Loading...
CM-2019-0373 - 12/2/2019 City of Round Rock ROUND ROCK TEXAS Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 1 with Patin Construction, LLC for the Westside Trail Improvement Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 11/29/2019 Dept Director: Rick Atkins, Director Cost: $9,764.00 Indexes: 2017 General Obligation Bonds Attachments: Change Order 1 - Patin (Signed), LAF-QA-CO#1 w- Patin Construction, LLC-Westside Trail (00435671xA08F8) Department: Parks and Recreation Department Text of Legislative File CM-2019-0373 This item will authorize the City Manager to execute a change order with Patin Construction. During the construction of the Round Rock West Greenbelt trail, sections of trail were found to be out of ADA compliance. The original plan of replacing existing asphalt with new concrete trail at the current grades would result in the same failure. A series of ramps and landings are required to bring the trail section into ADA compliance. Drains are included in this change order to help facilitate drainage in the area due to the new grades. The Westside Trail Improvement Project identified two sections of trail at the Round Rock West Greenbelt and Behrens Ranch Greenbelt that has required continued monitoring and maintenance because of instability of asphalt and decomposed granite as a trail surface, causing ADA compliance and safety issues. Round Rock Parks and Recreation has proposed to construct concrete trails in place of the asphalt and decomposed granite to correct ADA compliance issues and also for ease of maintenance, reducing the required man hours to keep these two sections of trail to Round Rock standards. Cost:$9,764.00 Source of Funds: 2017 General Obligation Bonds Cityo/Round Rock Page 1 Printed on 1112712019 Page I of 3 Contract Quantity Adjustment/Change order Rn no rev,01/16 Department: 2300 Project Name: Westside Trail Project Date: 11/18/19 City Project Change Order/Quantity ID Number Adjustment No. 1 3800 West 2nd St Vendor Patin Construction LLC Taylor,TX 78574 512-269-1071 Company Name Address Phone No. Justification During construction,sections of trail were found to be out of ADA compliance,where replacing existing asphalt with new concrete at the current grades would not have solved the issues.A series of ramps and landings are needed to bring the trail section into compliance.Drains are included in this change order to provide adequate drainage for the revised grades. SUMMARY Amount ®/o Change Original Contract Price: $541,334.65 Previous Quantity Adjustment(s): ;✓ jiii/' 9 This Quantity Adjustment: $0.00 Total Quantity Adjustment(s): ! Total Contract Price with Quantity Adjustment(s): 41, 34.65 Previous Change Order(s): 0% This Change Order: $9,764.00 2% Total Change Order(s)To Date: $9,764.00 2% Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s)Plus Change Order(s)]: $551,098 65 t Difference between Original and Adjusted Contract Prices. $9,764,00 Original Contract Time: 150 days Time Adjustment by previous Quan.Adj/Change Order: none Time Adjustment by this Quan.Adj./Change Order: 30 days New Contract Time: 180 days 5 omitted Yor 11„pprgvat� ; Prepared By: 1% Michael Chau,Park Development Specialist,CORR 11/18/19 Sig a Printed Name,Title,Company Date w Jp .,, ,n,.e,,,1 r,,,u�o,� %�,,, r �'�!! �,�.i, nom. f,e,^M"���a�.0 c ,., 1 �,,..�� i�.,«wa' �, .,,,.�h sa,o o,...., Y Contractor � Si natur r" ° Title, e panted Name T itle,Com P n Date City Project Manager: M 4� Fc¢� 11 lel 19 h ro Printed Name,Title Date Mayor/City ' Manager12 o, M c Signature Printed Name,Title Date Page 2 of 3 Contract Quantity Adjustment/Change Order rev,OE(d6 Project Name: Westside Trail Project Quan.Adj./Change Order No.: 1 Change Order Data 77771,77 Contract Time Item# Item Description Unit Qty Adjustment Unit Price Amount (Davs) it i iyrf Oi 1� i97- r� ,� t, 1 i, `a✓ ,"ir,r.,a, ✓ y /1lf4 a� �ia,r,� %ad ,yet" � , 8'Concrete Trail Section per Revised 1 Grading SF 3088 $3.00 $9,264.00 30 2 8"Sch 40 PVC Drain Pipes LF 20 $25.00 $500.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 , Page 3 of 3 Contract Quantity Adjustment/Change Order aawno Rxx r,r,; Project Name: Westside Trail Project Quan.Adj./Change Order No.: 1 Quantity Adjustment Data x , a Contract Time Bid Item# Item Description Unit Qty. Unit Price Amount Adjustment 11, �l F /1�,ry,r,�„ f„ nw ���, ar/l✓!r �i,�� �� J ff �4r $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1, i �.�� 0