CM-2019-0376 - 12/6/2019"M MOCK Department: Project Name: City Project FD Number Vendor Page 1 00 Contract Quantity Adjustment/ Change Order 23000 Rabb Pavilion Improvements Project Date: 11/19/19 Change Order/Quantity Adjustment No. I Fazzone Construction Co. 1302 West Blanco Road San Antonio, TX 78232 210-408-9095 Company Name Address Phone No. Justification It was determined that the contractor should carry out some of the more difficult conduit work for this project. Existing drinking fountain was found to be at the end of its useful life. After requesting inspection of the existing double-check backflow preventer, PARD learned it was out of compliance and needed to be replaced with an above ground RPZ unit. Sidewalk panels were creating a trip hazard and needed to be replaced. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s)-. Total Contract Price with Quantity Adjustment(s): Previous Change Order(s)- This Change Order: Total Change Order(s) To Date: Adjusted Contract Price (Original Contract Price Plus Quantity Adjustments) Pius Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time Time Adjustment by previous Quan. Adi,/Change Order: Time Adjustment by this Quan. Adj /Change Order: New Contract Time submitted for°ApPiatrIl Rachel Morris, Park Developm Printed Name, Title, Company Amount a/a Chanae $0.00 0% $16,902.55 4% $16,902.55 4% E: $405,290.22 $16,902.55 120 days none 15 days _ 135 days CORR Date Contractor: Paul Whetstone, Senior Project Manager 11-21-2019 City Project Signature Printed Name, Title, Company Date Manager: Rim" orris GA -k- . S °a�;s� 1� Z2 tq Sign re Printed Name, Title Date Mayor/City ,. ManagerL*akyjhL6kj%-12- �. Signature Printed Name, Title U narp %0— Contract Quantity Adjustment/ Change Order MROCK Project Name: Rabb Pavilion Improvements Project Quan. Adj.Xhange Order No.: Item unit Data Unit Price I Amount Contract Time Adjustment Owner/Customer Item Description Contact Katie Baker Company City of Round Rock, Texas Address 221 East Main Street City, State, Zip Round Rock, TX 78664 Phone 512.218.7044 Fax 512.218.5563 Prime Contract Change Order (CO) Contractor Contact Paul Whetstone Company Fazzone Construction Co., Inc. Address 1302 West Blanco Road City, State, Zip San Antonio, TX 78232 Phone 210.408.9095 Fax 512.335.3711 Project Information Prime Contract Change Order Project # 00001 CO # 001 Project Name Rabb Pavilion Improvements Issue Date 30 -Sep -2019 Address 3300 E Palm Valley Blvd City, State, Zip Round Rock, TX 78665 All labor, materials and conditions of performance involved in this change order shall be In accordance with the provisions of the original contract for work described below: Item No. Item Description quantity Unit Unit Price Total Price 1 275 LF of conduit buried and stubbed for future use. Excavate 1 $2,750.00 $2,750.00 30" install pipe with risers T above FF 2 The price to saw cut trench bed pipe and pour concrete cap is 1 $2,63S.00 $2,635.00 3 4" pipe under the parking lot. Bottom of pipe is 36" has bedding 1 $1,192.55 $1,192.55 and foil tae with 90 risers on both ends. 4 Provide the fountain unit with install. That includes removing the 1 $2,800.00 $2,800.00 old unit and slab. Install new slab utilizing the existing water and drain lines. 5 Replace RPZ at Rabb Pavilion $3,575.00 $3,57S.00 6 Concrete Panel replacement at Silver Slugger 4 panels @ 100 sq 1 $3,950.00 $3,950.00 ft per panel Total = $16,902.55 All other terms and conditions of the Contract Documents shall remain in effect. Original Contract Price $388.387.67 Net change by previous Change Orders $0.00 Contract Amount Prior to this Change $388,387.67 Amount of this Change Order $16,902.55 Revised Contract Amount, including this Change Order $405,290.22 The Contract time due to this Change Order has increased by 15 Working Days City of Round Rock Texas Fazzone Construction Co.. Inc. Architect Owner / Representative Contractor By (Signature) Printed Name, Title By (Signature) Printed Name, Title By (Signature) Printed Name, Title Date Date Date Please sign and return original to: Fauone Consimction Co , Inc. , Attn. Acmunq^g 1302 West 91anco Road, San Antonio, TX 78232 acmundngigaaoneconstrucbon.com Page 1 of 1 City of Round Rock ,- f` ROUND ROCK Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 1 with Fazzone Construction Company, Inc. for the Rabb Pavilion Improvements Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 12/6/2019 Dept Director: Rick Atkins, Director Cost: $16,902.55 Indexes: 2014 General Obligation Bonds Attachments: From Fazzone - Rabb CO#1, Change Order #1—Fazzone (signed) Department: Parks and Recreation Department Text of Legislative File CM -2019-0376 This item will authorize the City Manager to execute a change order with Fazzone Construction Company for the Rabb Pavilion Improvements Project. After construction began, PARD decided it would be the best value to have the Contractor install electrical conduit beneath all driveways to be utilized for future electrical connections of the restroom and pavilions. The existing drinking fountain was found to be at the end of its useful life. The Contractor had a similar drinking fountain in stock and offered it to the City at a heavily discounted price. Finally, after requesting inspection of the existing double-check backflow preventer, PARD learned it was out of compliance and needed to be replaced with an above ground RPZ unit. At an adjacent facility in Old Settlers Park, several sidewalks had shifted due to the expansive soils, creating a trip hazard. Since the Contractor was already pouring concrete for the Rabb Pavilion Improvements Project, it was the best value to the City to have the Contractor replace these panels at the same time as the concrete work associated with this project. The Rabb Pavilion Improvements Project includes the installation of a new pavilion, improved parking lot, accessible cricket batting cage, concrete slab under existing shade structure, new sidewalk, prefab restroom, water & wastewater service, grading for better drainage, irrigation, and various other improvements. Cost. $16,902.55 Source of Funds: 2014 General Obligation Bonds Viy o/Round Rock page t ,,, Printed on IVS/ZU19