R-2019-0484 - 12/5/2019 RESOLUTION NO. R-2019-0484 WHEREAS, Section 395.058 of the Texas Local Government Code ("the Act") requires the Capital Improvement Advisory Committee ("CIAC") to report to the City Council the progress of the capital improvements plan and any perceived inequities in implementing the plan or imposing the impact fee; and WHEREAS, the CIAC is also required to advise the Council of the need to update the land use assumptions, capital improvements plan and impact fees; and WHEREAS, the CIAC has submitted a Capital Improvement Plan Progress Semi-Annual Report; and WHEREAS, the City Council has reviewed the attached Capital Improvement Plan Progress Semi-Annual Report and has determined same to be in compliance with the Act,Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Capital Improvement Plan Progress Semi-Annual Report, attached hereto as Exhibit "A" and incorporated herein, is hereby approved. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Goveriunent Code, as amended. RESOLVED this 5th day of December, 2019. C=oRounxck, ON, Mayor CTexas ATTEST: SARA L. WHITE, City Clerk 0112.1902;00435680 EXHIBIT C r mss.. c � T ROUND ROCK TEMS UTILITIES AND ENVIRONMENTAL SERVICES C"ty R0m#& u ,1*ft1d 0111to Aft a" 0 uti i ies & ,cnviron ents-al zoervices Depart Capi tai I prove ents Plan Progress Se uwAnnual ,rt SUMMARY The Local Government Code Section 395.058 requires the Capital Improvement Advisory Committee (CIAC) to report to the political subdivision the progress of the capital improvements plan and any perceived inequities in implementing the plan or imposing the impact fee. Included herein is the semi- annual report for the reporting period of April 1, 2019 to September 30, 2019. This report consists of an assessment of the actual growth rate in comparison to the projected growth rate, the status update of capital improvement projects, and the impact fees collected during the reporting period. The local government code also requires the CIAC to advise the City Council of the need to update the land use assumptions, capital improvements plan, and impact fees. These items were last updated by the City in November 2015. 1 11/18/2019 Figure 1 shows the groundwater and surface water produced along with the number of active water services over the past two years. Although the City continues to grow, the total water production remains relatively steady. Water usage is highly dependent on weather patterns; however, the City's conservation and reuse water programs are also making an impact. Figure 1 Water Treatment Plant 3,000 - 36 4� EEi 3 E 2,500 _. E � O O 2,000 ...___ _... _....... ;.. ._...._ ! 34 ! U U V i 1,500 33 LA O { o ' .. 1 000 ............. __.._._...___.._ ___............... _._............_._... ___._ .._...... ..... 32 0 Ql E E z 50031 4 E 0 1st Qtr FY'18 2nd Qtr FY'18 3rd Qtr FY'18 4th Qtr FY 18 1sE Qtr FY'19 2nd Qtr FY'19 3rd Qtr FY'19 4th Qtr FY'19 E 30 €�...W._,._,. Active Services 33981 34706 1 34403 34816 € 34900 35106 3515_7 35377 Groundwater lb7,410,000 1!0,924,000 170,164,000 139,894,000 ' 46,990,000 :. 123,343,000 193,32l,ODfl 3!8,293,000 L: Surface Water ((---1,410,181,000 1,148,171,000 7 1,844 03 000: 2 257,593,000 1,291,589,000 1,119,280,000 1,451,88D,000 2,497,480,000 €... _...._1................_.................................._....._._......._........................_?................._'_....` ...... .......... .......... ......... ....................................._.............._.........._......._......... ........................._................. . 2 11/18/2019 Figure 2 reflects the daily average of potable water produced each month over the past ten years. Total water production is dependent on weather conditions; therefore, discretionary water usage is higher during the summer months. Figure 2 Average Potable Daily Demand Each Month 40 . 35 - 30 f ' in25 -- 20 ' 15 ' ZI 10 1 k 4 C Jan Feb Mar Apr May Jun Jul Aug Sep tact Nov Dec W2010 W20,1. x;012 92011, u 2.014 X201.5 w201.6 W201.7 -2018 x+2010 3 11/18/2019 Figure 3 reflects the monthly potable treated water production and the Type I Reuse treated water production. The City's reuse water system began production in October 2012 with three customers: Old Settlers Park, Dell Diamond, and Forest Creek Golf Course. The City has since expanded the system to Forest Creek HOA, Legends Village Subdivision, Austin Community College, Texas A&M Health Science Center, and the Forest Grove and Vizcaya Subdivisions. The City continues to promote the reuse water system in the Northeast part of Round Rock, and as depicted in Figure 3, the demand continues to grow. Figure 3 Potable vs. Reuse Water 36 Average Daily Demand Each Month 32 2 24 4 c20 t1No 016 r 41 o .. _ _� .._ .. .:..._: .._l.. _ __ ._... . is ...._..._ . _' _..:.. —:.— Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sept FY-13 o FY-14 o FY-15 ❑FY-16 o FY-17 N FY-18 o FY-19 n Reuse Water 4 11/18/2019 Figure 4 shows the number of new single-family building permits issued in the City of Round Rock and the City's extra-territorial jurisdiction (ETI) over the past ten years. The number of new housing starts per year in the City of Round Rock has ranged from 222 to 911 annually. Single-family permits have slowed down slightly from last year with 849 issued in 2019 compared to 911 in 2018. Most of the activity is in Madsen Ranch, Saul's Ranch, Vizcaya, Cottages at Meadowlake, Diamond Oaks, Freeman Park, and Concord. Several Municipal Utility Districts (MUDs) located in Round Rock's ETI, as noted in Figure 4, continue to experience a steady number of single-family housing starts during this time as well. Figure 4 Annual Single-Family Building Permits Issued Residential & MUDs 1600 1512 1511 1400 1.328 1200 1042 1051 1000 i 800 a 676 600526 556 58.1 615 400 338 P 1 200 � I FY-09 FY-10 FY-11 FY-12 FY-13 FY-14 FY-15 FY-16 FY-17 FY-18 FY-19 a Round Rock x Palorna #1 !Palorna #2 xTera Vista #10 .Tera Vista #11 Walsh Ranch Siena #1 Siena #2 5 11/18/2019 Table 1 represents the number of multi-family building permits issued annually. Currently, there are three multi-family complexes, Round Rock Plaza, Shadow Ridge, and Holly Brook Apartments, under construction. There is presently one multi-family permit in for review, Aura Avery Center, and several other potential multi-family developments that have met with the Planning Department. Table 1 Fiscal . Muld-Family Permits FY 2005 538 FY 2006 56 FY 2007 2147 FY 2008 224 FY 2009 274 FY 2010 130 FY 2011 0 FY 2012 280 FY 2013 884 (124 LUEs) FY 2014 334 (63.5 LUEs) FY 2015 792 (302 LUEs) FY 2016 608 (157 LUEs) FY 2017 330 (170 LUEs) FY 2018 652 (327.5 LUEs) FY 2019 432 (218 LUEs) 6 11/18/2019 Table 2 reflects the number of new commercial building permits issued over the past ten years. This number has been steady, ranging from 20 to 60 annually; however, the past six months show an upward trend. Table 2 Fiscal • i ® ' s .. FY 2009 30 FY 2010 29 FY 2011 27 FY 2012 20 (100 LUEs) FY 2013 37 (185 LUEs) FY 2014 33 (165 LUEs) FY 2015 47 (202 LUEs) FY 2016 63 (442.5 LUEs) FY 2017 25 (168 LUEs) FY 2018 43 (220.5 LUEs) FY 2019 50 (262 LUEs) Current permits are mostly hotels, office buildings, retail stores, restaurants, schools, and industrial warehouse facilities. 7 11/18/2019 Table 3 and Figure 5 summarize the impact fees collected from FY-15 through FY-19 for residential and commercial permits within the City, as well as permits issued in the wholesale customer areas. There has been a significant increase in the total amount of impact fees collected during this time due to the construction in single-family residential, multi-family residential, and commercial developments. Table 3 I.... ...................................... .................................. . ............. ImpactC • ............. ..... i Residential Water $1,616,580 $1,516,823 $2,812,465 $3,830,017 $2,770,650 Commercial Water $2,273,857 $2,342,270 $915,617 $2,399,541 $2,750,040 Wholesale Water $1,035,951 $1,117,590 $818,121 $692,763 $ 639,567 ........ ... ... .._. Residential Sewer $618,240 $701,551 $1,201,518 $1,905,615 $1,381,154 Commercial Sewer $1,084,193 $1,020,587 $935,750 $1,102,400 $1,701,974 Wholesale Sewer $1,304,686 $1,529,096 $1,532,360 $639,776 $1,650,108 ............ .........:...: :, ... ... ... _ ..._.............._ Total Collected $ 71933,507 $ 8,227,917 $ 81215,831 $ 10,570,111 $ 10,893,493 8 11/18/2019 Figure 5 Impact Fees Collected FY 2415 - 2419 $12,000,000 $10,570,111 $10,893,493 $10,000,000 $8,227,917 $8,000,000 $7,933,507 � $8,.215,831 , y, > $6,000,000 gem $4,000,000 $2,000,000 FY-15 FY-16 FY-17 FY-18 FY-19 Residential Water a Commercial Water -Wholesale water z Residential Sewer a Commercial Sewer Wholesale Sewer In 2015, the latest version of the water model assumed that 1,524 LUEs per year would be added to the water system. For an impact fee of $4,025 per LUE, this would indicate that the City should have collected approximately $6.13 million per year in water impact fees if the City would be growing as projected. The wastewater model assumed that 1,089 LUEs would be added to the wastewater system per year. For an impact fee of $2,099 per LUE, this would indicate that the City should have collected approximately $2.29 million per year in wastewater impact fees if the City would be growing as projected. Comparing these assumptions to the actual impact fees collected indicates that the number of FY-19 new connections to our water and wastewater systems is slightly higher than projected. 9 11/18/2019 Table 4 provides population projections for Round Rock and Round Rock's ETJ. These projections, anticipating a steady growth rate, indicate that to keep up with growth, capital improvements to the City's water and wastewater utility systems would be necessary. However, 2012-2019 estimates, shown in parenthesis, indicate a slightly slower growth rate than projected. Table 4 Inside City City's ETJ Year Projection :.... :. ._., :, Growth Rate Projections Growth Rate _.._... .._ _m..._ . 2010 (Census) 99,887 - 141,807 - 2011 100,659 0.8% 143,960 1.5% 2012 102,349 (101,702) 1.7% (1.0%) 147,027 2.1% 2013 104,805 (102,349) 2.4% (0.6%) 151,133 2.8% 2014 107,635 (103,494) 2.7% (1.1%) 155,613 3.0% 2015 110,757 (105,405) 2.9% (1.9%) 160,385 3.1% 2016 113,968 (107,117) 2.9% (1.9%) 1651024 2.9% 2017 1171160 (110,300) 2.8% (3.0%) 1691213 2.5% 2018 120,440 (113,390) 2.8% (2.8%) 173,490 2.5% 2019 123,812 (117,169) 2.8% (3.3%) 177,859 2.5% 2020 127,279 2.8% 182,323 2.5% -------------- 2021 1301461 2.5% 1861062 2.1% 2022 133,723 2.5% 189,881 2.1% 2023 1371066 2.5% 193,508 1.9% 2024 140,492 2.5% 1971218 1.9% 2025 143,302 2.0% 200,312 1.6% 2026 1461168 2.0% 2031462 1.6% 2027 149,092 2.0% 206,670 1.6% 2028 152,073 2.0% 209,651 1.4% 2029 155,115 2.0% 212,693 1.5% 2030 158,217 2.0% 215,795 1.5% Notes: 2010 is the base year for these projections ( ) Annual Estimates by Planning & Development Services Department 10 11/18/2019 Table 5 summarizes the Water System (impact fee eligible) Capital Improvement Projects that have been completed or are in progress since the last impact fee analysis was completed in November 2015. In addition, projects that are anticipated over the next 10 years are also shown below. Table 5 Completed Water Projects Completion Impact Fee Report Actual Cost Estimated Cost BCRUA Treated Waterline - Ph 1 Seg. 3 2015 $8,400,000 $8,749,000 University Blvd Waterline Ph 1 2015 $3,634,169 $1,877,000 Parcel 150 2015 $2,955,650 $3,144,000 CR 112 Phase 2 - 24" Waterline (890 PP) 2015 $1,188,049 $888,000 _...................... __.._..------------........................._....................................... __---.--_-_-_.._.._.._..__-......_....................._............ Water Dist. Master Plan & Impact Fee 2015 _$138,000 $141,000 .........._............................._.................._......._.............._...... f _..............._--............ ..__.,..... __.._ _... __.._._........ Creek Bend 12" Waterline 2016 $415,000 $415,000 Arterial H Waterline 2017 $856,400 $162,460 __.............__..._._.._... .._........ ._......_._.._.. ... .... _._....._..........................._..._.................._._..........._.............. __._._.............................................._..._............................._ ...__.._................................................................_...._....._...__._...._._.......................................................... BCRUA Water Treatment Plant - Ph 1B 2018 $34,000 ......-...................._.........I.....................,...................................... . . . . . ...._...._......._......._ _......__..................................._....____._ _..!__-_._._.._ - ._..__._._.._..___._... $31,000 South 81 Elevated Storage Tank Pump _._.._._.... �...__.................. ._ .................................................................. Station 2019 $157 000 $1,070,900 $17,778,268 $16,478,360 ._..__-------..___..__.._...._____ ____--------_ __..__________.._____-----------__ _.___ ____ _.._......_.._....__..__......__....___________..__.._.__.._..____...................... .._.................. Water Projects In Progress Completion Impact Fee Report Updated Actual Estimated Cost Cost .Arterial^ H .Phase ' _._I_L____________.... 2020 __--------________.._..________$1,470,500 $1,465,000 BCRUA Water Treatment Plant - Ph IC 2020 $4,465,000 $4,363,400 Water Dist. Master Plan & Impact Fee 2020 $66,000 $220,570 Arterial AWaterline - 24" (Kenny Ft. 2022 $5,024,000 $5,024 000 Blvd.) ------------ BCRUA Intake & RW Line Ph2A, Seg. E 2026 $57,895,705 $57,895,705 _..............._...._... ..._.................................................................._.............._...._.._.............._........................................................................... ........._........................_............_._...................................... .. t $68,921,205 $68,968,675 11 11/18/2019 Upcoming Water Projects Estimated Impact Fee Report Updated Completion Estimated Cost Estimated Cost Southeast Red Bud Lane Waterlines ( 2021 $629,000 $629,000 ....___._------_________-____-_- -___..._............_...................__...... ----- .____________._____........................... ........... ........._................ ...._.. _................... ...................... .. Brenda Lane Waterlines 2021 $2,074,000 $2,074,000 Palm Valley Waterline 2022 $1,180,000 $1,180,000 Meadow Lake Lines 2022 $2,367,000 $2,624,000 _._..__....__._.._.._._.._.................._.______....__.__.___.._.._............._..._..........................__.._._______..........._...._........___.._}...............___...._._.____......_ ._.___._..._...._.._ __...._..._.__._....___._._........_........_............_...................................__................................................. . Saddle Brook Waterlines ! 2022 $629,000 $697,000 .............__........_...............___.._..___.__._____ _.._._.... Sam Bass Phase I i 2022 $14,469,000 $14,469,000 Sam Bass Phase II E 2022 $1,578,000 $1,578,000 Avery Center East j 2023 $4,160,000 $41160,000 ...._............_......_..._._..._..._.__..._..._......_...................... __.._____ Palm Valley Phase II ; 2023 $1,0021000 $1,002,000 Water Dist. Master Plan & Impact Fee I 2023 $148,000 $154,000 Gattis School Road 2023 $1,130,600 $51653,000 Round Rock Glen Waterlines ! 2024 $2,715,000 $2,715,000 East Loop II I 2024 $7,795,000 $7,795,000 South Creek Phase II i 2024 $2,419,000 $2,419,000 ............._............................................................................................................................-_-_.._............................................... ...._-..._.._....._._........................_..._.................................._............_......................_-................................_....._..__.._............................... .............................................................................. South Creek Waterline I2025 $1,604,000 $1,604,000 �.-.---- __.------_.. __.___........__......._.....__...._......... 2.0 MGD Elevated Storage Tank (PP 890) 2025 $7,138,000 $7,138,000 BCRUA Water Treatment Plant - Ph 1D 2025 $12,905,000 $12,905,000 .................................................................................................................................._....................................... Water Dist. Master Plan & Impact Fee ! 2026 $158,000 1 $158,000 .._..................-...................................................................... East Loop III 2027 $7,171,000 $7,171,000 West Loop 2028 $17,818,000 $17,818,000 ............__....._._..._....___.............._......___....__.._.._..____...._._. _._......_...._........................................_.................._...__............... Water Dist. Master Plan & Impact Fee 2029 $75,000 $75,000 $89,164,600 1 $94,018,000 12 11/18/2019 Table 6 summarizes the Wastewater System (impact fee eligible) Capital Improvement Projects that have been completed or are in progress since the last impact fee analysis was completed in November 2015. In addition, projects that are anticipated over the next 10 years are also shown below. Table 6 Impact Fee Report Completed Wastewater Projects Completion 11 Actual Cost 1 Estimated Cost McNutt Creek C3 2014 $1,191,000 $940,000 McNutt Creek C9 2015 $2,046,000 $1,471,000 _ .. ......................................................................................................._. . . . . . .. ........... . ._ _......_..._...._._..._........-.....__...._.._..........__ ._........_._..._................................................._._....- _.._.._..._....__....._.............................. ..............._._.__.__ _.._.__..._...__._._......_. .__._.._.....__ _......._. Chandler Creek 1 (Upper) 2015 $552,000 $573,000 Lake Creek 2 2017 $2,652,000 $1,916,000 ................... ................. .._.................................................._.._...........................................I................ ............ Lake Creek 3 2017 $591,000 $563,000 .._..._......... ___ __.......................__. McNutt Creek C2 (referred to as C5) 2018 $1,324,000 $1,762,000 ........... _ __m.. .._. Brushy Creek 5 2018 $288,000 $282,618 _._......._._.........___.._._............_.._....._..._.._.............. .............................................. Brushy Creek 2 2019 $685,000 $349,000 Brushy Creek 4 2019 $173,000 $173,000 ____..........___.__...._..__.._..__.._..___..--------------- ................_.._.._________........ *Gattis School WW Extension 2019 $1,100,000 $1,100,000 $91502,000 $8,029,618 Wastewater Projects in Progress Completion Impact Fee Report Updated Estimated Cost Actual Cost Lake Creek 1 2019 $1,995,000 $2,400,000 ------------ WWTP Expansion 1 2022 $41,600,000 $15,000,000 _..._..._._-__.....__.-_....__.W..W.__ __._W.._...___................................................................. *Lake Creek 10 2020 $642,000 $642,000 *Lake Creek 11 2020 $1,112,000 $1,112,000 ......... ... ... . $431595,000 $17,400,000 3 * Not included in current impact fee calculation, will be included in upcoming calculation. 13 11/18/2019 1 Upcoming Wastewater Projects € Estimated Impact Fee Report Updated Completion Estimated Cost Estimated Cost McNutt Creek C10 2019 $1,014,000 $1,265,887 Chandler Creek 2 2022 $520,000 $520,222 McNutt Creek C4 2023 $734,000 $765,875 ........ ....... _ __._...._........_..._..................._..__....__. Chandler Creek 3 2023 $753,000 $857,680 __........... _... __..______._..____............ Lake Creek 4 2023 $2,235,000 $2,235,053 McNutt Creek 15 (referred to as 12) 2024 $528,000 $527,897 Hilton Head LS 2024 $11,000 $17,000 ......_.__.................................................... McNutt Creek C12 2024 $949,000 $1,204,491 McNutt Creek D2 2025 $3,678,000 $3,339,000 SE Annex LS 2025 $820,000 $819,036 ___._............................................._ .. ............................. McNutt Creek D4 2025 $1,394,000 $1,1311,502 Forest Creek LS 2026 $11211,000 Y $1,600,000 Forest Creek 2 2026 $2,148,000 $2,148,396 ...... _.._.. ..................._............................--................ Onion Creek 1 2026 $359,000 $1,500,000 ._._..................._.......................................... McNutt Creek C6 2027 $207,000 $790,782 Onion Creek 2 2027 $214,000 $1,348,025 ............._._................._.__. ...._.................................................... Spanish Oak 1 2027 $1,492,000 $1,491,858 __._.... ........ .. McNutt Creek D5 2028 $691,000 $748,000 Mayfield Park 2 2028 $1,960,000 $1,960,456 _...._.____..___._.._......_....____.._____.._.._...__............. McNutt Creek C8b 2028 $823,000 $706,355 ......................__.__._._._..........................................................._.. Mayfield Park 1 2028 $393,000 $393,290 Stone Oak LS 2028 $295,000 $295,000 $22,429,000 $25,665,805 14 11/18/2019 Table 7 summarizes the Reuse Water System (impact fee eligible) Capital Improvement Projects that have been completed or are in progress since the last impact fee analysis was completed in November 2015. In addition, projects that are anticipated over the next 10 years are also shown below. Completed Reuse Projects Completion Impact Fee Report Actual Cost Estimated Cost Reuse Phase II j 2015 $2,108,500 $2,108,500 Reuse Phase VI 2016 $900,000 $900,000 ......................................_.........__............................_...... _....._..__ __.._..... ........... _.................._._..._.__.................................... .............................................___...._..__............................................._..._........................_......._-___............................_..._._._............. Reuse Phase IV-B 2016 $3,719,000 $3,013,152 Forest Creek Golf Course Reuse Rehab ; 2016 $150,000 $83,890 .................._..._...._.._.................._............................................................................................................................................. ...._.._.__.._.. !_ .. .............................._.........._......_.._.._............................................_..............................._......................_..._.._.._........... ..................................................... ......_.... E $6,877,573 $6,105,542 Upcoming Reuse Projects Estimated Impact Fee Report Updated Completion Estimated Cost Estimated Cost Reuse Phase V - Stony Point High School 2022 $558,376 $600,000 $558,376 ' $600,000 15 11/18/2019 Figure 6 provides a comparison of the Single-Family Residential Utility Rates for Round Rock customers versus surrounding Central Texas City and Municipal Utility Districts. As depicted, Round Rock utility rates remain some of the lowest in the region. Figure 6 Single-Family Residential Water and Wastewater Rates Comparison (monthly cost)* $200 $183.03 $180 $160 $155.02-.................................................................................................................. $150.05 $140 $123.75 $120 $115.60 $113.82 8100 ._$98,22.....$97.10............................................_........,........._..............._.....__.......... $9z.a5 $91.36 580 $85.70 $82.51 $70.60 $65.00 566 $63.80 540 520 50 ..... Qc, ova Lte� `r� ■Water ■Wastewater * assumes 10,000 gallons water & 8,000 gallons wastewater used 16 11/18/2019 Table 8 compares Round Rock's Water and Wastewater Impact Fees to other Central Texas cities. Historically, Round Rock had one of the highest total impact fees charged for new connections to the water and wastewater systems. However, several of the surrounding cities have increased their fees over the past few years and have surpassed Round Rock. Round Rock's philosophy is for new customers and developments to pay for the capital improvements that are required due to the growth. Table 8 Area Impact Fee Comparison Last ity City/utillr 'u rWsta "" Total Updated Brushy Creek MUD 1 2012 $2,095 $1,804 $3,899 a Cedar Park 2014 $2,250 $2,000 $4,250 1 Hutto 9 2018 4 363 1 � $ $ ,068 � $5,431 «xe:.x xnaaen<e(uxxe<xa«.xaua<eeavmaN,n+ev.<xarovaee«aattm,.aaeu:ea4 k 2 k . p:mxawxewee«aaw.xasew«aaaee.ve«neeamvaww:<ex«m+::eaa.n.auxw:.svawreuwcx«em>aro.'eeeo-.xaame«tttt�ec: vay.rv««,ax«.aaa ., .. Round Rock 2016 $4,025 $2,099 $6f 124 San Marcos 2018 $3,801 $2,684 $6,485 r Pflugerville 2014 $4,241 $2,725 $6,966 I � R � Leander 1 2017 $4,309 $2,820 $7129 3 k { Austin i 2018 $4,700 $2,500 $7,200 m F Georgetown 1 2018 $6,921 $3,115 $10,036 9 17 11/18/2019 CONCLUSION AND RECOMMENDATIONS The CIAC and City Council approved the current Impact Fees, which went into effect on March 1, 2016. Although the population growth in Round Rock is proceeding slightly slower than projected in the impact fee analysis, the number of connections to the water and wastewater systems is occurring as anticipated by the City. Due to the volatility in growth rates and infrastructure requirements, the City recommends the impact fees be reviewed every three to four years. In September, the City commenced with updating the Water and Wastewater Master Plans. Following the completion of the Master Plan updates in the Spring of 2020, we will review our current impact fees. The next Capital Improvements Plan Progress Report will be presented to the CIAC and the City Council in approximately six months. 18 11/18/2019