenney Fort Boulevard 16" Water Relocation Project. Type. City Manager Item Governing Body: City Manager Approval Agenda Date: 10/25/2019 Dept Director: Michael Thane, Utilities and Environmental Services Director Cost: $34,409.00 Indexes: RR Transportation and Economic Development Corporation (Type B) Attachments: QA -CO No. 1.pdf, LAF.pdf, MAP.pdf Department: Utilities and Environmental Services Text of Legislative File CM -2019-0333 On April 26, 2018, City Council awarded an Engineering contract to provide a set of full roadway construction plans to address the off-site roadway improvements for the proposed Kalahari Resort Development. The proposed roadway improvements consist of three northbound Kenney Fort Blvd. right turn lanes, one southbound Kenney Fort Blvd. hooded left turn within the existing median, and a traffic signal design for the proposed intersection of Kenney Fort Blvd. and Kalahari Blvd. Also included is the water main relocation design and to investigate the pavement failures on a portion of Kenney Fort Blvd. The engineering contract was in the amount of $182,942. The required timeline for the construction of the roadway improvements and the waterline relocation have changed resulting in the waterline relocation construction prior to roadway improvements. Supplemental Agreement No. 1 was approved for additional engineering services associated with creating the waterline relocation as a separate project. Supplemental Agreement No. 1 included both the additional engineering and construction phase services for $5,578. On July 2, 2019, eleven bids were submitted for the waterline relocation portion of the project. The lowest bid was in the amount of $291,870 submitted by Coyote Construction Services, LLC. C!ty of Round Rock Pape 1 Printed on 10124/a019 Agenda Item Summary Continued (CM -2019-0333) Change Order/Quantity Adjustment No. 1 is needed for Change Order item and final bid items quantity adjustments in the amount of $34,409 which increases contract amount to $326,279. Cost: $34,409 Source of Funds: RR Transportation and Economic Development Corporation City o1 Round Rock Paye 2 Printed on 10/24/2049 Z P n er W � 3 ; W ry Kwv . �r ,J z ;P� m o 0 Ix nC a o si�4 a o Ty wF w i 1G zZ oc T tf AN o W - I H zLULUI r IL YV Z v0 R �Oqc' NNS "A p+ 4. N KENNY FD raw i. -•��. h • All R' V � r I � P All � N g Paul'gwuNwidw{uo{pwgnl PNB>to�A�uw�{lgwwunidw:wlparwWl-PN9NelAauwNv0�ne71E1GLtsdvwNa�daLph >t�Llw7.rs:e Lwednw�ui:e :w�a lwwnaan