CM-2020-040 - 2/7/2020Page I or
Contract Quantity Adjustment/Change Order
M Ol.1i
Department: I3aao
Project
Name: Rabb Pavilion Imffavements Project T Date: 11 6i920
City Project Change Order/Quantity
1D Number Adjustment No. 2
Vendor Faaone Constructlon CD. 1302 West Blanco Road San Antonio, TX 78232 210-408.9095
Company Name Address Phone Na
3ustilication
After working with the local cricket club and securing a portion of the funds required to build the second batting cage, PARR believes it makes
better fiscal sense to build the second batting cage now, rather than In the future.
JYf'11'INRT
Original Contract Price:
Previous Quantity Adjustment(s).
This Quantity Adjustment:
Total Quantity Adjustment(s).
Total Contract Price with Quantity Adjustment(s);
Previous Change Order(s)-,
This Change Order.
Total Change Order(s) To Date:
Adjusted Contract Price [Original Contract Price Phis
Quantity Adjustment(s) Plus Change Order(s)]:
Difference between Original and Adjusted Contract Prices:
Original Contract Time:
Time Adjustment by previous Quan. Ad)./Change Order.
Time Adjustment by this Quan. Adj.JChange Order:
New Contract Time:
Submitted for Approval
Amount
$388,387,67
$0.00
$0.00
0.00
5388,397.67
$16,90255
$48,070.77
$65,773.32
$454,160.99
$65,773.32
120 days
15 days
30 days
165 days
% Change
4%
13%
17%
Prepared By: Rachel (Norris Park Development Specialist, CORR i Im, I low
Signature Printed Name, Title, Company pate
tQi �Approvals
�� PQu l ", 4' ', iii /+ I 7J -269Contractor/�• ��/J
Signature Printed Name, ntte, Company Date
Pagt 3 of 3
Contract Quantity Adjustment/Change Order
� nputioaotx„
+n, 1+16
Project Name: Rabb Pavillon Improvements Project
Quan. Adj./Change Order No.;
Page 3 of 3
Contract Quantity Adjustment/Change Order
per- ,
rem 01 16
Project Name: Rabb Pavilion Improvements Project
Quan. Adj./Change Order No.
City of Round Rock
Tom RQa` Agenda Item Summary
Agenda Number:
Title: Consider executing Quantity Adjustment/Change Order No. 2 with Fazzone
Construction Company, Inc. for the Rabb Pavilion Improvements Project.
Type: City Manager Item
Governing Body: City Manager Approval
Agenda Date: 2/7/2020
Dept Director: Rick Atkins, Director
Cost: $48,870.77
Indexes: 2017 General Obligation Bonds
Attachments: From Fazzone - Rabb CO#2, Change Order #2_Fazzone (signed), LAF -
QA-CO#2 - Fazzone - Rabb Pavilion
Department: Parks and Recreation Department
Text of legislative File CM-2020-040
This item will authorize the City Manager to execute a change order with Fazzone Construction
Company for the Rabb Pavilion Improvements Project. After working with the local cricket club
to secure a portion of the funds required to build the second batting cage, PARD believes it
makes better financial sense to build the second cage now, while a contractor is already
mobilized, rather than in the future.
The Rabb Pavilion Improvements Project includes the installation of a new pavilion, improved
parking lot, accessible cricket batting cage, concrete slab under existing shade structure, new
sidewalk, prefab restroom, water & wastewater service, grading for better drainage, irrigation,
and various other improvements.
Cost: $48,870.77
Source of Funds: 2017 General Obligation Bonds
City of Round Roeh Page i Printed on 217/2020
A ends Item Summary Continued CM•202"41
Prior to construction, PARD had identified items that could be done in-house. During
construction, PARD identified it would be a better use of resources for the contractor to
complete due to expertise, time, and cost. Those items include the egress doors and painting
of the interior of the containers.
Cost. $32,425.00
Source of Funds: General Self -Financed Construction
Cffy of Round Rack Page 2 Pdafed an 2/7/2020