Loading...
CM-2020-040 - 2/7/2020Page I or Contract Quantity Adjustment/Change Order M Ol.1i Department: I3aao Project Name: Rabb Pavilion Imffavements Project T Date: 11 6i920 City Project Change Order/Quantity 1D Number Adjustment No. 2 Vendor Faaone Constructlon CD. 1302 West Blanco Road San Antonio, TX 78232 210-408.9095 Company Name Address Phone Na 3ustilication After working with the local cricket club and securing a portion of the funds required to build the second batting cage, PARR believes it makes better fiscal sense to build the second batting cage now, rather than In the future. JYf'11'INRT Original Contract Price: Previous Quantity Adjustment(s). This Quantity Adjustment: Total Quantity Adjustment(s). Total Contract Price with Quantity Adjustment(s); Previous Change Order(s)-, This Change Order. Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Phis Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Ad)./Change Order. Time Adjustment by this Quan. Adj.JChange Order: New Contract Time: Submitted for Approval Amount $388,387,67 $0.00 $0.00 0.00 5388,397.67 $16,90255 $48,070.77 $65,773.32 $454,160.99 $65,773.32 120 days 15 days 30 days 165 days % Change 4% 13% 17% Prepared By: Rachel (Norris Park Development Specialist, CORR i Im, I low Signature Printed Name, Title, Company pate tQi �Approvals �� PQu l ", 4' ', iii /+ I 7J -269Contractor/�• ��/J Signature Printed Name, ntte, Company Date Pagt 3 of 3 Contract Quantity Adjustment/Change Order � nputioaotx„ +n, 1+16 Project Name: Rabb Pavillon Improvements Project Quan. Adj./Change Order No.; Page 3 of 3 Contract Quantity Adjustment/Change Order per- , rem 01 16 Project Name: Rabb Pavilion Improvements Project Quan. Adj./Change Order No. City of Round Rock Tom RQa` Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 2 with Fazzone Construction Company, Inc. for the Rabb Pavilion Improvements Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 2/7/2020 Dept Director: Rick Atkins, Director Cost: $48,870.77 Indexes: 2017 General Obligation Bonds Attachments: From Fazzone - Rabb CO#2, Change Order #2_Fazzone (signed), LAF - QA-CO#2 - Fazzone - Rabb Pavilion Department: Parks and Recreation Department Text of legislative File CM-2020-040 This item will authorize the City Manager to execute a change order with Fazzone Construction Company for the Rabb Pavilion Improvements Project. After working with the local cricket club to secure a portion of the funds required to build the second batting cage, PARD believes it makes better financial sense to build the second cage now, while a contractor is already mobilized, rather than in the future. The Rabb Pavilion Improvements Project includes the installation of a new pavilion, improved parking lot, accessible cricket batting cage, concrete slab under existing shade structure, new sidewalk, prefab restroom, water & wastewater service, grading for better drainage, irrigation, and various other improvements. Cost: $48,870.77 Source of Funds: 2017 General Obligation Bonds City of Round Roeh Page i Printed on 217/2020 A ends Item Summary Continued CM•202"41 Prior to construction, PARD had identified items that could be done in-house. During construction, PARD identified it would be a better use of resources for the contractor to complete due to expertise, time, and cost. Those items include the egress doors and painting of the interior of the containers. Cost. $32,425.00 Source of Funds: General Self -Financed Construction Cffy of Round Rack Page 2 Pdafed an 2/7/2020