CM-2020-038 - 2/7/2020STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: HALFF ASSOCIATES INC. {'Engineer") ADDRESS: 9500 Amber len Boulevard Buildine F Suite 125 Austin TX 78729 PROJECT: Chisholm VaHgl Storm Drain Improvements — Area 3 This Supplemental Contract No. 1 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Halff Associates, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract', on the 1 I th day of July, 2019 for the Chisholm Valley Storm Drain Improvements -- Area 3 Project in the amount of $131,535.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $17,005.00 to a total of $148,540.00; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2, Engineering Services and Exhibit B Engineering Services shall be amended as set forth in the attached Addendum to Exhibit B. Exhibit C Work Schedule shall be amended as set forth in the attached Addendum to Exhibit C. lip Article 4, Compensation and Exhibit D._Fee Schedule shall be amended by increasing by $ I 7,005.00 the maximum amount payable under the Contract for a total of $148,540.00, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. [signature pages follow] 'c e'Zo w 0 199,1928; 0043 8696 Rev.06/ 16 84275 HALFF ASSOCIATES, INC. By: 'Iz� zazo Dare Supplemcntal Contract Rev.06-'16 0199.1928;00438696 84275 CITY OF ROUND ROCK AS TO ORM: By: Laurie Hadley, C ty Manager UStepha&Sheets, City Attorney c�?, - f7_ ea o Date Supplemental Contract Rev.06r 16 0199,1928;00438696 84275 City of Round Rock Chisholm Valley Drainage Assessment Contract for Engineering Services ADDENDUM TO EXHIBIT B Engineering Services 1. PROJECT PURPOSE The purpose of this supplemental to the Chisholm Valley Drainage Assessment Project Study Area 3 is for additional services to refine the 2D Hydraulic Model for Study Area 3. The refinement is for updating the existing and proposed analysis to utilize 2017 Lidar for better design resolution and to utilize NOAA Atlas 14 rainfall data at the direction of the City of Round Rock. In addition to these refinements, additional economically feasible storm drain improvements were determined to improve capture and conveyance of storm water and reduce the flooding potential within the Study Area 3 at the direction of the City of Round Rock. ProjeclAreoFIL . V .ter• ',pprnuo era r ^ - - • . � � o o� n �PrpP+nM Pp• � � � Q � • leexp mia � � � Q _ Y 1 yu44r� 4= Figure 1. Study Area 3 Project Limits 2. SCOPE OF WORK The scope of work for the services to be provided under this additional work effort request includes the following tasks: Chisholm Valley Study Area 3 Flood Mitigation Desigg • Task 2: Site Data Acquisition • Task 3: Preliminary Engineering Design (30%) City of Round Rock Chisholm Valley Drainage Assessment Contract for Engineering Services lask 1: Project Management • No additional effort requested. 2.1 Site Visit • No additional effort requested. 2.2 ToRogLaphic Survey Tasks include the following: • Topographic survey associated with additional economically feasible storm drain improvements on Buckskin Drive, Chisholm Valley Drive and Sagebrush Drive. • Locate property corners for southwest property line of Wag -A -Bag on Chisolm Valley Drive. • Survey manholes and flowline elevations of sanitary sewer manholes within PUE adjacent to above reference property line. • Topographic survey of PUE and channel adjacent to above referenced property line for potential new outfall location. Subsurface Utility Investigation • No additional effort requested. Environmental Deskto Assessment • No additional effort requested. Task : Preliminary Engi=ringi • Additional tasks include refinements and updates to the 2D analysis to incorporate best available data and additional economically feasible storm drain improvements, cost estimate analysis to determine additional improvements, and additional survey needs. Tasks include the following: • Update 2D hydraulic model with more detailed 2017 LiDAR data for more accurate 2D modeling results. • Update modeling methodology to approximate standard design calculations and methodology. • Update 2D hydraulic model with NOAA Atlas 14 Rainfall data. • Evaluate 2D hydraulic model for additional economically feasible storm drain improvements for Study Area 3. • Revise cost estimate to reflect additional economically feasible storm drain improvements. TTask 4: 60% Design Phase Submittal • No additional effort requested. City of Round Rock Chisholm Valley Drainage Assessment Contract for Engineering Services Task 5: 100 % Design Phase Submittal • No additional effort requested. Task 6: OA/OC Review • No additional effort requested. City of Round Rock Chisholm Valley Drainage Assessment Contract for Engineering Services ADDENDUM TO EXHIBIT C Work Schedule Halff Associated, Inc. (Halft) can commence work on this project within two weeks after notice -to - proceed is received from the City of Round Rock. Halff anticipates completing Work Authorization No. 3 within ten (10) months after receiving a Notice to Proceed (NTP). • Task 1: Project Management - 10 months • Task 2: Site Data Acquisition - 2 months • Task 3: Preliminary Engineering Design (30%) - 3 months • Task 4: 60% Design Phase Submittal - 3 months • Task 5: 100% Design Phase Submittal - 2 months • Task 6: QA/QC - 10 month City of Round Rock Chisholm Valley Drainage Assessment Contract for Engineering Services ADDENDUM TO EXHIBIT D Fee Schedule Hourly rates to be billed on a time and materials basis per the following Rate Schedule attached (behind this page): *Rates may be amended once between Nov. 1, 2018 and Nov. 1, 2019, not to exceed a 3% increase. Chisholm Vallgy Storm Drain Improvements - Area 3 Su lemental Work Authorization #1 Exhibit D Fee Schedule Total Total Other Task Labor Hours Loaded Labor Cost Direct Costs Subconsultams TOTALS Task 1: Project Management 0 S0.00 S0.00 S0.00 $0.00 Task 2: Site Data Acquisition 16 $2,455,00 $0.00 $0.00 $2,455.00 Task 3: Prcliminary Engineering Design (30%) 101 $14,550.00 $0.00 $0.00 $14,550.00 Task 4: 60% Design Phase Submittal 0 $0.00 S0.00 $0.00 $0.00 Task 5: 100% Design Phase Submittal 0 $0.00 $0.00 $0.00 $0.00 Task 6: QA/QC 0 $0.00 S0.00 $0.00 $0.00 SUPPLEMENTAL NO.ITOTAL 117 $ 17,005.00 0 0 S 17,003.00 ORIGINAL CONTRACTTOTAI. 850 S 129,360.00 2075 0 S 131,535.00 REVISED CONTRACT TOTAL: 1,084 S 146,365.00 2,175 0 $ 148,W nn 0 s ONO, �p r `h 'o w dv P S ;still �p SAGEBRUSH AR d d• ��r �. a� R011t1011P CRC Q o N GHEE co p b'ON d• � M j GP? p ,�-Ys�j�� ��� �PGON� 1Ea�p e0 �4 0°0o e• °i 000°o � � � *i s��R��p Q� .� � oo t °e • °off° ° �0000 �aEy 5 s°pia e•°ss ••o° °• ° eo°o� 0 , °0• 43 s0 o� �+ d%ly JAo°.� a Z o NNy LN � ..*♦��4 �yJ ���°° � �4�G'S 7J �d�J fii E eweco p s s • �. � P$E � y fgUr' Gi 7b �07a �3 j sad OgFP WOO[) OR 3 u�GE 0 ■ ■ City of Round Rock JourvoRoac Agenda Item Summary Agenda Number: Title: Consider executing Supplemental Contract No. 1 with Halff Associates, Inc. for the Chisholm Valley Storm Drain Improvements - Area 3 Project Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 2/7/2020 Dept Director: Michael Thane, Utilities and Environmental Services Director Cost: $17,005.00 Indexes: 2014 Drainage Revenue Bonds Attachments: SC#1, Map Department: Utilities and Environmental Services Text of Legislative File CM-2020-038 The City previously entered into an Engineering Services Contract with Nalff Associates, Inc. for the design of the Chisholm Valley - Area 3. The scope of services for this contract includes the design of construction plans and bidding documents for Area 3 of the proposed improvements for the neighborhood. These improvements are necessary for reducing some of the flooding within this area. Supplemental No. 1 is to provide additional funding required for Task 2 - Site Data Acquisition and Task 3 - Preliminary Engineering Design (30%) of the original design phase contract. At the direction of the City, the scope of services for these two tasks was revised to include updates to the modeling and revisions to the preliminary design for the purpose of including the recently released NOAA Atlas 14 rainfall data into the model. The previous model was revised to include this new rainfall data and the topographic survey area was extended beyond the previously approved limits of the project in order to capture the additional areas within the revised scope. The current Engineering Services Contract provided for a maximum payment of $131,535. This supplement is for $17,005 and will increase the contract to a maximum of $148,540. Cost: $17,005 Source of Funds: 2014 Drainage Revenue Bonds City of Round Rock Page i Printed on V712020