Loading...
Contract - PM Construction dba IPR South Central - 2/13/2020 (2) iz-vioao-to2-1 CITY OF ROUND ROCK UTILITIES AND ENVIRONMENTAL SERVICES • • ROUND ROCK TEXAS Project Manual For: Lake Creek 10 & Lake Creek 11 Wastewater Improvements December 2019 _ �"� Prepared By: P�E OF T\���f '� . •. bi0(�' 00 g.• ��. Sean Mason, P.E. * �� • *�i, Kimley-Horn and Associates, Inc. i .......................*✓ 2600 Via Fortuna, Building 1 .....SEANMASON•... 7i 110102 Suite 300 �f1 '•'•�1101 2 •' ' r Austin,Texas 78746 APPROVED BY • • r `'� r9► '•�..---� �' CITY ATTORNEY TBPE Firm Registration No r - 1 2,‹: Lake Creek 10 & Lake Creek 11 Wastewater Improvements TABLE OF CONTENTS Section Description No. of Pages 00020 Notice to Bidders 1 00100 Instructions to Bidders 4 Exhibit A 1 00200 Bid Bond 5 00300 Bid Form 9 00410 Statement of Bidder's Safety Experience 9 00500 Agreement 5 00600 Insurance & Construction Bond Forms Performance & Payment Bond Instructions 1 Insurance Instructions 1 00610 Performance Bond 2 00620 Payment Bond 7 00650 Certificate of Liability Insurance 14 00700 General Conditions 42 00800 Supplemental General 1 00900 Conditions Special Conditions 5 01000 Technical Specifications 4 Bypass Pumping of Existing Sewer Systems 4 Rehabilitation of Existing Wastewater Main by Pipe Bursting 10 02000 Plans, Details and Notes 24 02000 Construction Plans 8-2016 Table of Contents 00090665 00020 NOTICE TO BIDDERS NOTICE TO BIDDERS Sealed bids addressed to Eddie Zapata,City of Round Rock,Utilities and Environmental Services, 3400 Sunrise Road, Round Rock, TX 78665, for furnishing all labor, material and equipment and performing all work required for the project titled, Lake Creek 10 & Lake Creek 11 Wastewater Improvements (project includes the open cut installation of approximately 185 linear feet of 15-inch and 650 linear feet of 12-inch wastewater main and trenchless rehabilitation via pipe bursting of approximately 2,350 linear feet of 8-inch and 550 linear feet of 10-inch wastewater collection), will be received until January 15, 2020 at 10:00 a.m., then publicly opened and read aloud at the same address. Bid envelopes shall state date and time of bid and "Lake Creek 10 &Lake Creek 11 Wastewater Improvements". Bids must also be accompanied by a "Statement of Bidder's Safety Experience" included in Section 410 of the Project Manual. No bids may be withdrawn after the scheduled opening time. Any bids received after scheduled bid opening time will be returned unopened. Bids must be submitted on City of Round Rock bid forms and must be accompanied by an acceptable bid security as outlined in the Instructions to Bidders, payable to the City of Round Rock, Texas equal to five percent (5%) of the total bid amount. Plans, Bid Forms, Specifications, and Instructions to Bidders may be obtained from the City of Round Rock website at the following web address: www.civcastusa.com; registration with CivCast is required at the website to download the documents. Bidders shall be responsible for printing or obtaining prints of the aforementioned documents as necessary. For questions please contact the City's Project Manager, Eddie Zapata, (512) 218-6605. In case of ambiguity,duplication, or obscurity in the bids,the City of Round Rock reserves the right to construe the meaning thereof. The City of Round Rock further reserves the right to reject any or all bids and to waive any informalities and irregularities in the bids received. The successful bidder will be expected to execute the City of Round Rock's standard contract and to furnish performance and payment bonds, all as described in the bid documents. Contractors and subcontractors shall pay to laborers,workmen,and mechanics the prevailing wage rates as determined by the City of Round Rock. A non-mandatory Pre-Bid conference will be held at 3400 Sunrise Road, Round Rock, Texas 78665, on January 8, 2020 at 10:00 a.m.. Publish Dates: Round Rock Leader:: December 14, 2019 December 19, 2019 December 21, 2019 December 26, 2019 Pflugerville Pflagg: December 18, 2019 December 25, 2019 00020 10-2015 Notice to Bidders 00193093 Page 1 00100 INSTRUCTIONS TO BIDDERS INSTRUCTIONS TO BIDDERS 1. Prior to submitting any bid,bidders are required to read all drawings(plans),specifications, and all other Project Manual and/or Contract Documents carefully; to inform themselves by their independent research, test and investigation of the difficulties to be encountered and judge for themselves of the accessibility of the Work and all attending circumstances affecting the cost of doing the Work and the time required for its completion and obtain all information required to make a bid. The aforementioned documents may only be obtained from the City's website at the following web address: www.civcastusa.com . Bidders shall be responsible for printing or obtaining prints of the aforementioned documents as necessary. 2. Should the bidder find discrepancies in, or omissions from the drawings (plans), specifications, or other Project Manual and/or Contract Documents, or should he be in doubt as to their meaning, he should notify at once the City and obtain clarification or addendum prior to submitting any bid. Any addenda issued will be posted with the documents at the web address mentioned in 1 above no later than two business days prior to the Bid Opening Date.Prior to submitting a bid,the bidder is responsible for determining if any addenda have been issued and for following any instructions required in any addenda issued. 3. It shall be the responsibility of the bidder to see that his bid is received at the place and time named in the Notice to Bidders in the Project Manual. Bids received after the scheduled opening time will be returned unopened. 4. Bids shall be submitted in sealed envelopes plainly marked "Sealed Bid" and showing the name of the project, the job number if applicable, and the opening date and time. 5. Bidders shall be responsible for submitting a copy of the City's Bid Form, Bid Bond Form, and Statement of Bidder's Safety Experience from the Project Manual documents posted at the web address as described in 1 above. 6. Bids shall be accompanied by a bid security consisting of a certified cashier's check in an amount not less than five percent (5%) of the total maximum bid price, payable without recourse to the City of Round Rock,or a bid bond in the same amount from a reliable surety company, as a guarantee that the bidder will enter into a contract and execute performance and payment bonds, as stipulated by item 15 below, within ten (10) days after notice of award of contract to him. Bid securities must be submitted in the same sealed envelope with the bid. Bids submitted without a bid security may not be considered at the sole discretion of the City. Page 1 00100 2-2016 Instructions to Bidders 00090650 7. If awarded the bid,the bidder must complete a Form 1295 electronically on the Texas Ethics Commission (TEC) Web site at https://www.ethics.state.tx.us/whatsnew/elf info form1295.htm and submit the signed and notarized Form 1295 within ten (10) business days of notification of the award. Instructions for completing a Form 1295 are attached as Exhibit "A" to the Instructions to Bidders. 8. No conditional bids will be accepted. 9. A bidder wishing to withdraw his submitted sealed bid prior to the scheduled bid opening time must do so by presenting in person a written request signed by an authorized representative of the bidder to a City employee at the location for which sealed bids are to be addressed. No telephone, facsimile, or email requests will be accepted. The City will expend the time and effort that the City in its sole discretion determines is necessary to investigate the authenticity of a request before complying with a request. The City shall in its sole discretion determine if the City will comply with a request and the City shall not be held liable for not complying with a request. If the City does not comply with a request, the request shall automatically become null and void. 10. A bidder wishing to revise his sealed bid after submittal but before the scheduled bid opening time must first withdraw his bid as provided for in the Instructions to Bidders and then submit a sealed bid in accordance with the Instructions to Bidders. No revisions to a bid will be allowed after the scheduled bid opening time. The bidder shall be responsible for ensuring the amount of the bid security is as specified in the Instructions to Bidders. 11. All bid securities will be returned to the respective bidders within twenty-five (25) days after bids are opened, except those which the City elects to hold until the successful bidder has executed the Agreement. Thereafter, all remaining securities, including security of the successful bidder, will be returned within sixty(60) days. 12. Until the award of the contract, the City reserves the right to reject any and all bids and to waive technicalities; to advertise for new bids; or to do the work otherwise when the best interest of the City will be thereby promoted. 13. In case of ambiguity or lack of clarity in the statement of prices in the bids,the City reserves the right to consider the most favorable analysis thereof, or to reject the bid. Unreasonable and/or unbalanced prices submitted in a bid may result in rejection of such bid or other bids. 14. Award of the contract, if awarded,will be made within sixty(60) days after opening of the bids, and no bidder may withdraw his bid within said sixty (60) day period of time unless a prior award is made. A Notice to Proceed will be issued within sixty (60) days after contract Execution Date as defined in the General Conditions. 15. Within ten (10) days after written notification of award of the contract, the successful bidder must furnish a performance bond and a payment bond in the amount of one hundred Page 2 00100 2-2016 Instructions to Bidders 00090650 percent (100%) of the total Contract Amount. Said performance bond and payment bond shall be from an approved surety company holding a permit from the State of Texas, indicating it is authorized and admitted to write surety bonds in this state. In the event the bond exceeds $100,000.00, the surety must also (1)hold a certificate of authority from the United States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law; or (2) have obtained reinsurance for any liability in excess of $100,000.00 from a reinsurer that is authorized and admitted as a reinsurer in this state and is the holder of a certificate of authority from the United States secretary of the treasury to qualify as a surety or reinsurer on obligations permitted or required under federal law. In determining whether the surety or reinsurer holds a valid certificate of authority,the City may rely on the list of companies holding certificates of authority as published in the Federal Register covering the date on which the bond is to be executed. 16. Failure to execute the Agreement within ten (10) days of written notification of award or failure to furnish the performance bond and payment bond as required by item 15 above, shall be just cause for the annulment of the award. In case of annulment of the award, the bid security shall become the property of the City, not as a penalty, but as liquidated damages. 17. No contract shall be binding upon the City until it has been signed by its Mayor after having been duly authorized to do so by the City Council. 18. The Contractor shall not commence Work under the Agreement until he has furnished certification of all insurance required and such has been approved by the City,nor shall the Contractor allow any Subcontractor to commence work on his subcontract until proof of all similar insurance that is required of the subcontractor has been furnished and approved. The Contractor's insurer shall use the certificate of insurance form included in the bid documents or the standard ACORD form. 19. If the bidder's insurance company is authorized, pursuant to its agreement with bidder, to arrange for the replacement of a loss, rather than by making a cash payment directly to the City,the insurance company must furnish or have furnished by bidder, a performance bond in accordance with Section 2253.021(b), Texas Government Code, and a payment bond in accordance with Section 2253.021(c). 20. Any quantities given in any portion of the Bid Documents, including the drawings (plans), are estimates only, and the actual amount of work required may differ somewhat from the estimates. The basis for payment shall be the actual amount of work done and/or material furnished as specified in the General Conditions. 21. Bids shall be submitted on a separated contract basis. No Texas sales tax shall be included in the prices bid for materials consumed or incorporated into the Work. This contract is issued by an organization which is qualified for exemption pursuant to the provisions of Section 151.309(5) of the Texas Tax Code. The City will issue an exemption certificate to the Contractor. The Contractor must then issue a resale certificate to the material supplier Page 3 00100 2-2016 Instructions to Bidders 00090650 for materials purchased. The Contractor must have a valid sales tax permit in order to issue a resale certificate. Upon obtaining consumable materials, the Contractor will issue a resale certificate in lieu of payment of sales tax, and the following conditions shall be observed; 1) The Contractor will transfer title of consumable, but not incorporated, materials to the City at the time and point of receipt by the Contractor; 2) The Contractor will be paid for these consumable materials by the City as soon as practicable. Payment will not be made directly but considered subsidiary to the pertinent bid item. The Contractor's monthly estimate will state that the estimate includes consumables that were received during the month covered by the estimate; and 3) The designated representative of the City must be notified as soon as possible of the receipt of these materials so that an inspection can be made by the representative. Where practical, the materials will be labeled as the property of the City. 22. The Contractor, after execution of the contract and pursuant to Internal Revenue Service (IRS) regulations, shall furnish its Taxpayer Identification Number(TIN) to the City. The Contractor shall provide the appropriate information on a W-9 form(which can be provided by the City upon request). This form shall be submitted directly to the City's Accounts Payable Department to ensure security of the information. 23. If the Bid Form includes Add and/or Deduct Alternate bid items and/or otherwise provides for Alternate bids, the City will determine whether to select or not select one or more of the Add and/or Deduct Alternate bid items and/or Alternate bids at the City's sole discretion and for its greatest advantage. If the City selects any Add and/or Deduct Alternate bid items, the total bid amount will be determined by adding the amount of the selected Add Alternate(s)to, and deducting the amount of the selected Deduct Alternate(s) from the Base Bid or the selected Alternate bid. Page 4 00100 2-2016 Instructions to Bidders 00090650 EXHIBIT "A" FORM 1295 INSTRUCTIONS Pursuant to newly enacted Section 2252.90 of the Texas Government Code, as of January 1, 2016, any business entity entering into a contract with a local government that requires approval of the governing body must submit a disclosure of interested parties to the local governmental prior to the execution of the contract. The Texas Ethics Commission (TEC)has adopted a form for the disclosure of interested parties (Form 1295)and has created a website application for business entities to submit the required information. The City of Round Rock may not enter into a contract that requires the approval of the City Council until the business entity that is a party to the contract files a Form 1295 with the City Clerk. The instructions to complete Form 1295 and file it with the City Clerk are as follows: 1. Upon being notified of a bid award,the award recipient("business entity")must go to the following website: https://www.ethics.state.tx.us/whatsnew/elf info_fonn1295.htm and follow the login directions on the website application to complete a Form 1295. If this is a business entity's first time logging on to the website application, the business entity must create a login Username and Password and then follow the application's instructions to complete a Form 1295. 2. The City does not have a Contract ID Number System. Please insert the project name in this box. 3. Even if a business entity has no interested parties, Form 1295 still must be completed using the website application and filed with the City Clerk. 4. Once confirmation is received that the information has been submitted,the business entity MUST print, sign and notarize the printed out completed Form 1295. 5. The signed and notarized Form 1295 must be filed with the Clerk of the City of Round Rock within ten (10) business days of the date of notification of the award. The signed and notarized Form 1295 may be scanned and e-mailed to swhite(roundrocktexas.gov OR mailed or hand-delivered to the address below. 6. Once the City Clerk receives the signed and notarized Form 1295, the City Clerk will submit confirmation of receipt through the TEC website application within thirty(30)days of the filing of Form 1295. 7. This process must be followed for each contract a business entity enters into with the City of Round Rock. 8. A Form 1295 cannot be handwritten. It must be completed electronically through the TEC website application. 9. If you have any questions regarding the filing of Form 1295,please contact: Sara White,City Clerk 221 East Main Street Round Rock,Texas 78664 Phone: (512)218-5404 Fax: (512)218-7097 E-mail: swhite@roundrocktexas.gov 00200 BID BOND BID BOND THE STATE OF TEXAS § § KNOW ALL BY THESE PRESENTS: COUNTY OF WILLIAMSON § PM Construction&Rehab,LLC dba IPR South CentralThat ot the City of Pasadena County of Harris State of Texas as Principal, and Arch Insurance Company authorized under the laws of the State of Texas to act as surety on bonds for principals, are held and firmly bound unto the CITY OF ROUND ROCK, TEXAS ("Owner"), in the penal sum of Five Percent (5%) of the total amount of the Bid of the Principal submitted to the Owner,for the Work described below;for the payment whereof,well and truly to be made, and the said Principal and Surety do herby bind themselves and their heirs, administrators, executors, successors and assigns,jointly and severally, as follows: In no case shall the liability of the Surety hereunder exceed the sum of Cr kj-nine .i-I10USQJld, -live. hundrd nine -Sid(. dollars oid Dollars ($ 2q,5gti,(75 ). semn ' een-t5 THE CONDITIONS OF THIS OBLIGATION ARE SUCH that,whereas,the Principal has submitted the above-referenced Bid to the Owner, for construction of the Work under the "Specifications for Construction of Lake Creek 10 & Lake Creek 11 Wastewater Improvements for which Bids are to be opened at the office of Owner on the 15th day of January , 20 20 . NOW, THEREFORE, if the Principal is awarded the Contract, and within the time and manner required under the "Instructions to Bidders," after the prescribed forms are presented to her/him for signature,enters into a written Agreement substantially in the form contained in the Bid Documents, in accordance with the Bid, and files the two (2) bonds with the Owner, one to guarantee faithful performance and the other to guarantee payment for labor and materials,then this obligation shall be null and void; otherwise, it shall be and remain in full force and effect. In the event that suit is brought upon this Bond by the Owner and judgment is recovered,said Surety shall pay all costs incurred by the Owner in such suit,including a reasonable attorney's fee to be fixed by the Court. IN WITNESS WHEREOF,the said Principal and Surety have signed this instrument on this the 8th day of the month of January 20 20 . PM Construction&Rehab,LLC dba IPR South Central Arch Insurance Company Pri—n�c-i�al Surety zedi n e t 1 a Victoria P.Parkerson Printed e Printed Name B • By: 1141614—?›Wz9 it Title: A orney-in-Fact Address: 131 N.Ric Address: 3 Parkway,Ste 1500 Pasadena,TX 77506 Philadelphia,PA 19102 00200 9-2015 Page 1 Bid Bond 00090652 Resident Agent of Surety: Signature Teresa D.Kelly Printed Name 51111 Westheimer,Ste 900 Street Address Houston,TX 77056 City, State, Zip Page 2 00200 9-2015 Bid Bond 00090652 SURPATH 2017 This Power of Attorney limits the acts of those named herein, and they have no authority to bind the Company except in the manner and to the extent herein stated. Not valid for Note, Loan,Letter of Credit, Currency Rate,Interest Rate or Residential Value Guarantees. POWER OF ATTORNEY Know All Persons By These Presents: That the Arch Insurance Company, a corporation organized and existing under the laws of the State of Missouri, having its principal administrative office in Jersey City, New Jersey(hereinafter referred to as the"Company")does hereby appoint: Victoria P.Parkerson its true and lawful Attorney-in-Fact,to make,execute,seal,and deliver from the date of issuance of this power for and on its behalf as surety,and as its act and deed: Any and all bonds, undertakings,recognizances and other surety obligations. Surety Bond Number: N/A Principal: PM Construction & Rehab, LLC dba IPR South Central Obligee: City of Round Rock This authority does not permit the same obligation to be split into two or more bonds In order to bring each such bond within the dollar limit of authority as set forth herein. The execution of such bonds,undertakings,recognizances and other surety obligations in pursuance of these presents shall be as binding upon the said Company as fully and amply to all intents and purposes,as if the same had been duly executed and acknowledged by its regularly elected officers at its principal administrative office in Jersey City, New Jersey. This Power of Attorney is executed by authority of resolutions adopted by unanimous consent of the Board of Directors of the Company on September 15, 2011, true and accurate copies of which are hereinafter set forth and are hereby certified to by the undersigned Secretary as being in full force and effect: "VOTED, That the Chairman of the Board, the President, or the Executive Vice President, or any Senior Vice President, of the Surety Business Division, or their appointees designated in writing and filed with the Secretary, or the Secretary shall have the power and authority to appoint agents and attorneys-in-fact, and to authorize them subject to the limitations set forth in their respective powers of attorney, to execute on behalf of the Company, and attach the seal of the Company thereto, bonds, undertakings, recognizances and other surety obligations obligatory in the nature thereof, and any such officers of the Company may appoint agents for acceptance of process." This Power of Attorney is signed, sealed and certified by facsimile under and by authority of the following resolution adopted by the unanimous consent of the Board of Directors of the Company on September 15,2011: VOTED,That the signature of the Chairman of the Board,the President,or the Executive Vice President,or any Senior Vice President, of the Surety Business Division,or their appointees designated in writing and filed with the Secretary,and the signature of the Secretary, the seal of the Company, and certifications by the Secretary, may be affixed by facsimile on any power of attorney or bond executed pursuant to the resolution adopted by the Board of Directors on September 15, 2011, and any such power so executed, sealed and certified with respect to any bond or undertaking to which it is attached,shall continue to be valid and binding upon the Company. 00ML0013 00 03 03 Page 1 of 2 Printed in U.S.A. SURPATH 2017 In Testimony Whereof, the Company has caused this instrument to be signed and its corporate seal to be affixed by their authorized officers,this 28th day of September ,20 17 Attested and Certified Arch Insurance Company �jance 0 fi -41aAgel Ctitia, . o� CORPORATE 'O .. :)-6-4--- ' v SEAL d 1911 il ", t'i:-1/1 kl-- Patrick K. Nails,Secretary Missouri David M. Finkelstein, Executive Vice President STATE OF PENNSYLVANIA SS COUNTY OF PHILADELPHIA SS I,Michele Tripodi,a Notary Public,do hereby certify that Patrick K.Nails and David M.Finkelstein personally known to me to be the same persons whose names are respectively as Secretary and Executive Vice President of the Arch Insurance Company, a Corporation organized and existing under the laws of the State of Missouri, subscribed to the foregoing instrument, appeared before me this day in person and severally acknowledged that they being thereunto duly authorized signed, sealed with the corporate seal and delivered the said instrument as the free and voluntary act of said corporation and as their own free and voluntary acts for the uses and purposes therein set forth. COMMONWEALTH OF PENNSYLVAN to NOTARIAL 1,4....L r , t�f/(,-- 4,,_.,' 1,11C HELE TRIPOD). NotaryPubliC City of Phi4:detphil,Phila. County My Ccanmiiicn Exptfes July 31.2421 Michele Tripodi, Notary Public My commission expires 07/31/2021 CERTIFICATION I,Patrick K.Nails,Secretary of the Arch Insurance Company,do hereby certify that the attached Power of Attorney dated September 28,2017 on behalf of the person(s)as listed above is a true and correct copy and that the same has been in full force and effect since the date thereof and is in full force and effect on the date of this certificate;and I do further certify that the said David M.Finkelstein, who executed the Power of Attorney as Executive Vice President,was on the date of execution of the attached Power of Attorney the duly elected Executive Vice President of the Arch Insurance Company. IN TESTIMONY WHEREOF, I have hereunto subscribed my name and affixed the corporate seal of the Arch Insurance Company on this 8th day of January ,2020 . 'Pleehe-d Patrick K. Nails,Secretary This Power of Attorney limits the acts of those named therein to the bonds and undertakings specifically named therein and they have no authority to bind the Company except in the manner and to the extent herein stated. PLEASE SEND ALL CLAIM INQUIRIES R.ELATING TO THIS BOND TO THE FOLLOWING ADDRESS: Arch Insurance—Surety Division 3 Parkway,Suite 1500 �o;ance�,a Philadelphia,PA 19102 4` 4. CORPORATE 'V 4 SEAL Q 1971 {,�, Missouri OOML0013 00 03 03 Page 2 of 2 Printed in U.S.A. IMPORTANT NOTICE TO ALL TEXAS POLICYHOLDERS IMPORTANT NOTICE AVISO IMPORTANTE To obtain information or make a complaint: Para obtener informacion o para someter una queja: You may call Arch Insurance Group's toll-free Usted puede Ilamar al numero de telefono gratis telephone number for information or to make a de Arch Insurance Group para informacion o complaint at: para someter una queja al: 1-866-413-5550 1-866-413-5550 You may also write to Arch Insurance Group at: Usted tambien puede escribir a Arch Insurance Group Arch Insurance Group Arch Insurance Group Harborside 3 Harborside 3 210 Hudson Street, Suite 300 210 Hudson Street,Suite 300 Jersey City, NJ 07311-1107 Jersey City, NJ 07311-1107 You may contact the Texas Department of Puede comunicarse con el Departamento de Insurance to obtain information on companies, Seguros de Texas para obtener informacion coverages, rights or complaints at: acerca de companias, coberturas, derechos o quejas al 1-800-252-3439 1-800-252-3439 You may write the Texas Department of Puede escribir al Departamento de Seguros de Insurance: Texas: P.O. Box 149091 P.O. Box 149091 Austin, TX 78714-9091 Austin, TX 78714-9091 Fax: (512)490-1007 Fax: (512)490-1007 Web: http://www.tdi texasgov Web:http://www.tdi.texas.gov E-mail: ConsumerProtection@tdi texas gov E-mail: ConsumerProtection@tdi.texas.gov PREMIUM OR CLAIM DISPUTES DISPUTAS SOBRE PRIMAS 0 RECLAMOS: Should you have a dispute concerning your Si tiene una disputa concerniente a su prima o a premium or about a claim you should contact un reclamo, debe comunicarse con el Arch the Arch Insurance Group first. If the dispute is Insurance Group primero. Si no se resuelve la not resolved, you may contact the Texas disputa, puede entonces comunicarse con el Department of Insurance. departamento(TDI). ATTACH THIS NOTICE TO YOUR POLICY UNA ESTE AVISO A SU POLIZA: Este aviso es This notice is for information only and does not solo para proposito de informacion y no se become a part or condition of the attached convierte en parte o condicion del documento document. adjunto. 00 ML0042 44 04 16 Page 1 of 1 00300 BID FORM BID FORM PROJECT NAME: LAKE CREEK 10 AND 11 WASTEWATER IMPROVEMENTS PROJECT LOCATION: Round Rock, Texas OWNER: City of Round Rock. Texas DATE: January 15, 2020 Gentlemen: Pursuant to the foregoing Notice to Bidders and Instructions to Bidders, the undersigned bidder hereby proposes to do all the Work, to furnish all necessary superintendence, labor, machinery, equipment, tools, materials, insurance and miscellaneous items, to complete all the Work on which he bids as provided by the attached Bid Documents, and as shown on the plans for the construction of Lake Creek 10 and 11 Wastewater Improvements and binds himself on acceptance of this bid to execute the Agreement and bond for completing said Work within the time stated, for the following prices, to wit: Any addenda issued will be posted with the Project Manual and or Contract Documents on the City's website at www.civcastusa.com by the close of business on . Prior to submitting a bid, the bidder is responsible for determining if any addenda have been issued and for following any instructions in any addenda issued. Bidder acknowledges receipt of the following Addenda by listing Addendum "number" and "date". BASE BID Bid Approx. Item Description Item Quantit Unit and Written Unit Price Unit Price Amount 1 60 SY HOT MIX ASPIIALTIC CONCREET PAVEMENT REPAIR complete in place per SPEC. 340 for i Ytchi dollars and 7 y ' cents. 4q0-0° 4 5 a 2 30 SY CONCRETE DRAINAGE REPAIR complete in place per SPEC. 360 9 for E ht�-c:l v.� dollars and L ,v- cents. 't il_316.O4) 4)2.,G50.o 0 00300-9-2015 Page 1 of 9 Bid Form BASE BID Bid Approx. Item Description Item Quantit Unit and Written Unit Price Unit Price Amount 3 120 LF P.C. CONCRETE CURB AND GUTTER (EXCAVATING) complete in place per SPEC. 430 for Epr"-h dollars and yp cents. it 4O °° 1.LMe . DO 4 2350 SF NEW P.C. CONCRETE SIDEWALKS TO 4" THICKNESS, INCLUDING REMOVAL OF EXISTING SIDEWALK complete in place per SPEC. 432 for Fpri-Li- j dollars $.42,50 and � - --' 77" cents. '. • t qq,2175.co 5 150 SY P.C. C NCRETE DRIVEWAY REPAIR, (EXCAVATION, MATCH EXISTING) complete in place per SPEC. 433 for dollars and 'Ts j,,-r cents. st go.D0 t 13sod' oo 6 60 LF BORING 24" STEEL PIPE, INCLUDING BORE PITS, EXCAVATION, AND BACKFILL complete in place per SPEC. 501 fort hunk -- --Rite_dollars and cents. t 425`0 D t 25,SWD•bo 7 150 LF CONCRETE ENCASEMENT FOR 12" DIA. PIPE complete in place per SPEC. 505 for I Vt j r dollars and Wrp cents. 30'O o `- 4,5 Od ' o v 00300-9-2015 Page 2 of 9 Bid Form BASE BID Bid Approx. Item Description Item Quantit Unit and Written Unit Price Unit Price Amount 8 1 EA MINOR MANHOLE ADJUSTMENT AND INTERIOR LINING PER DETAL WW-01, 4' complete in place per SPEC. 506 for.4hree -housoM -fi,vp hwyJir 1 dollars and l j vD cents. )25Q'OU ?Je2C).00 9 10 EA REMOVAL OF EXISTING MANHOLE, 4' DIA. complete in place per SPEC. 506 for dollars and ,j cents. 12 g 50.00 t 28, '0 0 10 14 EA NEW MANHOLE CONSTRUCTION, 4' EA complete in place per SPEC. 506 for Re 4Yd 1- huyarrd dollars and 'fi-Ph-i cents. ,2' D.DO $cm,coo.00 11 1 EA DROP MANHOLE, 4' DIA. complete in place per SPEC. 506 for aj` ,.,,hop SQlid h o lags and LLvc, cents. i5I113).' $5,7 5-0 .0 0 12 2050 LF TRENCH SAFETY SYSTEMS (ALL DEPTHS) complete in place per SPEC. 509 for one dollars and ZQXD cents. I .O D 2,0 GD• 0 o 00300-9-2015 Page 3 of 9 Bid Form BASE BID Bid Approx. Item Description Item Quantit Unit and Written Unit Price Unit Price Amount 13 60 LF PIPE, 12" DIA. SDR-26 PVC INSTALLED IN 24" STEEL ENCASEMENT WITH SPACERS, WW complete in place per SPEC. 510 for LI;h _seven dollars and -A cents. 41617.5b S1S5Q.00 14 310 LF PIPE, 12" DIA. SDR-26 PVC (ALL DEPTHS), INCLUDING EXCAVATION AND BACKFILL, WW complete in place per SPEC. 510 for El` ki -1 vL dollars g and 1.1•v1) cents. n.ov 210,350.00 15 185 LF PIPE, 15" DIA. SDR-26 PVC (ALL DEPTHS), INCLUDING EXCAVATION AND BACKFILL, WW complete in place per SPEC. 510 for ( ( VUJ J d -f U-e- dollars and ZQl 7 cents. I rj5 00 16 3160 LF INSPECTION - PRE CONSTRUCTION TV, WW complete in place per SPEC. 510 for fR3LIJ' dollars and 'fl pii, cents. +. t4. i4,22 .°° 00300-9-2015 Page 4 of 9 Bid Form BASE BID Bid Approx. Item Description Item Quantit Unit and Written Unit Price Unit Price Amount 17 3690 LF INSPECTION - POST CONSTRUCTION CLEANING AND TV, WW complete in place per SPEC. 510 for One_ dollars and -thwe(rl -,R 1 cents. 41 .25 t 4 s(Q 12 18 5 EA INSTALLING OR RECONNECTING LATERAL SERVICE TO REPLACED PIPE (4" DIA. SERVICE) IN (10" DIA. PIPE) complete in place per SPEC. 510 for ,9j i humped fbrhj-t?ve . dollars and z,Q.VD cents. Sip14.5.0° 3, 225 d0, 19 350 LF OPEN CUT - REHAB/INSTALL OF 12" SEWER LINE (INCLUDING BYPASS PUMPING) complete in place per SPEC. 510 for (e hw1red C- �`� _R dollars and ZlLVD cents. )75.00 *CA Zct •O a 20 2050 SY NATIVE GRASSLAND SEEDING AND PLANTING complete in place per SPEC. 609 for -- ) dollars and kihj 014--Fj'VC._ cents. a•35 21 7 EA STABILIZED CONSTRUCTION ENTRANCE complete in place per SPEC. 641 for �ydAte ars c1b,QSO'°° and 2.11-3/0 cents. $1,5g).00 4 00300-9-2015 Page 5 of 9 Bid Form BASE BID Bid Approx. Item Description Item Quantit Unit and Written Unit Price Unit Price Amount 22 2400 LF SILT FENCE FOR EROSION CONTROL complete in place per SPEC. 642 for ale_ dollars and -PrN cents. ti,50 i 3 tptL•D O 23 1 LS TOTAL MOBILIZATION complete in place per SPEC. 700 for *R-Pl eels you SaRel dollars and 7 LD cents. t 15,00C' d $I'5 ADO&° 24 70 LF WOOD FENCE complete in place per SPEC. 701 for -j-e-P n dollars and Z. LVD cents. ct,15.00 c I,OSD• Do 25 3 MO BARRICADES, SIGNS, AND TRAFFIC HANDLING complete in place per SPEC. 803 for-ArCE4hnU Sand dollars and Zi-V7 cents. .$3 b()(10° q UC0.00 26 530 LF PIPE BURST - 8" TO 10" HDPE IPS DR19 (INCLUDING BYPASS PUMPING), WW complete in place per SPEC. KH for Fp - dollars and 7 L r cents. S. LJ .0o 22,200.°0 00300-9-2015 Page 6 of 9 Bid Form BASE BID Bid Approx. Item Description Item Quantit Unit and Written Unit Price Unit Price Amount 27 1820 LF PIPE BURST - 8" TO 12" HDPE IPS DR11 (INCLUDING BYPASS PUMPING), WW complete in place per SPEC. KH for 1-71--Ptq dollars and ZJ,V O cents. $ woo 4a 1,&&Q•b 0 28 550 LF PIPE BURST - 10" TO 12" HDPE IPS DR19 (INCLUDING BYPASS PUMPING), WW complete in place per SPEC. KH for f -fhJ-f \ , dollars and 2,e_42.,0 cents. t 55.03 4;1))a o.b 0 00300-9-2015 Page 7 of 9 Bid Form BASE BID Bid Approx. Item Description Item Quantit Unit and Written Unit Price Unit Price Amount 00300-9-2015 Page 8 of 9 Bid Form TOTAL BASE BID (Items 1 thru 28 ) 4t5j1 q 35 00 Materials: 4O0'? /77.a5 All Other Charges: 73 ) (? /7. • Total: otal: * Note: This total must be the same amount as shown above for "Total Base Bid" If this bid is accepted, the undersigned agrees to execute the Agreement and provide necessary bonds and insurance certification as per the Instructions to Bidders. The undersigned certifies that the bid prices contained in the bid have been carefully checked and are submitted as correct and final. The Owner reserves the right to reject any or all bids and may waive any informalities or technicalities. Respectfully Submitted, 131 N. Richey Street ignature Jamee Bedingfield Pasadena, TX 77506 Print Name Address Treasurer 832-252-4807 Title Telephone PM Construction & Rehab, LLC dba IPR South Central Name of Firm January 13, 2020 Date Secreta , if Bidder is a Corpor ' n Wendy Wilkes 00200-9-2015 Page 9 of 9 Bid Form 00410 STATEMENT OF BIDDER'S SAFETY EXPERIENCE Page 1 00410 8-2014 Statement of Bidder's Safety Experience 00090654 Solicitation Requirements, Contract Forms & Conditions of Contract Statement of Bidder's Safety Experience Section 00410 Bidder must submit a signed Statement of Bidder's Safety Experience form with his Bid; failure to do so will constitute an incomplete Bid that may be rejected. In order to make a responsive Bid, Bidder must provide evidence that it meets minimum OSHA construction safety program requirements, has not been fined by OSHA for any willful safety violations in the past three years, and has a lost time injury rate that doesn't exceed the limits established below. All questions must be answered and data given must be clear and comprehensive. If necessary, questions may be answered on separate attached sheets. Company Name: PM Construction & Rehab, LLC dba IPR South Central Address: 131 N. Richey Street, Pasadena, TX 77506 Phone: 832-252-4807 Completed by: Sara Grogan Date: 1/13/2020 1. Does the company have a written construction Safety program? ❑✓Yes ❑No 2. Does the company conduct construction safety inspections? ❑✓Yes ❑No 3. Does the company have an active construction safety-training program? ❑✓Yes 0 No 4. Has the company been fined by OSHA for any willful safety violations in the past ❑Yes ❑✓ No three years? 5. Does the company have a lost time injury rate of 7.8 for SIC 15, or 7.6 for SIC 16, ✓[Yes ❑No or less over the past three years? Attach the company's OSHA 200/300 logs for the past three years. 6. Does the company or affected subcontractors have competent persons in the following Areas? A. Scaffolding ❑Yes ❑No ❑✓ N/A B. Excavation ❑✓ Yes No ❑N/A C. Cranes ❑Yes ❑No ❑✓ N/A D. Electrical ❑Yes ❑No ❑✓ N/A E. Fall Protection ❑Yes ❑No ❑✓ N/A F. Confined Spaces ❑✓ Yes ❑No ❑N/A I hereby certify that the above information is true and correct. Signature � Title Treasurer amee Bedingfield Page 1 00410 8-2014 Statement of Bidder's Safety Experience 00090654 O O \V� J A O.. g a g _ ocid E� N a y n.x 8 c C6 • 10 �° o a) fn ., u. m V. n A _O i C N A O N C P t D c7 N a � U U U g O m g Ol f0 y N C 01 Ts H .2N N U L O N Y K N a 2 0m 9 m U c y 2 n `) 3 y w m o - ri o L f0 U rI A Ccii v '- C L (n 7 O c o 3 U H c 0 0 2 ¢ EL, m fi E Y �1 •2 m o E Em E) CU 9 a m U U NO 76 I N n °' T :T.:E g > a o Ua c ° ay v - C m c. c v U ' m E Oo N O a x m f 6L N I C _ E L EcLs2U ,n 2 c- tC" E n c E E O N t0 N er I E 4- C C yT' • > Uct m asa Nc N Y rl m ; w L N C t [0 y = C N N T N I 19 a ' � a N 5 V L E j _L ` .3 E Q d � o T c f°m` y o mE Y p) U (4 Z O Qc F>. t Y U U c O E a) w in U) CD co co 0 E l r o 8 a o"o` D`o o m::L d 2 o g o L C O y d O U c as U t Q mi zV L ,, mNN G $ m EE r)am `c a ot� o E a) �_ O E U O v O O w dt"y 5aL C V 'O O U .` N2 LL Cn N 7 Oan C Q 76 O m NI O.2O yO O' t. F-O L yO OE mmp=CN N o Oy O0 =N 4iti . O V- o y CVC > A LNo mNNL N. g y O C d o m U cp N_ t Oy y TU N - n d EO 2 p " o' ot3 V O f° y . Mc c mE,a CU fn c 0 E � cp as o LP. o" o:fp p 2 N E0 it O .2 o _ a O o f O)J o 2$ '- (7 =) N I C -CI w •Cm `N G h m� ' €o E o Ey O s _ g j y = a ° €j Li ` T., t LT.= C o'° c c o a CD 1 ` p U O O Q m o $oY d � $ >w w y � 3 � - o vLn m P g1— o . o �o� NQ 0 O "O m ms o >'', 8 L igia E '` o en a E U N .'tF - = E3 c 1 °a v 2 E m 2 3 ch o o E L o E zE Oaa me a CcN "- 5g2a ta 6` - vm e QO aE Ea d� Q. g 8 ,aE . > Do0 o I- �c �aL, Eli � N� d y y : . A oE0 g. c(/) o ctz¢ f0 O "a' E o w 0 y y ° J '' ,o c E o C7 o E m m Y c E� mac y =-° t¢ o � ��._ L E `0 h O� O%3 r) .a C L C N (C C Y d O O. c''O �/� m m Iii 0 A m rn� nmo �° io E :° >Y �tn�c ., 2 m� Q E W es° 2 F�a Z F--- 3 H ���8 d 2 11`o ,assauw Ja41O UV 'D o sassaull!�a410 IIV tO c ,T al O c O No sso-1 6uueak E o sso�6ul�eaH In E u 0= m F" C N 6wuasod ? 0 6u!uosiod v 00 d= w $o uo!lipuoo uoil!puo0 2. O E = a U bole idsaa 0.. f ole�!dsaa N °- L 1ii ppo I N Y t1 x v tinful ><0- -0- O a U i J O O O D ] C N D v 0 a rut;7Lya .J =-E.o 3 0 0 m Y m o O 211U N Y Q W> p "O C tp O W D co C C p N E U `° N '7 O fT N N . j U d O N C ' co U a L al D O N d w O m N E ° m w o a m E w E m v o 5 N w u O m n ❑ N W U o 0 L C°a N ° 7 U Lk O N o d L o a t m N = x .- O m o r E n o 22 w rn v m T. a C O O N 2.Z El co a " E ° N 9`oN n O m ° o Lv E F°a 2 F, o` N C 7 L (T C a/U v! c U (o N S UO O O a W a. to O O � Ql � C U .` m O 19 a Q Q Q Co p L m 3 xo ® Z Z Z E 'N n E E� °, 3�t N WZ U)Nw o U 0 LL oO 2 n m U m v ¢ ' o Z 9 c 5 4 m .T- o rn O m c c E O N U W ii E c U Q >aD r o E 0 v C y Q 4-7Y �E oC J N �C 6 0y N aO -" _O c d o O o (ai Q Oa H. a LN y 0 CQ) ONN cmN Oal tUs w ° 3 (Oa rn y Tl C!W) LOma E P m 2 0, 5-.Ef0 n 6 m y to v `w a a 3 E N U 'ALL o Di m o 3 dm 0 N`tE.-5 N L vQ Q mwo Nt0 ¢ T U /�) m E m o c°i g m W a o a N E° u_r'l m E i c O m O. a o a E O . C � m rn a ° E c ° U E a._', a v V ra c V`Ut D'O U F- m a1N3 al F A cx Et _N v �- b °L N O v`u 'a' a) °VY On' ni _- pQ L•L i0O LEI', CCL mOU Pi g O O = S a kzg-iii u al J E L . U y 0 3 ,w 'c a h _ i€ Q c c y N LO O O O N . (h O `-al 0 - H= N VUl C \O ry N N �p m H V. z m p ❑ a- E € o U O �V w y oa o E N C , N a v• 0 A\ 0.5 a.' Evs um W �L U g a n �° a aF l o d z o N m (a - m la_ E 5, 1,7] 3 -, J J v t-O O 1 � ma E M Lod o`o"N 3 m r E H E N`� E O o m E - a" _ v m v o� o � 0 v.g c c E a`l c m s, >,o s L n 0 o m > ,1 4 i m cm`.c 0 a m m N Z � 2 u c`o � O iaa: N : o i w H H :L¢ E Li- o I'd o 0 m y m a`l - 0 u) 4� ,� ° o € T o O a_ . o y o ,`o _O.v E`o `� w a U N o � 2 -o m Q E ,- E N o H al m o W ° rn� m m = En 1 a m> C U rn m m o a c E{ Cl) 0 h- e�� J E y N • o N O �i Q A O - (N m Q a) (O a- to m F; (' Q 12 O E m O c o c T `..U 2 a E o g - a- 5 O S'o o o 1 J„ L m � w m 5 Q o N m aa,, 2 a O.2 a al O m 0 OD e0 m N G N m etc o_ Q. N a c� m U U O 2 m` y d C NC l9 ? C 2 N L ~ N 3 i) 0 !n F.,- C Y FEa `8 V _y E (� m Of n in U , U F v m W U) 5 N G 0 _ O L {'Op U O] Y A O a' U 2 - C, C] C L O C fn U 'O C ~O O U N C E Y Z F. C 2 0 = m 2 d U O y , _ 7 C U U co NI U �-- T O C O Si w 1m C V= T g Si 7 ... p y O. O O e_ m a m m E a U --‘C'' OC L w v U m m •o a-ei x c y • 0 .N I T. C O _ y C N O , E mix y , O y •L_.. � C L W m _ E °�' ` c U nI , io E n rn x f0 a c L E 2 2 a o E p y � c o m c � E c m '` m o S. N Z U S 0_ O % 0 OI O y t C U m y n U m 3 ;� o C y _ C .0 N _ O O LN N Q d C Eai U N w ,- m Ili . r E m m 3 c a m N 1 > 6 U . (A Z 2 Q .F % L Y u 8 ago a C w O E a) w 0 G) E L c .O c- E U m y o_ L , m o m '[n • 13 O o 2 F o S. c g E .p � 15N U � o8 y mo "� QO m N C >` O a Oay■ y 8 a LT`L. N a.) y' mac 2,,., E p - 3 00 o L 1�s .0,, O G xNt C O N O) .�H� C a .— e.� " ono 0 L N 3 ' 2ay m =_ y O y N , y 1— O U Q o 0 m I (:) 0 3 G.gzi g 2' ,,o O 2 ' I > > .- C A E g.6 o Al O� t f° o U C N O O j, o E o V/ �,G N y N N N N Q O d . C L 2 N E G ` h 0 2,+ ,C'j� ,C V U O fq y '_'' c v2i ; c C ,CD C', U R'e m O N N O w o o O N C O E ` N A+ Ern m o o o o o V o;_i - o g V/ V)J t' e N G fl 2 a C O: U) M �a o g3 C y N U O ' o E « C - C C L m j 2 > t..S. U. t 62.E C 3�3 O C .O CU Q G � o G) I .2.N o e roQ:u .—` Cm o ri E_ ai o E 2 m °- �o a, 1- 3 2 o avitQL 8° E Get ZyO m > ; `2' wo mo m 0 t 0E 9 � ° a3 g;p , 'C.e .� u ci, rn jL Oc, i E o o e) 1,'�. a) c - m C = 'O O E chi E Oa ` m G=e G 2 onmw 2 z Laa . , ° 00 '�o ca �i4 Fo m E Gw Aac8 ,5 ez U. E U �a3 m a °• a-w o m Eoct N Z2 ti uU So m " N 4- H y N N o m a mNG1u ° '= o R o f c o - E 8g 0Q a Et o 2 -O o a o (7 0 >. o Y 'o N f° o Cl) Cl)= .a),, S- 0) O.2 C L .G C (0 C v O 32 N •,L••, n a, m O / " o U) E a og, O O O O �0 A�c O 9 C(n C Vl Y a`, m O Q: E w., Z I---o Z 1--o 3 c I-- 7-��o a a rn v E a cassau l,a o T II yl Hy O sa so.ull!,a410 Ild '� c ,T v O C O ON o ssoi 6uueaH v� o sso�6uyeaH _J E a o x 0 L m H c 6uluoslod v o 6uwoslod v g v t, .co, O c I-- d 2 v u o uoiopuoa uol3lpuoa O E f0 oa U /ode ldsaa �o1eildsaa T arri N R m m c Japiosia ui)IS N o .apiosia ua Ei L y m Ecc ,— CIw n a) 3 ro t "• knit,' x .- funful C a U) U DO O = o v m O O C C, [[3 -J p O a v a m v- E -- C�N . 3 .E Y % s3 0 0 , Y o O Ail 3 . a c - C a) _ U U v U! N N y Q N O N U 2 N d L '" a L O m U1— E E ° 0 m o U N N d fn U c E — ` L N �_ v O v a W U 'o 0 o C a j O U 4 j O Y a wa °o N O y L i .1 w t I n 0 N.2 Q o n a O W o v M a °' my `- T E C ,� N 4 0 m m 2 O N T O N 4 v E a 4 u O m C Q U U m 4 O m m N O C L Uo s 0 O N . O N p N N O U L y 3 O 0 E nE E N w 7 a d f0 Z U) N—o n U 0 F_a rn - O w C o ? w Z O o Iv m o w p Q o Y c E ° h U m Q E E Ern= U U N ''Ell t o v � a c — M m o '^c w io �' = p m o` -P I;,_ N INO o m U N J a¢v v w R O t U O j Q N F[" D v m 7 N N C N —_ N N N m C N V U a E c � v � v `U U al 2 T C Cl) y i �{/ 3 E$3 n Co L O v E L. m Cl) T= U U O � Cl) CD v n m mT W `E N Y o v d c E N o �'o N o f U c T E m O U fU 22 T O L O w N O C 13 L_` W O U� a C NW 1 n m O L � ' U aRI L O1 C m m u n o E o ^N, L' c O YI c o o G S U C N N c W _ o Y $m N ar mt Ell, U O ....gm_ • c u' N� O �S�--� L >v m _. o, o a`o OA ag va og�coi of 3 E $R I a `o v v 3 0)v = t d w c — - v '3 m 11 z y N — c m ,f o 6 0`o. S0 rn o f O?' a1 v a v' �o .. O '�O C U V E',7 O N y , offs. E `m E'_mf E m ;-- ♦I/�[( m T.o o o O V v 4¢ ,. c u = U A� `o`�O t U v c E m 1'� W r m E o n oa y c v m m°v z a '2 v o i m L a -s 3 _o'E' o 0 L. 3`�v - E v m Cl L v uEOiUL m L_ C C v �' 4y q R oms' m O Z � olgoO NZ, N N am oe a2U c0 Q CO O- mSi 6 v O >N oLm2 w UOU `aE`NOaTv Ea c ,a _ W LLa }�, = =o C o, LE I VI ` 2 NE 'O nLETsV) 0 r a, 23 -gNOJ >sTa QUz .- N ' Q fm , mOO '- N (7Q ( a ` NE79-o L C O o y � f0 m J H N w O•C c .. E C< 5m CO d Q O E o L r" N CO 2 2 a. L- 0 c E co R) to 5 FA N V) >, r >- jV.. m m m d m s ai c o- '2 O is R U n a, 7 U N O a) a, Y, a, C a) t , HIa7 X a, a, Of 'O a) o 0 _N Y C N �., O _ o ca a, c.., N .c, U c a) Jai ;; - N tE « a, a, _ C A YO L ya U O, w ?I C Q, (n , N ._ O �, Y n6 O U) I N C 0 0 U m i, E Z `_1 T c m 2 O CI c h E E y O y N 7 7 C fn NI N r.l N• y o O o m �- ' a E 7 m o m o a 7 y E o U « U c a e n m m E o- a) m U m E .. e X d i0 a,.2 o, m I'� I c0 i m E c d E 2 N N N N T o, N a] c c U c ' 7 r, E c w E .O a,E. U m a m m I- I c ar w a, 0 c E lx d a w c o d " N ,>a a •+ y Z i U 7 U C m xi_ L o U — y N _ ° d E c m 7 rn « a, E y 2' a, Q Qf To L c N N N j N T V C C E 7 L 3 S E 2 N N >, C f0 d ° Fa Y () U = 6 Z C Q I-- ,. C Y u c8, co ,a w 0 E rn w in CD a) 2 v� 2 C Um C m Om 1-- T 8 a S 9 C y -0 g E g— N a 2° C, 2 G 8 E CU 30 0 L. 0 d m d m C °- 2 da 8a 0 E "2CD 1M E o CO .L. y 8 ao 6-4-2 E g 0 V 00 0 « E °t� 'C 9 ` IL° a, 7 Q) O) o' r`pn 0 0 10 m Q°l ay, c c v 8- ■ .0 y Q C =N.t.. 0 N N G d e c C O Q) y O N p O L 0co C° O — y H �- O U O c 2 >, - y y G V C.O 4, 8-,y0 a'i 2 3 2 2) .9 c Ca d d o cA 13 N W a..Z N a >'� g O O O a h o m E -.. .0▪ m e o•CL O U U o. E co - CO4 m o 2 U O in En c m o O \V E e s O m O O 2 O C O E m,w CDE 8, a) to O 0 0 0 J O:J = 0 '�CL 5 ''`).A C=i € o E c E c, p.c L C > Ce d'�- t li C O C C 5 2) Q Q. E ate, > 1 3 o o m o m _ Q °o E re mo o o o 5 9 �L C To a .= Q O °�o E o L. EF �• a �°O � F 3 2 H.o �� co Eo �= < 0 O O a, m•C N U C U E y aya''g'C (a y d > O O y a O N c a.-2" O V,Y 7 $ N U o m o M e C nL3 LL E3—"4 `— °� ='3 p O 2 C7 O O _ EE m n z. c O om 8Oao 5..6. m -gy- R i -p a) o v C 2 ca m '-2 m I- 0 c0 a a 2-§P,OU c� �m o A L8 �L jO 'C2 OR2U ~ .t.. > cia Cti o O `C ::-.-2 .. Eoq W yN N Eg- o' `�o coO N O E O � �N .z' o' m ,Q m ca g E2 2 0 , uo OE7o a cE Zp.g NE, t=ho ,m, ay,. •-. E , ♦^ y C,.0 C u) '5 y y A �' c�c E mo E E afDi E o m o . c c v, �L �$ ¢._ E L °' z 12-o z H-0 3 5 1- ���U C a o,$o v >' ;assaulll'ay10IIV g o sassaulll'aw.IIV m IgoN o sso,6uuH '?' oea sso7 6uueHto m 8 Vt m .y 6uiuosi0d ? 0 6uluosiod v m a+m p CO d v o °u uolpuoO o uoeds0a aE D '` � ,('o)e'dsaa ra- O tvTam J 'ap'osIQ ul)ls E o 1ap'osIQ was E CDO o O RI 0 c ' U 9 s 0 o .. U tinful E, x x x >- fn o. a ) E r, �'nful o= D O u O C U ° o`m m N 8 C C , J O O N N N D E -2 J J C C $ m >,E N t y v 3 , 0 ° 2",,, 0 0 c m o Q w o 3 m m C E °' s 3 v _ Ti, cti y U - V .� O ry J C V N N (O ° N L U 2,v N n t c, O m V E ° E ° 0 m o N U N C U _ D n CZ m = � o N U N m y $ y o tV a N • W U O O O Q L a j ° p 4 U O (;s T U N a N s n 22 v L N f0 i a y - ,, Z o O E E t E a'2 .a o � .CD(a v 01 f0 — E O C i C ° a v o c7 v E a v E N - N `,E, C - W m 2 O iV-- N O O o o a ° o' C U U 13 2 U N N UO N 3 a. E' '; U x Itl x ^ ? h . E 8 V N 3 0 x0 L� E N' u y L N D E o E. N w UNo Dv m O NwLay a Nw >2 O of0o ex ,+ O NO oo.c3 N. 0 4 E o H o,m w( O E- E e U U m m ° 0i =. N N E T m V ', U U L H a U 41 D C E > O N rNy °v a°, N1 o fa, Na) _ n Oa „ i' m Da ° `' b c`m m m a � Lv U D N tU ° LL E ° °1 v7, OD° L q.U 'D= D N a) E N N D_ t N F OI-€ C J C ° O e N 2. °v o m °E N V >.5°- a" >. 3 L mJ m Cl) N 41 D . '° ''E a�°' v nTd Iv y E v N U a `w m N `o°D'E v N Fa„, v o c) Ei k :Ej o= r”, y 2,,v m � �� O o • m m c ai 1 W 12 L Ic, ° O O L m N (13 mdt O m n to — L D as`� �F. J`p 19 N N ^+ 41 y 0 U C } N - -U W _E D T° _ •0 :a 0 LL1 C O N O O 4 G N c O D L H- u=i V>0) U O O O� U p a O `I- °C N N N vni U N N O _ L-O _a O O y �'v 3 m m 0 2 2 a 1 =3 Co H o m 6, O v v o z �^ E� L - ai 'o 3 v`m E ' >' FF 0 0 ° O c o y al (7 V W N Al j N - t N \Y,2 i 4 O c o= E o o U a _v O Y i N y o o E `m v o) m v v �CD ^, "— m.. m w E m 4 � m D m z c_ m D D c _ t E i 3 ° o o m- o c 1 = w o J U °P=° 3 ° m _� ° _ m O ,,Es o rn u o h o E = o `o a,, `° - = C _,tPA' �'m t al 10 O m v E v c fu c o O 5. o 6 m ` z N Eo >, o m 0- �,m N rn _ N m L¢ E o c o 4 V>'°,O a Cl) 0 E c N y o `m m _ - a E N ° Q E E O N c ° 0 = 7'T\ o m i C w w o,' 2 V� . a a' c a a c //�/� 0 - o _ o E D 0 —i E N i ` r Q,UZ N M y u' co mrn o �Q �n �E omio c a= �O s 'P 044 Secretary's Certificate of PM Construction & Rehab, LLC dba IPR South Central (The "Company") The undersigned hereby certifies,on behalf of the Company, as follows: 1) He is the duly elected and qualified President and Chief Executive Officer: 2) The following individuals are the duly elected and qualified officers the company, (each an "Officer"and collectively the "Officers") elected by the Board of Directors of the Company of occupying the positions set forth next to their respective names below: Robert McCrae- President and CEO Wendy Wilkes-CFO and Secretary Patrick Maginn -COO and Vice President Jamee Bedingfield -Treasurer Bac Ong-Vice President Greg Baggett-Assistant Secretary 3) Each of the Officers is duly authorized, on behalf of the Company,to bid upon and enter into any competitive contract(each a "Bid" and collectively the "Bids") related to the Company's business,and is hereby authorized, on behalf of the Company,to execute and deliver any contacts, agreements or documents required in connection with any such Bid (such authority conferred on the Officers the Board of Directors of the Company effective HELD FRIDAY APRIL 10, 2019.) By: Robert McCrae, President and Chief Executive Officer Dated:April 10, 2019 Corporations Section /.-1 j _C jf, Rolando B. Pablos P.O.Box 13697 � i:, Secretary of State Austin,Texas 7871 1-3697 �' `'�'` Office of the Secretary of State CERTIFICATE OF FILING OF PM Construction & Rehab, LLC File Number: 9809011 Assumed Name: IPR South Central The undersigned, as Secretary of State of Texas, hereby certifies that the assumed name certificate for the above named entity has been received in this office and filed as provided by law on the date shown below. ACCORDINGLY the undersigned, as Secretary of State, and by virtue of the authority vested in the secretary by law hereby issues this Certificate of Filing. Dated: 10/26/2018 Effective: 10/26/2018 „,---- r-r 14 i•-1 -, 4s .---=`----"- A\ /cn/lifer, ,-, .,;-\\ / ;Arc; -"Al . .t.,,,\ tr-Q/ Tri =t verA- 47 A ><44\) YCf) \\4`pw„■411E / Rolando B. Pablos '/- '-� �' Secretary of State Come visit us on the internet at http://www.sos.state.tx.us/ Phone:(512)463-5555 Fax:(512)463-5709 Dial: 7-1-1 for Relay Services Prepared by: Lisa Sartin TID: 10342 Document: 846058920003 00500 AGREEMENT City of Round Rock, Texas Contract Forms Standard Form of Agreement: Section 00500 City of Round Rock, Texas Standard Form of Agreement between Owner and Contractor AGREEMENT made as of the elA (1 t' .)day of M in the year 20 BETWEEN the Owner: City of Round Rock,Texas(hereafter"Owner"or"City") 221 East Main Street Round Rock,Texas 78664 and the Contractor PM Construction&Rehab,LLC dba IPR South Central ("Contractor") 131 N.Richey Street Pasadena,TX 77506 The Project is described as: Lake Creek 10&Lake Creek 11 Wastewater Improvements: Open cut installation of approx. 185 LF of 15-inch and 650 LF of 12-inch wastewater main and trenchless rehabilitation via pipe bursting of approx.2,350 LF of 8-inch and 550 LF of 10-inch wastewater collection. The Engineer is: Sean Mason,P.E. Kimley-Horn and Associates, Inc. 2600 Via Fortuna,Building 1 - Suite 300 Austin, Texas 78746 For and in consideration of the mutual terms, conditions and covenants of this Agreement and all accompanying documents between Owner and Contractor, the receipt and sufficiency of which are hereby acknowledged,Owner and Contractor agree as follows: ARTICLE I THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement,Conditions of the Contract(General,Supplementary and other Conditions), Drawings, Specifications,Addenda issued prior to execution of this Agreement, other documents listed in this Agreement and Modifications issued after execution of this Agreement;these form the Contract,and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations,representations or agreements, either written or oral.An enumeration of the Contract Documents,other than Modifications,appears in Article 7. ARTICLE 2 THE WORK OF THIS CONTRACT Contractor shall fully execute the Work described in the Contract Documents,except to the extent specifically indicated in the Contract Documents to be the responsibility of others. 00500 4-2016 Page 1 of 5 Standard Form of Agreement 00307791 ARTICLE 3 DATE OF COMMENCEMENT; DATE OF SUBSTANTIAL COMPLETION;DATE OF FINAL COMPLETION 3.1 The date of commencement of the Work shall be the date of this Agreement unless a different date is stated below or provision is made for the date to be fixed in a Notice to Proceed issued by Owner. 3.2 The Contract Time shall be measured from the date delineated in the Notice to Proceed. 3.3 Contractor shall commence Work within ten ( 10 ) calendar days from the date delineated in the Notice to Proceed. 3.4 Contractor shall achieve Substantial Completion of the items of Work listed on Attachment A to this Agreement no later than NA ( NA )calendar days from issuance by Owner of Notice to Proceed, and Contractor shall achieve Substantial Completion of the entire Work no later than one hundred and eighty ( 180 )calendar days from issuance by Owner of Notice to Proceed,subject to adjustments of this Contract Time as provided in the Contract Documents. 3.5 If Contractor fails to achieve Substantial Completion of the Work(or any portion thereof) on or before the date(s)specified for Substantial Completion in the Agreement,Contractor shall pay to Owner,as liquidated damages, the sum of five hundred and No/100 Dollars($500.00 ) for each calendar day that Substantial Completion is delayed after the date(s) specified for Substantial Completion. It is hereby agreed that the liquidated damages to which Owner is entitled hereunder are a reasonable forecast of just compensation for the harm that would be caused by Contractor's failure to achieve Substantial Completion of the Work(or any portion thereof)on or before the date(s)specified for Substantial Completion in the Agreement. It is agreed that the harm that would be caused by such failure,which includes loss of expected use of the Project areas,provision of alternative storage facilities and rescheduling of moving and occupancy dates,is one that is incapable or very difficult of accurate estimation.It is hereby agreed that if Substantial Completion of the Work (or any portion thereof) is not achieved on or before thirty (30) days after the date(s) specified for Substantial Completion in the Agreement,the Owner shall have the option to either collect liquidated damages as set forth herein or to thereafter rely on its remedies under the Contract Documents and at law and in equity, including without limitation,the recovery of actual damages.The date(s)specified for Substantial Completion of the Work(or any portion thereof)in the Agreement shall be subject to adjustment as provided in the Contract Documents. 3.6 Contractor shall achieve Final Completion of the entire Work no later than two hundred and ten ( 210 )calendar days from issuance by Owner of Notice to Proceed. ARTICLE 4 CONTRACT SUM 4.1 Owner shall pay Contractor the Contract Sum in current funds for Contractor's performance of the Contract. The Contract Sum shall be five hundred ninty-one thousand,nine hundred and thirty-five and no cents ($591,935.00 ),subject to additions and deductions as provided in the Contract Documents. 4.2 Does the Contract Sum include alternates which are described in the Bid Form? No x . Yes .If yes,please provide details below: "i/A 00500 4-2016 Page 2 of 5 Standard Form of Agreement 00307791 ARTICLE 5 PAYMENTS 5.1 PROGRESS PAYMENTS 5.1.1 Based upon Applications for Payment submitted to Engineer and Owner by Contractor, and Certificates for Payment issued by Engineer and not disputed by Owner and/or Owner's lender,Owner shall make progress payments on account of the Contract Sum to Contractor as provided below, in Article 14 of the City of Round Rock General Conditions,and elsewhere in the Contract Documents. 5.1.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month. 5.1.3 Provided that an Application for Payment is received by Engineer and Owner, and Engineer issues a Certificate of Payment not later than the tenth(10th) day of a month, Owner shall make payment to Contractor not later than the tenth(10th)day of the next month. If an Application for Payment is received by Engineer and Owner after the application date fixed above, payment shall be made by Owner not later than one month after the Engineer issues a Certificate for Payment. 5.1.4 Each Application for Payment shall be based on the most recent schedule of values submitted by Contractor in accordance with the Contract Documents.The schedule of values shall allocate the entire Contract Sum among the various portions of the Work. The schedule of values shall be prepared in such form and supported by such data to substantiate its accuracy as Engineer and Owner may require.This schedule,unless objected to by Engineer or Owner, shall be used as a basis for reviewing Contractor's Applications for Payment. 5.1.5 Applications for Payment shall warrant the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. 5.1.6 Subject to other provisions of the Contract Documents, the amount of each progress payment shall be computed as provided in Article 14 of the City of Round Rock General Conditions. 5.1.7 Except with Owner's prior written approval, Contractor shall not make advance payments to suppliers for materials or equipment which have not been delivered and stored at the site. 5.2 FINAL PAYMENT 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by Owner to Contractor when: .1 Contractor has fully performed the Contract except for Contractor's responsibility to correct Work, and to satisfy other requirements, if any,which extend beyond final payment;and .2 a final Certificate for Payment has been issued by Engineer. 5.2.2 Owner's final payment to Contractor shall be made no later than thirty (30) days after the issuance of Engineer's final Certificate for Payment. In no event shall final payment be required to be made prior to thirty(30) days after all Work on the Contract has been fully performed. Defects in the Work discovered prior to final payment shall be treated as non-conforming Work and shall be corrected by Contractor prior to final payment,and shall not be treated as warranty items. ARTICLE 6 TERMINATION OR SUSPENSION 6.1 The Contract may be terminated by Owner or Contractor as provided in Article 15 of the City of Round Rock General Conditions. 00500 4-2016 Page 3 of 5 Standard Form of Agreement 00307791 6.2 The Work may be suspended by Owner as provided in Article 15 of the City of Round Rock General Conditions. ARTICLE 7 ENUMERATION OF CONTRACT DOCUMENTS 7.1 The Contract Documents,except for Modifications issued after execution of this Agreement,are enumerated as follows: 7.1.1 The Agreement is this executed version of the City of Round Rock, Texas Standard Form of Agreement between Owner and Contractor,as modified. 7.1.2 The General Conditions are the "City of Round Rock Contract Forms 00700," General Conditions, as modified. 7.1.3 The Supplementary, Special,and other Conditions of the Contract are those contained in the Project Manual dated December 2019 7.1.4 The Specifications are those contained in the Project Manual dated December 2019 • 7.1.5 The Drawings, if any,are those contained in the Project Manual dated December 2019 • 7.1.6 The Insurance&Construction Bond Forms of the Contract are those contained in the Project Manual dated December 2019 7.1.7 The Notice to Bidders, Instructions to Bidders,Bid Form, and Addenda, if any,are those contained in the Project Manual dated December 2019 7.1.8 If this Agreement covers construction involving federal funds, thereby requiring inclusion of mandated contract clauses, such federally required clauses are those contained in the "City of Round Rock Contract Forms 03000,"Federally Required Contract Clauses,as modified. 7.1.9 Other documents, if any, forming part of the Contract Documents are as follows: NA ARTICLE 8 MISCELLANEOUS PROVISIONS 8.1 Where reference is made in this Agreement to a provision of any document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents. 8.2 Owner's representative is: Eddie Zapata,Project Manager City of Round Rock 3400 Sunrise Road Round Rock,Texas 78665 8.3 Contractor's representative is: Emily High,Project Manager PM Construction&Rehab,LLC dba IPR South Central 131 N.Richey Street Pasadena,TX 77506 8.4 Neither Owner's nor Contractor's representative shall be changed without ten(10)days'written notice to the other party. 8.5 Waiver of any breach of this Agreement shall not constitute waiver of any subsequent breach. 00500 4-2016 Page 4 of 5 Standard Form of Agreement 00307791 8.6 Owner agrees to pay Contractor from available funds for satisfactory performance of this Agreement in accordance with the bid or proposal submitted therefor, subject to proper additions and deductions,all as provided in the General Conditions, Supplemental Conditions, and Special Conditions of this Agreement, and Owner agrees to make payments on account thereof as provided therein. Lack of funds shall render this Agreement null and void to the extent funds are not available. This Agreement is a commitment of City of Round Rock's current revenues only. 8.7 Although this Agreement is drawn by Owner,both parties hereto expressly agree and assert that,in the event of any dispute over its meaning or application,this Agreement shall be interpreted reasonably and fairly, and neither more strongly for nor against either party. 8.8 This Agreement shall be enforceable in Round Rock, Texas, and if legal action is necessary by either party with respect to the enforcement of any or all of the terms or conditions herein, exclusive venue for same shall lie in Williamson County, Texas. This Agreement shall be governed by and construed in accordance with the laws and court decisions of the State of Texas. 8.9 Both parties hereby expressly agree that no claims or disputes between the parties arising out of or relating to this Agreement or a breach thereof shall be decided by an arbitration proceeding,including without limitation,any proceeding under the Federal Arbitration Act(9 USC Section 1-14)or any applicable state arbitration statute. 8.10 The parties, by execution of this Agreement, bind themselves, their heirs, successors, assigns, and legal representatives for the full and faithful performance of the terms and provisions hereof. This Agreement is entered into as of the day and year first written above and is executed in at least three(3) original copies, of which one is to be delivered to Contractor, one to Engineer for use in the administration of the Contract,and the remainder to Owner. OWNER CONTRACTOR PM Construction&Rehab,LLC dba IPR South Central CITY 0 ROUND RO ,TEXAS , Printed N e: ( MUa IV fie rinted Name: Jamee Beding Title MAI OIL Title: Treasurer Date Signed: ' ri—2020 Date Signed: 2/26/2020 ATTEST: clittuil. 104 City Clerk FOR CIT APPROVED AS TO FORM: Attorney 00500 4-2016 Page 5 of 5 Standard Form of Agreement 00307791 00600 INSURANCE AND CONSTRUCTION BOND FORMS BONDS AND INSURANCE INSTRUCTIONS Instruction Sheet 1. Insurance Company must be licensed by State of Texas. 2. Agent signing bonds must be licensed in Texas. 3. Agent signing bonds must have Power of Attorney on behalf of insurance company. 4. If Agent signing bonds has Power of Attorney, but not licensed in Texas, then the bond must be counter-signed by Texas local recording agent. ALL THE ABOVE INFORMATION CAN BE FOUND AT Texas Department of Insurance website—www.tdi.state.tx.us 5. Make sure the dollar amount on both Performance and Payment Bonds match the amount of the Agreement &Bid Form Sheet. 6. Both Performance and Payment Bonds should be signed by Authorized Person. If the contractor is a corporation, then it should be signed by the President or the Vice-President. If the contractor is not incorporated, then it may be signed by the Owner. Please state the title of the authorized person. CERTIFICATE OF LIABILITY INSURANCE Instruction Sheet 1. CERTIFICATE OF LIABILITY INSURANCE FORM The City of Round Rock's Certificate of Liability Insurance form provided herein or a standard ACORD form. 2. PRODUCER and INSURED -Please list name, address,phone number and e-mail. 3. COMPANIES AFFORDING COVERAGE — TDI number required. The TDI number can be obtained from the Texas Dept of Insurance Website: http://www.tdi.state.tx.us/.—Company Lookup. Note:Exception to this rule.In certain instances where there is unusual risks involved,Surplus Lines Insurance Carriers can be used.Below are the guidelines: a. Insurance Company does not have to be"licensed in Texas",but they do have to be"eligible for a Texas license." Please verify with the Texas Dept of Insurance Website:http://www.tdi.state.tx.us/.—Company Lookup b. Policy has to be written by licensed surplus lines Agent. Also verify with the Texas Dept of Insurance Website:http://www.tdi.state.tx.us/-Agent Lookup 4. TYPES OF INSURANCE COVERAGE— CONSTRUCTION CONTRACT: Please double check the General Conditions and the Supplemental General Conditions for the types and amounts of insurance required. The Supplemental General Conditions usually state the following: a. Business Automobile Liability Insurance b. Workers' Compensation and Employers' Liability Insurance c. Commercial General Liability Insurance d. Builders' Risk Insurance— (Generally required for all "vertical" construction. Check with Project Manager for requirements.) FOR ALL OTHER CONTRACTS, PLEASE REFER TO THE INSURANCE SECTION FOR TYPE OF INSURANCE REQUIRED. (For example Engineering Service Contracts usually require"professional liability insurance") 5. EFFECTIVE DATE & EXPIRATION DATE Please make sure dates are current. 6. City of Round Rock must be listed on the Certificate of Insurance as an additional insured (except Workers Compensation and Builders Risk). 7. Certificate must indicate that the insurance Company must give the City of Round Rock notice of any changes, cancellation , etc. at least thirty(30)days prior to date of change. 8. Make sure Certificate is signed by an Agent Licensed in the State of Texas, this can also be found on the Texas Department of Insurance website—www.tdi.state.tx.us—Agent Lookup. Bond No.SU 1 164155 Arch ES00004867 Everest PERFORMANCE BOND THE STATE OF TEXAS § § KNOW ALL BY THESE PRESENTS: COUNTY OF WILLIAMSON § PM Construction&Rehab,LLC dba IPR South Central That oftheP City of Pasadena CoDuntyv of Arch Insurance Compa(nv and Harris , and State of Texas , as Principal, and Everest Reinsurance Company authorized under the law of the State of Texas to act as surety on bonds for principals, are held and firmly bound unto THE CITY OF ROUND ROCK, TEXAS, (Owner), in the penal sum of five hundred ninty-one thousand, nine hundred and thirty-five and no cents Dollars ($ 591,935.00 ) for the payment whereof, well and truly to be made the said Principal and Surety bind themselves, and their heirs, administrators, executors, successors and assigns,jointly and severally, by these presents: WHEREAS, the Principal has entered into a c rtain written Agreement with the Owner dated the Ph" day of , 202(J to which the Agreement is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein consisting of: Lake Creek 10 & Lake Creek 11 Wastewater Improvements (Name of the Project) NOW, THEREFORE, THE CONDITIONS OF THIS OBLIGATION IS SUCH, that if the said Principal shall faithfully perform said Agreement and shall, in all respects, duly and faithfully observe and perform all and singular the covenants, conditions and agreements in and by said Agreement, agreed and covenanted by the Principal to be observed and performed, including but not limited to, the repair of any and all defects in said work occasioned by and resulting from defects in materials furnished by or workmanship of, the Principal in performing the Work covered by said Agreement and occurring within a period of twelve (12) months from the date of Final Completion and all other covenants and conditions, according to the true intent and meaning of said Agreement and the Plans and Specifications hereto annexed, then this obligation shall be void; otherwise to remain in full force and effect; PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Chapter 2253, Texas Government code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of said Chapter 2253 to the same extent as if it were copied at length herein. Page 1 00610 7-2009 Performance Bond 00090656 PERFORMANCE BOND (continued) Surety, for value received, stipulates and agrees that no change, extension of time, alteration or addition to the term of the Agreement, or to the Work performed thereunder, or the Plans, Specifications, or drawings accompanying the same, shall in anywise affect its obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Agreement, or to the work to be performed thereunder. IN WITNESS WHEREOF,the said Principal and Surety have signed and sealed this instrument this )6 its day of Pei,rear' , 20 20 PM Construction&Rehab,LLC dba IPR South Central Arch Insurance Company and Everest Reinsurance Company Principal Surety Jamee Bedingfield Victoria P.Parkerson Printed Name Printed Name By: By: c . Ti . reasurer Title: ttorney-in-Fact Address: /3/ IV, f cje 51-, Address: 3 Parkway,Ste 1500,Philadelphia,PA 19102 12,00,6)epia, 7- 77s06, PO Box 830,Liberty Corner,NJ 07938 Resident Agent of Surety: teA14.4;),gi-at Signature Teresa D.Kelly Printed Name 5444 Westheimer,Ste 900 Street Address Houston,TX 77056 City, State& Zip Code Page 2 00610 7-2009 Performance Bond 00090656 Bond No.SU 1164155 Arch ES00004867 Everest PAYMENT BOND THE STATE OF TEXAS § § KNOW ALL MEN BY THESE PRESENTS: COUNTY OF WILLIAMSON § PM Construction&Rehab,LLC dba IPR South Central_ thee City, of of Pasadena Count of ArcH Insurancetompany and Harris , and State of Texas as Principal, and Everest Reinsurance Company authorized under the laws of the State of Texas to act as Surety on Bonds for Principals, are held and firmly bound unto THE CITY OF ROUND ROCK, (OWNER), and all subcontractors, workers, laborers, mechanics and suppliers as their interest may appear, all of whom shall have the right to sue upon this bond, in the penal sum of five hundred ninty-one thousand, nine hundred and thirty-five and no cents Dollars ($ 591,935.00 ) for the payment whereof, well and truly be made the said Principal and Surety bind themselves and their heirs, administrators, executors, successors, and assigns,jointly and severally, by these presents: WHEREAS, the Principal has entered into a certain written Agreement with the Owner, dated the lv) day of 0 2bif , 20 20, to which Agreement is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein consisting of: Lake Creek 10 & Lake Creek 11 Wastewater Improvements (Name of the Project) NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall well and truly pay all subcontractors, workers, laborers, mechanics, and suppliers, all monies to them owing by said Principals for subcontracts, work, labor, equipment, supplies and materials done and furnished for the construction of the improvements of said Agreement, then this obligation shall be and become null and void; otherwise to remain in full force and effect. PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Chapter 2253, Texas Government code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of said Chapter 2253 to the same extent as if it were copied at length herein. Page 1 00620 7-2009 Payment Bond 00090656 PAYMENT BOND (continued) Surety, for value received, stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement, or to the Work performed thereunder, or the plans, specifications or drawings accompanying the same shall in anywise affect ifs obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract,or to the work to be performed thereunder. IN WITNESS WHEREOF, the said Principal and Surety have signed and sealed this Instrument this f).6 f" day of Feb fvar j , 20 20 PM Construction&Rehab,LLC dba IPR South Central Arch Insurance Company and Everest Reinsurance Company Principal Jamee Bedingfield Surety Victoria P. Parkerson Printed Name Printed Name By: By: Tit . Treasurer Title:— ttorney-in-Fact Address: 131 N. ic4,et54, Address: 3 Parkway.Ste 1500.Philadelphia.PA 19102 Pa Sac)eha, / 775-49 6 PO Box 830,Liberty Corner,NJ 07938 Resident Agent of Surety: -reAtain5„gilt Signature Teresa D.Kelly Printed Name 5444 Westheimer,Ste 900 Street Address Houston,TX 77056 Page 2 00620 7-2009 Payment Bond 00090656 SURPATH 2017 This Power of Attorney limits the acts of those named herein, and they have no authority to bind the Company except in the manner and to the extent herein stated. Not valid for Note, Loan,Letter of Credit, Currency Rate,Interest Rate or Residential Value Guarantees. POWER OF ATTORNEY Know All Persons By These Presents: That the Arch Insurance Company, a corporation organized and existing under the laws of the State of Missouri, having its principal administrative office in Jersey City,New Jersey(hereinafter referred to as the"Company")does hereby appoint: Victoria P.Parkerson its true and lawful Attorney-in-Fact,to make, execute,seal,and deliver from the date of issuance of this power for and on its behalf as surety,and as its act and deed: Any and all bonds, undertakings,recognizances and other surety obligations. Surety Bond Number: SU1164155 Principal: PM Construction & Rehab, LLC dba IPR South Central Obligee: City of Round Rock This authority does not permit the same obligation to be split into two or more bonds In order to bring each such bond within the dollar limit of authority as set forth herein. The execution of such bonds,undertakings,recognizances and other surety obligations in pursuance of these presents shall be as binding upon the said Company as fully and amply to all intents and purposes, as if the same had been duly executed and acknowledged by its regularly elected officers at its principal administrative office in Jersey City, New Jersey. This Power of Attorney is executed by authority of resolutions adopted by unanimous consent of the Board of Directors of the Company on September 15, 2011, true and accurate copies of which are hereinafter set forth and are hereby certified to by the undersigned Secretary as being in full force and effect: "VOTED, That the Chairman of the Board, the President, or the Executive Vice President, or any Senior Vice President, of the Surety Business Division, or their appointees designated in writing and filed with the Secretary, or the Secretary shall have the power and authority to appoint agents and attorneys-in-fact, and to authorize them subject to the limitations set forth in their respective powers of attorney, to execute on behalf of the Company, and attach the seal of the Company thereto, bonds, undertakings, recognizances and other surety obligations obligatory in the nature thereof, and any such officers of the Company may appoint agents for acceptance of process." This Power of Attorney is signed, sealed and certified by facsimile under and by authority of the following resolution adopted by the unanimous consent of the Board of Directors of the Company on September 15,2011: VOTED,That the signature of the Chairman of the Board,the President,or the Executive Vice President,or any Senior Vice President, of the Surety Business Division,or their appointees designated in writing and filed with the Secretary,and the signature of the Secretary, the seal of the Company, and certifications by the Secretary, may be affixed by facsimile on any power of attorney or bond executed pursuant to the resolution adopted by the Board of Directors on September 15, 2011, and any such power so executed, sealed and certified with respect to any bond or undertaking to which it is attached,shall continue to be valid and binding upon the Company. 00ML0013 00 03 03 Page 1 of 2 Printed in U.S.A. SURPATH 2017 In Testimony Whereof, the Company has caused this instrument to be signed and its corporate seal to be affixed by their authorized officers,this 28th day of September 20 17 Attested and Certified Arch Insurance Company ;ance C' ' C&16gei {� CORPORATE 'O 1471 Patrick K. Nails,Secretary Missouri David M. Finkelstein, Executive Vice President STATE OF PENNSYLVANIA SS COUNTY OF PHILADELPHIA SS I,Michele Tripodi,a Notary Public,do hereby certify that Patrick K.Nails and David M. Finkelstein personally known to me to be the same persons whose names are respectively as Secretary and Executive Vice President of the Arch Insurance Company, a Corporation organized and existing under the laws of the State of Missouri, subscribed to the foregoing instrument,appeared before me this day in person and severally acknowledged that they being thereunto duly authorized signed, sealed with the corporate seal and delivered the said instrument as the free and voluntary act of said corporation and as their own free and voluntary acts for the uses and purposes therein set forth. coA1MONWEALT}i cF RENNSYLVANtA r _ NOTARIAL SEAL 1.1ICHELETAfPOD!F0l3I,Nol:ryPublic City of Philadetptus,Phila. Canty My Crmrnizsicn Expires July 31.2021 Michele Tripodi, Notary Public My commission expires 07/31/2021 CERTIFICATION I,Patrick K.Nails,Secretary of the Arch Insurance Company,do hereby certify that the attached Power of Attorney dated September 28,2017 on behalf of the person(s)as listed above is a true and correct copy and that the same has been in full force and effect since the date thereof and is in full force and effect on the date of this certificate;and I do further certify that the said David M.Finkelstein, who executed the Power of Attorney as Executive Vice President,was on the date of execution of the attached Power of Attorney the duly elected Executive Vice President of the Arch Insurance Company. IN TESTIMONY WHEREOF, I have hereunto subscribed my name and affixed the corporate seal of the Arch Insurance Company on this day of , 2020 Patrick K. Nails,Secretary This Power of Attorney limits the acts of those named therein to the bonds and undertakings specifically named therein and they have no authority to bind the Company except in the manner and to the extent herein stated. PLEASE SEND ALL CLAIM INQUIRIES R.ELATING TO THIS BOND TO THE FOLLOWING ADDRESS: Arch Insurance—Surety Division 3 Parkway,Suite 1500 .0-anCe C Philadelphia, PA 19102 4`y .� CORPORATE 'O a SEAL 1971 Missouri 00ML0013 00 03 03 Page 2 of 2 Printed in U.S.A. )'.m. L'1 E R F,S\ POWER OF ATTORNEY EVEREST REINSURANCE COMPANY DELAWARE KNOW ALL PERSONS BY THESE PRESENTS: That Everest Reinsurance Company, a corporation of the State of Delaware ("Company") having its principal office located at 477 Martinsville Road, Liberty Corner, New Jersey 07938, do hereby nominate, constitute,and appoint: Victoria P.Parkerson its true and lawful Attorney-in-fact to make, execute, attest, seal and deliver for and on its behalf,as surety, and as its act and deed, where required,any and all bonds and undertakings in the nature thereof,for the penal sum of no one of which is in any event to exceed UNLIMITED,reserving for itself the full power of substitution and revocation. Bond No.: ES00004867 Principal: pM Construction&Rehab, LLC dba IPR South Central Obligee: City of Round Rock Such bonds and undertakings,when duly executed by the aforesaid Attorney-in-fact shall be binding upon the Company as fully and to the same extent as if such bonds and undertakings were signed by the President and Secretary of the Company and sealed with its corporate seal. This Power of Attorney is granted and is signed by facsimile under and by the authority of the following Resolutions adopted by the Board of Directors of Company("Board")on the 28th day of July 2016: RESOLVED, that the President, any Executive Vice President, and any Senior Vice President and Anthony Romano are hereby appointed by the Board as authorized to make, execute, seal and deliver for and on behalf of the Company, any and all bonds, undertakings,contracts or obligations in surety or co-surety with others and that the Secretary or any Assistant Secretary of the Company be and that each of them hereby is authorized to attest to the execution of any such bonds, undertakings, contracts or obligations in surety or co-surety and attach thereto the corporate seal of the Company. RESOLVED, FURTHER, that the President, any Executive Vice President, and any Senior Vice President and Anthony Romano are hereby authorized to execute powers of attorney qualifying the attorney named in the given power of attorney to execute,on behalf of the Company, bonds and undertakings in surety or co-surety with others, and that the Secretary or any Assistant Secretary of the Company be, and that each of them is hereby authorized to attest the execution of any such power of attorney, and to attach thereto the corporate seal of the Company. RESOLVED, FURTHER, that the signature of such officers named in the preceding resolutions and the corporate seal of the Company may be affixed to such powers of attorney or to any certificate relating thereto by facsimile,and any such power of attorney or certificate bearing such facsimile signatures or facsimile seal shall be thereafter valid and binding upon the Company with respect to any bond, undertaking,contract or obligation in surety or co-surety with others to which it is attached. IN WITNESS WHEREOF, Everest Reinsurance Company has caused their corporate seals to be affixed hereto, and these presents to be signed by their duly authorized officers this 28th day of July 2016. �esti rahc � \P Everest Reinsurance Company L i SEAL j.6 d 1973 a Attest: Nicole Chase,Assistant Secretary By:Anthony Romano,Vice President On this 28th day of July 2016,before me personally came Anthony Romano,known to me,who,being duly sworn,did execute the above instrument; that he knows the seal of said Company; that the seal affixed to the aforesaid instrument is such corporate seal and was affixed thereto;and that he executed said instrument by like order. LINDA ROBINS Notary Public,State of New York No 01 R06239736 Qualified in Queens County Term Expires April 25,2023 IN WITNESS WHEREOF, I have hereunto set my hand and affixed the seal of said Company,at the Liberty Corner,this day of 20 20 ES00010416 IMPORTANT NOTICE TO ALL TEXAS POLICYHOLDERS IMPORTANT NOTICE AVISO IMPORTANTE To obtain information or make a complaint: Para obtener informacion o para someter una queja: You may call Arch Insurance Group's toll-free Usted puede Ilamar al numero de telefono gratis telephone number for information or to make a de Arch Insurance Group para informacion o complaint at: para someter una queja al: 1-866-413-5550 1.866-413-5550 You may also write to Arch Insurance Group at Usted tambien puede escribir a Arch Insurance Group' Arch Insurance Group Arch Insurance Group Harborside 3 Harborside 3 210 Hudson Street, Suite 300 210 Hudson Street, Suite 300 Jersey City, NJ 07311-1107 Jersey City, NJ 07311-1107 You may contact the Texas Department of Puede comunicarse con el Departamento de Insurance to obtain information on companies, Seguros de Texas para obtener informacion coverages, rights or complaints at: acerca de companias, coberturas, derechos o quejas al 1-800-252-3439 1-800-252-3439 You may write the Texas Department of Puede escribir al Departamento de Seguros de Insurance: Texas: P.O. Box 149091 P.O. Box 149091 Austin, TX 78714-9091 Austin, TX 78714-9091 Fax: (512)490-1007 Fax: (512)490-1007 Web: http://www.tdi texas.gov Web: http://www.tdi.texas.gov E-mail: ConsumerProtection@tdi texas gov E-mail: ConsumerProtection@tdi.texas.gov PREMIUM OR CLAIM DISPUTES DISPUTAS SOBRE PRIMAS 0 RECLAMOS: Should you have a dispute concerning your Si tiene una disputa concerniente a su prima o a premium or about a claim you should contact un reclamo, debe comunicarse con el Arch the Arch Insurance Group first. If the dispute is Insurance Group primero. Si no se resuelve la not resolved, you may contact the Texas disputa, puede entonces comunicarse con el Department of Insurance. departamento(TDI). ATTACH THIS NOTICE TO YOUR POLICY. UNA ESTE AVISO A SU POLIZA: Este aviso es This notice is for information only and does not solo para proposito de informacion y no se become a part or condition of the attached convierte en parte o condicion del documento document. adjunto. 00 ML0042 44 04 16 Page 1 of 1 l�.lw ZWE 1\ ✓ TEXAS IMPORTANT NOTICE TEXSAS AVISO IMPORTANTE To obtain information or make a complaint: Para obener informacion o para someter una queja: You may call toll-free for information or to make a Usted puede Ilamar al numero de telefono gratis complaint at para informacion o para someter una queja al 1-866-287-1736 1-866-287-1736 You may also write to: Usted tambien puede escribir a: Everest National Insurance Company Everest National Insurance Company 477 Martinsville Road, PO Box 830 477 Martinsville Road, PO Box 830 Liberty Corner, NJ 07938-0830 Liberty Corner, NJ 07938-0830 You may contact the Texas Department of Puede comunicarse con el Departamento de Insurance to obtain information on companies, Seguros de Texas para obtener informacion acerca coverages, rights or complaints at 1-800-252-3439 de companies, coberturas, derechos o quejas al 1- 800-252-3439 You may write the Texas Department of Insurance Puede escribir al Departamento de Seguros de Consumer Protection (111-1A) Texas Consumer Protection (111-1A) P.O. Box 149091 P.O. Box 149091 Austin,TX 78714-9091 Austin,TX 78714-9091 FAX: (512) 490—1001 FAX#(512)490-1007 Web: http://www.tdi.texas.gov Web: http://www/tdi.texas.gov E-mail:ConsumerProtection@tdi.texas.gov E-mail: ConsumerProtection@tdi.texas.gov PREMIUM OR CLAIM DISPUTES: DISPUTAS SOBRE PRIMAS 0 RECLAMOS: Should you have a dispute concerning your Si tiena una disputa concerniente a su prima o a un premium or about a claim you should first contact reclamo, debe comunicarse con el agente o the agent or call 1-908-604-3000. If the dispute is primero. Si no se resolve la disputa, puede not resolved, you may contact the Texas entonces comunicarse con el departamento (TDI). Department of Insurance. ATTACH THIS NOTICE TO YOUR POLICY: UNA ESTE AVISO A SU POLIZA: This notice is for information only and does not Este aviso es solo para proposito de informacion y become a part of condition of the attached no se convierte en parte o condicion del document document. adjunto. NP 70 68 0901 ACO L7R EVIDENCE OF PROPERTY INSURANCE DATE 2/26/2020 ) THIS EVIDENCE OF PROPERTY INSURANCE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE ADDITIONAL INTEREST NAMED BELOW. THIS EVIDENCE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.THIS EVIDENCE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE ADDITIONAL INTEREST. AGENCY PHONE 832-485-4000 COMPANY (A/C No.Ext) Alliant Insurance Services Houston, LLC 5444 Westheimer, Suite 900 ZURICH AMERICAN INSURANCE COMPANY NAIC#16535 Houston, TX 77056 FAX 602 707 1932 E-MAIL (A/C,No): Brett.Sauer(a)alliantcom ADDRESS: CODE: SUB CODE: AGENCY CUSTOMER ID#: INSURED LOAN NUMBER POLICY NUMBER PM Construction & Rehab, LLC dba IPR South Central CPP 0645310-01 131 N. Richey Street, EFFECTIVE DATE EXPIRATION DATE CONTINUED UNTIL 04/01/2019 04/01/2020 TERMINATED IF CHECKED Pasadena, TX 77506 THIS REPLACES PRIOR EVIDENCE DATED: 2/24/2020 PROPERTY INFORMATION LOCATION/DESCRIPTION Location: Round Rock, TX Description: Lake Creek 10 & Lake Creek 11 Wastewater Improvements Duration of Project: 180 Calendar Days Contract Amount: $591,935.00 THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS EVIDENCE OF PROPERTY INSURANCE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. COVERAGE INFORMATION PERILS INSURED BASIC BROAD SPECIAL COVERAGE/PERILS/FORMS AMOUNT OF INSURANCE DEDUCTIBLE Installation Property Coverage Form PPP-0141 $591,935.00 $2,500* REMARKS(Including Special Conditions) Installation Deductibles: $2,500 except for Named Storm and Flood if applicable. CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. ADDITIONAL INTEREST NAME AND ADDRESS ADDITIONAL INSURED LENDER'S LOSS PAYABLE LOSS PAYEE MORTGAGEE LOAN# City of Round Rock 221 East Main Street AUTHORIZED REPRESENTATIVE Round Rock, TX 78664 { -`� -Lli A )1, `1 ACORD 27(2016/03) ©1993-2015 ACORD CORPORATION.All rights reserved. The ACORD name and logo are registered marks of ACORD ADO 0 C E RTI F I C DATE(MM/DD/YYYY) I,_.,_.. ATE OF LIABILITY INSURANCE 02/26/2020 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Brett Sauer NAME: PHONE 602-707-1931 FAX No): 602-707-1932 Alliant Insurance Services Houston, LLC (A/C,No,Ext): (A/C 5444 Westheimer, Suite 900 E-MAIL ADDRESS: Brett.Sauer@alliant.com Houston, TX 77056 INSURER(S)AFFORDING COVERAGE NAIC# INSURER A: Greenwich Insurance Company 22322 INSURED INSURER B: Starr Indemnity&Liability Company 38318 PM Construction&Rehab,LLC dba IPR South Central INSURER C: XL Specialty Insurance Company 37885 131 N.Richey INSURER D: Indian harbor Insurance Company 36940 Pasadena,TX 77506 INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS, INSR ADDL SUBR POLICY EFF POLICY EXP LTR TYPE OF INSURANCE INSR WVD POLICY NUMBER (MM/DD/YYYY) (MM/DD/YYYY) LIMITS _ X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 CLAIMS-MADE X OCCUR DAMAGE TO RENTED PREMISES(Ea occurrence) $ 300,000 MED EXP(Any one person) $ 10,000 A CGD740922006 04/01/2019 04/01/2020 PERSONAL&ADV INJURY $ 1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ 2,000,000 POLICY I X I JERt° I I LOC PRODUCTS-COMP/OP AGG $ 2,000,000 OTHER: $ AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT (Ea accident) $ 2,000,000 X ANY AUTO BODILY INJURY(Per person) $ A OWNED SCHEDULED CAD740922106 04/01/2019 04/01/2020 BODILY INJURY(Per accident) AUTOS ONLY AUTOS $ HIRED AUTOS NON-OWNED PROPERTY DAMAGE ONLY AUTOS (Per accident) $ $ UMBRELLA LIAB X OCCUR EACH OCCURRENCE $ 10,000,000 B X EXCESS LIAB CLAIMS MADE 1000585633191 04/01/2019 04/01/2020 AGGREGATE $ 10,000,000 DED RETENTION$ $ WORKERS COMPENSATION X PER OTH- AND EMPLOYERS'LIABILITY Y/N STATUTE ER ANY PROPRIETOR/PARTNER/EXECUTIVE E.L.EACH ACCIDENT C OFFICER/MEMBER EXCLUDED? N N/A CWD740921906 04/01/2019 04/01/2020 $ 1,000,000 (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE If yes,describe under $ 1,000,000 DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ 1,000,000 D OTHER CE0742019404 04/01/2019 04/01/2020 EACH LOSS $ 10,000,000 PROFESSIONAL LIABILITY AGGREGATE $ 10,000,000 DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES(ACORD 101,Additional Remarks Schedule,may be attached if more space is required) This cancels and replaces certificate issued 2/24/2020 Re:Lake Creek 10&Lake Creek 11 Wastewater Improvements.The City of Round Rock,its officers,employees,and elected officials.The General Liability and Commercial Auto policy includes blanket Additional Insured endorsements that provide Additional Insured status to certain persons and organizations when required by written contract and subject to the terms and conditions of the endorsements.The Auto,General Liability,and Workers Compensation policy includes a blanket Waiver of Subrogation when required by contract or written agreement and subject to the terms and conditions of the endorsements.The General Liability policy provides that to the extent that insurance is afforded to any Additional Insured under the policy,the insurance shall apply as primary and not contributing with any insurance carried by such Additional Insured,as required by written contract.The General Liability,Auto Liability,and Workers Compensation policies includes an endorsement providing that 30 days'notice of cancellation will be furnished to the certificate holder,however 10 days if canceled for non-payment. CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN City of Round Rock ACCORDANCE WITH THE POLICY PROVISIONS. 221 East Main Street Round Rock, TX 78664 AUTHORIZED REPRESENTATIVE ©1988-2015 AC• •D •RPORA 16 '. All rights reserved. ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD POLICY NUMBER: CGD740922006 COMMERCIAL GENERAL LIABILITY CG 20 10 04 13 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - SCHEDULED PERSON OR ORGANIZATION This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Person(s) Or Organization(s) Location(s) Of Covered Operations Any Person Or Organization That You Are Required In A Various As Required Per Written Contract Written Contract Or Written Agreement To Include As An Additional Insured Provided The"Bodily Injury" Or "Property Damage" Occurs Subsequent To The Execution Of The Written Contract Or Written Agreement Information required to complete this Schedule, if not shown above, will be shown in the Declarations. A. Section II — Who Is An Insured is amended to B. With respect to the insurance afforded to these include as an additional insured the person(s) or additional insureds, the following additional organization(s) shown in the Schedule, but only exclusions apply: with respect to liability for "bodily injury", "property This insurance does not apply to "bodily injury" or damage" or "personal and advertising injury" caused, in whole or in part, by: "property damage" occurring after: 1. Your acts or omissions; or 1. All work, including materials, parts or equipment furnished in connection with such 2. The acts or omissions of those acting on your work, on the project (other than service, behalf; maintenance or repairs) to be performed by or in the performance of your ongoing operations for on behalf of the additional insured(s) at the the additional insured(s) at the location(s) location of the covered operations has been designated above. completed; or However: 2. That portion of "your work" out of which the 1. The insurance afforded to such additional injury or damage arises has been put to its intended use by any person or organization insured only applies to the extent permitted by other than another contractor or subcontractor law; and engaged in performing operations for a 2. If coverage provided to the additional insured is principal as a part of the same project. required by a contract or agreement, the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. CG 20 10 04 13 ©Insurance Services Office, Inc., 2012 Page 1 of 2 C. With respect to the insurance afforded to these 2. Available under the applicable Limits of additional insureds, the following is added to Insurance shown in the Declarations; Section III—Limits Of Insurance: whichever is less. If coverage provided to the additional insured is This endorsement shall not increase the required by a contract or agreement, the most we applicable Limits of Insurance shown in the will pay on behalf of the additional insured is the Declarations. amount of insurance: 1. Required by the contract or agreement; or Page 2 of 2 ©Insurance Services Office, Inc., 2012 CG 20 10 04 13 POLICY NUMBER: CGD740922006 COMMERCIAL GENERAL LIABILITY CG20370413 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - COMPLETED OPERATIONS This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Person(s) Location And Description Of Completed Or Organization(s) Operations ANY PERSON OR ORGANIZATION THAT YOU ARE VARIOUS AS REQUIRED PER WRITTEN REQUIRED IN A WRITTEN CONTRACT OR WRITTEN CONTRACT AGREEMENT TO INCLUDE AS AN ADDITIONAL INSURED PROVIDED THE "BODILY INJURY" OR "PROPERTY DAMAGE" OCCURS SUBSEQUENT TO THE EXECUTION OF THE WRITTEN CONTRACT OR WRITTEN AGREEMENT Information required to complete this Schedule, if not shown above, will be shown in the Declarations. A. Section II — Who Is An Insured is amended to B. With respect to the insurance afforded to these include as an additional insured the person(s) or additional insureds, the following is added to organization(s) shown in the Schedule, but only Section III—Limits Of Insurance: with respect to liability for "bodily injury" or If coverage provided to the additional insured is "property damage" caused, in whole or in part, by required by a contract or agreement, the most we "your work" at the location designated and will pay on behalf of the additional insured is the described in the Schedule of this endorsement amount of insurance: performed for that additional insured and included in the "products-completed operations 1. Required by the contract or agreement; or hazard". 2. Available under the applicable Limits of However: Insurance shown in the Declarations; 1. The insurance afforded to such additional whichever is less. insured only applies to the extent permitted This endorsement shall not increase the applicable by law; and Limits of Insurance shown in the Declarations. 2. If coverage provided to the additional insured is required by a contract or agreement, the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. CG 20 37 04 13 © Insurance Services Office, Inc., 2012 Page 1 of 1 POLICY NUMBER: CAD740922106 COMMERCIAL AUTO CA2001 1013 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. LESSOR - ADDITIONAL INSURED AND LOSS PAYEE This endorsement modifies insurance provided under the following: AUTO DEALERS COVERAGE FORM BUSINESS AUTO COVERAGE FORM MOTOR CARRIER COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by the endorsement. This endorsement changes the policy effective on the inception date of the policy unless another date is indicated below. Named Insured: IPR ACQUISITIONCO, INC. Endorsement Effective Date: April 1, 2019 SCHEDULE Insurance Company: Greenwich Insurance Company Policy Number: CAD740922106 Effective Date: April 1, 2019 Expiration Date: April 1, 2020 Named Insured: IPR ACQUISITIONCO, INC. Address: 1510 Klondike Road, Suite 400 Conyers, GA 30094 Additional Insured (Lessor): All Lessors Address: Designation Or Description Of"Leased Autos": All Leased Autos CA 20 01 10 13 ©Insurance Services Office, Inc., 2011 Page 1 of 2 Coverages Limit Of Insurance Covered Autos Liability $ 2,000,000 Each "Accident" ' Actual Cash Value Or Cost Of Repair,Whichever Is Less, Minus Comprehensive $ 1,000 Deductible For Each Covered "Leased Auto" Actual Cash Value Or Cost Of Repair,Whichever Is Less, Minus Collision $ 1,000 Deductible For Each Covered "Leased Auto" Actual Cash Value Or Cost Of Repair,Whichever Is Less, Minus Specified $ Deductible For Each Covered "Leased Auto" Causes Of Loss Information required to complete this Schedule, if not shown above, will be shown in the Declarations. A. Coverage 2. The insurance covers the interest of the lessor unless the "loss" results from fraudulent acts or 1. Any "leased auto" designated or described in the Schedule will be considered a covered omissions on your part. "auto" you own and not a covered "auto" you 3. If we make any payment to the lessor, we will hire or borrow. obtain his or her rights against any other party. 2. For a "leased auto" designated or described in C. Cancellation the Schedule, the Who Is An Insured 1. If we cancel the policy, we will mail notice to provision under Covered Autos Liability the lessor in accordance with the Cancellation Coverage is changed to include as an Common Policy Condition. "insured" the lessor named in the Schedule. However, the lessor is an "insured" only for 2. If you cancel the policy, we will mail notice to "bodily injury" or "property damage" resulting the lessor. from the acts or omissions by: 3. Cancellation ends this agreement. a. You; D. The lessor is not liable for payment of your b. Any of your"employees" or agents; or premiums. c. Any person, except the lessor or any E. Additional Definition "employee"or agent of the lessor, operating As used in this endorsement: a "leased auto" with the permission of any "Leased auto" means an "auto" leased or rented to of the above. you, including any substitute, replacement or extra 3. The coverages provided under this "auto" needed to meet seasonal or other needs, endorsement apply to any "leased auto" under a leasing or rental agreement that requires described in the Schedule until the expiration you to provide direct primary insurance for the date shown in the Schedule, or when the lessor. lessor or his or her agent takes possession of the "leased auto", whichever occurs first. B. Loss Payable Clause 1. We will pay, as interest may appear, you and the lessor named in this endorsement for"loss" to a "leased auto". Page 2 of 2 © Insurance Services Office, Inc ., 2011 CA 20 01 10 13 POLICY NUMBER: CAD740922106 XIC 411 1013 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. AUTOMATIC ADDITIONAL INSURED This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM MOTOR CARRIER COVERAGE FORM AUTO DEALERS COVERAGE FORM A. COVERED AUTOS LIABILITY COVERAGE, Who Is An Insured, is amended to include as an "insured" any person or organization you are required in a written contract to name as an additional insured, but only for "bodily injury" or "property damage" otherwise covered under this policy caused, in whole or in part, by the negligent acts or omissions of: 1. You, while using a covered "auto"; or 2. Any other person, except the additional insured or any employee or agent of the additional insured, operating a covered "auto"with your permission; Provided that: a. The written contract is in effect during the policy period of this policy; b. The written contract was signed by you and executed prior to the "accident" causing "bodily injury" or"property damage" for which liability coverage is sought; and c. Such person or organization is an "insured" solely to the extent required by the contract, but in no event if such person or organization is solely negligent. B. The Limits of Insurance provided for the Additional Insured shall not be greater than those required by contract and, in no event shall the Limits of Insurance set forth in this policy be increased by the contract. C. General Conditions, Other Insurance is amended as follows: Any coverage provided hereunder shall be excess over any other valid and collectible insurance available to the additional insured whether such insurance is primary, excess, contingent or on any other basis unless the contract specifically requires that this policy be primary. All terms, conditions, exclusions and limitations of this policy shall apply to the liability coverage provided to any additional insured, and in no event shall such coverage be enlarged or expanded by reason of the contract. All other terms and conditions of this policy remain unchanged. XIC 411 1013 ©2013 X.L. America, Inc. All Rights Reserved. Page 1 of 1 May not be copied without permission. Includes copyrighted material of Insurance Services Office, Inc.,with its permission. POLICY NUMBER: CGD740922006 COMMERCIAL GENERAL LIABILITY CG 24 04 05 09 WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART SCHEDULE Name Of Person Or Organization: WHERE REQUIRED BY WRITTEN CONTRACT OR AGREEMENT EXECUTED PRIOR TO LOSS (EXCEPT WHERE NOT PERMITTED BY LAW). Information required to complete this Schedule, if not shown above, will be shown in the Declarations. The following is added to Paragraph 8. Transfer Of Rights Of Recovery Against Others To Us of Section IV—Conditions: We waive any right of recovery we may have against the person or organization shown in the Schedule above because of payments we make for injury or damage arising out of your ongoing operations or"your work" done under a contract with that person or organization and included in the "products-completed operations hazard". This waiver applies only to the person or organization shown in the Schedule above. CG 24 04 05 09 ©Insurance Services Office, Inc., 2008 Page 1 POLICY NUMBER: CAD740922106 COMMERCIAL AUTO CA 04 44 10 13 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US (WAIVER OF SUBROGATION) This endorsement modifies insurance provided under the following: AUTO DEALERS COVERAGE FORM BUSINESS AUTO COVERAGE FORM MOTOR CARRIER COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by the endorsement. This endorsement changes the policy effective on the inception date of the policy unless another date is indicated below. Named Insured: IPR ACQUISITIONCO, INC. Endorsement Effective Date: April 1, 2019 SCHEDULE Name(s) Of Person(s) Or Organization(s): WHERE REQUIRED BY WRITTEN CONTRACT OR AGREEMENT EXECUTED PRIOR TO LOSS (EXCEPT WHERE NOT PERMITTED BY LAW). Information required to complete this Schedule, if not shown above, will be shown in the Declarations. The Transfer Of Rights Of Recovery Against Others To Us condition does not apply to the person(s) or organization(s) shown in the Schedule, but only to the extent that subrogation is waived prior to the "accident" or the "loss" under a contract with that person or organization. CA 04 44 10 13 © Insurance Services Office, Inc., 2011 Page 1 of 1 WORKERS COMPENSATION AND EMPLOYERS LIABILITY INSURANCE POLICY WC 00 03 13 (Ed. 4-84) WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce our right against the person or organization named in the Schedule. (This agreement applies only to the extent that you perform work under a written contract that requires you to obtain this agreement from us.) This agreement shall not operate directly or indirectly to benefit anyone not named in the Schedule. Schedule WHERE REQUIRED BY WRITTEN AGREEMENT SIGNED PRIOR TO LOSS. This endorsement changes the policy to which it is attached and is effective on the date issued unless otherwise stated. (The information below is required only when this endorsement is issued subsequent to preparation of the policy.) Endorsement Effective April 1,2019 Policy No. CWD740921906 Endorsement No. Insured IPR ACQUISITIONCO, INC. Insurance Company Countersigned by XL Specialty Insurance Company WC 00 03 13 (Ed. 4-84) ©1983 National Council on Compensation Insurance. ENDORSEMENT# This endorsement, effective 12:01 a.m., April 1, 2019, forms a part of Policy No. CGD740922006 issued to IPR ACQUISITIONCO, INC. by Greenwich Insurance Company THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. CANCELLATION NOTIFICATION TO OTHERS ENDORSEMENT In the event coverage is cancelled for any statutorily permitted reason, other than nonpayment of premium, advanced written notice will be mailed or delivered to person(s)or entity(ies) according to the notification schedule shown below: Number of Days Name of Person(s)or Entity(ies) Mailing Address: Advanced Notice of Cancellation: CITY OF ROCK HILL POST OFFICE BOX 11706 30 SC RISK MANAGEMENT DIVISION ROCK HILL, SC 29731 CITY OF ROSENBERG 2110 4TH STREET 30 ROSENBERG, TX 77471 CITY OF ROUND ROCK 221 EAST MAIN STREET 30 ROUND ROCK, TX 78664 CITY OF RUSTON 701 EAST TENNESSEE AVENUE 30 RUSTON, LA 71270 CITY OF SAGINAW 333 WEST MCLEROY BLVD. 30 SAGINAW, TX 76179 CITY OF SAINT LOUIS-MO 1200 MARKET STREET 30 CITY HALL ROOM 102-104 SAINT LOUIS, MO 63103 CITY OF SHREVEPORT PO BOX 31109 30 SHREVEPORT, LA 71130-1109 CITY OF SIMPSONVILLE, SC 118 NE MAIN STREET 30 SIMPSONVILLE, SC 29681 All other terms and conditions of the Policy remain unchanged. IXI 405 0910 ©2010 X.L. America, Inc. All Rights Reserved. May not be copied without permission. No Text POLICY NUMBER: CAD740922106 IXI 405 0910 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. CANCELLATION NOTIFICATION TO OTHERS ENDORSEMENT In the event coverage is cancelled for any statutorily advanced written notice will be mailed or delivered toperson(s)or entity(ies)according nonpaymentrmitted reason, other than to the of premium, schedule shown below: 9notification Number of Days Name of Person(s)or Entity(ies) Mailing Address: Advanced Notice of CITY OF PEACHTREE CITY, GA Cancellation: 151 WILLOWBEND ROAD 30 PEACHTREE CITY, GA 30269 CITY OF PEARLAND 3519 LIBERTY DRIVE 30 PEARLAND, TX 77581 CITY OF PLANO PO BOX 860358 30 PLANO, TX 75086 CITY OF PLEASANT RIDGE 23925 WOODWARD AVENUE 30 PLEASANT RIDGE, MI 48069 CITY OF PORTLAND, TEXAS, &COYM, 1900 BILLY WEBB DRIVE 30 REHMET AND GUTIERREZ PORTLAND, TX 78374 ENGINEERING LP CITY OF RICHMOND, TEXAS 600 MORTON STREET 30 RICHMOND, TX 77469 CITY OF RIVER OAKS 4900 RIVER OAKS BLVD 30 RIVER OAKS, TX 76114 CITY OF ROCK HILL POST OFFICE BOX 11706 30 SC RISK MANAGEMENT DIVISION ROCK HILL, SC 29731 CITY OF ROSENBERG 2110 4TH STREET 30 ROSENBERG, TX 77471 CITY OF ROUND ROCK 221 EAST MAIN STREET 30 ROUND ROCK, TX 78664 CITY OF RUSTON 701 EAST TENNESSEE AVENUE 30 RUSTON, LA 71270 All other terms and conditions of the Policy remain unchanged. IXI 405 0910 ©2010 X.L. America, Inc. All Rights Reserved. May not be copied without permission. No Text WORKERS COMPENSATION AND EMPLOYERS LIABILITY INSURANCE POLICY WC 99 06 57 (Ed. 12/10) This endorsement, effective 12:01 a.m., April 1, 2019, forms a part of Policy No. CWD740921906 issued to IPR ACQUISITIONCO, INC. by XL Specialty Insurance Company THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. CANCELLATION NOTIFICATION TO OTHERS ENDORSEMENT In the event coverage is cancelled for any statutorily permitted reason, other than nonpayment of premium, advanced written notice will be mailed or delivered to person(s)or entity(ies)according to the notification schedule shown below: Number of Days Name of Person(s)or Entity(ies) Mailing Address: Advanced Notice of Cancellation: CITY OF RIVER OAKS 4900 RIVER OAKS BLVD 30 RIVER OAKS,TX 76114 CITY OF ROCK HILL POST OFFICE BOX 11706 30 SC RISK MANAGEMENT DIVISION ROCK HILL,SC 29731 CITY OF ROSENBERG 2110 4TH STREET 30 ROSENBERG,TX 77471 CITY OF ROUND ROCK 221 EAST MAIN STREET 30 ROUND ROCK,TX 78664 CITY OF RUSTON 701 EAST TENNESSEE AVENUE 30 RUSTON,LA 71270 CITY OF SAGINAW 333 WEST MCLEROY BLVD. 30 SAGINAW,TX 76179 CITY OF SAINT LOUIS-MO 1200 MARKET STREET 30 CITY HALL ROOM 102-104 SAINT LOUIS,MO 63103 All other terms and conditions of the Policy remain unchanged. This endorsement changes the policy to which it is attached and is effective on the date issued unless otherwise stated. (The information below is required only when this endorsement is issued subsequent to preparation of the policy.) Endorsement Effective April 1, 2019 Policy No. CWD740921906 Endorsement No. Insured IPR ACQUISITIONCO, INC. Premium Included Insurance Company XL Specialty Insurance Company Countersigned by WC 99 06 57 Ed. 12/10 ©2010 X.L. America, Inc. All Rights Reserved. May not be copied without permission. ! T 00700 GENERAL CONDITIONS No Text City of Round Rock Contract Forms General Conditions Section 00700 TABLE OF CONTENTS OF GENERAL CONDITIONS Article Page Number& Title Number 1. DEFINITIONS 2 2. PRELIMINARY MATTERS 5 3. CONTRACT DOCUMENTS: INTENT,AMENDING, REUSE 7 4. AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; REFERENCE POINTS 8 5. BONDS AND INSURANCE 10 6. CONTRACTOR'S RESPONSIBILITIES 15 7. OTHER WORK 23 8. OWNER'S RESPONSIBILITIES 24 9. ENGINEER/ARCHITECT'S STATUS DURING CONSTRUCTION 24 10. CHANGES IN THE WORK 26 11. CHANGE OF CONTRACT AMOUNT 27 12. CHANGE OF CONTRACT TIMES 29 13. TESTS AND INSPECTIONS;AND CORRECTION OR REMOVAL OF DEFECTIVE WORK 31 14. PAYMENTS TO CONTRACTOR AND COMPLETION 33 15. SUSPENSION OF WORK AND TERMINATION 37 16. DISPUTE RESOLUTION 39 17 RIGHT TO AUDIT 40 18. MISCELLANEOUS 41 00700 11-2017 Page 1 General Conditions 00162837 GENERAL CONDITIONS ARTICLE 1 -DEFINITIONS Whenever used in these General Conditions or in the other Contract Documents the following terms have the meanings indicated which are applicable to both the singular and plural thereof: 1.1 Addenda -Written or graphic instruments issued prior to the receipt of Proposals or the opening of Bids that clarify, correct or change the proposal or bidding requirements or the Contract Documents. 1.2 Agreement-Prescribed form, referenced as Section 00500. 1.3 Alternative Dispute Resolution-The process by which a disputed Claim may be settled if the OWNER and .�.T..r-. i �_ a I�.�1.......... �I.............I. alternative to litigation. the CONTRACTOR RAC I OR cannot reach an agreement between themselves, as an alterna ive nuga ion. 1.4 Bid - Proposal of bidder on prescribed forms setting forth prices for performing the Work described in the Contract Documents. 1.5 Bid Documents-The advertisement or invitation for bids, instructions to bidders, the bid form, the Contract Documents and Addenda. 1.6 Calendar Day-Any day of the week; no days being excepted. Work on Saturdays, Sundays, and/or Legal Holidays shall only be conducted with prior express written consent of the OWNER. 1.7 Change Directive-A written directive to the CONTRACTOR, signed by the OWNER, ordering a change in the Work and stating a proposed basis for adjustment, if any, in the Contract Amount or Contract Time, or both. A Change Directive may be used in the absence of total agreement on the terms of a Change Order. A Change Directive does not change the Contract Amount or Contract Time, but is evidence that the parties expect that the change directed or documented by a Change Directive will be incorporated in a subsequently issued Change Order. 1.8 Change Orders - Written agreements entered into between the CONTRACTOR and the OWNER authorizing an addition, deletion, or revision to the Contract, issued on or after the Execution Date of the Agreement and within the Contract term. 1.9 Claim - A written demand seeking, as a matter of right, adjustment or interpretation of Contract terms, payment of money, extension of time or other relief with respect to the terms of the Contract. 1.10 Contract - The Contract represents the entire and integrated agreement between the OWNER and the CONTRACTOR for performance of the Work, as evidenced by the Contract Documents. 1.11 Contract Amount-The amount payable by the OWNER to the CONTRACTOR for completion of the Work in accordance with the Contract Documents. 1.12 Contract Documents—Invitation to Bid, Instructions to Bidders, General Conditions, Supplemental General Conditions, Special Conditions, Technical Specifications, Project Manual, Drawings,Addenda and Change Orders. 1.13 Contract Time-The number of days allowed for completion of the Work as defined by the Contract. When any period is referred to in days, it will be computed to exclude the first and include the last day of such period. A day of twenty-four(24) hours measured from midnight to the next midnight will constitute a day. 1.14 CONTRACTOR - The individual, firm, corporation, or other business entity with whom the OWNER has entered into the Contract. 1.15 Drawings - Those portions of the Contract Documents which are graphic representations of the scope, extent and character of the Work to be furnished and performed by the CONTRACTOR and which have been 00700 11-2017 Page 2 General Conditions approved by the OWNER. Drawings may include plans, elevations, sections, details, schedules and diagrams. Shop Drawings are not Drawings as so defined. 1.16 Engineer/Architect(E/A) -The OWNER's design professional identified as such in the Contract. The titles of "Architect/Engineer," "Architect" and "Engineer" used in the Contract Documents shall be read the same as Engineer/Architect (E/A). Nothing contained in the Contract Documents shall create any contractual or agency relationship between E/A and the CONTRACTOR. 1.17 Equal-The terms "equal"or"approved equal"shall have the same meaning. 1.18 Execution Date-Date of last signature of the parties to the Agreement. 1.19 Field Order-A written order issued by Owner's Representative which orders minor changes in the Work and which does not involve a change in the Contract Amount or the Contract Time. 1.20 Final Acceptance— The stage in the Contract process when, in the OWNER's opinion, Final Completion of the Work has been attained and a Certificate of Acceptance approved by the OWNER is issued. 1.21 Final Completion -The stage in the progress of the Work when, in the OWNER's opinion, the entire Work has been completed, the CONTRACTOR's obligations under the Contract Documents have been fulfilled, and the OWNER is processing or has made final payment to the CONTRACTOR, as evidenced by a Certificate of Acceptance approved by the OWNER. 1.22 Inspector-The authorized representative of any regulatory agency that has jurisdiction over any portion of the Work. 1.23 Legal Holidays 1.23.1 The following are recognized by the OWNER: Holiday Date Observed New Year's Day January 1 Martin Luther King, Jr.'s Third Monday Birthday in January President's Day Third Monday in February Memorial Day Last Monday in May Independence Day July 4 Labor Day First Monday in September Veteran's Day November 11 Thanksgiving Day Fourth Thursday in November Friday after Friday after Thanksgiving Thanksgiving 00700 11-2017 Page 3 General Conditions Christmas Eve December 24 Christmas Day December 25 1.23.2 If a Legal Holiday falls on Saturday, it will be observed on the preceding Friday. If a Legal Holiday falls on Sunday, it will be observed on the following Monday. 1.23.3 If Christmas Eve falls on a Saturday or a Sunday, the preceding Friday is observed as the Christmas Eve holiday. 1.23.4 If Christmas Day falls on a Saturday or a Sunday, the following Monday is observed as the Christmas Day holiday. 1.24 Milestones-A significant event specified in the Contract Documents relating to an intermediate completion date or time prior to Substantial Completion of ail the Work. 1.25 Notice to Proceed -A Written Notice given by the OWNER to the CONTRACTOR fixing the date on which the Contract Times will commence to run and on which the CONTRACTOR shall start to perform the CONTRACTOR's obligations under the Contract Documents. 1.26 OWNER—The City of Round Rock, Texas, a municipal corporation, home-rule city and political subdivision organized and existing under the laws of the State of Texas, acting through the City Manager or his/her designee, officers, agents or employees to administer design and construction of the Project. 1.27 Owner's Representative-The designated representative of the OWNER. 1.28 Partial Occupancy or Use - Use by the OWNER of a partially completed part of the Work for the purpose for which it is intended (or a related purpose) prior to Substantial Completion of all the Work. 1.29 Project -The total construction of which the Work to be provided under the Contract Documents may be the whole, or a part, as indicated elsewhere in the Contract Documents. 1.30 Project Manual - That portion of the Contract Documents which may include the following: introductory information; bidding requirements, Contract forms and General and Supplemental General Conditions; General Requirements; Specifications; Drawings; Project Safety Manual; and Addenda. 1.31 Proposal — Proposal of Offeror, under Local Government Code §271.113 providing for alternative project delivery methods, on prescribed forms setting forth prices for performing the Work described in the Contract Documents. 1.32 Proposal Documents—The advertisement or invitation for Proposals, Instruction to Offerors, the Proposal form, the Contract Documents and Addenda. 1.33 Resident Project Representative -The authorized representative of E/A who may be assigned to the site or any part thereof. 1.34 Shop Drawings -All drawings, diagrams, illustrations, schedules and other data or information which are specifically prepared or assembled by or for the CONTRACTOR and submitted by the CONTRACTOR as required by the Contract Documents. 1.35 Specifications - Those portions of the Contract Documents consisting of written technical descriptions as applied to the Work, which set forth to the CONTRACTOR, in detail, the requirements which must be met by all materials, equipment, construction systems, standards, workmanship, equipment and services in order to render a completed and useful project. 00700 11-2017 Page 4 General Conditions 1.36 Substantial Completion - The stage in the progress of the Work when the Work, or designated portions thereof, may still require minor modifications or adjustments but, in the OWNER's opinion,the Work has progressed to the point such that all parts of the Work under consideration are fully operational, as evidenced by a Certificate of Substantial Completion approved by the OWNER. 1.37 Subcontractor-An individual, firm, or corporation having a direct contract with the CONTRACTOR for the performance of a part of the Work. 1.38 Sub-subcontractor-A person or entity who has a direct or indirect contract with a Subcontractor to perform a portion of the Work. 1.39 Superintendent - The representative of the CONTRACTOR authorized in writing to receive and fulfill instructions from Owner's Representative, and who shall supervise and direct construction of the Work. 1.40 Supplemental General Conditions-The part of the Contract Documents which either amends or supplements the General Conditions. All General Conditions which are not so amended or so supplemented shall be considered as remaining in full force and effect. 1.41 Supplier-An individual or entity having a direct contract with the CONTRACTOR or with any Subcontractor to furnish materials or equipment to be incorporated in the Work by the CONTRACTOR or any Subcontractor. 1.42 Time Extension Request-An approved request for time extension on a form acceptable to the OWNER. 1.43 Work - The entire completed construction, or the various separately identifiable parts thereof, required to be furnished under the Contract Documents. 1.44 Working Day - Any day of the week, not including Saturdays, Sundays, or Legal Holidays, in which conditions not under the CONTRACTOR's control will permit work for at least seven (7)hours of the Working Times. Upon authorization by the Owner's Representative, work on Saturdays, Sundays and/or Legal Holidays may be allowed and in that event a Working Day will be counted for each such day. 1.45 Working Times — Times of day(s) during which work may be performed. Unless authorized by Owner's Representative, all Work shall be performed between 7:00 a.m. and 6:00 p.m. on weekdays and, if previously authorized as provided for in paragraph 1.44 or paragraph 1.6 herein, as applicable, between 9:00 a.m. and 6:00 p.m. on Saturdays, Sundays or Legal Holidays. When the CONTRACTOR has been authorized to perform Work during hours outside Working Times, such hours shall be considered time worked on Working Day contracts. Notwithstanding the preceding, emergency work may be done without prior permission only as provided in paragraph 6.11.5 herein. 1.46 Written Notice-Written communication between the OWNER and the CONTRACTOR. Written Notice shall be deemed to have been duly served if delivered in person to Owner's Representative or to the CONTRACTOR's duly authorized representative, or if such Written Notice is delivered to or sent by registered or certified mail to the attention of Owner's Representative or to the CONTRACTOR's duly authorized representative at the last business address known to the party giving notice. ARTICLE 2 -PRELIMINARY MATTERS 2.1 Delivery of Agreement, Bonds, Insurance, and Other Documentation: Within ten (10) Calendar Days after written notification of award of Contract, the CONTRACTOR shall deliver to the OWNER signed Agreement, Bond(s), Insurance Certificate(s) and other documentation required for execution of the Contract. 00700 11-2017 Page 5 General Conditions 2.2 Copies of Documents: The OWNER shall furnish to the CONTRACTOR two (2) copies of the Contract Documents unless otherwise specified. 2.3 Commencement of Contract Times; Notice to Proceed: The Contract Time(s) will begin to run on the day indicated in the Notice to Proceed. Notice to Proceed will be given at any time within sixty (60) Calendar Days after the Execution Date of the Agreement, unless extended by written agreement of the parties. 2.4 Before Starting Construction: 2.4.1 No Work shall be done at the site prior to the preconstruction conference without the OWNER's approval. Before undertaking each part of the Work, the CONTRACTOR shall carefully study and compare the Contract Documents and check and verify pertinent figures shown thereon and all applicable field measurements. The CONTRACTOR shall promptly report in writing to Owner's Representative any conflict, error, ambiguity or discrepancy which the CONTRACTOR may discover and shall obtain a written interpretation or clarification from Owner's Representative before proceeding with any Work affected thereby. The CONTRACTOR shall be liable to the OWNER for failure to report any conflict, error, ambiguity or discrepancy in the Contract Documents of which the CONTRACTOR knew or reasonably should have known. 2.4.2 The CONTRACTOR shall submit the following to Owner's Representative for review and approval no later than the preconstruction conference: .1 a preliminary progress schedule indicating the times (number of days or dates) for starting and completing the various stages of the Work, including any Milestones specified in the Contract Documents, identifying when all Subcontractors will be utilized, and taking into consideration any limitations on Working Hours; .2 a preliminary schedule of Shop Drawing and sample submittals; .3 a preliminary schedule of values for all of the Work, subdivided into component parts in sufficient detail to serve as the basis for progress payments during construction. Such prices will include an appropriate amount of overhead and profit applicable to each item of Work; .4 a letter designating CONTRACTOR's Superintendent; .5 a letter from the CONTRACTOR and Subcontractor(s) listing any salaried specialists; .6 if applicable, a letter designating the "Competent Person(s)" on general safety and trench safety measures; .7 if applicable, a trench safety system plan; .8 if applicable, a plan illustrating proposed locations of temporary facilities; .9 if applicable, a traffic control plan; .10 a completed Non-Use of Asbestos Affidavit(Prior to Construction); and .11 if applicable, a letter designating the Texas Registered Professional Land Surveyor for layout of the Work. 00700 11-2017 Page 6 General Conditions 2.5 Preconstruction Conference: Prior to commencement of Work at the site,a preconstruction conference attended by the CONTRACTOR, Owner's Representative and others will be held. 2.6 Initially Acceptable Schedules: Unless otherwise provided in the Contract Documents, the CONTRACTOR shall obtain approval of Owner's Representative on final versions of the schedules submitted in accordance with paragraph 2.4.2 before the first progress payment will be made to the CONTRACTOR. The progress schedule must provide for an orderly progression of the Work to completion within any specified Milestones and Contract Times. Acceptance of the schedule by Owner's Representative will neither impose on Owner's Representative responsibility for the sequencing, scheduling or progress of the Work nor interfere with or relieve the CONTRACTOR from the CONTRACTOR's full responsibility therefor. The CONTRACTOR's schedule of Shop Drawings and sample submissions must provide an arrangement agreeable to the parties for reviewing and processing the required submittals. ARTICLE 3 -CONTRACT DOCUMENTS: INTENT,AMENDING, REUSE 3.1 Intent: 3.1.1 The intent of the Contract Documents is to include all information necessary for the proper execution and completion of the Work by the CONTRACTOR. The Contract Documents are complementary, and what is required by one shall be as binding as if required by all. In cases of disagreement, the following order of precedence shall govern (top item receiving priority of interpretation): Signed Agreement Addenda to the Contract Documents Special Conditions Supplemental General Conditions General Conditions Other Bidding Requirements and Contract Forms Special Provisions to the Standard Technical Specifications Special Specifications Standard Technical Specifications Drawings (figured dimensions shall govern over scaled dimensions) Project Safety manual, if applicable 3.1.2 Unless otherwise stated in the Contract Documents,words which have well-known technical or construction industry meanings are used in the Contract Documents in accordance with such recognized meanings. 3.2 Reporting and Resolving Discrepancies: If, during the performance of the Work, the CONTRACTOR discovers any conflict, error, ambiguity or discrepancy within the Contract Documents or between the Contract Documents and any provisions of any such law or regulation applicable to the performance of the Work or of any such standard, specification, manual or code or instructions of any Supplier, the CONTRACTOR shall immediately report it to Owner's Representative in writing, and the CONTRACTOR shall not proceed with the Work affected thereby until an amendment or supplement to the Contract Documents has been issued by one of the methods indicated in paragraph 3.3.1 or paragraph 3.3.2. The CONTRACTOR shall be liable to the OWNER for failure to report any such conflict, error, ambiguity or discrepancy of which the CONTRACTOR knew or reasonably should have known. 3.3 Amending and Supplementing Contract Documents: 00700 11-2017 Page 7 General Conditions 3.3.1 The Contract Documents may be amended to provide for additions, deletions and revisions in the Work or to modify the terms and conditions thereof in one or more of the following ways: .1 Change Order. .2 Change Directive. .3 Time Extension Request. 3.3.2 In addition, the requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work may be authorized, in one or more of the following ways: .1 Field Order. .2 Review of a Shop Drawing or sample. .3 Written interpretation or clarification. 3.4 Reuse of Documents Prohibited: The CONTRACTOR and any Subcontractor or Supplier or other person or organization performing or furnishing any of the Work under a direct or indirect contract with the OWNER: (i) shall not have or acquire any title to or ownership rights in any of the Drawings, Specifications or other documents (or copies of any thereof) prepared by or bearing the seal of E/A or E/A's consultants, and (ii) shall not reuse any of such Drawings, Specifications, other documents or copies on extensions of the Project or any other project without written consent of the OWNER and E/A. ARTICLE 4 - AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; REFERENCE POINTS 4.1 Availability of Lands: The OWNER shall furnish, as indicated in the Contract Documents, all required rights to use the lands upon which the Work is to be performed, rights-of-way and easements for access thereto, and such other lands which are designated for the use of the CONTRACTOR. The OWNER shall identify any encumbrances or restrictions not of general application but specifically related to use of lands so furnished with which the CONTRACTOR will have to comply in performing the Work. Easements for permanent structures or permanent changes in existing facilities will be obtained and paid for by the OWNER, unless otherwise provided in the Contract Documents. If the OWNER fails to furnish these lands, rights-of-way or easements in a timely manner, the CONTRACTOR may make a Claim for adjustments in the Contract Times. The CONTRACTOR shall provide for all additional lands and access thereto that may be required for temporary construction facilities or storage of materials and equipment. 4.2 Subsurface and Physical Conditions: 4.2.1 The CONTRACTOR hereby covenants that it has examined the site of the proposed Work and is familiar with all of the conditions surrounding construction of the Project, having conducted all inquiries, tests and investigations deemed necessary and proper. 4.2.2 If conditions are encountered at the site which are (1) subsurface or otherwise concealed physical conditions that differ materially from those indicated in the Contract Documents or(2) unknown physical conditions of an unusual nature, that differ materially from those normally encountered in the type of work being performed under this Contract, then notice by the observing party shall be given to the other party promptly before conditions are disturbed and in no event later than seven (7) calendar days after first observance of the conditions. Owner's Representative will promptly investigate such conditions with E/A and, if they differ materially and cause an increase or decrease in the CONTRACTOR's cost of, or time required for, performance of any part of the Work, will 00700 11-2017 Page 8 General Conditions recommend an equitable adjustment in the Contract Amount or Contract Time, or both. If Owner's Representative determines that the conditions at the site are not materially different from those indicated in the Contract Documents and that no change in the terms of the Contract is justified, the CONTRACTOR shall be notified in writing, stating the reasons. Any disputes arising from Owner's Representative's determination shall be resolved in accordance with Article 16. 4.2.3 Notwithstanding any other provision of this Contract,the CONTRACTOR shall be solely responsible for the location and protection of any and all public lines and utility customer service lines in the Work area. For the purposes of this section, "public lines"means the utility distribution and supply system within public rights-of-way or easements, and "utility customer service lines" (service) means any utility line connecting a utility customer to the utility distribution system. Generally, existing service connections within right-of-way or easements are not shown on the Drawings. The CONTRACTOR shall notify the OWNER and "One Call"and exercise due care to locate and to mark, uncover or otherwise protect all such lines in the construction zone and any of the CONTRACTOR's work or storage areas. The CONTRACTOR's obligation hereunder shall be primary and nondelegable. The CONTRACTOR shall indemnify or reimburse such expenses or costs (including fines that may be levied against the OWNER)that may result from unauthorized or accidental damage to all public lines and utility customer service lines in the Work area. The OWNER reserves the right to repair such damage the CONTRACTOR may cause, at the CONTRACTOR's expense. 4.2.4 The CONTRACTOR shall take reasonable precaution to avoid disturbing primitive records and antiquities of archaeological, paleontological or historical significance. No objects of this nature shall be disturbed without written permission of the OWNER and the Texas Department of Antiquities Protection. When such objects are uncovered unexpectedly, the CONTRACTOR shall stop all Work in close proximity and notify Owner's Representative and the Texas Department of Antiquities Protection of their presence and shall not disturb them until written permission and permit to do so is granted. All primitive rights and antiquities uncovered on the OWNER's property shall remain property of the State of Texas, the Texas Department of Antiquities Protection conforming to the Texas Natural Resources Code. If it is determined by the OWNER, in consultation with the Texas Department of Antiquities Protection,that exploration or excavation of primitive records or antiquities on Project site is necessary to avoid loss, the CONTRACTOR shall cooperate in salvage work attendant to preservation. If the Work stoppage or salvage work causes an increase in the CONTRACTOR's cost of, or time required for, performance of the Work, the Contract Amount and/or Contract Time may be equitably adjusted. 4.3 Reference Points: Unless otherwise specified, the OWNER will furnish all reference points, benchmarks, survey monuments, and control points which, in the OWNER's opinion,are suitable for laying out the Work. Such benchmarks and reference points will be placed at intervals not to exceed 1,500 feet. All reference points, benchmarks, survey monuments and control points shall be carefully preserved by the CONTRACTOR by use of flags, laths or other appropriate measures and, in case of destruction or removal by the CONTRACTOR or its employees, such reference points, benchmarks, survey monuments, and control points shall be replaced by a Registered Professional Land Surveyor at the CONTRACTOR's expense. When reference points, benchmarks, survey monuments, or control points are in conflict with the Work, then reestablishment will be the OWNER's responsibility during or upon completion of the Work. 4.4 Hazardous Materials: 4.4.1 The OWNER shall be responsible for any hazardous material uncovered or revealed at the site which was not shown, indicated or identified in the Contract Documents to be within the scope of the Work and which may present a substantial danger to persons or property exposed thereto in connection with the Work at the site. The CONTRACTOR shall immediately notify Owner's Representative of any suspected hazardous materials encountered before or during performance of the Work and shall take all necessary precautions to avoid further disturbance of the materials. 4.4.2 The CONTRACTOR shall be responsible for any hazardous materials brought to the site by the CONTRACTOR, Subcontractor, Suppliers or anyone else for whom the CONTRACTOR is responsible. 00700 11-2017 Page 9 General Conditions 4.4.3 No asbestos-containing materials shall be incorporated into the Work or brought on the Project site without prior approval of the OWNER. ARTICLE 5-BONDS AND INSURANCE 5.1 Surety and Insurance Companies: All bonds and insurance required by the Contract Documents shall be obtained from solvent surety or insurance companies that are duly licensed by the State of Texas and authorized to issue bonds or insurance policies for the limits and coverages required by the Contract Documents. The bonds shall be in a form acceptable to the OWNER and shall be issued by a surety which complies with the requirements of Art. 7.19-1, Texas Insurance Code(1997) and which is otherwise acceptable to the OWNER. OWNER may require the surety to obtain reinsurance for any portion of the risk that exceeds 10% of the surety's capital and surplus. For bonds exceeding $100,000, the surety must also hold a certificate of authority from the U.S. Secretary of the Treasury or have obtained reinsurance from a reinsurer that is authorized as a reinsurer in Texas and holds a certificate of authority from the U.S. Secretary of the Treasury. 5.2 Workers'Compensation Insurance Coverage: 5.2.1 Definitions: .1 Certificate of coverage ("certificate") -A copy of a certificate of insurance, a certificate of authority to self-insure issued by the commission, or a coverage agreement showing statutory workers' compensation insurance coverage for the person's or entity's employees providing services on the Project, for the duration of the Project. .2 Duration of the Project - includes the time from the beginning of the Work on the Project until the CONTRACTOR's/person's Work on the Project has been completed and accepted by the OWNER. .3 Persons providing services on the Project ("subcontractor" herein) - includes all persons or entities performing all or part of the services the CONTRACTOR has undertaken to perform on the Project, regardless of whether that person contracted directly with the CONTRACTOR and regardless of whether that person has employees. This includes, by way of illustration and not of limitation, independent contractors, Subcontractors, leasing companies, motor carriers, owner-operators, employees of any such entity, or employees of any entity which furnishes persons to provide services on the Project. "Services" include, without limitation, providing, hauling, or delivering equipment or materials, or providing labor, transportation, or other service related to a project. "Services" does not include activities unrelated to the Project, such as food/beverage vendors, office supply deliveries, and delivery of portable toilets. 5.2.2 The CONTRACTOR shall provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44)for all employees of the CONTRACTOR providing services on the Project, for the duration of the Project. 5.2.3 The OWNER will not execute the Contract prior to the CONTRACTOR providing all required certificates of coverage. 5.2.4 If the coverage period shown on the CONTRACTOR's current certificate of coverage ends during the duration of the Project, the CONTRACTOR must, prior to the end of the coverage period, file a new certificate of coverage with the OWNER showing that coverage has been extended. 5.2.5 The CONTRACTOR shall obtain from each person providing services on the Project, and provide to the OWNER: 00700 11-2017 Page 10 General Conditions .1 a certificate of coverage, prior to that person beginning Work on the Project, so the OWNER will have on file certificates of coverage showing coverage for all persons providing services on the Project; and .2 no later than seven (7)days after receipt by the CONTRACTOR, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the Project. 5.2.6 The CONTRACTOR shall retain all required certificates of coverage for the duration of the Project and for one (1) year thereafter. 5.2.7 The CONTRACTOR shall notify the OWNER in writing by certified mail or personal delivery within ten (10) days after the CONTRACTOR knew or should have known of any change that materially affects the provision of coverage of any person providing services on the Project. 5.2.8 The CONTRACTOR shall post at its office or on each Project site a notice, in the text, form and manner prescribed by the Texas Workers' Compensation Commission, informing all persons providing services on the Project that they are required to be covered, and stating how a person may verify coverage and report lack of coverage. 5.2.9 The CONTRACTOR shall contractually require each person with whom it contracts to provide services on a Project to: .1 provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44)for all of its employees providing services on the Project, for the duration of the Project; .2 provide to the CONTRACTOR, prior to that person beginning Work on the Project, a certificate of coverage showing that coverage is being provided for all employees of the person providing services on the Project, for the duration of the Project; .3 provide the CONTRACTOR, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the Project; .4 obtain from each other person with whom it contracts, and provide to the CONTRACTOR: a) a certificate of coverage, prior to the other person beginning Work on the Project; and b) a new certificate of coverage showing extension of coverage, prior to the end of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the Project; .5 retain all required certificates of coverage on file for the duration of the Project and for one (1) year thereafter; .6 notify the OWNER in writing by certified mail or personal delivery within ten (10) days after the person knew or should have known of any change that materially affects the provision of coverage of any person providing services on the Project; and .7 contractually require each person with whom it contracts,to perform as required by paragraphs 5.2.9.1 - 5.2.9.7, with the certificates of coverage to be provided to the person for whom they are providing services. 5.2.10 By signing this Contract or providing or causing to be provided a certificate of coverage, the CONTRACTOR is representing to the OWNER that all employees of the CONTRACTOR who will provide services 00700 11-2017 Page 11 General Conditions on the Project will be covered by workers'compensation coverage for the duration of the Project, that the coverage will be based on proper reporting of classification codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or, in the case of a self-insured, with the commission's Division of Self-Insurance Regulation. Providing false or misleading information may subject the CONTRACTOR to administrative penalties, criminal penalties, civil penalties, or other civil actions. 5.2.11 The CONTRACTOR's failure to comply with any of these provisions is a breach of Contract by the CONTRACTOR which entitles the OWNER to declare the Contract void if the CONTRACTOR does not remedy the breach within ten (10) days after receipt of notice of breach from the OWNER. 5.3 Contractor Insurance Requirements: For specific bond requirements and additional insurance requirements, refer to the Supplemental General Conditions. 5.3.1.1 General Requirements: .1 CONTRACTOR shall carry insurance in the types and amounts indicated below for the duration of the Contract, which shall include items owned by OWNER in the care, custody and control of CONTRACTOR prior to and during construction and warranty period. .2 CONTRACTOR must complete and forward the required Certificates of Insurance to OWNER before the Contract is executed as verification of coverage required below. CONTRACTOR shall not commence Work until the required insurance is obtained and until such insurance has been reviewed by OWNER. Approval of insurance by OWNER shall not relieve or decrease the liability of CONTRACTOR hereunder and shall not be construed to be a limitation of liability on the part of CONTRACTOR. CONTRACTOR must also complete and forward the required Certificates of Insurance to OWNER whenever a previously identified policy period has expired as verification of continuing coverage. .3 CONTRACTOR's insurance coverage is to be written by companies licensed to do business in the State of Texas at the time the policies are issued and shall be written by companies with A.M. Best ratings of B+VII or better, except for hazardous material insurance which shall be written by companies with A.M. Best ratings of A-or better. .4 All endorsements naming the OWNER as additional insured, waivers, and notices of cancellation endorsements as well as the Certificate of Insurance shall indicate: City of Round Rock, 221 E. Main St., Round Rock, Texas 78664. .5 The "other" insurance clause shall not apply to the OWNER where the OWNER is an additional insured shown on any policy. It is intended that policies required in the Contract, covering both OWNER and CONTRACTOR, shall be considered primary coverage as applicable. .6 If insurance policies are not written for amounts specified below, CONTRACTOR shall carry Umbrella or Excess Liability Insurance for any differences in amounts specified. If Excess Liability Insurance is provided, it shall follow the form of the primary coverage. .7 OWNER shall be entitled, upon request and without expense, to receive certified copies of policies and endorsements thereto and may make any reasonable requests for deletion or revision or modification of particular policy terms, conditions, limitations, or exclusions except where policy provisions are established by law or regulations binding upon either of the parties hereto or the underwriter on any such policies. .8 OWNER reserves the right to review the insurance requirements set forth during the effective period of this Contract and to make reasonable adjustments to insurance coverage, limits, and exclusions when deemed necessary and prudent by OWNER based upon changes in statutory law, 00700 11-2017 Page 12 General Conditions court decisions, the claims history of the industry or financial condition of the insurance company as well as CONTRACTOR. .9 CONTRACTOR shall not cause any insurance to be canceled nor permit any insurance to lapse during the term of the Contract or as required in the Contract. .10 CONTRACTOR shall be responsible for premiums, deductibles and self-insured retentions, if any, stated in policies. All deductibles or self-insured retentions shall be disclosed on the Certificate of Insurance. .11 CONTRACTOR shall provide OWNER thirty (30) days written notice of erosion of the aggregate limits below occurrence limits for all applicable coverages indicted within the Contract. .12 If OWNER-owned property is being transported or stored off-site by CONTRACTOR, then the appropriate property policy will be endorsed for transit and storage in an amount sufficient to protect OWNER's property. .13 The insurance coverages required under this contract are required minimums and are not intended to limit the responsibility or liability of CONTRACTOR. 5.3.1.2 Business Automobile Liability Insurance. Provide coverage for all owned, non-owned and hired vehicles. The policy shall contain the following endorsements in favor of OWNER: a) Waiver of Subrogation endorsement TE 2046A; b) 30 day Notice of Cancellation endorsement TE 0202A; and c) Additional Insured endorsement TE 9901 B. Provide coverage in the following types and amounts: .1 A minimum combined single limit of$500,000 per occurrence for bodily injury and property damage. Alternate acceptable limits are $250,000 bodily injury per person, $500,000 bodily injury per occurrence and at least$100,000 property damage liability each accident. 5.3.1.3 Workers'Compensation and Employers' Liability Insurance: Coverage shall be consistent with statutory benefits outlined in the Texas Workers' Compensation Act (Section 401). CONTRACTOR shall assure compliance with this Statute by submitting two (2) copies of a standard certificate of coverage (e.g. ACCORD form) to Owner's Representative for every person providing services on the Project as acceptable proof of coverage. The required Certificate of Insurance must be presented as evidence of coverage for CONTRACTOR. Workers' Compensation Insurance coverage written by the Texas Workers Compensation Fund is acceptable to OWNER. CONTRACTOR's policy shall apply to the State of Texas and include these endorsements in favor of OWNER: a) Waiver of Subrogation, form WC 420304; and b) 30 day Notice of Cancellation, form WC 420601. The minimum policy limits for Employers' Liability Insurance coverage shall be as follows: .1 $100,000 bodily injury per accident, $500,000 bodily injury by disease policy limit and $100,000 bodily injury by disease each employee. 00700 11-2017 Page 13 General Conditions 5.3.1.4 Commercial General Liability Insurance. The Policy shall contain the following provisions: a) Blanket contractual liability coverage for liability assumed under the Contract and all contracts relative to this Project. b) Completed Operations/Products Liability for the duration of the warranty period. c) Explosion, Collapse and Underground (X, C & U) coverage. d) Independent Contractors coverage. e) Aggregate limits of insurance per project, endorsement CG 2503. f) OWNER listed as an additional insured, endorsement CG 2010. g) 30 day notice of cancellation in favor of OWNER, endorsement CG 0205. h) Waiver of Transfer of Recovery Against Others in favor of OWNER, endorsement CG 2404. Provide coverages A&B with minimum limits as follows: .1 A combined bodily injury and property damage limit of$500,000 per occurrence. 5.3.1.5 Builders' Risk Insurance. CONTRACTOR shall maintain Builders' Risk Insurance or Installation Insurance on an all risk physical loss form in the Contract Amount. Coverage shall continue until the Work is accepted by OWNER. OWNER shall be a loss payee on the policy. If off site storage is permitted, coverage shall include transit and storage in an amount sufficient to protect property being transported or stored. 5.4 Bonds: 5.4.1 General. .1 Bonds, when required, shall be executed on forms furnished by or acceptable to OWNER. All bonds signed by an agent must be accompanied by a certified copy of such agent's authority to act. .2 If the surety on any bond furnished by CONTRACTOR is declared bankrupt or becomes insolvent or its right to do business is terminated in the State of Texas or it ceases to meet the requirements of the preceding paragraph, CONTRACTOR shall within ten (10)days thereafter substitute another bond and surety, both of which must be acceptable to OWNER. .3 When Performance Bonds and/or Payment Bonds are required, each shall be issued in an amount of one hundred percent (100%) of the Contract Amount as security for the faithful performance and/or payment of all CONTRACTOR's obligations under the Contract Documents. Performance Bonds and Payment Bonds shall be issued by a solvent surety company authorized to do business in the State of Texas, and shall meet any other requirements established by law or by OWNER pursuant to applicable law. Any surety duly authorized to do business in Texas may write Performance and Payment Bonds on a project without reinsurance to the limit of 10 percent of its capital and surplus. Such a surety must reinsure any obligations over 10 percent. 5.4.2 Performance Bond. 00700 11-2017 Page 14 General Conditions .1 If the Contract Amount exceeds $100,000, CONTRACTOR shall furnish OWNER with a Performance Bond in the form set out by OWNER. .2 If the Contract Amount exceeds $25,000 but is less than or equal to $100,000, CONTRACTOR shall furnish OWNER with a Performance Bond in the form set out by OWNER, unless the original Contract Time is 60 Calendar Days/40 Working Days or less, in which case CONTRACTOR can agree to the following terms and conditions for payment in lieu of providing a Performance Bond: no money will be paid to CONTRACTOR until completion and acceptance of the Work by OWNER; CONTRACTOR shall be entitled to receive 95%of the Contract Amount following Final Completion, and the remaining 5%of the Contract Amount following the one year warranty period. .3 If the Contract Amount is less than or equal to $25,000, CONTRACTOR will not be required to furnish a Performance Bond; provided that no money will be paid to CONTRACTOR until completion and acceptance of the Work by OWNER under the following terms and conditions: CONTRACTOR shall be entitled to receive 95%of the Contract Amount following Final Completion, and the remaining 5%of the Contract Amount following the one year warranty period. .4 If a Performance Bond is required to be furnished, it shall extend for the one year warranty period. 5.4.3 Payment Bond. .1 If the Contract Amount exceeds $25,000, CONTRACTOR shall furnish OWNER with a Payment Bond in the form set out by OWNER. .2 If the Contract Amount is less than or equal to $25,000, CONTRACTOR will not be required to furnish a Payment Bond; provided that no money will be paid to CONTRACTOR until completion and acceptance of the Work by OWNER under the terms and conditions specified in paragraph 5.4.2.3. ARTICLE 6 -CONTRACTOR'S RESPONSIBILITIES 6.1 Supervision and Superintendence: 6.1.1 The CONTRACTOR shall supervise, inspect and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the Work in accordance with the Contract Documents. Unless otherwise directed by the OWNER in the Contract Documents, the CONTRACTOR shall be solely responsible for the means, methods, techniques, sequences and procedures of construction. The CONTRACTOR shall be responsible to see that the completed Work complies accurately with the Contract Documents. 6.1.2 The CONTRACTOR shall have an English-speaking, competent Superintendent on the Work at all times that work is in progress. Upon request of Owner's Representative, the CONTRACTOR shall present the resume of the proposed Superintendent to Owner's Representative showing evidence of experience and successful superintendence and direction of work of a similar scale and complexity. If, in the opinion of Owner's Representative, the proposed Superintendent does not indicate sufficient experience in line with the Work, he/she will not be allowed to be the designated Superintendent for the Work. The Superintendent shall not be replaced without Written Notice to Owner's Representative. If the CONTRACTOR deems it necessary to replace the Superintendent, the CONTRACTOR shall provide the necessary information for approval, as stated above, on the proposed new Superintendent. A qualified substitute Superintendent may be designated in the event that the designated Superintendent is temporarily away from the Work, but not to exceed a time limit acceptable to Owner's Representative. The CONTRACTOR shall replace the Superintendent upon the OWNER's request in the event the Superintendent is unable to perform to the OWNER's satisfaction. The Superintendent will be the CONTRACTOR's representative on the Work and shall have the authority to act on behalf of the CONTRACTOR. All communications given to the Superintendent shall be as binding as if given to the CONTRACTOR. Either the CONTRACTOR or the 00700 11-2017 Page 15 General Conditions Superintendent shall provide an emergency and home telephone number at which one or the other may be reached if necessary when work is not in progress. 6.2 Labor, Materials and Equipment: 6.2.1 The CONTRACTOR agrees to employ only orderly and competent workers, skillful in performance of the type of Work required under this Contract. The CONTRACTOR, Subcontractors, Sub-subcontractors, and their employees may not use or possess any firearms, alcoholic or other intoxicating beverages, illegal drugs or controlled substances while on the job or on the OWNER's property, nor may such workers be intoxicated, or under the influence of alcohol or drugs, on the job. If the OWNER or Owner's Representative notifies the CONTRACTOR that any worker is incompetent, disorderly or disobedient, has knowingly or repeatedly violated safety regulations, has possessed any firearms, or has possessed or was under the influence of alcohol or drugs on the job, the CONTRACTOR shall immediately remove such worker from performing Contract Work, and may not employ such worker again on Contract Work without the OWNER's prior written consent. The CONTRACTOR shall at all times maintain good discipline and order on or off the site in all matters pertaining to the Project. The CONTRACTOR shall pay workers no less than the wage rates established in Section 00900, and maintain weekly payroll reports as evidence thereof. 6.2.2 Unless otherwise specified, the CONTRACTOR shall provide and pay for all materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities and all other facilities and incidentals necessary for the furnishing, performance, re-testing of defective work, start-up and completion of the Work. 6.2.3 All materials and equipment shall be of good quality and new (including new products made of recycled materials), except as otherwise provided in the Contract Documents. If required by Owner's Representative, the CONTRACTOR shall furnish satisfactory evidence (reports of required tests, manufacturer's certificates of compliance with material requirements, mill reports, etc.) as to the kind, quantity and quality of materials and equipment. All materials and equipment shall be applied, installed, connected, erected, used, cleaned and conditioned in accordance with instructions of the applicable Supplier, except as otherwise provided in the Contract Documents. 6.2.4 Substitutes and "Approved Equal" Items: 6.2.4.1 Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type,function and quality required. Unless the specification or description contains words reading that no like, equivalent or"approved equal" item or no substitution is permitted, other items of material or equipment of other Suppliers may be submitted to Owner's Representative under the following circumstances: .1 "Approved Equal": If, in the OWNER's sole discretion, an item of material or an item of equipment proposed by the CONTRACTOR is functionally equal to that named and sufficiently similar so that no change in related Work will be required, it may be considered by the OWNER as an "approved equal" item, in which case review of the proposed item may, in the OWNER's sole discretion, be accomplished without compliance with some or all of the requirements for evaluation of proposed substitute items. The CONTRACTOR shall provide the OWNER with the documentation required for the OWNER to make its determination. .2 Substitute Items: If, in the OWNER's sole discretion, an item of material or an item of equipment proposed by the CONTRACTOR does not qualify as an "approved equal" item under paragraph 6.2.4.1.1, then it will be considered a proposed substitute item. The CONTRACTOR shall submit sufficient information to allow the OWNER to determine that the item of material or item of equipment proposed is essentially equivalent to that named and a substitute therefor. 6.2.4.2 Substitute Construction Methods and Procedures: If a specific means, method, technique, sequence or procedure of construction is shown or indicated in and expressly required by the Contract Documents, the CONTRACTOR may with prior approval of the OWNER furnish or utilize a substitute means, method, technique, 00700 11-2017 Page 16 General Conditions sequence, or procedure of construction. The CONTRACTOR shall submit sufficient information to Owner's Representative to allow the OWNER, in the OWNER's sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. 6.2.4.3 OWNER's Evaluation: The OWNER will be allowed a reasonable time within which to evaluate each proposal or submittal made pursuant to paragraph 6.2.4.1.1 and paragraph 6.2.4.1.2. The OWNER will be the sole judge of acceptability. No "approved equal" or substitute shall be ordered, installed, or utilized until the OWNER's review is complete, which will be evidenced by either a Change Order or completion of the Shop Drawing review procedure. The OWNER may require the CONTRACTOR to furnish at the CONTRACTOR's expense a special performance guarantee or other surety bond with respect to any"approved equal"or substitute. The OWNER shall not be responsible for any delay due to review time for any "approved equal"or substitute. 6.2.4.4 CONTRACTOR's Expense: All data to be provided by the CONTRACTOR in support of any proposed "approved equal"or substitute item will be at the CONTRACTOR's expense. 6.2.5 The CONTRACTOR agrees to assign to the OWNER any rights it may have to bring antitrust suits against its Suppliers for overcharges on materials incorporated in the Project growing out of illegal price fixing agreements. The CONTRACTOR further agrees to cooperate with the OWNER should the OWNER wish to prosecute suits against Suppliers for illegal price fixing. 6.3 Progress Schedule: Unless otherwise directed, the CONTRACTOR shall adhere to the progress schedule established in accordance with paragraph 2.6 as it may be adjusted from time to time as provided below: .1 The CONTRACTOR shall submit to Owner's Representative for acceptance proposed adjustments in the progress schedule that will not change the Contract Times or Milestones. Such adjustments will conform generally to the progress schedule then in effect. .2 Proposed adjustments in the progress schedule that will change the Contract Times or Milestones shall be submitted in accordance with the requirements of Article 12. Such adjustments may only be made by a Change Order or Time Extension Request in accordance with Article 12. 6.4 Concerning Subcontractors, Suppliers and Others: 6.4.1 Assignment: The CONTRACTOR agrees to retain direct control of and give direct attention to the fulfillment of this Contract. The CONTRACTOR agrees not to, by Power of Attorney or otherwise, assign said Contract without the prior written consent of the OWNER. 6.4.2 Award of Subcontracts for Portions of the Work: The CONTRACTOR shall not employ any Subcontractor, Supplier or other person or organization, whether initially or as a substitute, against whom the OWNER may have reasonable objection. The CONTRACTOR must provide the OWNER with a list of all Subcontractors, Suppliers, or other persons or organizations it will use in the Work, and such list must be provided prior to the preconstruction conference. Should the OWNER have objections,the OWNER will communicate such objections by Written Notice. If the OWNER requires a change without good cause of any Subcontractor, person or organization previously accepted by OWNER,the Contract Amount may be increased or decreased by the difference in the cost occasioned by any such change, and an appropriate Change Order shall be issued. The CONTRACTOR shall not substitute any Subcontractor, person or organization that has been accepted by the OWNER, unless the substitute has been accepted in writing by the OWNER. No acceptance by the OWNER of any Subcontractor, Supplier or other person or organization shall constitute a waiver of any right of the OWNER to reject defective Work. 6.4.3 The CONTRACTOR shall enter into written agreements with all Subcontractors and Suppliers which specifically bind the Subcontractors or Suppliers to the applicable terms and conditions of the Contract Documents for the benefit of the OWNER and E/A. The OWNER reserves the right to specify that certain requirements shall be adhered to by all Subcontractors and Sub-subcontractors as indicated in other portions of the Contract 00700 11-2017 Page 17 General Conditions Documents and these requirements shall be made a portion of the agreement between the CONTRACTOR and Subcontractor or Supplier. 6.4.4 The CONTRACTOR shall be fully responsible to the OWNER for all acts and omissions of the Subcontractors, Suppliers and other persons and organizations performing or furnishing any of the Work under a direct or indirect contract with the CONTRACTOR just as the CONTRACTOR is responsible for the CONTRACTOR's own acts and omissions. Nothing in the Contract Documents shall create for the benefit of any such Subcontractor, Supplier or other person or organization any contractual relationship between the OWNER and any such Subcontractor, Supplier or other person or organization, nor shall it create any obligation on the part of the OWNER or E/A to pay or to see to the payment of any amounts due any such Subcontractor, Supplier or other person or organization except as may otherwise be required by laws and regulations. 6.4.5 The CONTRACTOR shall be solely responsible for scheduling and coordinating the Work of Subcontractors, Suppliers and other persons and organizations performing or furnishing any of the Work under a direct or indirect contract with the CONTRACTOR. The CONTRACTOR ONTRACTOR shall require all Subcontractors, ubcont.ac ors, Suppliers and such other persons and organizations performing or furnishing any of the Work to communicate with Owner's Representative through the CONTRACTOR. 6.4.6 The divisions and sections of the Specifications and the identifications of any Drawings shall not control the CONTRACTOR in dividing or delineating the Work to be performed by any specific trade. 6.4.7 The CONTRACTOR shall pay each Subcontractor and Supplier their appropriate share of payments made to the CONTRACTOR not later than ten (10) Calendar Days after the CONTRACTOR's receipt of payment from the OWNER. 6.5 Patent Fees and Royalties: 6.5.1 The CONTRACTOR shall be responsible at all times for compliance with applicable patents or copyrights encompassing, in whole or in part, any design, device, material, or process utilized, directly or indirectly, in the performance of the Work or the formulation or presentation of its Bid. 6.5.2 The CONTRACTOR shall pay all royalties and license fees and shall provide, prior to commencement of Work hereunder and at all times during the performance of same, for lawful use of any design, device, material or process covered by letters, patent or copyright by suitable legal agreement with the patentee, copyright holder, or their duly authorized representative whether or not a particular design, device, material, or process is specified by the OWNER. 6.5.3 The CONTRACTOR shall defend all suits or claims for infringement of any patent or copyright and shall save the OWNER harmless from any loss or liability, direct or indirect, arising with respect to the CONTRACTOR's process in the formulation of its bid or the performance of the Work or otherwise arising in connection therewith. The OWNER reserves the right to provide its own defense to any suit or claim of infringement of any patent or copyright in which event the CONTRACTOR shall indemnify and save harmless the OWNER from all costs and expenses of such defense as well as satisfaction of all judgments entered against the OWNER. 6.5.4 The OWNER shall have the right to stop the Work and/or terminate this Agreement at any time in the event the CONTRACTOR fails to disclose to the OWNER that the CONTRACTOR's work methodology includes the use of any infringing design, device, material or process. 6.6 Permits, Fees: Unless otherwise provided in the Supplemental General Conditions, the CONTRACTOR shall obtain and pay for all construction permits, licenses and fees required for prosecution of the Work. OWNER will obtain and pay for the following permits, licenses and/or fees, if required: .1 Site Development Permit. 00700 11-2017 Page 18 General Conditions .2 Building Permit(s). .3 Texas Department of Transportation permit for work in State rights-of-way. .4 Railroad Utility License Agreement. 6.7 Laws and Regulations: 6.7.1 The CONTRACTOR shall give all notices and comply with all laws and regulations applicable to furnishing and performing the Work. Except where otherwise expressly required by applicable laws and regulations, neither the OWNER nor E/A shall be responsible for monitoring the CONTRACTOR's compliance with any laws and regulations. 6.7.2 The CONTRACTOR shall plan and execute its operations in compliance with all applicable Federal, State and local laws and regulations, including those concerning control and abatement of water pollution and prevention and control of air pollution. 6.7.3 If the CONTRACTOR performs any Work knowing or having reason to know that it is contrary to laws or regulations, then the CONTRACTOR shall bear all claims, costs, losses and damages arising therefrom; however, it shall not be the CONTRACTOR's primary responsibility to make certain that the Specifications and Drawings are in accordance with laws and regulations, but this does not relieve the CONTRACTOR of the CONTRACTOR's obligations under Article 3. 6.8 Taxes: 6.8.1 The CONTRACTOR shall pay all sales, consumer, use and other similar taxes required to be paid by the CONTRACTOR in accordance with the laws and regulations of the State of Texas. 6.8.2 The OWNER is an exempt organization as defined by Chapter 11 of the Property Tax Code of Texas and is thereby exempt from payment of Sales Tax under Chapter 151, Limited Use Sales, Excise and Use Tax, Texas Tax Code, and Article 1066 (C), Local Sales and Use Tax Act, Revised Civil Statutes of Texas. 6.9 Use of Premises: 6.9.1 The CONTRACTOR shall confine construction equipment, the storage of materials and equipment and the operations of workers to the site and land and areas identified in and permitted by the Contract Documents and other land and areas permitted by laws and regulations, rights-of-way, permits and easements, and shall not unreasonably encumber the premises with construction equipment or other materials or equipment. The CONTRACTOR shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof or of any adjacent land or areas, resulting from the performance of the Work. Should any claim be made by any such owner or occupant because of the performance of the Work, the CONTRACTOR shall promptly settle with such other party by negotiation or otherwise resolve the claim by dispute resolution proceeding or at law. The CONTRACTOR shall indemnify, defend and hold harmless the OWNER, E/A, E/A's consultants and anyone directly or indirectly employed by any of them from and against all claims, costs, losses and damages (including court costs and reasonable attorneys' fees) arising out of or resulting from any claim or action, legal or equitable, brought by any such owner or occupant against the OWNER, E/A or any other party indemnified hereunder to the extent caused by or based upon performance of the Work or failure to perform the Work. 6.9.2 During the progress of the Work and on a daily basis, the CONTRACTOR shall keep the premises free from accumulations of waste materials, rubbish and other debris resulting from the Work. At the completion of the Work, the CONTRACTOR shall remove all waste materials, rubbish and debris from and about the premises as well as all tools, appliances, construction equipment and machinery and surplus materials. The CONTRACTOR shall leave the site clean and ready for occupancy by the OWNER at Substantial Completion of the Work. The CONTRACTOR shall, at a minimum, restore to original condition all property not designated for alteration by the Contact Documents. 00700 11-2017 Page 19 General Conditions 6.9.3 The CONTRACTOR shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall the CONTRACTOR subject any part of the Work or adjacent property to stresses or pressures that will endanger it. 6.10 Record Documents: The CONTRACTOR shall maintain in a safe place at the site, or other location acceptable to the OWNER, one (1) record copy of all Drawings, Specifications,Addenda, Change Orders, Change Directives, Field Orders and written interpretations and clarifications (issued pursuant to paragraph 9.5) in good order and annotated to show all changes made during construction. These record documents, together with all final samples and all final Shop Drawings,will be available to the OWNER and E/A for reference during performance of the Work. Upon Substantial Completion of the Work, these record documents, samples and Shop Drawings shall be promptly delivered to Owner's Representative. 6.11 Safety and Protection: 6.11.1 The CONTRACTOR shall be responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. Upon request, and prior to installation of measures,the CONTRACTOR shall submit a site security plan for approval by the OWNER. By reviewing the plan or making recommendations or comments, the OWNER will not assume liability nor will the CONTRACTOR be relieved of liability for damage, injury or loss. The CONTRACTOR shall take all necessary precautions for the safety of and shall provide the necessary protection to prevent damage, injury or loss to: .1 all persons on the Work site or who may be affected by the Work; .2 all the Work and materials and equipment to be incorporated therein, whether in storage on or off the site; and .3 other property at the site or adjacent thereto, including but not limited to, trees, shrubs, lawns, walks, pavements, roadways, structures, utilities and underground facilities not designated for removal, relocation or replacement in the course of construction. 6.11.2 The CONTRACTOR shall comply with all applicable laws and regulations of any public body having jurisdiction for safety of persons or property or to protect them from damage, injury or loss; and shall erect and maintain all necessary safeguards for such safety and protection. The CONTRACTOR shall notify owners of adjacent property and of underground facilities, and utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation and replacement of their property. All damage, injury or loss to any property referred to in paragraph 6.11.1.2 and paragraph 6.11.1.3 caused, directly or indirectly, in whole or in part, by the CONTRACTOR, Subcontractor, Supplier or any person or organization directly or indirectly employed by any of them to perform or furnish any of the Work or anyone for whose acts any of them may be liable, shall be remedied by the CONTRACTOR (except damage or loss attributable to the fault of Drawings or Specifications or to the acts or omissions of the OWNER, or E/A, or E/A's consultant or anyone employed by any of them or anyone whose acts any of them may be liable, and not attributable, directly or indirectly, in whole or in part, to the faults or negligence of the CONTRACTOR or any Subcontractor, Supplier or other person or organization directly or indirectly employed by any of them). The CONTRACTOR's duties and responsibilities for safety and protection of the Work shall continue until such time as all the Work is completed and Owner's Representative has issued a notice to the OWNER and the CONTRACTOR in accordance with Article 14 that the Work is acceptable (except as otherwise expressly provided in connection with Substantial Completion). 6.11.3 Safety Representative: The CONTRACTOR shall designate a qualified and experienced safety representative at the site whose duties and responsibilities shall be the prevention of accidents and the maintaining and supervising of safety precautions and programs. Upon request of the OWNER, the CONTRACTOR shall provide certifications or other documentation of the safety representative's qualifications. 00700 11-2017 Page 20 General Conditions 6.11.4 Hazard Communication Programs: The CONTRACTOR shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers at the site in accordance with laws and regulations. 6.11.5 Emergencies: 6.11.5.1 In emergencies affecting the safety or protection of persons or the Work at the site or adjacent thereto, the CONTRACTOR, without special instruction or authorization from the OWNER or E/A, is obligated to act reasonably to prevent threatened damage, injury or loss and to mitigate damage or loss to the Work. The CONTRACTOR shall give Owner's Representative prompt written notice if the CONTRACTOR believes that any significant changes in the Work or variations from the Contract Documents have been caused thereby. If Owner's Representative determines that a change in the Contract Documents is required because of the action taken by the CONTRACTOR in response to such an emergency, a Change Directive or Change Order will be issued to document the consequences of such action; otherwise the OWNER will not be responsible for the CONTRACTOR's emergency action. 6.11.5.2 Authorized agents of the CONTRACTOR shall respond immediately to call-out at any time of any day or night when circumstances warrant the presence on Project site of the CONTRACTOR or its agent to protect the Work or adjacent property from damage, restriction or limitation or to take such action or measures pertaining to the Work as may be necessary to provide for the safety of the public. Should the CONTRACTOR and/or its agent fail to respond and take action to alleviate such an emergency situation, the OWNER may direct other forces to take action as necessary to remedy the emergency condition,and the OWNER will deduct any cost of such remedial action from the funds due to the CONTRACTOR under this Contract. 6.11.5.3 In the event there is an accident involving injury to any individual on or near the Work, the CONTRACTOR shall notify Owner's Representative within twenty-four (24) hours of the event and shall be responsible for recording the location of the event and the circumstances surrounding the event through photographs, interviewing witnesses, obtaining medical reports and other documentation that describes the event. Copies of such documentation shall be provided to Owner's Representative, for the OWNER's and E/A's records, within forty-eight (48) hours of the event. 6.12 Continuing the Work: The CONTRACTOR shall carry on the Work and adhere to the progress schedule during all disputes or disagreements with the OWNER. No Work shall be delayed or postponed pending resolution of any disputes or disagreements, except as the OWNER and the CONTRACTOR may agree in writing. 6.13 CONTRACTOR's General Warranty and Guarantee: 6.13.1 The CONTRACTOR warrants and guarantees to the OWNER that all Work will be performed in a good and workmanlike manner in accordance with the Contract Documents and will not be defective. The CONTRACTOR's warranty and guarantee hereunder excludes defects or damage caused by: .1 abuse, modification or improper maintenance or operation by persons other than the CONTRACTOR, Subcontractors or Suppliers; or .2 normal wear and tear under normal usage. 6.13.2 The CONTRACTOR's obligation to perform and complete the Work in a good and workmanlike manner in accordance with the Contract Documents shall be absolute. None of the following will constitute acceptance of Work not in accordance with the Contract Documents or a release of the CONTRACTOR's obligation to perform the Work in accordance with the Contract Documents: .1 observations by Owner's Representative and/or E/A; .2 recommendation of any progress or final payment by Owner's Representative; 00700 11-2017 Page 21 General Conditions .3 the issuance of a certificate of Substantial Completion or any payment by the OWNER to the CONTRACTOR under the Contract Documents; .4 use or occupancy of the Work or any part thereof by the OWNER; .5 any acceptance by the OWNER or any failure to do so; .6 any review of a Shop Drawing or sample submittal; .7 any inspection, test or approval by others; or .8 any correction of defective Work by the OWNER. 6.14 indemnification: 6.14.1 The CONTRACTOR shall defend, indemnify and hold harmless the OWNER, E/A, E/A's consultants and subconsultants and their respective officers, directors, partners, employees, agents and other consultants and any of them from and against all claims, costs, losses and damages (including but not limited to all fees and charges of engineers, architects, attorneys and other professionals and all court or other dispute resolution costs) arising out of or resulting from the performance of the Work, provided that any such claim, cost, loss or damage: .1 is attributable to bodily injury, sickness, disease or death, or to injury to or destruction of tangible property (other than the Work itself), including the loss of use resulting therefrom, and .2 is caused in whole or in part by any negligent act or omission of the CONTRACTOR,any Subcontractor, any Supplier, any person or organization directly or indirectly employed by any of them to perform or furnish any of the Work or anyone for whose acts any of them may be liable, regardless of whether or not caused in part by any negligence or omission of a person or entity indemnified hereunder or whether liability is imposed upon such indemnified party by laws and regulations regardless of the negligence of any such person or entity. 6.14.2 The indemnification obligation under paragraph 6.14.1 shall not be limited in any way by any limitation on the amount or type of damages, or compensation or benefits payable by or for the CONTRACTOR or any such Subcontractor, Supplier or other person or organization under workers'compensation acts, disability benefit acts or other employee benefit acts. 6.14.3 The obligations of the CONTRACTOR under paragraph 6.14.1 shall not extend to the liability of the OWNER, E/A, E/A's consultants, and their officers, directors, partners, employees or agents caused primarily by negligent preparation of maps, drawings, surveys, designs or specifications upon which is placed the applicable state-authorized design professional seal of the OWNER's, E/A's or E/A's consultant's officers, directors, partners, employees or agents. 6.14.4 In the event the CONTRACTOR fails to follow the OWNER's directives concerning use of the site, scheduling or course of construction, or engages in other conduct which proximately causes damage to property based on inverse condemnation or otherwise, then and in that event, the CONTRACTOR shall indemnify the OWNER against all costs resulting from such claims. 6.14.5 In the event the CONTRACTOR unreasonably delays progress of the work being done by others on the site so as to cause loss for which the OWNER becomes liable, then the CONTRACTOR shall reimburse the OWNER for such loss. 6.15 Survival of Obligations: 00700 11-2017 Page 22 General Conditions All representations, indemnifications, warranties and guarantees made in, required by or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion and acceptance of the Work and termination or completion of the Agreement. 6.16 Losses from Natural Causes: Unless otherwise specified, all loss or damage to the CONTRACTOR arising out of the nature of the Work to be done or from action of the elements,floods or from unforeseeable circumstances in prosecution of the Work or from unusual obstructions or difficulties which may be encountered in prosecution of the Work, shall be sustained and borne by the CONTRACTOR at its own cost and expense. 6.17 Notice of Claim: Should the CONTRACTOR suffer injury or damage to person or property because of any error, omission or act of the OWNER or of any of the OWNER's employees or agents or others for whose acts the OWNER is liable, a Claim will be made to the other party within thirty (30) calendar days of the event giving rise to such injury or damage. The provisions of this paragraph 6.17 shall not be construed as a substitute for or a waiver of the provisions of any applicable statute of limitations or statute of repose. 6.18 Liquidated Damages: At set forth in the Agreement, paragraph 1.2,the CONTRACTOR or its Surety shall be liable for Liquidated Damages for the CONTRACTOR's failure to timely complete the Work or any portion thereof within the Contract Time. See Supplemental Conditions for amount of Liquidated Damages. ARTICLE 7 -OTHER WORK 7.1 The OWNER may perform other work related to the Project at the site by the OWNER's own forces, or let other contracts therefor, or have other work performed by utility owners. If the CONTRACTOR believes that delay or additional cost is involved because of such action by the OWNER, the CONTRACTOR may make a Claim as provided in Article 11 or Article 12. 7.2 The CONTRACTOR shall afford other contractors who are in a contract with the OWNER and each utility owner (and the OWNER, if the OWNER is performing the additional work with the OWNER's employees) proper and safe access to the site and a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work and shall properly connect and coordinate the Work with theirs. Unless otherwise provided in the Contract Documents, the CONTRACTOR shall do all cutting, fitting and patching of the Work that may be required to make its several parts come together properly and integrate with such other work. The CONTRACTOR shall not endanger any work of others by cutting, excavating or otherwise altering their work and will only cut or alter their work with the written consent of Owner's Representative and the other contractors whose work will be affected. The CONTRACTOR shall promptly remedy damage wrongfully caused by the CONTRACTOR to completed or partially completed construction or to property of the OWNER or separate contractors. 7.3 If the proper execution or results of any part of the CONTRACTOR's Work depends upon work performed by others under this Article 7, the CONTRACTOR shall inspect such other work and promptly report to Owner's Representative in writing any delays, defects or deficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of the CONTRACTOR's Work. The CONTRACTOR's failure to report will constitute an acceptance of such other work as fit and proper for integration with the CONTRACTOR's Work except for latent or non-apparent defects and deficiencies in such other work. 7.4 The OWNER shall provide for coordination of the activities of the OWNER's own forces and of each separate contractor with the Work of the CONTRACTOR, who shall cooperate with them. The CONTRACTOR shall participate with other separate contractors and Owner's Representative in reviewing their construction schedules when directed to do so. The CONTRACTOR shall make any revisions to the construction schedule 00700 11-2017 Page 23 General Conditions deemed necessary after a joint review and mutual agreement. The construction schedules shall then constitute the schedules to be used by the CONTRACTOR, separate contractors and the OWNER until subsequently revised. 7.5 Unless otherwise stated herein, costs caused by delays or by improperly timed activities or defective construction shall be borne by the party responsible therefor. ARTICLE 8 -OWNER'S RESPONSIBILITIES 8.1 Prior to the start of construction, the OWNER will designate in writing a person or entity to act as Owner's Representative during construction. Except as otherwise provided in these General Conditions, the OWNER shall issue all communications to the CONTRACTOR through Owner's Representative. 8.2 The OWNER will not supervise, direct, control or have authority over or be responsible for the CONTRACTOR's means, methods,techniques, sequences or procedures of construction or the safety precautions and programs incident thereto. The OWNER is not responsible for any failure of the CONTRACTOR to comply with laws and regulations applicable to furnishing or performing the Work. The OWNER is not responsible for the CONTRACTOR's failure to perform or furnish the Work in accordance with the Contract Documents. Failure or omission of the OWNER to discover, or object to or condemn any defective Work or material shall not release the CONTRACTOR from the obligation to properly and fully perform the Contract. 8.3 The OWNER is not responsible for the acts or omissions of the CONTRACTOR, or of any Subcontractor, any Supplier, or of any other person or organization performing or furnishing any of the Work. 8.4 Information or services under the OWNER's control shall be furnished by the OWNER with reasonable promptness to avoid delay in the orderly progress of the Work. 8.5 The foregoing are in addition to other duties and responsibilities of the OWNER enumerated herein and especially those in respect to Article 4 (Availability of Lands; Subsurface and Physical Conditions; Reference Points), Article 7 (Other Work) and Article 14 (Payments to the CONTRACTOR and Completion). 8.6 Notice of Claim: Should the OWNER suffer injury or damage to person or property because of any error, omission or act of the CONTRACTOR or of any of the CONTRACTOR's employees or agents or others for whose acts the CONTRACTOR is liable, a Claim will be made to the other party within thirty (30) calendar days of the event giving rise to such injury or damage. The provisions of this paragraph 8.6 shall not be construed as a substitute for or a waiver of the provisions of any applicable statute of limitations or statute of repose. ARTICLE 9 -ENGINEER/ARCHITECT'S STATUS DURING CONSTRUCTION 9.1 E/A's Authority and Responsibilities: 9.1.1 The duties and responsibilities and the limitations of authority of E/A during construction are set forth in the Contract Documents and shall not be extended without written consent of the OWNER and E/A. The assignment of any authority, duties or responsibilities to E/A under the Contract Documents, or under any agreement between the OWNER and E/A, or any undertaking, exercise or performance thereof by E/A, is intended to be for the sole and exclusive benefit of the OWNER and is not for the benefit of the CONTRACTOR, Subcontractor, Sub- subcontractor, Supplier, or any other person or organization, or for any surety or employee or agent of any of them. 9.1.2 E/A will not supervise, direct, control or have authority over or be responsible for the CONTRACTOR's means, methods, techniques, sequences or procedures of construction, or the safety precautions and programs incident thereto. E/A is not responsible for any failure of the CONTRACTOR to comply with laws and regulations applicable to the furnishing or performing the Work. E/A is not responsible for the CONTRACTOR's failure to perform or furnish the Work in accordance with the Contract Documents. Failure or omission of E/A to discover, or 00700 11-2017 Page 24 General Conditions object to or condemn any defective Work or material shall not release the CONTRACTOR from the obligation to properly and fully perform the Contract. 9.1.3 E/A is not responsible for the acts or omissions of the CONTRACTOR, or of any Subcontractor, any Supplier, or of any other person or organization performing or furnishing any of the Work. 9.1.4 If the OWNER so directs, E/A will review the final Application for Payment and accompanying documentation and all maintenance and operating instructions, schedules, guarantees, bonds and certificates of inspection,tests and approvals and other documentation required to be delivered by Article 14,but only to determine generally that their content complies with the requirements of, and in the case of certificates of inspections, tests and approvals that the results certified indicate compliance with, the Contract Documents. 9.1.5 The limitations upon authority and responsibility set forth in this paragraph 9.1 shall also apply to E/A's Consultants, Resident Project Representative and assistants. 9.2 E/A as Owner's Representative: 9.2.1 E/A may be designated as Owner's Representative under paragraph 8.1. 9.3 Visits to Site: If the OWNER so directs, E/A will make visits to the site at intervals appropriate to the various stages of construction as is necessary in order to observe as an experienced and qualified design professional the progress that has been made and the quality of the various aspects of the CONTRACTOR's executed Work. Based on information obtained during such visits and observations, E/A will endeavor for the benefit of the OWNER to determine if the Work is proceeding in accordance with the Contract Documents. E/A will not be required to make exhaustive or continuous on-site inspections to check the quality or quantity of the Work. E/A's efforts will be directed toward providing for the OWNER a greater degree of confidence that the completed Work will conform to the Contract Documents. On the basis of such visits and on-site observations, E/A will keep the OWNER informed of the progress of the Work and will endeavor to guard the OWNER against defective Work. E/A's visits and on-site observations are subject to all the limitations on E/A's authority and responsibility set forth in paragraph 9.1. 9.4 Project Representative: If the OWNER and E/A agree, E/A will furnish a Resident Project Representative to assist E/A in providing more continuous observation of the Work. The responsibilities and authority and limitations of any such Resident Project Representative and assistants will be as provided in paragraph 9.1 and in the Supplemental General Conditions. The OWNER may designate another representative or agent to represent the OWNER at the site who is not E/A, E/A's consultant, agent or employee. 9.5 Clarifications and Interpretations: E/A may determine that written clarifications or interpretations of the requirements of the Contract Documents (in the form of drawings or otherwise) are necessary. Such written clarifications or interpretations will be consistent with the intent of and reasonably inferable from the Contract Documents,will be issued with reasonable promptness by Owner's Representative and will be binding on the OWNER and the CONTRACTOR. If the OWNER or the CONTRACTOR believes that a written clarification or interpretation justifies an adjustment in the Contract Amount or the Contract Times, the OWNER or the CONTRACTOR may make a Claim therefor as provided in Article 11 or Article 12. 9.6 Rejecting Defective Work: E/A will recommend that the OWNER disapprove or reject Work which E/A believes to be defective, or believes will not produce a completed Project that conforms to the Contract Documents or will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. 00700 11-2017 Page 25 General Conditions ARTICLE 10-CHANGES IN THE WORK 10.1 Changes: 10.1.1 Without invalidating the Contract and without notice to any surety, the OWNER may, at any time or from time to time, order additions, deletions or revisions in the Work. Such changes in the Work will be authorized by Change Order, Change Directive or Field Order. 10.1.2 Changes in the Work shall be performed under applicable provisions of the Contract Documents, and the CONTRACTOR shall proceed promptly, unless otherwise provided in the Change Order, Change Directive or Field Order. 10.1.3 The CONTRACTOR shall not be entitled to an increase in the Contract Amount or an extension of the Contract Times with respect to any Work performed that is not required by the Contract Documents as amended, modified and supplemented as provided in paragraph 3.3.1 and paragraph 3.3.2, except in the case of an emergency as provided in paragraph 6.11.5 or in the case of uncovering Work as provided in paragraph 13.4. 10.1.4 Except in the case of an emergency as provided in paragraph 6.11.5, a Change Order or Change Directive is required before the CONTRACTOR commences any activities associated with a change in the Work which, in the CONTRACTOR's opinion, will result in a change in the Contract Amount and/or Contract Times. 10.1.5 If notice of any change affecting the general scope of the Work or the provisions of the Contract Documents (including, but not limited to, Contract Amount or Contract Times) is required by the provisions of any Bond to be given to a surety, the giving of any such notice will be the CONTRACTOR's responsibility, and the amount of each applicable Bond will be adjusted accordingly. 10.2 Change Orders: 10.2.1 The OWNER and the CONTRACTOR shall execute appropriate written Change Orders covering: .1 a change in the Work; .2 the amount of the adjustment in the Contract Amount, if any; and .3 the extent of the adjustment in the Contract Time, if any. 10.2.2 An executed Change Order shall represent the complete, equitable, and final amount of adjustment in the Contract Amount and/or Contract Time owed to the CONTRACTOR or the OWNER as a result of the occurrence or event causing the change in the Work encompassed by the Change Order. 10.3 Change Directives: 10.3.1 The OWNER may by written Change Directive,without invalidating the Contract, order changes in the Work within the general scope of the Contract consisting of additions, deletions or other revisions, the Contract Amount and Contract Time being adjusted as necessary. A Change Directive shall be used in the absence of complete and prompt agreement on the terms of a Change Order. 10.3.2 If the Change Directive provides for an adjustment to the Contract Amount, the adjustment shall be based on the method provided for in paragraph 11.5. 10.3.3 A Change Directive shall be recorded later by preparation and execution of an appropriate Change Order. 10.3.4 Upon receipt of a Change Directive, CONTRACTOR shall promptly proceed with the change in the Work involved. 00700 11-2017 Page 26 General Conditions 10.4 Field Order: 10.4.1 Owner's Representative may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Amount or the Contract Times and are compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. These shall be accomplished by written Field Order and shall be binding on the OWNER and on the CONTRACTOR who shall perform the Work involved promptly. 10.4.2 If the CONTRACTOR believes that a Field Order would require an adjustment in the Contract Amount and/or Contract Times, the CONTRACTOR shall make written request to Owner's Representative for a Change Order. Any request by the CONTRACTOR for an adjustment in Contract Amount and/or Contract Times shall be made in writing prior to beginning the work covered by the Field Order. 10.5 No Damages for Delay: The CONTRACTOR shall receive no compensation for delays or hindrances to the Work. If delay is caused by specific orders given by the OWNER to stop work or by performance of extra Work or by failure of the OWNER to provide information,access to the work, material or necessary instructions for carrying on the Work,then such delay will entitle the CONTRACTOR to an equivalent extension of time, the CONTRACTOR's application for which shall, however, be subject to approval of the OWNER. No such extension of time shall release the CONTRACTOR or surety on its performance bond from all the CONTRACTOR's obligations hereunder which shall remain in full force until discharge of the Contract. ARTICLE 11 -CHANGE OF CONTRACT AMOUNT 11.1 The Contract Amount is stated in the Agreement and, including authorized adjustments, is the total amount payable by the OWNER to the CONTRACTOR for performance of the Work under the Contract Documents. 11.2 The original Contract Amount may not be increased by more than twenty-five percent(25%)and it may not be decreased more than twenty-five percent(25%)without the consent of the CONTRACTOR to such decrease. 11.3 The Contract Amount shall only be changed by a Change Order. Any claim for an adjustment in the Contract Amount shall be made by Written Notice delivered by the party making the Claim to the other party promptly (but in no event later than thirty(30)calendar days)after the start of the occurrence or event giving rise to the Claim and stating the general nature of the Claim. Notice of the amount of the Claim with supporting data shall be delivered within thirty(30) calendar days after Written Notice of Claim is delivered by claimant, and shall represent that the adjustment claimed covers all known amounts to which claimant is entitled as a result of said occurrence or event. If the OWNER and the CONTRACTOR cannot otherwise agree, all Claims for adjustment in the Contract Amount shall be determined as set out in Article 16. 11.4 Determination of Value of Work: 11.4.1 The value of any Work covered by a Change Order or of any Claim for an adjustment in the Contract Amount will be determined by one or more of the following methods: .1 by application of unit prices contained in the Contract Documents to the quantities of the items involved. .2 by a mutually agreed lump sum properly itemized and supported by sufficient substantiating data to permit evaluation. .3 by cost of Work plus the CONTRACTOR's fee for all overhead costs and profit(determined as provided in paragraph 11.5). 00700 11-2017 Page 27 General Conditions 11.4.2 Before using the method described in paragraph 11.4.1.3, the OWNER and the CONTRACTOR agree to negotiate a Change Order using the methods identified in paragraph 11.4.1.1 and paragraph 11.4.1.2, as appropriate, to determine the adjustment in the Contract Amount. 11.5 Cost of Work: If neither of the methods defined in paragraph 11.4.1.1 or paragraph 11.4.1.2 can be agreed upon before a change in the Work is commenced which will result in an adjustment in the Contract Amount, then the change in the Work will be performed by Change Directive and payment will be made as follows: .1 For all personnel, the CONTRACTOR will receive the rate or wage specified in the prevailing wage rates established in Section 00900 for each hour that said personnel are actually engaged in such Work, to which will be added an amount equal to twenty-five percent (25%) of the sum thereof as compensation for the CONTRACTOR's and any affected Subcontractor's total overhead and profit. No separate charge will be made by the CONTRACTOR for organization or overhead expenses. For the cost of premiums on public liability insurance, workers' compensation insurance, social security and unemployment insurance, an amount equal to fifty-five percent (55%) of the wages paid personnel, excluding the twenty-five(25%)compensation provided above,will be paid to the CONTRACTOR. The actual cost of the CONTRACTOR's bond(s) on the extra Work will be paid based on invoices from surety. No charge for superintendence will be made unless considered necessary and ordered by the OWNER. .2 The CONTRACTOR will receive the actual cost, including freight charges, of the materials used on such Work, to which costs will be added a sum equal to twenty-five percent (25%) thereof as compensation for the CONTRACTOR's and any affected Subcontractor's total overhead and profit. In case material invoices indicate a discount may be taken, the actual cost will be the invoice price minus the discount. .3 For machinery, trucks, power tools, or other similar equipment agreed to be necessary by the OWNER and the CONTRACTOR, the OWNER will allow the CONTRACTOR the rate as given in the latest edition of the Associated General Contractors of America "Contractor's Equipment Cost Guide" as published by Dataquest for each hour that said tools or equipment are in use on such work, which rate includes the cost of fuel, lubricants and repairs. No additional compensation will be allowed on the equipment for the CONTRACTOR's overhead and profit. .4 The compensation, as herein provided for, shall be received by the CONTRACTOR and any affected Subcontractor as payment in full for work done by Change Directive and will include use of small tools, and total overhead expense and profit. The CONTRACTOR and the Owner's Representative shall compare records of work done by Change Directive at the end of each day. Copies of these records will be made upon forms provided for this purpose by the OWNER and signed by both Owner's Representative and the CONTRACTOR, with one (1) copy being retained by the OWNER and one (1) by the CONTRACTOR. Refusal by the CONTRACTOR to sign these records within two (2) working days of presentation does not invalidate the accuracy of the record. 11.6 Unit Price Work: 11.6.1 Where the Contract Documents provide that all or part of the Work is to be unit price Work, initially the Contract Amount will be deemed to include for all unit price work an amount equal to the sum of the established unit price for each separately identified item of unit price work times the estimated quantity of each item as indicated in the Bid. The estimated quantities of items of unit price work are not guaranteed and are solely for the purpose of comparison of Bids and determining an initial Contract Amount. Determinations of the actual quantities and classifications of unit price work performed by the CONTRACTOR will be made by Owner's Representative. Owner's Representative will review with the CONTRACTOR the preliminary determinations on such matters before rendering a written decision thereon (by recommendation of an Application for Payment or otherwise). 00700 11-2017 Page 28 General Conditions 11.6.2 When "plan quantity" is indicated for a bid item, the CONTRACTOR shall be paid the amount specified in the Contract Documents without any measurements. 11.6.3 Each unit price will be deemed to include an amount considered by the CONTRACTOR to be adequate to cover the CONTRACTOR's overhead and profit for each separately identified item. 11.6.4 A Major Item is any individual bid item in the Bid that has a total cost equal to or greater than five percent (5%) of the original Contract Amount or $50,000, whichever is greater, computed on the basis of bid quantities and Contract unit prices. 11.6.5 The OWNER or the CONTRACTOR may make a Claim for an adjustment in the Contract Amount in accordance with Article 11 if: .1 the actual quantity of any Major Item should become as much as twenty percent (20%) more than or twenty percent(20%) less than in the Bid; or .2 The CONTRACTOR presents proper documentation contesting the accuracy of "plan quantity," and Owner's Representative verifies quantity and determines original quantity is in error by five percent (5%) or more. 11.6.6 Right to Verify Information: The CONTRACTOR agrees that any designated representative of the OWNER shall have the right to examine the CONTRACTOR's records to verify the accuracy and appropriateness of the pricing data used to price change proposals. Even after a Change Order Proposal has been approved, the CONTRACTOR agrees that if the OWNER later determines the cost and pricing data submitted was inaccurate, incomplete, not current or not in compliance with the terms of this Agreement regarding pricing of change orders, then an appropriate contract price reduction will be made. 11.6.7 Pricing Information Requirements: The CONTRACTOR agrees to provide and require all subcontractors to provide a breakdown of allowable labor and labor burden cost information as outlined herein. This information will be used to evaluate the potential cost of labor and labor burden related to change order work. It is intended that this information represent an accurate estimate of the CONTRACTOR's actual labor and labor burden cost components. This information is not intended to establish fixed billing or change order pricing labor rates. However, at the time change orders are priced the submitted cost data for labor rates may be used to price change order work. The accuracy of any such agreed-upon labor cost components used to price change orders will be subject to later audit. Approved change order amounts may be adjusted later to correct the impact of inaccurate labor cost components if the agreed-upon labor cost components are determined to be inaccurate. ARTICLE 12 -CHANGE OF CONTRACT TIMES 12.1 Working Day and Calendar Day Contracts: 12.1.1 The Contract Times (or Milestones) shall only be changed by Change Order or Time Extension Request duly executed by both the CONTRACTOR and Owner's Representative. Any claim for an adjustment of the Contract Times(or Milestones)shall be made by Written Notice delivered by the party making the Claim to the other party promptly (but in no event later than thirty (30) calendar days) after the start of the occurrence or event giving rise to the delay and stating the general nature of the delay. Notice of the extent of the delay with supporting data shall be delivered within thirty (30) calendar days after Written Notice of Claim is delivered by claimant, and shall represent that the adjustment claimed is the entire adjustment to which claimant is entitled as a result of said occurrence or event. If the OWNER and the CONTRACTOR cannot otherwise agree, all Claims for adjustment in the Contract Times (or Milestones) shall be determined as set out in Article 16. No Claim for an adjustment in the Contract Times (or Milestones)will be valid if not submitted in accordance with the requirements of this paragraph. 12.1.2 When the CONTRACTOR is at fault and the OWNER stops the Work so that corrections in the Work can be made by the CONTRACTOR, then no extension in time will be allowed. 00700 11-2017 Page 29 General Conditions 12.1.3 When the CONTRACTOR is prevented from completing any part of the Work within the Contract Times (or Milestones) due to delay not caused by the CONTRACTOR, an extension of the Contract Times (or Milestones) in an amount equal to the time lost due to such delay shall be the CONTRACTOR's sole and exclusive remedy for such delay. However, adverse weather shall not be considered justification for extension of Contract Times on Calendar Day contracts except as provided for in paragraph 12.2. 12.1.4 The OWNER will consider time extension requests and may grant the CONTRACTOR an extension of time because of: .1 Changes ordered in the work which justify additional time. .2 Failure of materials or products being at the Project site due to delays in transportation or failures of Suppliers, which are not the result of the CONTRACTOR's, Subcontractor's or Supplier's negligence. The request for an extension of time shall be supported by a recitation of acts demonstrating that such delays were beyond the control of the CONTRACTOR, including but not limited to, the CONTRACTOR's efforts to overcome such delays documented as follows: a) Copy of purchase order for delayed item(s) indicating date ordered by the CONTRACTOR/Subcontractor and date purchase order received by Supplier. b) If item(s) require Shop Drawings or other submittal information in accordance with the Contract Documents, provide record of date submittal(s) forwarded to Owner's Representative, date submittal(s) returned to the CONTRACTOR, and date submittal(s)forwarded to Supplier. c) Copy of document(s) from Supplier, on Supplier's letterhead, indicating date(s) item(s) would be ready for shipment and/or actual shipment date(s). d) Copies of all correspondence between the CONTRACTOR/Subcontractor and Supplier indicating the CONTRACTOR/Subcontractor's efforts to expedite item(s). e) If item(s) are being purchased by a Subcontractor, provision of meeting notes, correspondence, and the like which reflect the CONTRACTOR's efforts with the Subcontractor to expedite delivery of the item(s). .3 When acts of the OWNER, E/A, utility owners or other contractors employed by the OWNER delay progress of work through no fault of the CONTRACTOR. .4 When the CONTRACTOR is delayed by strikes, lockouts, fires, losses from natural causes, or other unavoidable cause or causes beyond the CONTRACTOR's control. 12.2 Calendar Day Contracts: Under a Calendar Day Contract,the CONTRACTOR may also be granted an extension of time because of unusual inclement weather that is beyond the normal weather expected for the Williamson and Travis Counties,Texas area. Normal weather which prevents the CONTRACTOR from performing Work is expected during a Calendar Day Contract, and is not a justification for an extension of time. The following delineates the number of days per month for which,for purposes of Calendar Day Contracts, expected normal weather will prevent performance of Work: January 7 days February 7 days March 7 days April 7 days May 8 days June 6 days July 6 days August 5 days September 7 days October 7 days 00700 11-2017 Page 30 General Conditions November 7 days December 7 days Days per month exceeding the number shown above may be credited as Rain Days if a Claim is made in accordance with paragraph 12.1.1 and meets the following definition: a"Rain Day" is any day in which a weather event occurs at the site and is sufficient to prevent the CONTRACTOR from performing units of Work critical to maintaining the project schedule. ARTICLE 13 -TESTS AND INSPECTIONS; AND CORRECTION OR REMOVAL OF DEFECTIVE WORK 13.1 Notice of Defects: Prompt notice of all defective Work of which the OWNER or E/A has actual knowledge will be given to the CONTRACTOR. All defective Work may be rejected or corrected as provided for in Article 13. 13.2 Access to Work: The OWNER, E/A, E/A's Consultants, other representatives and personnel of the OWNER, independent testing laboratories and governmental agencies having jurisdiction will have unrestricted physical access to the Work site for observing, inspecting and testing. The CONTRACTOR shall provide them proper and safe conditions for such access, and advise them of the CONTRACTOR's site safety procedures and programs so that they may comply therewith as applicable. 13.3 Tests and Inspections: 13.3.1 The CONTRACTOR shall give timely notice of readiness of the Work for all required inspections, tests or approvals, and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. 13.3.2 The OWNER shall employ and pay for services of an independent testing laboratory to perform all inspections, tests or approvals required by the Contract Documents except: .1 for inspections, tests or approvals covered by paragraph 13.3.3 below; .2 for reinspecting or retesting defective Work; and .3 as otherwise specifically provided in the Contract Documents. All testing laboratories shall be those selected by the OWNER. 13.3.3 If laws or regulations of any public body having jurisdiction require any Work (or part thereof) specifically to be inspected, tested or approved by an employee or other representative of such public body, the CONTRACTOR shall assume full responsibility for arranging and obtaining such inspections, tests or approvals, pay all costs in connection therewith and furnish Owner's Representative the required certificates of inspection or approval. The CONTRACTOR shall also be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests or approvals required for the OWNER's and E/A's review of materials or equipment to be incorporated in the Work, or of materials, mix designs or equipment submitted for review prior to the CONTRACTOR's purchase thereof for incorporation in the Work. 13.4 Uncovering Work: 13.4.1 If any Work (or the work of others) that is to be inspected, tested or approved is covered by the CONTRACTOR without concurrence of Owner's Representative, or if any Work is covered contrary to the written request of Owner's Representative, it must, if requested by Owner's Representative, be uncovered and recovered at the CONTRACTOR's expense. 00700 11-2017 Page 31 General Conditions 13.4.2 If Owner's Representative considers it necessary or advisable that covered Work be observed, inspected or tested, the CONTRACTOR shall uncover, expose or otherwise make available for observation, inspection or testing that portion of the Work in question, furnishing all necessary labor, material and equipment. If it is found that such Work is defective,the CONTRACTOR shall pay all claims, costs, losses and damages caused by, arising out of or resulting from such uncovering, exposure, observation, inspection and testing and of satisfactory replacement or reconstruction (including but not limited to all costs of repair or replacement of work of others); and the OWNER shall be entitled to an appropriate decrease in the Contract Amount, and may make a Claim therefor as provided in Article 11. If, however, such Work is not found to be defective, the CONTRACTOR shall be allowed an increase in the Contract Amount or an extension of the Contract Times (or Milestones), or both, directly attributable to such uncovering, exposure, observation, inspection, testing, replacement and reconstruction; and the CONTRACTOR may make a Claim therefor as provided in Article 11 and Article 12. 13.5 OWNER May Stop the Work: 13.5.1 If the Work is defective, or the CONTRACTOR fails to supply sufficient skilled workers or suitable materials or equipment, or fails to furnish or perform the Work in such a way that the completed Work will conform to the Contract Documents, the OWNER may order the CONTRACTOR to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, this right of the OWNER to stop the Work shall not give rise to any duty on the part of the OWNER to exercise this right for the benefit of the CONTRACTOR or any surety or other party. 13.5.2 If the CONTRACTOR persistently fails to correct defective Work or submit a satisfactory plan to take corrective action, with procedure and time schedule, the OWNER may order the CONTRACTOR to stop the Work, or any portion thereof, until cause for such order has been eliminated, or take any other action permitted by this Contract. A notice to stop the Work, based on defects, shall not stop calendar or working days charged to the Project. 13.6 Correction or Removal of Defective Work: If required by the OWNER,the CONTRACTOR shall promptly,as directed,either correct all defective Work,whether or not fabricated, installed or completed, or, if the Work has been rejected by Owner's Representative, remove it from the site and replace it with Work that is not defective.The CONTRACTOR shall correct or remove and replace defective Work, or submit a plan of action detailing how the deficiency will be corrected, within the time frame identified in the notice of defective Work. The CONTRACTOR shall pay all claims, costs, losses and damages caused by or resulting from such correction or removal(including but not limited to all costs of repair or replacement of work of others). 13.7 Warranty period: 13.7.1 If, at any time after the date of Substantial Completion or such longer period of time as may be prescribed by laws or regulations or by the terms of any applicable special guarantee required by the Contract Documents or by any specific provision of the Contract Documents, any Work is found to be defective, the CONTRACTOR shall promptly, without cost to the OWNER and in accordance with the OWNER's written instructions: (i) correct such defective Work, or, if it has been rejected by the OWNER, remove it from the site and replace it with Work that is not defective, and (ii) satisfactorily correct or remove and replace any damage to other Work or the work of others resulting therefrom. If the CONTRACTOR does not promptly comply with the terms of such instructions, or in an emergency where delay would cause serious risk of loss or damage, the OWNER may have the defective Work corrected or the rejected Work removed and replaced, and all claims, costs, losses and damages caused by or resulting from such removal and replacement (including but not limited to all costs of repair or replacement of work of others) will be paid by the CONTRACTOR. 00700 11-2017 Page 32 General Conditions 13.7.2 In special circumstances where a particular item of equipment is placed in continuous service before Substantial Completion of all the Work, the warranty period for that item may start to run from an earlier date if so provided in the Contract Documents. 13.8 OWNER May Correct Defective Work: If the CONTRACTOR fails within a reasonable time after Written Notice of the OWNER to correct defective Work, or to remove and replace rejected Work, or if the CONTRACTOR fails to perform the Work in accordance with the Contract Documents, or if the CONTRACTOR fails to comply with any other provision of the Contract Documents, the OWNER may, after seven (7) calendar days' Written Notice to the CONTRACTOR, correct and remedy any such deficiency. If, in the opinion of Owner's Representative, significant progress has not been made during this seven(7)calendar day period to correct the deficiency,the OWNER may exercise any actions necessary to remedy the deficiency. In exercising the rights and remedies under this paragraph,the OWNER shall proceed expeditiously. In connection with such corrective and remedial action, the OWNER may exclude the CONTRACTOR from all or part of the site, take possession of all or part of the Work, and suspend the CONTRACTOR's services related thereto, and incorporate in the Work all materials and equipment stored at the site or for which the OWNER has paid the CONTRACTOR but which are stored elsewhere. The CONTRACTOR shall allow the OWNER, its agents and employees,the OWNER's other contractors, E/A and E/A's consultants access to the site to enable the OWNER to exercise the rights and remedies under this paragraph. All claims, costs, losses and damages incurred or sustained by the OWNER in exercising such rights and remedies will be charged against the CONTRACTOR and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work. Such claims, costs, losses and damages will include but not be limited to all costs of repair or replacement of work of others destroyed or damaged by correction, removal or replacement of the CONTRACTOR's defective Work. The CONTRACTOR shall not be allowed an extension of the Contract Times (or Milestones), or claims of damage because of any delay in the performance of the Work attributable to the exercise by the OWNER of the OWNER's rights and remedies hereunder. ARTICLE 14-PAYMENTS TO CONTRACTOR AND COMPLETION 14.1 Application for Progress Payment: 14.1.1 Not more than once per month, the CONTRACTOR shall submit to Owner's Representative for review an Application for Payment, in a form acceptable to the OWNER, filled out and signed by the CONTRACTOR covering the Work completed as of the date of the Application and accompanied by such supporting documentation as is required by the Contract Documents. 14.1.2 Such applications shall not include requests for payment on account of changes in the Work which have been properly authorized by Change Directives but not yet included in Change Orders. 14.1.3 Such applications shall not include requests for payment of amounts the CONTRACTOR does not intend to pay to a Subcontractor or Supplier because of a dispute or other reason. 14.1.4 Owner will not pay for materials or equipment not incorporated in the work but delivered and suitably stored at the site or at another location. Payment will be made by Owner only for work completed in accordance with the plans and contract documents. 14.1.5 Where the original Contract Amount is less than $400,000, the OWNER will pay to the CONTRACTOR the total amount of approved Application for Payment, less ten percent (10%) of the amount thereof,which ten percent (10%)will be retained until final payment, less all previous payments and less all sums that may be retained by the OWNER under the terms of this Agreement. Where the original Contract Amount is$400,000 or more,the OWNER will pay to the CONTRACTOR the total amount of approved Application for Payment, less five percent(5%) of the amount thereof, which five percent(5%)will be retained until final payment, less all previous payments and less all sums that may be retained by the OWNER under the terms of this Agreement. In either case, if the Work is near completion and delay occurs due to no fault or neglect of the CONTRACTOR, the OWNER may pay a portion of the retained amount to the CONTRACTOR. The CONTRACTOR, at the OWNER's option, may be relieved of the 00700 11-2017 Page 33 General Conditions obligation to complete the Work and, thereupon, the CONTRACTOR shall receive payment of the balance due under the Contract subject to the conditions stated under paragraph 15.2. 14.1.6 Applications for Payment shall include the following documentation: .1 updated progress schedule; .2 monthly subcontractor report; and .3 any other documentation required under the Supplemental General Conditions. 14.2 CONTRACTOR's Warranty of Title: The CONTRACTOR warrants and guarantees that title to all Work, materials and equipment covered by any Application for Payment, whether incorporated in the Project or not, will pass to the OWNER not later than the time of payment to the CONTRACTOR free and clear of all liens. 14.3 Review of Applications for Progress Payment: 14.3.1 Owner's Representative will, within seven (7) calendar days after receipt of each Application for Payment, either indicate a recommendation for payment and forward the Application for processing by the OWNER, or return the Application to the CONTRACTOR indicating Owner's Representative's reasons for refusing to recommend payment. In the latter case,the CONTRACTOR may make the necessary corrections and resubmit the Application. 14.3.2 Owner's Representative's recommendation of any payment requested in an Application for Payment will constitute a representation by Owner's Representative, based upon Owner's Representative's on-site observations of the executed Work and on Owner's Representative's review of the Application for Payment and the accompanying data and schedules, that to the best of Owner's Representative's knowledge, information and belief: .1 the Work has progressed to the point indicated; and .2 the quality of the Work is in accordance with the Contract Documents (subject to an evaluation of the Work as a functioning whole prior to or upon Substantial Completion, to the results of any subsequent tests called for in the Contract Documents, to a final determination of quantities and classifications for unit price Work, and to any other qualifications stated in the recommendation). 14.3.3 By recommending any such payment, Owner's Representative will not thereby be deemed to have represented that: .1 exhaustive or continuous on-site inspections have been made to check the quality or the quantity of the Work; .2 examination has been made to ascertain how or for what purpose the CONTRACTOR has used money previously paid on account of the Contract Amount; .3 the CONTRACTOR's construction means, methods, techniques, sequences or procedures have been reviewed; or .4 that there may not be other matters or issues between the parties that might entitle the CONTRACTOR to be paid additionally by the OWNER or entitle the OWNER to withhold payment to the CONTRACTOR. 14.4 Decisions to Withhold Payment: 14.4.1 The OWNER may withhold or nullify the whole or part of any payment to such extent as may be necessary on account of: 00700 11-2017 Page 34 General Conditions .1 defective Work not remedied; .2 reasonable evidence that the Work cannot be completed for the unpaid balance of the Contract Amount; .3 damage to the OWNER or another contractor; .4 reasonable evidence that the Work will not be completed within the Contract Time, and that the unpaid balance would not be adequate to cover actual or liquidated damages for the anticipated delay; .5 failure of the CONTRACTOR to submit a schedule of values in accordance with the Contract Documents; .6 failure of the CONTRACTOR to submit a submittal schedule in accordance with the Contract Documents; .7 failure of the CONTRACTOR to submit or update construction schedules in accordance with the Contract Documents; .8 failure of the CONTRACTOR to maintain a record of changes on drawings and documents; .9 failure of the CONTRACTOR to maintain weekly payroll reports; .10 failure of the CONTRACTOR to submit monthly subcontractor reports; .11 the CONTRACTOR's neglect or unsatisfactory prosecution of the Work, including failure to clean up; or .12 failure of the CONTRACTOR to comply with any provision of the Contract Documents. 14.4.2 When the above reasons for withholding payment are removed, the CONTRACTOR shall resubmit a statement for the value of Work performed. Payment will be made within thirty (30) calendar days of receipt of approved Application for Payment. 14.5 Delayed Payments: Should the OWNER fail to make payment to the CONTRACTOR of a sum named in any Application for Payment within thirty(30) calendar days after the day on which the OWNER received the mutually acceptable Application for Payment, then the OWNER will pay to the CONTRACTOR, in addition to the sum shown as due by such Application for Payment, interest thereon at the rate of one percent (1%) per month from date due until fully paid, which shall fully liquidate any injury to the CONTRACTOR growing out of such delay in payment. 14.6 Arrears: No money shall be paid by the OWNER upon any claim, debt, demand or account whatsoever, to any person, firm or corporation who is in arrears to the OWNER; and the OWNER shall be entitled to counterclaim and offset against any such debt, claim, demand or account so in arrears and no assignment or transfer of such debt, claim, demand or account, shall affect the right of the OWNER to so offset said amounts, and associated penalties and interest if applicable, against the same. 14.7 Substantial Completion: 14.7.1 If a Certificate of Occupancy is required by public authorities having jurisdiction over the Work, said certificate shall be issued before the Work or any portion thereof is considered substantially complete. When the CONTRACTOR considers that the Work, or a portion thereof which the OWNER agrees to accept separately, is 00700 11-2017 Page 35 General Conditions substantially complete, the CONTRACTOR shall notify Owner's Representative and request a determination as to whether the Work or designated portion thereof is substantially complete. If Owner's Representative does not consider the Work substantially complete, Owner's Representative will notify the CONTRACTOR giving reasons therefor. Failure on the OWNER's part to list a reason does not alter the responsibility of the CONTRACTOR to complete all Work in accordance with the Contract Documents. After satisfactorily completing items identified by Owner's Representative, the CONTRACTOR shall then submit another request for Owner's Representative to determine substantial completion. If Owner's Representative considers the Work substantially complete, Owner's Representative will prepare and deliver a certificate of Substantial Completion which shall establish the date of Substantial Completion, shall include a punch list of items to be completed or corrected before final payment, shall establish the time within which the CONTRACTOR shall finish the punch list, and shall establish responsibilities of the OWNER and the CONTRACTOR for security, maintenance, heat, utilities, damage to the Work, warranty and insurance. Failure to include an item on the punch list does not alter the responsibility of the CONTRACTOR to complete all Work in accordance with the Contract Documents. The certificate of Substantial Completion shall be signed by the OWNER and the CONTRACTOR to evidence acceptance of the responsibilities assigned to them in such certificate. 14.7.2 The OWNER shall have the right to exclude the CONTRACTOR from the Work after the date of Substantial Completion, but the OWNER will allow the CONTRACTOR reasonable access to complete or correct items on the punch list. 14.8 Partial Utilization: The OWNER, at the OWNER's sole option, shall have the right to take possession of and use any completed or partially completed portion of the Work regardless of the time for completing the entire Work. The OWNER's exercise of such use and possession shall not be construed to mean that the OWNER acknowledges that any part of the Work so possessed and used is substantially complete or that it is accepted by OWNER, and the OWNER's exercise of such use and possession shall not relieve the CONTRACTOR of its responsibility to complete all Work in accordance with the Contract Documents. 14.9 Final Inspection: Upon Written Notice from the CONTRACTOR that the entire Work or an agreed portion thereof is complete,Owner's Representative will make a final inspection with the CONTRACTOR and provide Written Notice of all particulars in which this inspection reveals that the Work is incomplete or defective. The CONTRACTOR shall immediately take such measures as are necessary to complete such Work or remedy such deficiencies. 14.10 Final Application for Payment: The CONTRACTOR may make application for final payment following the procedure for progress payments after the CONTRACTOR has completed all such corrections to the satisfaction of Owner's Representative and delivered the following documents: .1 Three (3) complete operating and maintenance manuals, each containing maintenance and operating instructions, schedules, guarantees, and other documentation required by the Contract Documents; .2 Record documents (as provided in paragraph 6.10); .3 Consent of surety, if any, to final payment. If surety is not provided, complete and legally effective releases or waivers (satisfactory to the OWNER) of all claims arising out of or filed in connection with the Work; .4 Certificate evidencing that insurance required by the Supplemental General Conditions will remain in force after final payment and through any warranty period; .5 Non-Use of Asbestos Affidavit(After Construction); and 00700 11-2017 Page 36 General Conditions .6 Any other documentation called for in the Contract Documents. 14.11 Final Payment and Acceptance: 14.11.1 If, on the basis of observation of the Work during construction, final inspection, and review of the final Application for Payment and accompanying documentation as required by the Contract Documents, Owner's Representative is satisfied that the Work has been completed and the CONTRACTOR's other obligations under the Contract Documents have been fulfilled, Owner's Representative will recommend the final Application for Payment and thereby notify the OWNER,who will pay to the CONTRACTOR the balance due the CONTRACTOR under the terms of the Contract. 14.11.2 As Contract Time is measured to Final Completion, Owner's Representative will issue a letter of final acceptance to the CONTRACTOR which establishes the Final Completion date and initiates any warranty period. 14.11.3 Final payment is considered to have taken place when the CONTRACTOR or any of its representatives negotiates the OWNER's final payment check, whether labeled final or not, for cash or deposits check in any financial institution for its monetary return. 14.12 Waiver of Claims: The making and acceptance of final payment will constitute: .1 a waiver of claims by the OWNER against the CONTRACTOR, except claims arising from unsettled claims, from defective Work appearing after final inspection, from failure to comply with the Contract Documents or the terms of any warranty specified therein, or from the CONTRACTOR's continuing obligations under the Contract Documents; and .2 a waiver of all claims by the CONTRACTOR against the OWNER other than those previously made in writing and still unsettled. ARTICLE 15-SUSPENSION OF WORK AND TERMINATION 15.1 OWNER May Suspend Work Without Cause and for Convenience: At any time and without cause and for convenience, the OWNER may suspend the Work or any portion thereof for a period of not more than ninety(90)calendar days by written agreement or by Written Notice to the CONTRACTOR which will fix the date on which the Work will be resumed. The CONTRACTOR shall resume the Work on the date so fixed. The CONTRACTOR may be allowed an adjustment in the Contract Amount or an extension of the Contract Times,or both,directly attributable to any such suspension if the CONTRACTOR makes an approved Claim therefor as provided in Article 11 and Article 12. 15.2 OWNER May Terminate Without Cause: Upon seven (7) calendar days' Written Notice to the CONTRACTOR, the OWNER may, without cause and without prejudice to any right or remedy of the OWNER, elect to terminate the Agreement. In such case, the CONTRACTOR shall be paid (without duplication of any items): .1 for completed and acceptable Work executed in accordance with the Contract Documents prior to the effective date of termination; .2 for all claims incurred in settlement of terminated contracts with Suppliers, Subcontractors, and others. The CONTRACTOR agrees to negotiate in good faith with Subcontractors, Suppliers and others to mitigate the OWNER's cost; and .3 for anticipated profits on entire Contract not previously paid. 00700 11-2017 Page 37 General Conditions 15.3 OWNER May Terminate With Cause: 15.3.1 Upon the occurrence of any one or more of the following events: .1 if the CONTRACTOR persistently fails to perform the Work in accordance with the Contract Documents; .2 if the CONTRACTOR disregards laws or regulations of any public body having jurisdiction; .3 if the CONTRACTOR disregards the authority of Owner's Representative; .4 if the CONTRACTOR makes fraudulent statements; .5 if the CONTRACTOR fails to maintain a work force adequate to accomplish the Work within the Contract Time; .6 if the CONTRACTOR fails to make adequate progress and endangers successful completion of the Contract; or .7 if the CONTRACTOR otherwise violates in any substantial way any provisions of the Contract Documents; The OWNER may, after giving the CONTRACTOR (and the surety, if any) seven (7) calendar days'Written Notice terminate the services of the CONTRACTOR. The OWNER, at its option, may proceed with negotiation with surety for completion of the Work. Alternatively,the OWNER may under these circumstances exclude the CONTRACTOR from the site and take possession of the Work (without liability to the CONTRACTOR for trespass or conversion), incorporate in the Work all materials and equipment stored at the site or for which the OWNER has paid the CONTRACTOR but which are stored elsewhere, and finish the Work as the OWNER may deem expedient. In such case the CONTRACTOR shall not be entitled to receive any further payment until the Work is finished. If the unpaid balance of the Contract Amount exceeds all claims, costs, losses and damages sustained by the OWNER arising out of or resulting from completing the Work, such excess will be paid to the CONTRACTOR. If such claims, costs, losses and damage exceed such unpaid balance, the CONTRACTOR or surety shall pay the difference to the OWNER. 15.3.2 Where the CONTRACTOR's services have been so terminated by the OWNER, the termination will not affect any rights or remedies of the OWNER against the CONTRACTOR and surety then existing or which may thereafter accrue. Any retention or payment of amounts due the CONTRACTOR by the OWNER will not release the CONTRACTOR from liability. In the event the OWNER terminates the Contract with cause, the OWNER may reject any and all bids submitted by the CONTRACTOR for up to three (3) years. 00700 11-2017 Page 38 General Conditions 15.4 CONTRACTOR May Stop Work or Terminate: If through no act or fault of the CONTRACTOR,the Work is suspended for a period of more than ninety(90)calendar days by the OWNER or under an order of court or other public authority, or (except during disputes) Owner's Representative fails to forward for processing any mutually acceptable Application for Payment within thirty (30) calendar days after it is submitted, or(except during disputes)the OWNER fails for sixty(60)calendar days after it is submitted to pay the CONTRACTOR any sum finally determined by the OWNER to be due, then the CONTRACTOR may, upon seven (7)calendar days'Written Notice to the OWNER,and provided the OWNER does not remedy such suspension or failure within that time, terminate the Agreement and recover from the OWNER payment on the same terms as provided in paragraph 15.2. In lieu of terminating the Agreement and without prejudice to any other right or remedy, if(except during disputes) Owner's Representative has failed to forward for processing any mutually acceptable Application for Payment within thirty(30) calendar days after it is submitted, or (except during disputes) the OWNER has failed for sixty (60) calendar days after it is submitted to pay the CONTRACTOR any sum finally determined by the OWNER to be due, the CONTRACTOR may upon seven (7) calendar days' Written Notice to the OWNER stop the Work until payment of all such amounts due the CONTRACTOR, including interest thereon. The provisions of this paragraph 15.4 are not intended to preclude the CONTRACTOR from making a Claim under Article 11 and Article 12 for an increase in Contract Amount or Contract Times or otherwise for expenses or damage directly attributable to the CONTRACTOR's stopping Work as permitted by this paragraph. ARTICLE 16-DISPUTE RESOLUTION 16.1 Filing of Claims: 16.1.1 Claims arising from the circumstances identified in paragraphs 3.2, 4.1, 4.2.2, 4.2.4, 6.4.2, 6.11.5.2, 6.17, 7.5, 8.6, 9.5, 10.4.2, 13.8, 15.1, 15.2, 15.3, or 15.4, or other occurrences or events, shall be made by Written Notice delivered by the party making the Claim to the other party within thirty (30) calendar days after the start of the occurrence or event giving rise to the Claim and stating the general nature of the Claim. Notice of the amount of the Claim with supporting data shall be delivered within thirty (30) calendar days after Written Notice of Claim is delivered by claimant and shall represent that the adjustment claimed covers all known amounts to which claimant is entitled. 16.1.2 Within thirty(30)calendar days of receipt of notice of the amount of the Claim with supporting data, Owner's Representative and the CONTRACTOR shall meet to discuss the Claim, after which an offer of settlement or notification of no settlement offer will be made to claimant. If claimant is not satisfied with the proposal presented, claimant shall have thirty (30) calendar days in which to: .1 submit additional supporting data requested by the other party; .2 modify the initial Claim; or .3 request Alternative Dispute Resolution. 16.2 Alternative Dispute Resolution: 16.2.1 If a dispute exists concerning a Claim, the parties agree to use the following procedure prior to pursuing any other available remedies. The OWNER reserves the right to include E/A as a party. 16.2.2 Negotiating with Previously Uninvolved Personnel: Either party may make a written request for a meeting to be held between representatives of each party within fourteen (14) calendar days of the request or such later period that the parties may agree to. Each party shall endeavor to include, at a minimum, one (1) previously uninvolved senior level decision maker empowered to negotiate on behalf of their organization. The purpose of this and subsequent meetings will be good faith negotiations of the matters constituting the dispute. Negotiations shall be concluded within thirty(30)calendar days of the first meeting, unless mutually agreed otherwise. This step may 00700 11-2017 Page 39 General Conditions be waived by written agreement of both parties, in which event the parties may proceed directly to mediation as described below. 16.2.3 Mediation: 16.2.3.1 If the procedure described in paragraph 16.2.2 proves unsuccessful or is waived pursuant to its terms, the parties shall initiate the mediation process. The parties agree to select within thirty (30) calendar days one (1) mediator trained in mediation skills, to assist with resolution of the dispute. The OWNER and the CONTRACTOR agree to act in good faith in the selection of the mediator and to give consideration to qualified individuals nominated to act as mediator. Nothing in this agreement prevents the parties from relying on the skills of a person who also is trained in the subject matter of the dispute and/or a contract interpretation expert. 16.2.3.2 Mediation is a forum in which an impartial person, the mediator, facilitates communication between parties to promote reconciliation, settlement, or understanding among them. The parties hereby agree that mediation, at a minimum, shall provide for 1) conducting an on-site investigation, if appropriate, by the mediator for fact-gathering purposes, 2) a meeting of all parties for the exchange of points of view and 3) separate meetings between the mediator and each party to the dispute for the formulation of resolution alternatives. The parties agree to participate in mediation in good faith for up to thirty(30)calendar days from the date of the first mediation session, unless mutually agreed otherwise. Should the parties fail to reach a resolution of the dispute through mediation, then each party is released to pursue other remedies available to them. ARTICLE 17—RIGHT TO AUDIT 17.1 Right to Audit: Whenever the OWNER enters into any type of contractual arrangement with the CONTRACTOR, then the CONTRACTOR's "records" shall upon reasonable notice be open to inspection and subject to audit and/or reproduction during normal business working hours. The OWNER's representative, or an outside representative engaged by the OWNER, may perform such audits. The CONTRACTOR shall maintain all records relating to this Agreement for four (4) years from the date of final payment under this Agreement, or until pending litigation has been completely and fully resolved,whichever occurs later. 17.1.1 The OWNER shall have the exclusive right to examine the records of the CONTRACTOR. The term "records"as referred to herein shall include any and all information, materials and data of every kind and character, including without limitation records, books, papers, documents, contracts, schedules, commitments, arrangements, notes, daily diaries, reports, drawings, receipts, vouchers and memoranda, and any and all other agreements, sources of information and matters that may, in the OWNER's judgment, have any bearing on or pertain to any matters, rights, duties or obligations under or covered by any contract document. Such records shall include (hard copy, as well as computer-readable data if it can be made available), written policies and procedures, time sheets, payroll registers, cancelled checks, personnel file data, correspondence, general ledger entries, and any other record in the CONTRACTOR's possession which may have a bearing on matters of interest to the OWNER in connection with the CONTRACTOR's dealings with the OWNER(all of the foregoing are hereinafter referred to as "records"). In addition,the CONTRACTOR shall permit interviews of employees as well as agents, representatives, vendors, subcontractors and other third parties paid by the CONTRACTOR to the extent necessary to adequately permit evaluation and verification of the following: a) The CONTRACTOR's compliance with contract requirements; b) The CONTRACTOR's compliance with the OWNER'S business ethics policies; and c) If necessary, the extent of the Work performed by the CONTRACTOR at the time of contract termination. 17.1.2 The CONTRACTOR shall require all payees(examples of payees include subcontractors, insurance agents, material suppliers, etc.) to comply with the provisions of this Article 17 by securing the requirements hereof in a 00700 11-2017 Page 40 General Conditions written agreement between the CONTRACTOR and payee. Such requirements include a flow-down right of audit provision in contracts with payees that also apply to subcontractors and sub-subcontractors, material suppliers, etc. The CONTRACTOR shall cooperate fully and shall require Related Parties and all of the CONTRACTOR's subcontractors to cooperate fully in furnishing or in making available to the OWNER from time to time whenever requested, in an expeditious manner, any and all such information, materials, and data. 17.1.3 The OWNER's authorized representative or designee shall have reasonable access to the CONTRACTOR's facilities, shall be allowed to interview all current or former employees to discuss matters pertinent to the performance of this Agreement, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with this Article 17. 17.1.4 If an audit inspection or examination in accordance with this Article 17 discloses overpricing or overcharges of any nature by the CONTRACTOR to the OWNER in excess of one-half of one percent(.5%) of the total contract billings, then the reasonable actual cost of the OWNER's audit shall be reimbursed to the OWNER by the CONTRACTOR. Any adjustments and/or payments,which must be made as a result of any such audit or inspection of the CONTRACTOR's invoices and/or records, shall be made within a reasonable amount of time (not to exceed 90 days) from presentation of the OWNER's findings to the CONTRACTOR. 17.1.5 The CONTRACTOR shall take reasonable actions to prevent any actions or conditions which could result in a conflict with the OWNER's best interests. These obligations shall apply to the activities of the CONTRACTOR's employees, agents, subcontractors, etc. in their dealings and relations with the OWNER's current and former employees and their relatives. For example, the CONTRACTOR's employees, agents or subcontractors should not make or provide to be made any employment, gifts, extravagant entertainment, payments, loans or other considerations to the OWNER's representatives, employees or their relatives. 17.1.6 It is also understood and agreed by the CONTRACTOR that any solicitation of gifts or any other item of value by anyone representing the OWNER is to be reported within two (2) business working days to the OWNER at the following telephone number: 512-218-5401. Failure to report any such solicitations or offers shall be deemed a material breach of contract entitling the OWNER to pursue damages resulting from the failure to comply with this provision. ARTICLE 18—MISCELLANEOUS 18.1 Venue: In the event of any suit at law or in equity involving the Contract, venue shall be in Williamson County, Texas and the laws of the state of Texas shall apply to Contract interpretation and enforcement. 18.2 Extent of Agreement: This Contract represents the entire and integrated agreement between the OWNER and the CONTRACTOR and supersedes all prior negotiations, representations or agreements, either written or oral. 18.3 Cumulative Remedies: The rights and remedies available to the parties are not to be construed in any way as a limitation of any rights and remedies available to any or all of them which are otherwise imposed or available by laws or regulations, by special warranty or guarantees or by other provisions of the Contract Documents, and the provisions of this paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right and remedy to which they apply. 18.4 Severability: 00700 11-2017 Page 41 General Conditions If any word, phrase, clause, sentence or provision of the Contract, or the application of same to any person or set of circumstances is for any reason held to be unconstitutional, invalid or unenforceable,that finding shall only effect such word, phrase, clause, sentence or provision, and such finding shall not effect the remaining portions of this Contract; this being the intent of the parties in entering into the Contract; and all provisions of the Contract are declared to be severable for this purpose. 18.5 Independent Contractor The Contract shall not be construed as creating an employer/employee relationship,a partnership,or a joint venture. The CONTRACTOR's services shall be those of an independent contractor. The CONTRACTOR agrees and understands that the Contract does not grant any rights or privileges established for employees of the OWNER. 18.6 Prohibition of Gratuities The OWNER may, by Written Notice to the CONTRACTOR, terminate the Contract without liability if is determined by the OWNER that gratuities were offered or given by the CONTRACTOR or any agent or representative of the CONTRACTOR to any officer or employee of the OWNER with a view toward securing the Contract or securing favorable treatment with respect to the awarding or amending or the making of any determinations with respect to the performing of such Contract. In the event the Contract is terminated by the OWNER pursuant to this provision, the OWNER shall be entitled, in addition to any other rights and remedies, to recover or withhold the amount of the cost incurred by the CONTRACTOR in providing such gratuities. 18.7 Prohibition Against Personal Interest in Contracts No officer, employee, independent consultant, or elected official of the OWNER who is involved in the development, evaluation, or decision-making process of the performance of any solicitation shall have a financial interest, direct or indirect, in the Contract resulting from that solicitation. Any violation of this provision, with the knowledge, expressed or implied, of the CONTRACTOR shall render the Contract voidable by the OWNER. End of General Conditions 00700 11-2017 Page 42 General Conditions 00800 SUPPLEMENTAL GENERAL CONDITIONS No Text City of Round Rock Contract Forms Supplemental General Conditions Section 00800 SUPPLEMENTAL GENERAL CONDITIONS TO AGREEMENT FOR CONSTRUCTION SERVICES The Supplemental General Conditions contained herein shall amend or supplement the General Conditions, Section 00700. ARTICLE 1 -DEFINITIONS 1.16 Engineer/Architect(E/A): Add the following: Name (Representative): Sean Mason,P.E. Firm: Kimley-Horn and Associates,Inc. Address: 2600 Via Fortuna,Building 1,Suite 300 City, State, Zip: Austin,Texas 78746 Telephone: 512-646-2238 Facsimile: N/A Email: sean.mason@kimley-horn.com 1.27 Owner's Representative: Add the following: Name: Eddie Zapata Title: Senior Project Manager Address: 3400 Sunrise Road City, State, Zip: Round Rock,Texas,78665 Telephone: 512-218-6605 Facsimile: N/A Email: ezapata@roundrocktexas.gov ARTICLE 6-CONTRACTOR'S RESPONSIBILITIES 6.18 Liquidated Damages Add the following: 1. CONTRACTOR SHALL PAY LIQUIDATED DAMAGES IN THE AMOUNT OF five hundred AND NO/100 DOLLARS $500.00 PER DAY FOR EACH DAY BEYOND THE DATE ESTABLISHED THEREFOR THAT THE CONTRACTOR FAILS TO ACHIEVE SUBSTANTIAL COMPLETION, AND FOR WHICH OWNER IS UNABLE TO UTILIZE THE IMPROVEMENTS AND FACILITIES DUE TO THE FAILURE OF CONTRACTOR TO HAVE ACHIEVED SUBSTANTIAL COMPLETION IN ACCORDANCE WITH THE CONTRACT. END OF SUPPLEMENTAL GENERAL CONDITIONS Page 1 00800 10-2015 Supplemental General Conditions 00090669 No Text 00900 SPECIAL CONDITIONS No Text SECTION 01-INFORMATION 01-01 COPIES OF PLANS AND SPECIFICATIONS FURNISHED The Agreement will be prepared in not less than five(5) counterpart(original signed) sets. The City will furnish to the Contractor two (2) sets of conforming Contract Documents and Specifications unless otherwise specified. 01-02 GOVERNING CODES All construction as provided for under these Plans and Specifications shall be governed by any existing Resolutions, Codes and Ordinances, and any subsequent amendments or revisions thereto as set forth by the City. 01-03 LOCATION The location of work shall be as set forth in the Notice to Bidders and as indicated on the Plans. 01-04 USAGE OF WATER All water used during construction shall be provided by the City and shall be metered. The City shall specify the location from which the Contractor is to procure water.The Contractor shall be responsible for obtaining a bulk water permit from the City and providing all apparatus necessary for procuring, storing,transporting and using water during construction.The Contractor shall strive to use no more water than reasonable to perform the work associated with this Contract and shall avoid waste. The Contractor will be required to pay for all water used if it is found that waste is occurring during construction. SECTION 02-SPECIAL CONSIDERATIONS 02-01 CROSSING UTILITIES Prior to commencing the Work associated with this Contract, it shall be the Contractor's responsibility to make arrangements with the Owners of utility companies to uncover their particular utility lines or otherwise confirm their location. Certain utility companies perform such services at their own expense,however,where such is not the case,the Contractor will cause such work to be done at his own expense. 02-02 UTILITY SERVICES FOR CONSTRUCTION The Contractor will be responsible for providing his own utility services while performing the Work associated with this Contract. Provision of said utility services shall be subsidiary to the various bid items and no additional payment will be made for this item. 00900-1-2016 Page 1 Special Conditions 02-03 WAGE RATES Wage Rates (Information From Chapter 2258,Texas Government Code Title 10) 2288.021.Duty of Government Entity to Pay Prevailing Wage Rates a. The State or any political subdivision of the State shall pay a worker employed by it or on behalf of it: (1) not less than the general prevailing rate of per diem wages for work of a similar character in the locality in which the work is performed; and (2) not less than the general prevailing rate of per diem wages for legal holiday and overtime work. b. Subsection(a)does not apply to maintenance work. c. A worker is employed on a public work for the purposes of this section if a Contractor or Subcontractor in the execution of a contract for the public work with the State, a political subdivision of the State or any officer or public body of the State or a political subdivision of the State, employs the worker. 2258.023. Prevailing Wage Rates to be Paid by Contractor and Subcontractor; Penalty a. The contractor who is awarded a contract by a public body, or a Subcontractor of the Contractor, shall pay not less than the rates determined under Section 2258.022 to a worker employed by it in the execution of the contract. b. A Contractor or Subcontractor who violates this section shall pay to the state or a political subdivision of the state on whose behalf the contract is made, $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the wage rates stipulated in the contract.A public body awarding a contract shall specify this penalty in the contract. c. A contractor or subcontractor does not violate this section if a public body awarding a contract does not determine the prevailing wage rates, and specify the rates in the contract as provided by Section 2258.022. d. The public body shall use any money collected under this section to offset the costs incurred in the administration of this chapter. e. A municipality is entitled to collect a penalty under this section only if the municipality has a population of more than 10,000. 00900-1-2016 Page 2 Special Conditions 2258.051.Duty of Public Body to Hear Complaints and Withhold Payment A public body awarding a contract, and an agent or officer of the public body, shall: 1. take cognizance of complaints of all violations of this chapter committed in the execution of the contract; and 2. withhold money forfeited or required to be withheld under this Chapter from the payments to the Contractor under the contract, except that the public body may not withhold money from other than the final payment without determination by the public body that there is good cause to believe that the Contractor has violated this chapter. Applicable wage rates to be used in Williamson and/or Travis County may be obtained from the U.S. Department of Labor website at the following web addresses: Construction Types: Heavy (Sewer/Water Treating Plant and Sewer/Incidental to Highway) http://www.wdol.gov/wdol/scafiles/davisbacon/TX33.dvb?v=0 Construction Types: Heavy and Highway http://www.wdol.gov/wdol/scafiles/davisbacon/TX 16.dvb?v=0 Construction Type: Building http://www.wdol.gov/wdol/scafiles/davisbacon/TX76.dvb?v=1 02-04 LIMIT OF FINANCIAL RESOURCES The City has a limited amount of financial resources committed to this Project; therefore, it shall be understood by all bidders that the City may be required to change and/or delete any items which it may feel is necessary to accomplish all or part of the scope of work within its limit of financial resources. Contractor shall be entitled to no claim for damages or anticipated profits on any portion of work that may be omitted. At any time during the duration of this contract,the City reserves the right to omit any work from this contract. Unit prices for all items previously approved in this contract shall be used to delete or add work per change order. 02-05 CONSTRUCTION REVIEW The City shall provide a project representative to review the quality of materials and workmanship. 02-06 LIMITS OF WORK AND PAYMENT It shall be the obligation of the Contractor to complete all work included in this Contract, so authorized by the City, as described in the contract documents and technical specifications. All items of work not specifically paid for in the bid proposal 00900-1-2016 Page 3 g Special Conditions shall be included in the unit price bids. Any question arising as to the limits of work shall be left up to the interpretation of the Engineer. 02-07 LAND FOR WORK Owner provides, as indicated on Drawings, land upon which work is to be done,right- of-way for access to same and such other lands that are designated for the use of the Contractor. Contractor provides, at his expense and without liability of Owner, any additional land and access thereto that may be required for his construction operations, temporary construction facilities, or for storage of materials. 02-08 DEVIATIONS OCCASIONED BY UTILITY STRUCTURES Whenever existing utilities, not indicated on Plans, present obstructions to grade and alignment of proposed improvements immediately notify engineer,who without delay, will determine if existing utilities are to be relocated, or grade and alignment of proposed improvements changed. Where necessary to move existing utilities and appurtenances as determined by the Engineer, the Engineer and Contractor will make relocation arrangements with the utility owner. The Owner will not be liable for delay costs or damages due to relocations of utilities which hinder progress of the work. 02-09 CONSTRUCTION STAKING All construction staking required to complete the work associated with this contract shall be provided by the Contractor. The Contractor shall be responsible for determining the layout and extent of staking necessary to construct the improvements to the lines and grades shown in the Plans and such staking shall be satisfactory to the Engineer.The Contractor shall consult with the Engineer and Owners representative in the field for assistance as necessary. Sufficient staking materials and equipment shall be provided by the Contractor including but not limited to: paint, flagging, laths,hubs, blue tops, nails, hammers, measuring chains or tapes, transits and levels. The Contractor shall be responsible for setting and marking control and off-set points for measuring distances and angles, for shooting levels,and for any other items pertaining to construction staking. This item shall not be paid for separately and shall be considered subsidiary to other bid items. 00900-1-2016 Page 4 Special Conditions SECTION 03-ACCESS AND TRAFFIC CONTROL Access shall be provided for the public and emergency vehicles at all possible times. When it becomes necessary to restrict access, the Contractor shall notify the Owner and coordinate with the Owner, all applicable agencies (i.e. Fire Department, E.M.S., Public Works, etc.), residents, and affected parties. If emergency access is required during the work and such access is being hindered by the work, the Contractor will suspend the work if necessary, and otherwise endeavor to assist emergency personnel in accessing a location restricted by the work. Unless otherwise approved by the Engineer, at the end of each day all lanes of traffic shall be opened to the public. The Contractor shall ensure compliance at all times with the accepted Traffic Control Plan for the project and shall be responsible for all maintenance, signing and safety precautions necessary for traffic control. These items shall be included in the bid item Traffic Control. 00900-1-2016 Page 5 Special Conditions No Text 01000 TECHNICAL SPECIFICATIONS No Text ITEM 1 GENERAL DESCRIPTION 1.01 SCOPE OF WORK The Work covered by these Specifications consists of furnishing all labor, equipment, appliances, materials and performing all operations in connection with the inspection and testing, complete in accordance with the Plans, and subject to the terms and conditions of the Contract Documents. 1.02 GOVERNING TECHNICAL SPECIFICATIONS STREET, WATER, SEWER AND DRAINAGE IMPROVEMENTS The Round Rock Standard Specification Criteria Manual is hereby referred to and included in this contract as fully and to the same extent as if copied at length herein, and shall be applied to this project unless modified elsewhere as discussed below.The aforementioned Criteria Manual is the"Standard Specifications"section of the City of Round Rock Design and Construction Standards. The Standard Specifications may be accessed from the City of Round Rock website (www.roundrocktexas.gov) at the following web address: www.roundrocktexas.gov/dacs. Any adjustments,alterations,or additional information regarding Governing Technical Specifications are contained in the Plans (Drawings), Details and Notes described in Section 02000 of the Project Manual or are included in Attachment A at the end of this Technical Specifications Section. ITEM 2 CONTROL OF WORK 2.01 CLEAN-UP 2.01.1 CONSTRUCTION SITE During construction the Contractor shall keep the site free and clean from all rubbish and debris and shall clean-up the site promptly when notified to do so by the Engineer. The Contractor shall,at his own expense,maintain the streets and roads free from dust, mud, excess earth or debris which constitutes a nuisance or danger to the public using the thoroughfare, or the occupants of adjacent properties. Care shall be taken to prevent spillage on streets and roads over which hauling is done, and any such spillage or debris deposited on streets, due to the Contractor's operations, shall be immediately removed. Page 1 01000-7-2015 Technical Specifications 00193116 2.01.2 BACKWORK The Contractor shall coordinate his operations in such a manner as to prevent the amount of clean-up and completion of back works from becoming excessive. Should such a condition exist,the Engineer may order all or portions of the work to cease and refuse to allow any work to commence until the back work is done to the Engineer's satisfaction. 2.02 GRADING The Contractor shall do such grading in and adjacent to the construction area associated with this contract as may be necessary to leave such areas in a neat and satisfactory condition approved by the Engineer. ITEM 3 EXAMINATION AND REVIEW 3.01 EXAMINATION OF WORK The work covered under this Contract shall be examined and reviewed by the Engineer, representatives of all governmental entities which have jurisdiction, and the City's authorized representative. The quality of material and the quality of installation of the improvements shall be to the satisfaction of the Engineer. It shall be the Contractor's responsibility for the construction methods and safety precautions in the undertaking of this Contract. 3.02 NOTIFICATION The Engineer and City must be notified a minimum of 24-hours in advance of beginning construction, testing, or requiring presence of the Engineer, project representative, or City's representative. 3.03 CONSTRUCTION STAKING The Engineer shall furnish the Contractor reference points and benchmarks that,in the Engineer's opinion, provide sufficient information for the Contractor to perform construction staking. 3.04 PROTECTION OF STAKES,MARKS,ETC. All engineering and surveyor's stakes, marks, property comers, etc., shall be carefully preserved by the Contractor,and in case of destruction or removal during the course of this project, such stakes, marks, property comers, etc., shall be replaced by the Contractor at the Contractor's sole expense. Page 2 01000-7-2015 Technical Specifications 00193116 ITEM 4 PROTECTION AND PRECAUTION 4.01 WORK IN FREEZING WEATHER Portions of the work may continue as directed by the Engineer. 4.02 PROTECTION OF TREES,PLANTS AND SHRUBS The Contractor shall take necessary precautions to preserve all existing trees, plants and shrubs but where it is justifiable and necessary the Contractor may remove trees and plants for construction right-of-way but only with approval of the Engineer. 4.03 TRAFFIC CONTROL MEASURES AND BARRICADES Traffic control measures and barricades shall be installed in accordance with the Texas Manual of Uniform Traffic Control Devices and in other locations deemed necessary by the Engineer, for the protection life and property. Under no circumstances will any existing road be permitted to remain closed over a weekend. No separate pay will be made for this item. Costs for this item shall be subsidiary to other items of work. 4.04 PROPERTY LINES AND MONUMENTS The Contractor shall be responsible for the protection, reference and resetting of property corner monuments if disturbed. 4.05 DISPOSAL OF SURPLUS MATERIAL The Contractor shall at his own expense,make arrangement for the disposal of surplus material, such as rock, trees,brush and other unwanted backfill materials. 4.06 CONTRACTOR'S USE OF PREMISES The Contractor shall,at his own expense,provide additional space as necessary for his operations and storage of materials. ITEM 5 MATERIALS 5.01 TRADE NAMES Except as specified otherwise, wherever in the specifications an article or class of material is designated by a trade name or by the name or catalog number of any maker, patentee,manufacturer,or dealer,such designations shall be taken as intending to mean and specify the articles described or another equal thereto in quality, finish, and serviceability for the purpose intended, as may be determined and judged by the Engineer in his sole discretion. 5.02 MATERIALS AND WORKMANSHIP No material which has been used by the Contractor for any temporary purpose whatever is to be incorporated in the permanent structure without the written consent of the Engineer. Where materials or equipment are specified by a trade or brand name, it is not the intention of the City to discriminate against an equal product of another manufacturer, but rather to set a definite standard of quality for performance, and to Page 3 01000-7-2015 Technical Specifications 00193116 establish an equal basis for the evaluation of bids. Where the words "equivalent", "proper" or"equal to" are used,they shall be understood to mean that the item referred to shall be "proper", the "equivalent" of, or"equal to" some other item, in the opinion or judgment of the Engineer. Unless otherwise specified, all materials shall be the best of their respective kinds and shall be in all cases fully equal to approved samples. Notwithstanding that the words "or equal to" or other such expressions may be used in the specifications in connection with a material, manufactured article or process, the material, article or process specifically designated shall be used, unless a substitute is approved in writing by the Engineer,and the Engineer will have the right to require the use of such specifically designated material, article or process. Page 4 01000-7-2015 Technical Specifications 00193116 TECHNICAL SPECIFICATION FOR BYPASS PUMPING OF EXISTING SEWER SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Bypass pumping of the existing sewer system,required sewer lines unless otherwise specified in the Contract Documents B. Related Specification Sections include,but are not necessarily limited to: 1. Technical Specification for Rehabilitation of Existing Wastewater Main by Pipe Bursting 2. Technical Specification for"Items No 510 Pipes" 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Measurement a. Measurement for this Item will be by lump sum. 2. Payment a. The work performed and materials furnished in accordance with this Item shall be subsidiary to the various items bid. 3. The price bid shall include: a. Mobilization b. Development of bypass plans c. Transportation and storage d. Setup e. Confined space entry f. Plugging g. Pumping h. Clean up i. Manhole restoration j. Surface restoration 1.3 REFERENCES A. Reference Standards 1. Reference standards cited in this Specification refer to the current reference standard published at the time of the latest revision date logged at the end of this Specification,unless a date is specifically cited. 2. Occupational Safety and Health Organization(OSHA). 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Schedule meeting with City to review sewer shutdown prior to replacing or rehabilitating any facilities. Technical Specifications 1 of 4 Bypass Pumping of Existing Sewer Systems 2. City reserves the right to delay schedule due to weather conditions, or other unexpected emergency within the sewer system. 3. Review bypass pumping arrangement or layout in the field with City prior to beginning operations. Facilitate preliminary bypass pumping run with City staff present to affirm the operation is satisfactory to the City. 4. After replacement or rehabilitation of facilities, coordinate the reestablishment of sewer flow with City staff 5. Provide onsite continuous monitoring during all bypass pumping operations using one of the following methods: a. Personnel on site b. Portable SCADA equipment 1.5 SUBMITTALS A. Submittals shall be in accordance with the submittal requirements. B. All submittals shall be approved by the City prior to delivery. 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS A. For bypass pumping sewer lines, submit a detailed plan and description outlining all provisions and precautions that will be taken with regard to the handling of sewer flows. Submit the plan to the City for approval a minimum of 7 days prior to commencing work. Include the following details: 1. Schedule for installation and maintenance of the bypass pumping system 2. Staging areas for pumps 3. Pump sizes, capacity,number of each size, and power requirements 4. Calculations for static lift, friction losses, and velocity 5. Pump curves showing operating range and system head curves 6. Sewer plugging methods 7. Size, length, material,joint type, and method for installation of suction and discharge piping 8. Method of noise control for each pump and/or generator,if required 9. Standby power generator size and location 10. Suction and discharge piping plan 11. Emergency action plan identifying the measures taken in the event of a pump failure or sewer spill 12. Staffing plan for responding to alarm conditions identifying multiple contacts by name and phone numbers (office, mobile) 13. A contingency plan to implement in the event the replacement or rehabilitation has unexpected delays or problems PART 2- PRODUCTS 2.1 EQUIPMENT A. Pumping 1. Provide equipment that will convey 100 percent of wet weather peak flow conditions. Technical Specifications 2 of 4 Bypass Pumping of Existing Sewer Systems 2. Provide fully automatic self-priming pumps. Foot-valves or vacuum pumps are not permitted for priming the system. 3. Pumps must be constructed to allow dry running for periods of time to account for the cyclical nature of sewer flow. 4. Provide 1 stand-by pump for each size to be maintained on site. Place backup pumps on line, isolated from the primary system by valve. 5. If multiple pumps are required to meet the flow requirements,provide the necessary fittings and connections to incorporate multiple discharges. 6. Noise levels of the pumping system must follow the requirements of the City noise ordinance for gas wells. B. Piping 1. Install pipes with joints which prevent the incident of flow spillage. C. Plugs or Stop Logs 1. Plugs a. Select a plug that is made for the size and potential pressure head that will be experienced. b. Provide an additional anchor, support or bracing to secure plug when back pressure is present. c. Use accurately calibrated air pressure gauges for monitoring the inflation pressure. d. Place inflation gauge at location outside of confined space area. Keep the inflation gauge and valve a safe distance from the plugs. e. Never over inflate the plug beyond its pressure rating. 2. Stop Logs a. Use stop log devices designed for the manhole or sewer vault structure in use. b. If applicable, obtain stop logs from City that may be used on specific structures. PART 3 - EXECUTION 3.1 PREPARATION A. Locate the bypass pipelines in area to minimize disturbance to existing utilities and obtain approval of those locations from the City. B. Make preparations to comply with OSHA requirements when working in the presence of sewer gases, oxygen-deficient atmospheres and confined spaces. C. Do not begin bypass preparation and operation until City approval of the submittals requested per this Specification. 3.2 INSTALLATION A. Install and operate pumping and piping equipment in accordance to the submittals provided per this Specification. B. When possible schedule work to avoid overnight bypass operations when possible. C. Sewer flow stoppage 1. Plugging a. Use confined space procedures and equipment during installation when necessary. Technical Specifications 3 of 4 Bypass Pumping of Existing Sewer Systems b. Thoroughly clean the pipe before insertion of the plug. c. Insert the plug seal surface completely so it is fully supported by the pipe. d. Position the plug where there are not sharp edges or protrusions that may damage the plug. e. Use pressure gauges for measuring inflation pressures. f. Minimize upstream pressure head before deflating and removing. D. Sewer flow control and monitoring 1. Take sufficient precautions to ensure sewer flow operations do not cause flooding or damage to public or private property. The Contractor is responsible for any damage resulting from bypass pumping operations. 2. Begin continual monitoring of the sewer system as soon as the sewer is plugged or blocked. Be prepared to immediately start bypass pumping if needed due to surcharge conditions. 3. Sewer discharge may be into another sewer manhole or appropriate vehicle or container only. Do not discharge sewer into an open environment such as an open channel or earthen holding facility. 4. Do not construct bypass facilities where vehicular traffic may travel over the piping. a. Provide details in the suction and discharge piping plan that accommodate both the bypass facilities and traffic without disrupting either service. 3.3 FIELD [oR] SITE QUALITY CONTROL A. Field[oR] Site Tests and Inspections 1. Perform leakage and pressure tests of the bypass pumping pipe and equipment before actual operation begins. Have City staff on site during tests. 2. Contractor is responsible for quality assurance of the work performed including any TCEQ fines associated with spills and any clean-up associated with spills. 3.4 CLOSEOUT ACTIVITIES A. Once plugging or blocking is no longer necessary,remove in such a way that permits the sewer flow to slowly return to normal—preventing surge, surcharging and major downstream disturbance. END OF SECTION Technical Specifications 4 of4 Bypass Pumping of Existing Sewer Systems TECHNICAL SPECIFICATION FOR REHABILITATION OF EXISTING WASTEWATER MAIN BY PIPE BURSTING PART 1 GENERAL 1.01 SCOPE OF WORK This specification provides the minimum requirements for the trenchless installation of wastewater pipe and consists of furnishing all labor, materials and equipment necessary for the replacement of wastewater mains by pipe bursting. Pipe bursting replacement is defined as a trenchless method which splits the existing pipe and immediately installs a new polyethylene pipe behind an apparatus which expands the existing wastewater pipe, tees, wyes and couplings into the adjacent ground forming a clear space to insert the new wastewater piping. Rehabilitation includes reconnecting existing sewer connections, television inspection of the polyethylene pipe and complete installation in accordance with the contract documents. 1.02 RELATED WORK A. Technical Specification for"Item No 506 Manholes B. Technical Specification for"Bypass Pumping of Existing Sewer Systems" C. Technical Specification for"Item No 509 Trench Safety Systems" D. Technical Specification for"Item No 510 Pipes" 1.03 QUALIFICATION REQUIREMENTS A. The Contractor shall be certified by the manufacturer of the particular pipe bursting system that such firm is a licensed installer of their system. Contractor must provide a letter to the Owner documenting this requirement. B. The Contractor shall have a minimum of three (3) years of verifiable experience using the pipe bursting method while meeting the following criteria: 1) A minimum total of 100,000 LF of completed pipe bursting footage 2) A minimum total of 50,000 LF of upsizing where similar sized diameter increases have been successfully completed in pipe diameters of 8-inch to 15-inch C. Personnel performing pipe bursting must be certified by the manufacturer of the pipe bursting system as having successfully completed training in: 1) Operating bursting head 2) Installing proposed replacement pipe 3) Operation and maintenance of all equipment to be used Technical Specifications 1 of 10 Rehabilitation of Existing Wastewater Main by Pipe Bursting 1.04 SUBMITTALS Contractor and manufacturers of the selected wastewater rehabilitation piping are to furnish engineering data covering design and installation. Submittals shall be made in a timely manner so that project schedule can be met. The data shall include: A. Shop drawings, catalog data and manufacturer's technical data showing complete information on material composition, physical properties, and dimensions of new pipe and fittings. Include manufacturer's recommendation for handling, storage, and repair of pipe and fittings damaged. B. Detailed installation procedure including pipe bursting method to be used and method of construction and restoration of existing sewer service connections. This shall include Detail drawings and written description of the entire construction procedure to install pipe, pit locations, bypass sewage flow and reconnection of sewer service connections. C. Design calculations: push/pull loads, thrust loads. D. Certification of workmen training for installing pipe E. Pre-television and post-televisions inspection reports F. References Provide a list of minimum three (3) previous projects completed in the last three years by the Contractor/installer where a wastewater main was successfully rehabilitated using the pipe bursting method to be employed. Include contact names, addresses, and phone numbers of agencies involved. 1.05 METHODS FOR NEW PIPE INSTALLATION The methods approved for rehabilitation of existing sanitary sewers by pipe bursting and installation of new polyethylene pipe are pneumatic, static, and/or hydraulic. 1.06 WARRANTY A. A two-year warranty for the pipe shall be included from the Contractor, and shall cover the cost of replacement pipe and freight to project site, should the pipe have any defects in material or workmanship B. In addition to the standard pipe warranty, the pipe bursting Contractor shall provide in writing a warranty for a period of two years for all the pipe bursting work including material, installation, and pressure testing at no additional cost to the Owner C. Unless otherwise specified, the warranty period shall begin after the Certificate of Acceptance is issued for the Contract Technical Specifications 2 of 10 Rehabilitation of Existing Wastewater Main by Pipe Bursting PART 2 PRODUCTS 2.01 MATERIALS Replacement pipe shall be high-density polyethylene pipe and meet the applicable requirements of ASTM F714 Polyethylene (PE) Plastic Pipe (SDR-PR) Based on Outside Diameter,ASTM D1248, and ASTM D3350. A. Sizes of the insertions to be used shall be as shown on the plans or to renew the sewer to its original or greater than flow capacity. B. All pipes shall be made of virgin material. No rework except that obtained from the manufacturer's own production of the same formulation shall be used. C. The pipe shall be homogenous throughout and shall be free of visible cracks, holes, foreign material, blisters or other deleterious faults. D. Material color shall be white, gray or light colored, suitable for TV inspection. E. Unless otherwise specified in the plans or specifications, the minimum wall thickness of the polyethylene pipe shall meet the following: Depth of Cover Separation Distance SDR Min. Pressure (ft.) from Water Main (ft) (DIPS HDPE) (psi) >9 19 111 < 10 < 9 11 160 > 10 As Required 11 160 2.02 TESTS Tests for compliance with this specification shall be made as specified herein and in accordance with the applicable ASTM Specification. A certificate with this specification shall be furnished, upon request, by the manufacturer for all material furnished under this specification. Polyethylene plastic pipe and fittings may be rejected for failure to meet any requirements of this specification. PART 3 EXECUTION 3.01 DELIVERY, STORAGE AND HANDLING Transport, handle and store pipe and fittings as recommended by manufacturer. If new pipe and fittings become damaged before or during installation, it shall be repaired as recommended by the manufacturer or replaced as required by the Engineer at the Contractor's expense, before proceeding further. Deliver, store and handle other materials as required to prevent damage. Technical Specifications 3 of 10 Rehabilitation of Existing Wastewater Main by Pipe Bursting 3.02 PRE-BURSTING TELEVISION INSPECTION The Contractor shall provide for the television inspection for the section or sections of pipe prior to construction as outlined in the technical section "Television Inspection of Wastewater Mains." 3.03 OBSTRUCTION REMOVAL A. Identify any point repairs required, such as dropped joints, intruding service connections, collapsed pipe, sags in main or any other obstructions prior to the pipe bursting process. The Contractor shall remove all obstructions to perform pipe bursting operation, as necessary. B. The contractor shall notify the Owner for approval to make an excavation after having exhausted all other options to remove any obstruction or retrieve any pipe bursting tool or camera from the wastewater main. 3.04 DIVERSION PUMPING A. The Contractor, when and where required, will divert wastewater flows for the cleaning, pipe bursting, television inspection, point repairs, obstruction removals, or other related work in this project as required to complete the work. All works to be done as per as per Technical Specification for "Wastewater Flow Control." B. The Contractor shall be responsible for continuity of sanitary sewer service to each facility connected to the section of sewer during the execution of the work. C. Sewage will not be permitted to backup into buildings at any time. If sewage backup occurs and enters buildings, the Contractor shall be responsible for cleanup, repair, property damage cost and claims. 3.05 INSERTION PITS OR ACCESS PITS A. Insertion or access pits shall be efficiently located so that total number of pits are minimized and footage of liner pipe installed in a single pull is maximized. Where possible, use existing manholes and excavations at point repair locations for insertion pits. B. To facilitate long insertion runs, intermediate insertion pits may be allowed at the most advantageous location to provide for replacement pipe to be installed in both directions. Pits in areas subject to traffic should be avoided as much as possible. If insertion pits in areas subject to traffic cannot be avoided, the operation shall be limited to one (1) lane of traffic or one-half (1/2) of the roadway, whichever is less. Technical Specifications 4 of 10 Rehabilitation of Existing Wastewater Main by Pipe Bursting C. Insertion pits shall be only as large as required to accommodate the equipment. All pit dimensions and locations shall be approved by the Owner in writing, prior to beginning work. D. Manholes may be placed at insertion pit location as indicated on the plans or as directed by the Owner. E. In the event the pipe bursting process requires the excavation of an insertion pit, the pipe through the pit shall be bedded in the required bedding material as shown on the plans. 3.06 PIPE BURSTING AND LINER INSERTION A. Equipment used to perform the work shall be located away from buildings so as to minimize noise impact. Provide silencers or other devices to reduce machine noise as required to meet requirements. B. The Contractor shall install all pulleys, rollers, bumpers, alignment control devices and other equipment required to protect existing manholes, and to protect the pipe form damage during installation. Lubrication may be used as recommended by the manufacturer. Under no circumstances will the pipe be stressed beyond its elastic limit. C. The installed pipe sha►l be allowed the manufacturer's recommended amount of time, but not less than four (4) hours, for cooling and relaxation due to tensile stressing prior to any reconnection of service lines, sealing of the annulus or backfilling of the insertion pit. Sufficient excess length of new pipe, but not less than four (4) inches, shall be allowed to protrude into the manhole to provide for occurrence. D. Following the relaxation period, the annular space may be sealed. Sealing shall be made with materials approved by the Engineer and/or his representative and shall extend a minimum of eight (8) inches into the manhole wall in such a manner as to form a smooth, uniform, watertight joint. E. The new wastewater pipe shall be placed without damaging the pipe joints or completed pipe sections. Any pipe which has been damaged during installation shall be replaced by the Contractor. F. The Contractor shall provide for the general safety of workers, pedestrians and traveling public throughout this project. Existing surface improvements and underground facilities and utilities shall also be protected. Damage caused by the Contractor shall be repaired at his own expense. G. Provide barricades, warning lights and signs for excavations created by point repairs. Conform to requirements of TXDOT, City of Round ROck, and other entities specified in the contract documents. Technical Specifications 5 of 10 Rehabilitation of Existing Wastewater Main by Pipe Bursting H. Protection of Manholes: The Contractor will install all pulleys, rollers, bumpers, alignment control devices and other equipment required to protect existing manholes, and to protect the pipe from damage during installation. Lubrication may be used as recommended by the manufacturer. Under no circumstances will the pipes be stressed beyond their elastic limit. I. Do not allow sand, debris, or runoff to enter sewer system. Verify location of all underground utilities and facilities potentially impacted by rehabilitation or other project activities, and take necessary precautions to provide protection from damage. Damage resulting from the Contractor shall be at his own cost and responsibility. J. Protect the new pipe and components during all phases of work, including hauling, installation, entry into the launching pit, and prevention of scarring or gouging of the pipe or components. K. Pipe shall be assembled and fused on the ground in sections equivalent to the length of the anticipated pull. During installation, all bending and loading of the pipe shall be in conformance with manufacturer's recommendations and shall not damage pipe. L. Manholes shall be prepared to provide pipe installation at the lines and grades indicated in the contract documents. The invert in the manholes shall be removed as required to allow for pipe installation activities and to accommodate invert replacement. Manhole inverts shall be restored upon completion with 3,000 psi grout to establish a minimum 4-inch-thick bottom on the manhole after shaping per the contract documents. M. Allow liner pipe to normalize to ambient temperatures as well as recover from imposed stretch before cutting to fit between manholes, sealing at manholes, and manhole invert shaping. Normalization usually takes at least 12 hours for polyethylene. N. Cut liner so that it extends four inches into manhole. Make a smooth, vertical cut and slope area over top of exposed liner using non-shrink grout. 0. Seal the annular space between liner and sanitary sewer main at each manhole with a chemical seal and non-shrink grout. Place strips of oakum soaked in sealer (Scotchseal 5600 as manufactured by 3M Corporation or approved equal) in a band to form an effective water-tight gasket in the annular space between liner and existing opening in manhole. Make width of the sealing band a minimum of eight inches or the thickness of the manhole wall, whichever is greater. P. Finish seal with a non-shrink grout placed around annular space from inside manhole.Apply grout in a band not less than six inches wide. Technical Specifications 6 of 10 Rehabilitation of Existing Wastewater Main by Pipe Bursting Q. Reshape and smooth the manhole invert. Form a smooth transition with a reshaped invert and a raised manhole bench to eliminate sharp edges of liner pipe, concrete bench, and channeled invert. Build up and smooth invert of manhole to match flow line of new liner. 3.07 PIPE JOINING A. The polyethylene pipe shall be assembled and joined at the site using the thermal butt-fusion method to provide a leak proof joint in accordance with ASTM F2620. Threaded or solvent-cement joints and connections are not permitted. All equipment and procedures used shall be used in strict compliance with the manufacturer's recommendations. Fusing shall be accomplished by personnel certified as fusion technicians by a manufacturer of polyethylene pipe and/or fusing equipment. B. The butt-fused joint shall be true alignment and shall have uniform roll-back- beads resulting from the use of proper temperature and pressure. The joint shall be allowed adequate cooling time before removal of pressure. When cool, all weld beads shall then be removed from both the inside and outside surface such that the joint surfaces shall be smooth. The fused joint shall be watertight and shall have tensile strength equal to that of the pipe. All joints shall be subject to acceptance by the Engineer and/or his representative prior to insertion. All defective joints shall be cut out and replaced at no cost to the Owner. Any section of the pipe with a gash, blister, abrasion, nick, scar or other deleterious fault greater in depth than ten percent (10%) of the wall thickness, shall not be used and must be removed from the site. However, a defective area of the pipe may be cut out and the joint fused in accordance with the procedures stated above. In addition, any section of pipe having other defects such as concentrated ridges, discoloration, excessive spot roughness, pitting, variable wall thickness or any other defect of manufacturing or handling as determined by the Engineer and/or his representative shall be discarded and not used. C. Terminal sections of pipe that are joined within the insertion pit shall be connected with a full circle pipe repair clamp. The butt gap between pipe ends shall not exceed one-half(%) inch. 3.08 LOW PRESSURE AIR TEST Prior to reconnection of service lines, all completed mainline sections will be tested by Low Pressure Air Testing in accordance with ASTM C828, ASTM C924, ASTM F1417, 30 TAC 217, or other AWWA procedures. All testing procedures, safety requirement and test times shall be strictly adhered to. Any section not passing the requirements of the test shall be replaced at no cost to the Owner. Technical Specifications 7 of 10 Rehabilitation of Existing Wastewater Main by Pipe Bursting 3.09 DEFLECTION TEST A. Deflection testing to be performed on all pipe installed. A rigid mandrel should be used. Test shall be conducted after the final backfill has been in place at least 30 days. No deflection should exceed 5%. B. Mandrel Sizing: The rigid mandrel shall have an outside diameter (O.D.) equal to 95% of the inside diameter(I.D) of the pipe. The inside diameter of the pipe, for the purpose of determining the outside diameter of the mandrel, shall be the average outside diameter minus two minimum wall thicknesses for O.D. controlled pipe and the average inside diameter for I.D. controlled pipe, all dimensions shall be per appropriate standard. Statistical or other "tolerance packages" shall not be considered in mandrel sizing. 3.10 SERVICE CONNECTIONS A. In providing re-connection of existing wastewater services, selected service connection pipe diameter must match existing service with a minimum diameter of 4 inches. Any existing service smaller than 4 inches shall be upsized to a minimum of 4 inches. B. All sewer service connections shall be identified, located and excavated prior to the pipe insertion to expedite reconnection. Upon commencement, pipe insertion shall be continuous and without interruption from one manhole to another, except as approved by the Owner. Upon completion of insertion of the new pipe, the Contractor shall expedite the reconnection of services to minimize any inconvenience to the customers. C. Mechanical saddles shall be made of polyethylene pipe compound that meets the requirements of ASTM D1248, Class C, have stainless steel straps and fasteners, neoprene gasket and backup plate. Mechanical saddles shall be heat fusion saddles, Strap-On-Saddle Type as manufactured by DriscoplexTM or Tapping Saddle manufactured by Fernco Joint Sealer Company, DFW Plastics, Inc. or approved equal. Once the saddle is secured in place, drill hole full inside diameter of saddle outlet in pipe liner. D. At all points where the polyethylene pipe has been exposed, as in starter excavations, at service connection fittings, outside of manholes, etc., the contractor shall encase the pipe and fittings in minimum of 6 inches of concrete or flowable backfill. If flowable backfill is used, the contractor shall remove all debris, and create a void along each side of the pipe at the spring line to undisturbed soil, in preparation for the cement stabilized sand backfill. Width of the void shall not exceed (main O.D.+2ft.) or (service line O.D.+2ft.) Technical Specifications 8 of 10 Rehabilitation of Existing Wastewater Main by Pipe Bursting 3.11 FIELD TESTING Tests for compliance with this specification shall be made as specified herein and in accordance with the applicable ASTM Specifications. A certificate with this specification shall be furnished, upon request, by the manufacturer for all material furnished under this specification. Polyethylene plastic pipe and fittings may be rejected for failure to meet any requirements of this specification. 3.12 POST-CONSTRUCTION TELEVISION INSPECTION A. The Contractor shall provide for the television inspection for the section or sections of pipe following rehabilitation. B. Post-construction television inspection shall be performed after the reconnection of the service laterals or as directed by the Engineer. In no case will the television inspection replace the low-pressure air test above. 3.13 FINAL CLEANUP Upon completion of installation, testing and inspection, clean and restore project area affected by work of this section. 3.14 MEASUREMENT AND PAVEMENT A. Installed Pipe: Payment for providing and installing the pipe bursting as specified in this section shall be for the unit price bid per linear foot of pipe installed. Measurement for providing and installing the pipe bursting will be by linear feet measured from center of manhole to center of manhole or end of main. The item will includes all pipe installation materials, all submittals, sealing and manholes repairs (if required), launching pits, receiving pits, post testing, shoring, bedding, backfill, and all related work specified. B. Services Locating and reconstruction of services and all connections of services will be paid for per each connection made, including fittings and pipe. Payment for abandoned services will be on a per each connection made basis. C. Point Repairs: Payment for providing point repairs as specified in this section shall be for the unit price bid per linear foot of pipe repair installed. Measurement for providing and installing the pipe bursting will be by linear feet measured from start to end of the point repair. Technical Specifications 9 of 10 Rehabilitation of Existing Wastewater Main by Pipe Bursting D. Obstruction Removal Obstruction removal will be paid for on a per each basis, as needed. END OF SECTION Technical Specifications 10 of 10 Rehabilitation of Existing Wastewater Main by Pipe Bursting 02000 PLANS, DETAILS AND NOTES No Text If applicable, insert reference(s) to project plans; details; and notes 02000 Construction Plans No Text CD rn x O r� o O mum i a .‹. 3 P n CD LC .0 C) -*I �� ►3 o rib 0 � �' Cn 7� t`' f� roc rib \ b t4d �ril 4 Oo `" n o� 8 y � „r. dO � 0o Cn �-+ �' � t) 6 iN d..._, z � Z d • _ � z �► � n x � °c 7d = n Md D▪ . - o 4 (4 -. n Z <x c o � U' a D n Pd Ili 4::, (:0'7) m x y v 00 .., to 0toil „...,..Li---, .4. ...... z 0,...„ cn ..„,... 1.< N W • • a a rn tin • N kn W v ‘ 1\ tli%lAW:.1t14,;1 6 i6tiolth-;itust.„ . 'PaiSl:ibo-... C) 11.11.1Po)zVr0tt.2_ 111„„M Crr..i.iI)i mp.m„sao,,s �� � V 1 i .. a 4 11SIt j,+z s =im rurrrrrr.\, . .,�arrrrruul 1 -7- •I�rrrriLe: rill < i icikk 11:7'rikVittilloo'w t•.: pz:j 23 \ (1111111) P:i x' b �1;>_�‘ c „,,. , , .-- z (III 04 n ►-r • zap' 111 p V %4. P:i P:iii H z tzi z ,... saw 0 H AL I iii /P:::1 (-C-:3:3:31.1111 •.II 4 rill z ♦i i• . io.r."( ♦♦ X ,,,0.0;,„:,- ,.00 o„,.. ., > P:i V 1 C:I) C) 1-11 < 0 Rr.) P:i �,a},,,,„,i ",, rill .._,,,„ Pi2 gcli.--N.e.Z 7 '~ �'4'.1 }47'' nn1 88 8 8 mmm vFf .� rn. u - moo v a2v nn n nNn n S 1 1 GW h G-0) VA 4 14u 'w III I Ili I -� 1 1 1t _ I I I I r MIA lui p m >>>>>> 000 DDDb' L.xxx' m Nmmm. m D D Y➢D> 0 0 0 0..0 mmmmm m to o`m m m Imrn —I nn nn zzz Z DDD> 73X17373X n-1r,-r mnnnon M M mmmmm 0 0 0 0 0 o n n o a RI m mmmmm >z 00 Zo D zzzzzz ozz mmmm xxxxx x coo°rnmmrn ���Soo r�*^� vm 000000 -i 000 D Dp> ? DO-- X rii rrr r 2 o v v v o o m m 73 N N N 0 C- M i mmmmm. rrr r -1-+-i-��-+ .1-in -- - zzzzz D D D D D D D>z <_" mmmmm C r trilcriitriiurluri�_ wo -_ mD 5 - >C z-C O 7S 7 O m n* a aIl p C1* 1. N cn -- p *r o6 V (:097) ��3'1tlN SSA/� 60LS613 9O :*ON VHN ,r-f ��SN3-/�..�u�,� SIN 1JkEAO'IdJAII �--� a}D0 A9 uolslnaa -•DN '4Y Z01011 , e.• SVX31N70a ONnoei /''� :03)iO3H9 W NOSYPI NUS , x�.I,�rnatsvrn f I S LIILoN'IvNaNJ J C) LCZZ-9r9-ZIS:d 9.LIU•xl W)aad'OM■IIB'I■..■1• .4 PM 009Z ,. . ^� T v V !��7"�J�7 , rwd :NW/HO BZ6-3'oN L++Li ♦•. l r T T �d O l•ll��Cl�MI VI 1 et 'a�J l L MIS :N91530 Ua0I-I <(ic: �I „,..„,,,,V. I 4111 ZLxv'� 610Z 838113030 :31V0 . 6L0Z,170/ZL w J I- Q¢wMm JO JII��O F J� �5Vcr w W mo O Z J QF OZ zZ O z O} maoaO Wzap WP0 J WV LLWD_ amQ W~OO mM wla�lln FI,1 .-� N V)w QW O 0 X ali W W1.1. ~O¢Z Q<WELfn x OO I� Z FNfn aWQa UZ >1-W Q 7J WO Z W w 00 JI?fnwwz J�)3a �30 0wow FWF wwm a'oaw F OQw5ofrioWa MD -IMwo 0 zw az0m}F Qo0 J aMa0 m,,, �z a, a a J F J aF ow I,���ZwO LU 0W Q¢mfwn ow.. a0 xj0 pw za�? Do oa�twi)a��I-vwi NO ao o �� UC9 R W OOJa OZYW w Jz U JZ w Z}� ¢w U ow p W ¢ 0ww 0w Q az Jz °° Ow COW pZ? OOJw ¢a<a -IMO Qm, MJZ 0zoo 0tn to F z W ¢W a MD_0Nf ,r OF-a.(7 0Z<M �'wx J Z J JW l,)a 0aZZJ<}MP QZ OQ z 0Z F-fn 0 W W a az J xX Z�fnw aro a0 J J J�mfn O WO W- p UO O W Frfn rti Z Qi 0 V] w aa0 a�wz pJfnw oO z F<0 w tnw < Po P}oN< wz JF 0 N P oal,i a w `J O F. W a a �� a OO oz Q z a� 3 _Mc:J W fnmF xW 3 a o Z0 a--) Fp '—' I C7 W .. J ztnf-¢ c�c�}o <0, 0 m U J Q< wa o \ z <wypoOo< 1-O az m OO ,wm �'0Z Q . v�,-. Iz'W F-: az�-U zWmz J..Zx wzt-D_ �-`'ui< �MX �JFz HO 00Z = 0 <0 o O rn �afn ZW la WO O z xp�a<f9 oa < JI+Im� 2QUO oa Wfn J 2 �< V��xwZ�OI,,IZ NJ dW ON fnN ZJ� ^' AN Oa.-i 0 W<OF d J N x jQ ~FQW mp OdK E`V1U j FOF m IE,IZ waa Q-)O 0 0o 0M0 t F F fn < D m w Ir O O O a a O aJal�aow mmo� N�wo ozzz aw' }o CJzp0o az HOzcnow ma Fw •WO , a� Qwa J=O �, rn W z Q ] 0 pip VY 00 p w O� o O p O<FW z aW w RI o U E. J �� zw �< O zw aw aw���� c��` ¢m ~ OO � � z U v, W.W m �F Q zoom < < < 0,..., a < w zo O t7`o 00 Z¢ci 4 j W o �E 00 OJ0W ZWoo c w() QZO oa oZ< o oaP0 w_ m a W o o W O F Z O W Zx U W a' <L lL J fn- o fr J Z F >� >Q WQ wmw mwz ¢pli o0 w Zp O xO a Z5 vaz N<- �zw000 fn rr O a p 0 Nz F-� O O 0 ❑ U M o Ed W I W OF W NQ o`' 2 C OU zoo cc, z<omw -00Z wa�0� awa m0U aoW 0 `` -,z 0Z-M OZ aW a aw mc, oz� co O Ao.. UU �'z O �d ' }o d - pm < In OU U� 0 O Mwmo o w J O¢,2�C m F < J O0 vy U O �FQ o QW Nz3 QF (naz ' •am U m0MWC < J> aLwQ' fnZ¢ fn w aQ3 to Wy~ W r W V L� p Oz'""' Z, w o pap. pw ¢ J ofr w• W x, D aa¢ a3_ OW az o oo� Ov .a fs. O z FpFW�3 ayxa� Z<p0 a�aZ¢ JWa O(9= Jaao InJ fn�a�O W Q�~ QW z ZO M w ��' = F".-1 t-� z OE'. .-1 �Q f0.7Q `,< 6< Z5fn VQ(na OJ W QJw Fps Q Wa aF NF WZW<n W um- O < pF Ww0 W R W OZ CZ O �~ woLUZ 0 aFaao pnjw 3 Wa xom za xwza O� azO oamr zw fna o aw �ZO " W Ca Z ¢ o o o 00 mmwzo fnJFpQF wzy0 =Zo mim OOC f`)o-Q UW �.F.-0zoF-� -.Or �� z zo waa Jol� U u•'�-a rx O re �� <8 po,Ow,< Cuxi<ao z my < >-50 zw omz ,¢M oQwW � aok'a�zQ�p Noo zo a Na mZ0 mpg �C]7� ¢ Ou: WZZ0 z WV Foa fr W< Om< NMO OZJm o �a 0 z p� �+I o0 Jz Z .a G1 z< �a <wW} }Qo ¢ ¢ IW,Wz • aQ<J o w as}}}Zrn F try 0a a a o w ap<oO� p�0 J >wwxUm z�xtYW pW p<Wa ZaZ pa O�O�m�pwlz,) OI?� 0o N WJ NFQa ozz,)z Z -00wz Q~Z aow<w zo zm¢ ~ p Z o O N2 O Z W Z J W Z V V. o m o m m O} <o‹ J w U m_ m w F F Q W-fn <m a aJ wQ ,p XZF0 WZJU 0 .0 ¢xi O VN� Z U' ow.cm-O a05 00 F ',win Qow <O. J< UFI-O- oD 0Q<UWF 0U)F ZMI-0 p0WOO o< ZOVC<a o5 O5 oa0 fr wK wow 0W ¢fnd F w 0 F am --wm mFo0 z �w zUV JCUamp0 woo}o JzWw w0Unwo `�'ow Rmzw xOWUa OO c,j<0<w¢www oox as w wm O0EU 000 UwLOzli UOom< <WO_O mowza ,a< whom 6 6n 6 ai , N ,- ,- In Id - f0 J O Z Z 0 0 0 m �� OLU ■ Fa wZU= 0E fiw•Wa a Zp w 0 m wwF �o <0i<WF 00 zzz aD WO 0Z OQO<W U �FF to oo Q ` �•F. �� fnO JDZvi J Wwa0 wW W�O >¢L� P OW aW 0 mom C7F Q w- zI-z xoa <aZ a� F- op Qz avom W fr o Ffn �ZU) p fnao O QFz z_o z a w 0 J w 0 ,w fr< <Q o �FO O ztn F O CUU O p LA, 00 Jw<ZO .. (2. �0aO ILO vie 3w O _J�+OJOJfn w Oz O oz ww�n �OWM,M OJ{{�, F 70 wy �m Fz JUJOZ OFam wowz }Z ■ zw 1 z OW -w,m )z mma¢ aU) pFFO H<Fr OOZ OF WV1�o a pacw� �aF ap oa a0 FF I- 0 0WF F 0 oY o wwo d Q <0 oW-Z z � O a}> w0< < 0z zo: X<>0w OWz< Za p Qlr o.. V a 0Sz z- r-, ow Ow I� ow ¢w- Ja OFIi ?- w z ¢ w m Q^afn tn� ' tea. Z- Fp �Q a0a z ppZww a U0 wp"m <o ..adw ZN UWaw ml�fn mfrF via0� , zQW as o O Fw>a zwoo:z_ mQ wlil,1 J w Owfn O Mfn azz o< 1 wo wfn I,iwOw FxoO wW�W Wo mm < a wW zw<mFO ,0 0 Y Vp~ omwW <FOJp¢W wJzEOz o0O 0 w}0 0z JI� az O 0 )Z oVWa V Uo. " 00 a� ¢ ~ pw Jp oz 00 zwa zF Fa 0 a OJQ Vo F wom o < JYF a0Q1z .. W) -< 3FZO wa 0.. • tnZ ¢ 0wz W <0_FDW z 000 <z.,a z,am aX < w 0 ozamlr OF <Z WVa z<M 0..wM zo wV., I,,O o zm�¢w� xa�= << mtnp w o0 fnz w xaOJ zro o`n� Swz00 aU 'rem _omm< 0 zpmJom < iW wUW ¢<�.. am ~ fn xw v)w �w v)�w Oo¢ ��oW N azo o Oz �tnw Qz a� EJ p<0,0 Z FNN MQ�z .. N�O FzJN z< a¢�_ �Z_,.._ ZO �m m=NZOz W�OJ mF w�F- QOJ o¢frm m aw w<0 woz-p,p0tn 0o° z o zO mOo<< <_ w w z- �O - < WV frW o J Q z FaOo az �� um o I o�n <� H o o¢ zOwO m 0- z z a^ fn <UZ0 w W WWa WZa F O m WZ _U'p, zw .. OO- J W WOQ fn- W>Ow <oa LUOF 0 k_'�'Np o�fn o mo p wF o OF o J<o O m� �a m-a,SyW IW0< OF (!) JW J U �W '� Q � ' r W- OO FJa UW QJJZO WWM QFM �JOap �aMV) Wx O W UJ Jao p Z U =Z ZQf9OW O JJ�� pow• ma: . OV wm QQO J0CUd WQm O�+I NF-� I�N�O aOm az 2F< W� f�/IQQ w Joan)} v�� Qm0 03Z zZ WJw aFaz zCo ., .. • 3w fn o F�oQa� >0po 'w- LU< O p �cnOpcnF< OzI-z U 0 <mm<~ 00 w M F0o0oo �Fa =zap ¢aW Nm - A W „I,1 zI�fnF 0, Oz a ciW W¢ woWw WFF Qp 0Z0 5 XM w- wma O} <ZOZ' pO<w fnW<U Z az.... �U a�D wI-FfnOL Z JaOza F�a OxO h O� aFUUI-OM U>UZJ W p wm0 N Z} OQwrr < P m U)0 _ • �`) z Oa zz��Q 00-0-Ow w 0 of p w z m o ww wQm JW UfpQ W¢Q lL maaU ZZ�} Ozmz C9U� Yw,' to Z pow o�--O a �QW-a v)O z 0 F Z 0 w JJ aam �aw�oli. FpJ Fo<O z_zJ- am �_ w < w 0 owa oQ v_io �-'Q pOfn � ZO Z"ao J J<p ON li F W 0.5.2 a }V)Om Ua F YaJ . (/iS�O OO fnOaVD=m< oo0aa0 a z LYF 0_ 0 JONza,,w Z • 5 m 0 < CU O a� 0 ri m< MJ 1 A.0 . W a zw z wa m0 w zo O- <fn� a xx} �� Y z U)<0 )w wXxO 05 < a3a ¢.. ,+ a p oOa N<)-NIA} OZW wQw oa maw �OOO xa �,w w� w 00m OQfn VOW Maww to I?I�0 N� fnx�:''o Du poQ oaw Z< }w vaJ Jaa o oa zp wJ za_IF 03 0O0 3 �F zaw}Ufn \d o = xo z tmi I- z ?� : QaJ wow Iwtn�w Waa p Oa OQ W< JF o w PQfnwm aJ o0a N 0- ■=F O } W N < Oz a C9 Q w Jlnw •O} JF 0 a Zz OZ 0a OQ-) z I.. M�le�le ZO Z z fn• o w 7 to V)pmK� NZw x �v�i> 0 6RW 2WZ o1a 6,%5V tnFOZ Up<a • wNF• �z .�:w ��Z ma moaFUw} OF 00 pm moJ zm00 xw��vaa =�fnzo� <Q< YaQ<W ,� < o mOa ¢< aZN< zMfn ��0 <-. :F J00 Job Yz �w?w wwJap o� Z0< W<M 0J} I._J fn.-0waa 33> awp20 OD- oo rez<<OQ a wo- fn-0 M0 . fn A OVp QfnM 000amv)� aQ"� MX pa0 NOOd aJWOW1 (UpLaw <Pp ‹) <a Ir w 0 OFwOm o�nz F0=�.k`' �Qz xW- aklzl,}w� �zvxi�0 �Z= cF>o= �wOz o<oc'F N ooazw moJoo �wQ IiOm wwa¢pp a�=o 3�a� 0oz:F wa��_ zzo fna pmm-W Q-FJ� -0N o p waz- 0ozo mow Ommow' M1Z>WZ fj03 pow fnmm zp CYx �'oa0 0M0-0 MN' • 0-a WXZ WW0wm,Z Oa-aa o O � 'vi ° aY < op aw f ��aaQ UWO a� Qac�Z�z ooWO < 01 WOU ;`,) <O . • - zmz o�z zzMk'zZ MMW-W ok`'m Z�0 .�a Nzza ZOQ�pOa om waa Ja>�w NSF VwF ovov<iwp p ajY 3a0�� 7zz:vFi a� . W-IM '�)OM wONOWFw ,JZFO boa OZJz N3� paOlJiFvi� 0vwipoo� o W zwo w0< Zw0 zJ w3lia Jx0 a }aa W JZ ,.A o<o J<< F0zsa0� JFf�Zm aW J << IJ0- w w2OOZMZZ w<COl-a O� xz omw owx ,_, Ui0mo0w -o03 <F'Fo< <3oAj au-. . • wmw <OUi nwoo?ao <0LMw <OF- aCCCU) 0U) LU F,<0WOO FE�woa F Z O X Z O w x OZ0Z U<)W - 0) N • N .-• N N ri 4 If) M N ri 4 occ O O 0 ¢ m wO H z } U J z Wwz w O d.0 Z ly,)� p } cn fr w Z L. Owp O_tn O OZ� ow Oa p0 ¢ flIan05 fn z o ao 0 m a aw 0 FZF aw� z vi J c� F x WO Q< Z N coo �Q UpM j 0 NN 0 m Q WZ0 ZJ }NOY tNI)V0 a ZW F}O M ZFJ Z Vz m mm 0a a I- 0,44m< li U , oa UW x J ¢ pJ CNOU W5p W OmwQYF 8 UFnEQOUFn aCU fn to J} Ja- 3Y afn Woo �`) I > O ¢ 3� < ¢-fro Om,- o m O}0- Mw 00 W Z fnfrw o W o U 0 ) F J a0 <L F o Oz ¢ 1a _ro 0<o tY z fnfrw�I+,IwO fnfrJ U I 0 z J as 30xF cnw DV rn^� 0a ¢ IW p zxZ 0 I- l,- Qw fnllya,lIa zz < aliaaam wm FF, r}�5 }}m z 0 N� ZQ OZ�� O=0 I Om 00 �� mV N QJJ a Q Oa d;;;z;I:mi:OW6<E ~ p 00 n _, I-xpOa Fa = a to Q a-O WUF UN� < a v FID O }W UWIir} UOW W W <L N Q xx CD ,QQm wZa 7Q Q* Z_Qa OD:W FO MJ �tnFZONZaf,9F JaaZOW U to U OW w-W Q m0<p JOB mz < c,mO�w aw mQ am Exx FOa ZfWY N OFJVJQaafn3F DLLM,,)wZ WO 0. - OW,,,z ZU x fno O Fa-OQ �U� NvQJ Wpm a p Va z,w SOU OF- � Uw QQaWO U)U COL mmmMmw Paz z >w Z ww oQ a 0 F�¢��`'ox w Ir=�° of o JZ<li 3O w< 0Owl- tnZ3F ZWJ z W W WL,,� a0w 3 CU _ -00 F onw. Wwfn <F p�} aN0a0w F0:0 } a Q ION O0o3 � W w�0 >�Z ZQ Q �ma 0 �a MI__ �p 0m w I�tn JO �z�5 wz }W a o ? a ZO z< > 0Z WoM0 W In a m W aMW fn0 ZJm �0 ZQ M>Z cc MM Ir Wacwiac�-wpV wocwim00m 00- W,M< >-Yi ,Yw N z Y<0 w J a Fz x 1-a< w < W J w w � Qaa fn as az�apowaoaQ MfnZOwtn<pxww as �o ZFa N Q ¢ _) fnfn0 00 M ~ o aw3� <'- F oQ vas .0 J ¢aQa �o a aNO� a- w m JY " w °Wm Fz 0 m Wp O 0waz mp� F m Z w C3> < 3 J a a N Ow W w0zo 00fAJfr FON O 0,0 _ W YW a O aw �0 N 0w 0 al- U wtn 3 ¢ Jp0 zJ ,-aw z wQfn Jz� a v)z0 w awa _ wpo, Ix z�}a �-Om J 1 W QoI- I p °' } rya O� <-wMz- w<<z n z� FU =Q?Oo0 w OO m Ut�j z�0cil to v�iwaQmoo v=i¢� Wwaa =p0 3W0Qo wZ� O QV wF J J� a fxP n C9 m- �a a000O0 a o �a a� J J as <a ~a'Ir FWa W o Fo ap m<fr ZW �(np<mOQwtnO =�fnO J Fz s fnW�p o p o wo p0Q J wOZk1 aQ�wO c <w caw <OO }tea m m0 z • Wow 5oW wm QOa =3 O�Ow�OWQwwa oaxWQOxFwvimW Nwm JZO�a ¢=p zz x 00 aZm 0 PzOV xzFQ 0-zm za0 3.:a< mWw J azz ao W0 z W-Wpfnz zo 0ozm00 m�,l} zFp¢NWo za awo fn 0W-`` Wwp 5oa� NOa� UU<p avJ w00 WaO Q J FaJ V_l-i Z z� W WZQ ZaaWQ3 W- OI`-Jfr Q <F WfnU F ONE pa fn rfn OOZ �aW� WWa.W NWZF ��a JM F-W� fxn a� OfnO OFF--W FaI,',IrW 5� XUVfn�oJx Xa a O'JOQ Qp�W xzfna W� pZF FW 3Q 0 0n0 F F w I--In_O w mwz m O m < O �x pal- w W O 0 I,I 0 F Oz WO w Ir- fntn<p a x Uzz p W U fnfn zUw N m< fna wZ.xU <fn O > W< z JW p z OJ o Lw No z wN v)IntrMr: w�tn N fn< 1 F w Z 0w03 <F fnw wwo zaf�w wy O.tZw 0FO fna-W70~ 0 Z O �)w RQI w La.,IOU Wm WWfnNZ aWUa 3jW aV�ON Qpm J zU xFW mJ<a 7,W.fOO QO'8• Qaz Oamm Omap ,0w IN,,IQzz,ww,, Qww_om _0� =V 0 3m �zF J W Q �ma a J a N W FF N}} QUa U {� Jp F m0 QO W<- W WM w Q JZO J �QZp <� OJ p< W OO O�W�fn tn0-)l,i ~ rZw I-o xOF a 0 c, �2xL-J�¢0 0 .<0,xFU x Qwa NJa N� V} pF J xWF O �Wa wFJO U-a'a li.a4< 0¢0 ao I6Qw 0=D f/)J CU3a2 pJ 1 a'¢JUOa�w IrQY NJm.-1 wOWVWO ��i JaP woo W SJ O Q W a a aJ O N J C Z OFO to O 3 Om CD 0 w ZO QN W Z OI,,I JU O I- MOo x O-WWxom -2 W-Z Qw<m Qp. QOaOp wWO� aN ww- UOZ MWa UQ • ZJ OWN I- Z°MMW OHM MMWOMP Zw a I-F-'zOZ 1- oo X fY N-F to �x ON oDoOF �U,¢ r.•.N O.: U W mm pfn<�FO ow- Vm O wQ J JFa z wc�� axF< a IQ-w00 .-.ate YO << Q0o Q0 m fn- �� �z1�0 z 1-<W oo� a 0 <Ja w w o�,. o z m xtn a w �a0fnw z o a OxWO Wwpa fn Wo fn NUH o a0 fn Z<w xxp 0 to z �<z Wa« boo FJF as O- o �5F �W ao >j • mx pVz aQa�+.I to �cj Ho Q O F xfnw mF<Ow�U¢ Ow00 pa wpZ 3wz�W a () X� wZ Wr aNUa �aNa 0,>N mJ Op,- O-z «ow oZm gym= Oomz 0 }Wow= Jm<CZWQO�aw oJowom ow- hi J ti z Fw Ow Q w Q z zz sO z >>' �w mow wX cFi wx¢¢z w�c�� Wa�� W�fnp0 coJ�c�o �p g w woo ��Lilp WOZW wt~nW paa0p0 I,OV aJ��'Ywaoaz_ p<FaWJ pay Vp > 3Q <00 J }�w �cLU<Oi LJWU (Ovwia a.3<..00LO 0U0m a5 <CFF �Oo a<F0-a -<OOOF 0�- Fawona3W0Fa0 U)U))O0CU3OOzw FFUILUZU) -<U) Pa WP a am moo a F-m�fn co 0ax aF 6 6 No fd . N ri a vi Id N UI of o .- 4 6 6 F a w w w fri olw.I w Qo a wa Za W wWaN fn ? } o fn W Q UO� mfn-F y'W a'Z W W Z w z z_ W a Z ¢ LW,W 0 a CIZ J zZcl,r1 OoP M o- 41 m �Zp ON mW QO aZ �m I',et aZaW_Q Oa < WNx aZ a OW w�WQO lL a WZ W OWW J O> Z ,,I F w Q W J`r F FN Qw F F Qa • 00 Q OJ ¢F Qaa W �w U W� w I,.F m a O< w ww < J } �za Zm aaowzQ o<w m 0�,,I aWJfn Z a> mz< D: �C2 Doo <O ¢wow OtWg >-wJOZ a O_< =ww OWz um m mwa f• J CO M 00J30 WOalyj WJ=WQ 0< F<laiJ= ~W OZ ZUf�l1Z25 wx a a QZQ <UVZ_ V2 Li FQpZfr o zzOa m FWx zmtna atn 0w<w wO x0aoo� ¢ 0W0O mw U)LU Flaw 2O mow OW1 - : ZzU.,Iw �ujaZWU WI- mp waQ aQ �0 „aw za awQo ama0a :113 .JwQ FZN w 00z,aw m OxZ WP Y L afn p0 mFpz�O fnJpo>- 0 p VOVO UfnNpUWwa UQ•I�FO¢ pw QWw J Ma 7JfnmJOwa �Jz 0m000 O J� zp aOUa QJaW OQpIZ o7 aww moowm Jpa} <JI-�zpJ FO wFF xa .Q waa'Owo m zwwZQ� 50<000<JIY JOONa wUQtn mw -JI LU0wa JJ {,J Z�N 3tn� O �iw (wN�N OfAS �¢ O� a�}� aa� cFiz d0 ZZp waOU �ZpWUI-OJ QwxO mop-o waau_ FOWzw Oo, >In U �O ¢ 0pF Qpw Fp Z ON<�W fxnQa wwp O , O y� O U Wa J O W OW4Oop w<tn U aaa tl QW QD:xm}wNX N o zF O �UN OZOaW ww yFOZvl`io mF ��w olr po zFaxZaw �NOw FJofna�Fa aW�F ooM a0 Fz mcn 2 fn z W(9 oafs O a .: w 5 F w p wo0 a (/jW p z $ a a a fn W o OF 0 zoo 00 V)VFp ZO WWF c��OFz wmwz Jo<0aF FW I- m as ma QJ� }xF zo p OmocxifnwZafn� WmaoZZ < zpm wa <wQpOp <pFY mm0i FDz w5 o0Z z_aaaWF zzzz iwUJOo Ow ooJ < fn ODow -1w0 OUFF OWZD<MQw a Ww p mO -, ON ofn}w�'� fr<0 tr w o J< ww Rwxww0 �W¢ In ¢ �W 0_ <wUaawiw0 awwQ wF wOWwJOW wJm��F ~zI- z pS+Qa Ww 000 0mO 00OF Oa �tna 0 w OO aw to 0Qw0 Ja 0Yx z SF Xtr O Fm a�+•I to CC ZZ0 0 cp. aN 0a w3 to 0 pia ow- zzz -.co oaoJ w ma amw .2. Jw wm0 V o Zxl,.i0 a mm w0- m z -z, ow 7 0� I�UF a�0 �OF ,OD trio px-) 0 oOav�i wwUp wa00 F- x} �3a M (CO Wo<OOwQa oz0y -aNJzpao Zfn=�xvai mzQwO OQ O `oc�Qz w a < w waly w� 0z m } z ]zWz (Tim < 0 wo w oF0f3�w�fn OW0 JazO«ww} <0v)-'*z_ J z z3w w0 1 Wow zaz z0 } �,IZ to 0w >_F zww U0__ 1 oz Qawaw iz0 ¢_ xx �m xFOw< in 0 mOFwZa I/1J W W[r ZYn< Jli �2m O§W WU W OW O J(n p N W F O VO TWO �O+I }ZaONv J Z O x wzz Sao I+I¢aw >O a0 xwmFFw z0x0 I?OrrF�� �W O Q Z0 F 3�=p�mz Iri wQ LFOawZ 3O m�p�0v0i =���o O�� J0O_<<I-I mF ¢¢a >�a� NF C9Wz wz�Q�O F��W wa0aaa Ow wzJ OF Mn JzCaw Ua0�0 jZ�V OQOOWO wzm zwwz ul fnot9Z0 pJm =zafno� Jp0a o< wain TF m w O 0 U� �W 0��� �wt�nZ Uzi- zwwz�ln a0 o a �W 0Wa } x z ME w�Ww J w IWyJ I,� mn paao0 1 mr}}o0 Jmo 001�wI�ww0 a7 WZ JOOF >a JZO pm zzm JZW �� UfnO U Nofn Ow N0 Opm Qpw F<O> Fa'Z <D<zwM 0}Za�W �F"�ZJ QUO }m pJO 2 } a Y <- (��I J 3 tr z<0 ,T, Wao ¢EF} pa aZ? OO 0 ,z - OZU OM F-JW OF az WJO J�IV �ozQ r3pwW�O O� wZ QZN OZQw< < FOmZ fn0 F<p f=aUJ V C7w mVaWFZ tnUOZ QpWZpV VaO ZJW Na <U zr Z<WJOJ POW fn U O<MOJfnW m< 0Mw wWMM pW� 3UO < p O W pQ W a N=P ww¢ N O a m Z_ a Q W N F w O Z a:w a p S 5 y F 0 •F<W W 0 a 2 W x O x» a Q W '-w 2 m Z U U 2 a 0 a l,l U W Q p O d O O Wpm W W w N 0 (Fjp Oz� oFfnW �� owO �?p0_Ow VFow ��'xpaN OOw Otn<? pa z� WWFJa�mW LU - < lwiU=O<Ja0fn0 Izamz OwwWZ NW I�'IWO N��pWw p } 0 >- 0�0m ¢ paw 6Ozpls')a Z00 Ufnlnoo a a WO }a w ZxwomPp°°.. �)oao Q,zlrO ZJazJO fnw JWw zM_mk' JM !.ce m z�m aFp� w0 <o`. OOwZ QOQoQzzIL0 W0a z zJ ma <OOfnOapa aFotr� fn I--<QOQz a wptn0I-0 �0W �w OWFza �, �pZLC - zzz Z��w} ¢a wW OzwwjFO 0a�a� OWw MPw< pX020J wx wWp�lix�zaw >CwV OZWx Om0 wWWmOQ pzoZ oU�Z�a pIQ-< Ua� owmO O<ZJ�Oo(nU ap�a W = ZwapWUpzWF-tnW� m�Qlr� 4 oC9} W UW< < mO Op QpZz WWJ UF � =z UVIn <CW>Ia�1W>UIa'1O F aOVa c,J mZ aa0 O(F-j a Qw3� pF-WQaZa�< pNpmp WO UJ��ZWNmzmz E0fnw0 L._ �N�Zw J~m ZwW rR w <0 I`f0. JWWUwL!,l wwrz I2Uxfr<Z WUO WoLw, IrW >Fo <Q``z,wI,,Ia}O Nwz <ow.w �ww<wxmONW J30NxN ¢Wfnpw aJz oz wpfnNaU <m< <Fa zFwm mF PZN <aa0c> aar-< FOUOc w P<M 3OPP ELM <DL� ?fnUOOE MO V ?<0Mw) Cmou.OwfnOfna ¢ouPoP mooKHD 0w5 vui.c<iIJ'ow • fV M a• vi td n 6 OI • .N- • N M .- N ri d Yid WC 611:2/1IZI 6.P'S3LON 1VN3N30\.4..4S\00/0\1l V 01 31..0■1.1 218-6DIS69£90\8M nrs\: K:\SAU_WR\063895109-RR Lake Creek 10&11\CA00\Sheets\GENERAL NOTES.dwg 12/4/2019 3:14 PM Cl UI - W N <-I UO m(7) . DOOO�m mmz>r 27 c020g Zmmmom2)y z_,xm7,o-i f*12 N-Im-1-r 57C fm-J fn 170D �m0M 22ZTDm >Cv r OmODZY1mMZam N m,O<N7ZD2m Dma,r nym7y➢mm �Z �Z mmm Om N�F�rDZ<O Do `�DzcMiQNA�Q o°v-I� m,0I-KaCM 2m1(=T2D OzrrD DOm<Fo--1A00z `mtn�,��j coo z .�.mZ m-Y>m m I I I I I m m m Kr G7 �O m m m Cl 0 O r vyOD zZOml(i1 � O(nymD O�mo�vnrm� D mD2zmOOpy vv(nN� AmmplzO I q r r m mmm< =O=K Cl O 0 z T Or�*r'�O p D Z2wz, Dmr Q rn1 �0 �m 0 vOQ (n2 me Ommym a i • m A� m C27 m V)mZm D mmzm { Omm QQ �� m-1C m I I I T z m O 0 00® • 4 ■ 0 0-41'❑�e m y© 0 •f. ® (� m mQ r---i1nGO f*<�1�� C1D--1 2Z0 m OX QZ�DO (7mrO (llDOyf�Tl-�M 1 n I I >3 q "' 2Dmm 2D�Om rmOC_ r5*ZoyZQ Z ➢vmm •fN*I�rn�ZD�0m7 C 9Z00DO DM QrnNOZ m 0r0(n >,-DM �mmztn zF mmvrn r Z K-U)Z m r-0, 01 I I I I I Z yAmD m.DCmJi ,ZojmCR�C -Z-I-'� OmOOmrr2 mOC�DAV)= Zy�N mZ2{O�p m fmTl rmn ux-i 0 0(x-n-i, z< >> r r r pH Z C7 c7 D o >o a m rn „m rn o c m,o 0 FyJ UJ� QO=T-`1� y(0�/l�mcz-7 mjOv�r.--mP1ZczJ tci)rr ocZilc 0P10or rZ2 (Q ,ZOjMOOm z m u,mm1 m)m m m m m z z �l * r x U)m (7 m O (7 r { D =G (7mV) O m2X 1mzP QyH-ommmJU)2m=r 2�M0mJzmr {z�r �� DrrIQU) O Cl z m]m z y m m7 2 2 TM,Dr 0 < 2 D D z �O OnOD �vOmN 2(0!)0 U) �mO7�0 �m O 3; r Dry ➢� r Om7O252C C 0 0 ml G7 m)m O O O m7 (� X m D 0 { Z O D -z{•-I Z r m m to (m/1 C m-D C-7Z7 D O ,'-.T��I-f O m 1 N 0 OC{m m N O r m m m m m N 0 . 0 , A _ m m = -1�O :L12-.➢ Or-{{�O P1 0Cm ZZfz*1{z� �y (mn� oo NOm mo �mZ7 m_ m5 *?=D Z N Z r N m m m m m m P m m = Z m n D Z m c Q 2, 0n cyKm mr2ym >1 C(no vZmOV1010 z mz 'O?U1 fmTlz2fn� OCZ O am O „ O z m m m O m y m7 D Z m z vl z� 01D Ozm (mr1 (nmD 01m0mZ 0Z mz 0 2 U)0D�m7 vzp0 mCOOFy m m DmZ z c---�{I m 2 r > o �-mi OD2Z �mm0 ZO-r2 m ZD�Fvr7C7m00 DrnoOmrOrn 0➢ Z ➢Omrn 2 A N xD Cl = Q 0 mm Zrm,70O Min Dmm mm7 r�mO G)DpZ Dm� Zm rDz Nmrn12 { OrO.Zm] O,mm'I�OmO = CO m m r O D O S! O frTl z -zi m mm .�OZD NQ U) mZZ Om�^V)D rZ C �Z0 W m m r m O Z m Cl =0-m) myNGo -{m°> N�Om,T010mN �y 33-<m,OM,m .mOZr zOm O0D�7 m O 0rm x m'0mfT1 { r�''7� fpx<-1, Om2 O(n Om 00(M* rxzm7y{-1mx n(Mm>rno 2Zf,*0OmJ m NDx ' OCmm0 {CfT12 m)➢�oDD2pmo� O�OOmJ-<2N� OZDo mxp 00 ZOr Om z2 mzD 1-mC Yro�mrrEm;C33z� m0 omxZ 2DN0 ml<D•)OrrD,(mmn� mm Z O= 0�m m1nS�0�Z��m m� r m7r r C) DM .ZD1f 1*m co C) a m r >m o o_O p 0 Div O 0 y m { y F rr ZONm?j !n 1n N ZO U) N O (D Cl V Cl Ut W N Pl C) ZM om>morm DOZ m-(nm m7DC Omm*g O DUJg <<C >oU)Dm COmD v<22Zrm AOOm- V) mmc- V7Dm7DOD-D*m o...�--�IDm m Zm DDm7D Zm D ODDrmDD Dm00 m'• c vzZOccn Z0 ommmxn2-7,m Dzm T Z2IDm PmDrn* m M0 00mOOO=ZOF M<-i vmil. (Z-7m�v(Oi120 -0OS j D DMx13Mo0MmMWD ,m0D;33 p 0-(13--0m{ Mom II zommmwr OSoZEn DO z cz>,,,m OrOscomom �02Drm* m7 m1 U) m 00»-{ 0omDcm °00ZIMMAmf7 ovorrm-A(n� rmzrrm0➢CZDZZm0m(rr)O0Z ma), fm*1m00Zymml �DOg(nxxx-1 -xr1S—d*-< mmmo��A mzO0m001 I I rOrlmJm- MM.< 00-0 Dp^xo r0 c-IZf*lOp2 AD Zo z-z0 m Umi zmD c CZ CCoIWZmcmD 2G7 err 2mo- m•mOCz7�* m1A my(n mODmDO Dm➢yzpZ-{-{ C0 D- ➢ ��D U)' Z1�z0D0�m DZmO➢70 NFOr1{Dr Novc27 vmim r� V1 C➢7Dm\O z2mOm0 m702ymCOr 2 mOm �m gZ Zzm z{yyo� m0D10 ZODrV)Mz OZAV)-mCm {o_ _-rn2mC �Z <7(nrOZO�� MOOD OZ M>rm0ZMrn n mama Om N� A ZO2O��(n�mlfrTlO��7o2 m7 U)m �mO�Omi 2 rrlZ� U)r�1�. {Zm) Z v<) Vl-2I O m0 Z Z- m rT7x -N �O Tl 00 CO ym>T,M AP DAP y �ODON 50 Ov�mm-cQ m N mDJrnCmn mrn D DnOD21m2z ��vQO n (Oj-ZIvOfV (/IN (n-{� Cl -�{rO o�;�70m m CVmDm➢r �mOZ�Z;C---I1oF�lmm DD mC) r QVfz�1� z N zmv-Z---II� ODm Dr<M m0 Nm- ODD{N��Oc'7D- QO mmC➢ gmtg -I Dycm_m �fTl 1�� �mOZ=tTl OmNn(On{rny2 Owz-N-i{�om 2cZZOm00m72fZnm2AAOo ODO 20--10.'1m1'Oo ra rZZ00➢D G2•)2z�mZ27° 1� GOmmAfZ*Irn (DnN�C 0 m7mOmNOOZKO�1C7 0OZG2.)� N �pWZO �� m mm0 O y0...1 Fm U)fT1N2 Vl Nmmm r�l ---IIm Z Z Z m7T1m0 2 OC -1 (<<ImD-1000�u7� O0 ym Z --IM M zMD m DQm OpGO (n m�m�m NONE rz�ZrNpOm OrQV1 ..'�yyZ�Z �Oo�ZmNmmDl�DCmc7.Zml mOlm0mzc� ��o OC(n D<;m2yv mFCmoNODn��m"T7rn�r�(nZ➢ ➢(C/1I��DD m7A��m0 ��mOA�O m �020 OCDnnD �� OMOOx- ZOO O (DOM.-0 r O r- G7 O M GO r�7 m m OHO m, m ZOym7Z�m(nm2 m.�Otvg<S mDZmj*DO 0mzfnCCmJO0amp5mm4:FOAn Chi➢GZ.7Z(gmnO yN O)7� 0➢mOOmOZODZOUlma(Zi)=mmJ mmD20{ fsT1-Dd{mD� 0V�..OnO mO00(mn�OC �(A�Of*1 OG) (--n--11 v oU1 Dmmm ZDD mM Dzz fT1c -OZ z f*1 R7 --I c2m(nOMMM(1n° wOzmOym�M vZZMM* Dmrrrlm(nMMZ�0 DO2 ZG7, 000 f* M(➢n � 2m-UDO*Z (-),�mj�mC'C�--<M,r-mam Ao➢ z-m{OZ DM VI f2*i zO DOS -<D� Ztmn27nm0Z -ZI0mmF 00 r�*Zmp2zpOrnp. Ommmrpzr, cm-nCNDrm Dz_ momc7mm�m� .D-„1m-'(A fmm›.0r0 cm<‹<x,-(07 0T0r1(m*ImxzSNyz2omQCmomt rn-0ErT, I v2(nmCmS ➢m7 mO0 DCmCymG7 00jmn r11 OD DU)z Dm1C 1 OO�j000M,K C)U0(-ITN 2oz (nZ10Cy--o�x _mom mM°-m+� �nlTl'*lm O D-DmOrf,Tl�mml�n(nmt�m�0 m120mz D➢��2� Z O< Orn� 2�OOmOfmT1 DvU7�� Nij (nr2momccm m QmZ-Z-I(ZjOCVI fn m O(/1 ODp rnZ Ofnm pzmC� Z C) OCDZV1 U) !!Ili FZr00zC27OF�0pmDm �m�ODWzm(n1 ,mmm An m-2Dmm!n<< mUImoZ ➢Zm Z m06J -4m 'm (J)my• Z=m7mA � D2OO2 NZ�m2mG2.7GOmOm (nO �Dm N0 ➢ DZm00A O O1-1-1 _C P m�DOm U • D O 2 -T1 r0> y2ZT.OmND--1 Z mJ -1 m--I 13 Z70--{{ M-� O FO Zm ^ f - TIY- m Qm UIZCOOmHcZAmDm0_2m1 Om2➢zm •Zm1M,0--IWDZ2,0rrommo rNrmvAcmmmm0o40v2OO2z.Zo-Mc U)�OOmO amm ml �D m1_m O O mD Z 0D NO Z 0 U! 1� 2-yy OZ ZC m 1 0G� m 5 0 mlO QmC { DC Om mi D m7 mr�r 2mm1 W mr O fmnZ m7 G7 gym I m1 Him'{ mo -rl0 N S OCZpO P SU7m O5,-20> O np Z N -� 10�m�mm2� _C C2v0Cr-7 0mm(n�7mN mr0(n-(200-zCODzwm zymmO -�,jjm=Dn0 m0006QC{{T m➢�1m2(0J1m m0--lymm ZmO2 CO >D0. D2lnD_ m MSC Dor-{-omp5 fm-i-c-�z00 m IpZmmCO�NWO m�m m Cl �mXr1r vam)0ONmZ,,,,o -z fTl➢�M 0 2�myCDom �l'7 ,1m7N10D�V)Z�mCmommojCDO NmO�Or Q00 z • K I-Om tnm gm z -{ 0 mmo m Elm N-pmzm➢ r�*rrnm°�' x o AM _m2_ m7 Zg(n0. m D F4r (:) (:, V)2- r10Nm1 m7 Nv) Rl� ! Om �Z• mm �mmU,^m O�NV ZNCm2 m (m!) '11(n vmD�� mrm�ilmOZ rD0 0mA 0 , MOD{-1mvm 0 MZTO m mm -cc Mmv 1M0 Pr m1N o NM cJ Z D ��O m p�v<z)• (nym Z 1tn ml UJrrm (27rm �� Z02m O U)mO mlo O. f*1 y1 fTl V) ZO vU) 0 m 1 rm � mZ Z7mm Z 0 OH <m rn 0 m 0 m _ v (n ^ m mr>0^Cmxmom 1D (01>CDm10 U) O Om1-W{ 01 OU) L- U)(-n--IoMrMm Cl Cl 00z>>'mmmDmxmDr ,4w>lzOmmm r�rcD, m Zml 0_0 ZO ODCZmmcm O T. r U) O w mJ m U)O r O D D O m 1 mJ .N.. WWNNN���-'Oa 1T m ^p l Z rn�20(n01 (n WO2➢ ZOZ U) V)� Z DD SO 01oWz 110 W OJ•P-030N0 ... m m 00 mm1C (Q( Z m Z m7 ('*7 ^OpQOmr mJ V) V) cO�O ,Z OMZr mo› z �.�mlr�mlO-{DO{MCm� Zr-2m*my mymQN2 vmm 0,-15M00-{,0000 ^m m2 NmmN^cmm0^ r^ AOAm^m-002roxA, ^ ro( DD,Orr Zm com ZiOmP1 CZzZ am N�VC) Z51Dmrl DC1,c7D�rlTpmm vr{m O-oOm,mzzmo._'m(On0 W mm.Oi.Zc7.Zml II rnll II II ZmI II t Orn�Omm D0Crm-<xIrmT M>*mJC➢m)Orn Fmmr o,Jc `.'M_z,-ZOOL(n mDmr m rO.ZDIZ�,��m�O�O Gm-7-j x--lIym ➢OD r➢Z*rmJOC- m> mC m rn m7 Y00� mlc_U)� UIOD mmm O m0„.„Tl� (TI ,mOO�mO�In� mpc m{ O ZmyyO DC(1j ZNO ZfTtmm mm OO�JOD mOm7mO z aorn(n�W ; Ofn�D(n r _ --11 _ O oom>Z Dim mpmZmrm Z Z m mm70 m,mv Z� mu), mD rD VOWOWi(ON NmrncnA r,07 2 Don mOD�z5D�Q�m DDOZ"A20"tnm`���2p��mN�ormCD {FiT2m`f7zOiU) -1 Or' me O�1g�10 vzrm rim ➢z Op 100D(mn <ZM M>M o2O(nO00000000V�0 O �� m -I 11OCm CC ODC mZ DZD COMM-➢OQ C 2Dmm-mW mlm_ mg y1Dr-(n O fOO->IC omm*Cmm -<rQz 0 mm y �m �D�_��7 1 �mACZ Z-Z{mDG Ozm2 2�x•T1Z m�C�AVDO �mOm=Zc �Omm�T3 mm Am Q�mO x'TOmo(1)Np OmzOzgO rx0m0 FMr1 r3. rn ZcJm-➢---I1nd N m -'[m)m7C Tm Omcn m.ZQl II Zy2�m�2�mmm��� W�mC l vtn�m��m5z m2vD���1 mmoaNZm-11 -IAmO➢ m-17JOmz TrTI(�Do(7SN-y-I�m mmmmm mm• C� mcm _ xZm - mmm ymmmnv0_0 z=y,-PD mny(n1,�.N< mWM1Q0mm ,m on, V)=m ZO mT I dONO DZ, 2Dm r m mD ml ZU)O C Or m7 •- 0O 2)-4 Q yMOC T7D NZD H(On c(n02m mp OM �Am1C� mZV) V)G V V)N� yr-1m7N *OND21�m OZm m-V) Om7-0-I0m I Dmoil ➢ m.-.ZZZ D ,, °O MOmMO-IMO >-{ CMM> wEr (n Zv 0(n D�� mm(n�OD 02 �C7 rn73 OOC m101MT QOZFmm Mc-Im mm�M rn�➢D➢ O r lm mm OO1F➢� ��mDo mnDm Zvmimm�v�Joom _ NNw 2D oh-Cm �� OmrCC px DCWr�m(�i121?mmDO mO{{DoAymmm N>OC O{O�pmC(n OC OM__, 0m0v 0v00x IOC71CZ>S�(�*POl*3Crn oZm2,m �`,,d gm �-__0 ZD NOOOO�W(mD(OD�000 �Zm �Om D� v,fmTlmr7� ZOmDC mmm OMm0 D2mn T�2 U-1 �Z�m �QOfl0mlr• Ov Om0mc7om� 2m0mr t Z(1i7 f%OTl m r>0� 2OZ 0mzMc m m0rZ Ow, 0 Z zm r0 ➢0,zo 0m0mm m-m 53T,orn ON VO:ON F-l-1 c m Zm�mD- mZ (n V)m m �� 001CDZ ��CD)ZZA�ZOj<D<(n< O Ozm C1 O 0 0- - ml-r , 1mo mJ m] D fn U) v D O z'A Nml- DfO'7ml(11(�,7 fT1m,f*IZm M22N Zo(N71�mmu) m� mG7N CW m�oAo �C00 mmA C mD =A1Xm �m 100D { m-TII1 < O O<-) 0 -4 y� r� (nr -iDNf*1 Z12mm<i7_ U) �m �� (7 Nm Om G7O0 �.�m {mmZ mm..' OO 1 UIU)D(T7m-�C) my mo O ZOyT1m �D2omy0➢�OZ O oWm z(npM mZe y m�D m�rZ Sm7TJN _ O DDOoO mJ2� U)O�rmr 2 WO z< p ZV7 0 2DNmr _0 D D, �m� Zm1 T` m7 U1�JW0• U)m r-mZ m MmO_ m mm..'m m{fTl(n (DOOM �Z� O 0- ZWmO z y�->r1 NO mZ pZyr-p�U10Dmm7�m m T] m o OHO m_Im7NN��-`V(T(,1N�0 r� O 1m lnN m Dmr (�TOQZG) rnZ _D D O)W�W()(00 Tr7z� r m_m(n• 1 m 1m� V)z m U)rNZC`-' Zmmm �_ { v D 0 _-DF1vN m e CCmmzm0D •--� z r, m > m7 (�Qg Ohm ➢C G) 020ow4101�tOA1 VN(T O mli m m2m 0 rn0 Cv_ _ C -{ mml Vlm NZ DmrnMom 1 ➢com10 2i-.i m cc Dmr 2 �m <m�➢m N�UO)OJVWNtG�0u1 ��m ZOO m G7Z O ON-0N Z11 DrD� 2. Dm�CmQ 1�7 my m1 0 O rUICZXO ��Nfr�1A m0 m yCmm0---I1Or (? �(ny �2mfn MO OM m7 m07 G)m, m Oy C OU1m7O y mJOm m7O� r 0 (nz u)M y< rn m➢mN0V1M OOi Wx 1ymz� DZOm mp O 0 mCC O w IPD or 1 D IT� 2:OOp m <7 Zm DOG7 Omtn O CZ U7 91 Om�m Om 0 DD m �2z Z �m(mn M , tNM� AZO mN rno rmn U) ZZ�rr1c�Dg ,-.<-. mDZ2 ON PUf0412Ommlmm C m7 ml Z OUI v r 1O'< UI(mn.... 0 2VI U) m7N 2yT7m m 4* d C70 C O>zD ���m� N o om07=mDmO �CO U) mO mo Z rr2O 2 r�* O 0 �m ,� m U) Om0 m1� m �-0 Z 1mrW m�ONOr m m� I00<mmO o0 „rill20 {y m 0 !*7 1 m .Ni,dm pits,70 1 0 0 rrri�m { m0 mZmm Cl mmm Pj m v m Cl rn amOD^^mt D 0>w^m^ m-M� mDFOv m-m o •i0 ,< >0Om O m D Z r n m VI,r m O 2 Z� m m 2 N 2 m y m m OD D - f v DDN �mm-{ �O---I1 {vpO�Zymp m:L1�<mo �<�rD ZDlj�mml OZm7Arm"'0 ➢Q0D O r��y�mfTlmapm apmzFrmz,r mm7m R1 y2 OC7p O_. m yo � 0mmm7'O�ZmI V)mm Om�Zm^O rnDSmmD^rmZ^COmU1D Cz0 Gr I U)� VISA{ r- 2 m mm m O Nm7 V7Q -mI mvx m1- r m Om- m D I O1CO2DZm(mn.-Imo- O n2m OO U) ZO mCjlprm00DD aV -.5(Tlrmmm— 2mo Omlmmx mr mmrmr102 m a...'_m y 02v N >,WM0r- cr ZMM MOM^v-= ,(n^mD^Z^v 0^�D^OOKm000KW^AZ*WDWO^�v2 cQ WZ onrm ,T-0 ZO m N 0 ZVI O��O--I11m 00 Z� -I� G7 V1 O 2-➢C -{ {{ (nmD---I1 { x➢ c(+72C0D ,00m,-., Fn r mAFm (nm Z m D y Z-C--{ _?1� CO O O O�r ml' DO r cn m O`-'2 m7C OO m Dm.00mly=m(n..'mJ� m<m1=c.vm m�zm=D020mmmym-m>O1 D- ml OV! ln�mx m1m➢ O-�0m7m DCZ OfmTlrm7 O m7rm-1 m7 Ozm my D �z y(n m� m D O { mJ Z m mmm-' mD m`-' C-i mv_f Dm(n➢v2 mOO1 --IIDDmy O-1 <<m r r- MM, W Om m ,-0m)4 mlr Wm rnozO(nmO� m>ZD{vrmD2DoD mrv� 01DDO c m 2 DMA 0rrn OD2iry mi IT10<Gm U10 A00➢rnA00 fTl�cm U)0 1�' ZOmm700-27>0 0�0A 7-COm nmZ��1m AZ mAs"7 ➢rn nn m2omD Dy mDA ArAriOr mp(nrm)��mOl�m QNommm➢A mr mmO.omo D O Dr�* -mmO AfnO m010 m mNz1 mt x m { -1 m T OW2 mJ�m D A��o�_ mmm �Z Arn mr7 r z mmm �0 O fT1m m V)1 m �m N •----�I m v D -1 r O r-r O Z o A(n m z- m D 1 m m.p y 0 mm01ZD OmrO OAmZD-,O<V) m.,c0 ?7 ml m'-.Z OD� N�V)Dmm)��fr1 DQ O V)m yf*1D(*10r�r"�z ao- m-D D' 027 m_ z _ �0 0 y 2Drrl N m7=�� �ml rZ.'iml�-IN{ C r-I m➢ O rz-1 CV Zm7m ZZl�v�m�2 1AD OZ OZ1m0-O A� ITlzmp rC7� r�pyVl ml0 O�mZn mO� mDGD7m m0'7N Nxm mrc�ir �zA z➢=mc�7 2 CV) D Fn(n Q rM-'''MOr Cm N 0QVO<p D m➢-'*100 z-n �- ➢ U)O vN m0007 m700xZ 2fTi r- 0 rnrl.lr 1 m m O0D ZOo N-1OU1D m.Tm7r�Z�C;Dm�NV1 2m0v(n{Z U)m OQmzfA*<m-I DC mom- Om.Zm1m grm(�rAm Or,Y0p0czzmlomNm0mN r2F-Qmp(i1AG7�crArl(imm A02x rx200cmx -1 VI l'1 > 1ZQm ,qr ODO Z rnom 7Om➢O-C O Z m pV1 m m-{ D ➢ND Ommmz OOm M 3{ 3 7r,m—M=07nNVmv >M➢ mOONm „MrDr� 1D{ mN Cr �m7ZZ(n(n_OZ mm1 mm- mD...'Z• O� zrmxZmm-C20N0DM➢ZCHNNDr mrm--•rm�vAi2D mm 2 y 2 m)z 2 D m- Z r r 2DO --112m7m7Dmr-p20m71 mJ m' IDtn Zv m-�➢�1 a1 0 C7� 0 z r Z� 21T01Z� 0' yp0 �Dm-�1 <<mO OD��C73Z0 Om Orm OmrOm7m DAO�OI�*OZD'Pm0-{ O�r' YD20 �p� 2v y=Zmp Oc�D� nCJ) 013r�0 co mom v,O0O m>ow=m� CO O �v �Mvm7m pOmc Dm yNzmm DOxf0 m.'6At XA0Dm1mTOfr*1 Z� �O Fmr1�RDmN�Om V)xZZZ�0O0xrr1 D m�c 1 102 (n AOorn 1-,mm Dm Z(7m00 mm10 ZZm m1 m] m0 G7r O o AO TN fvn?(nmAr 3; ml- m�Arm2 2om0� O(rTlm�:0�0 OOm QDOfN�* 0x� 0mm,ror> 5mm m�'72D0y m 2z, fOr11nC ,0N{Oox mm m .G7r Nmm07<D Ohm • .„zrmOC2Z20 V)Z(nZOOU) V)Z O<-)AVZOCDr C0Am2 OoT mMZ �Z2 Ocx ZDC r mJO m2O]mO➢N-I��SrO m(�n2 mOj��mm mnZ mm O(n Z-m.1 'Tl 0-I m Zrf*1 r1 HF o m)yomo Mo '- 1 my mm�zOm10X mD_x `L m1mD mm mfmn2 BMW rot m r rm m1{{ mm m7 D1 C7 Z0?m mmC'Ac>>DC Mr m (cn m-O{nz N(➢nm moY1mOV1 m mc) m > Or yO 1 1?7 c 1 m)y m0 ��x v O Dry* O m fTl mf'•10� OS r 1 202 m mC70 O m, r < 2RmO m1zmD D/ 10(n In -{ fl << �r� m7➢D �m oQ mp mm m7 2-I N fTl_7 m1DD v 0�f*1 mOZ MMLO• o m>>or--1 r>11 miTmo AVD M fx7 m>m Zrr > MAmm mkt AU) m C DCC m gCZ 1mDZmZmyoc(n� Qnm�CDy(pm �D �o� 2nD�Z 20D�U1 rm Zm�(�* p � ➢ITIm, N -OM MO 1 CDOM��D AT1 :(1OMO> 0m7 rn m 1OZ ➢� c D�mfnOQ� ➢Z > m m� 2 pDN mmmjmDm01O!`1rZm m7AZOA�9Z Mm mOZAP m02 MmmZD (DiIp � Z2� �°m1�m 2�� 1C mcJy��O pNC7 m mN v rnZ m7000 T. rA�NNOm m D m�70 H C mm�r ±O>Z zrn*m-mm0 O� om7DDZm ��;m r1rn�m m 0 'IT] p0M VI DOO mIZ m O O o 9J-c-I0 m' rn m z z mx�m Mg A,= O m• O Z A 2 O N O O K m 1 , z r M D A m 0 r O cy m m r9 2 0 m7 G _U1-H {O M M O t N 55, O x>F 1 v m,r0 >N 2 w m . -Di0 m 0 CDr > r m 0 Zr- oV1)m) O y 0 12 AA V) yr 0 0 o vm 1 vA� Zml Omm DN CmZ A 0 mm -< 1 Z O v m m 01 UI W N CO-`-‘Z OC mJ- ZmlmO N<7 O CCWC ZUfO DCDVIm0m2D2OODm0 2 m O O 0 O Z 0 m O 0 Z m 2 F COOD mo m< mmONCO MO U) (r= ONO mm1m1M (AO Srr*my(n _OZ mZ mcOc rmZ m<<1zm�5(nDy-1m7mDZm�m ammr�* Wc2) �mm<Z�<➢jDD AD OM -<-xN m r*1mZOlOcmm��m�2o� -<20m � O�V)C Orm 0� f`r1-O'1 s�DZ ZC-Of .� (n��VCIOOOmy2O0DZm y�2 Dv�mv Mz omK 10«(7 c-^m m� .O D C O "U r' �., DAD DO D0 mmm m2 <-7A Oymm 2 mU)0100m5mrmDr O2v0 U)A Zr z>Av OWv 2v Cn`J0 1 m7 z z O- z v 1 Z Z m- r D U) C 1 -I nn nD n n O m� c Or -< 0m7�m7m] mm, D' O z m-m m C C C2 m1 m ON Z O < ..{{ r Z U) vz olmm { 2) (7OO c DOrn c DCD O CD�D 2mCD o1v)�z 00 0 orlr oX n � -1001- 11 D OM Dmc r2 ZmZm21 mAyp mOOZ_o9; C�AOOS �1�i7��� Am yr� -I r- m ;m0 'z3�1 Z 'Za Zc O i--i ,r_1 d C71 2 O mm- mvZ cVl �D mvo O o _ m- y {A 001m mm Q_mm W 0 9ny zaw > >r- rr-, :, z .-ir F --7I m C7 m or A0 OUI- • O z --i{Zm(..)D Om (nz=C 2m-1 O cros��`U)U)I mmJ -i -i0 �� -im �'�iTiZ C77�-i �' mOAm O �('70m m\Um70 or mxDm minim OZVIDVIOV)f*1Nm <ODO M02m mm pii Z ,, "i 0 Z[) DZZN mf/1 mG')�Z Z S D <jC7D �vr0C0 tnCAUJ=o <Z omc7 5- - az {orr mo v m]- 7OOc � m m ar m0 .zn C� n Ct'1 so C7 000 ➢O o Omm 2 Om• m mJm7 OZ DOr1T O—1 m) O Er Zm- Pi!tm:;;;!0: Zm1OSz D m�D VI VI ➢m m)mOlyO m2 m� C o-t Z O O 0 (") n ."d c o V)mm)go nil co2v0 Z0D 910 9m m0(T12 O Ny Op m m C �OD• 1➢�•�-I 3O igo �y Z�Z Q � C7 �,C7 C� O '-� mvZ �D {ocm 0m�-Dir 01 xz o Ocnx ONO � 1rN Tmi1 DD(�yOm -'0 Ni F Qzz 3 r0 �•1 (,/) O n 'O /� O �v�D (nZ mJm DO (mn mJD Zy W �rN Z OZz'� OG7c 0m • zz z �� n r C� ~'tin °t�r �' rri 1.�I v om-A� r G z o< m �nm 02V) �0- m .��•.-.�11 V CC- 2 m z- mJZ O(n mr (� r 2D!mm <�%UZI+lCT7 '-< NDD� �� ym0<yf*1{V)mm0 O(.,, DAmmU)1rr--10p�' - � m-Ni ql G7 !Ii!41 fTi r�mm<<mmDDi6q ��p c� OMm00 NN mAZzmZ DZOrD C2O3rD� D'n?O��rOOCm1ZD10A:z t,C7 a°Oc yamn�mMvU) rM EU) mOm {- D ep� Zm �OmO rO cn �• OZO 00r�rQO ;Dm) fnGZj 0o;pm Vlomm�Zo-m0{(mjFOa1OG<NZom2 �Nv '� "rJ r-� D • � cADv • z' �mC��{ -1Of*1WO :m: r m m 0 �1m� O 2 ,0 1� ,o Z• H Y r A O2m v!m (7 m rn UI �m7 Q O_U)(TtD�tnm �V) mxC DYYYY O ni ➢ m m1 C �- O v mmT x D n xJ Z mAr cz�A m zm m� m1.z - D0O�D1ZZZyZZ^m ,� ov zxw 'U (n �m 0>m7vo mm mrZ C(n v_ mm U)- 00- D O m 1� �O O al OD D rU)➢U)�1A Z Km MOG� 1 mOA - �m AZ Om10 m �)P4• w 2 -{xO2 mQ VI v)c OD ZOm_10mDr-XDw� m KO 291 _Z0 zm�] Oo � ..' {y010r J,Aj mn• OZ1D�p Om7-rnZ`-'0 Omxmm ➢- mm 0$ r m M� Z- oQ Or-r,�r- (n� -O vv CA DM O0-Z m Z rn V)m 0-1 N r m7 r m 0 m)Q -{ Z m r- D Z Z D rn O Dm2 2D m O v7D�{ !n ZO o mI?ZZ ZO -<• N m <VI m(2/1 Dr...., m D Z{O 2 r m 0 m 0 2 z D z m : M MO m O C 2 r 0 ➢r m e r Oz0 r (n c) F Om rQ1 mlO Av 0 1�1 mm y(0J) v m V)Z V) DATE: DECEMBER 2019 `"Till 2019 KimIey >Horn DESIGN: SRM LAKE CREEK 10& 11 o, F�No. 28 c) Ki DRAWN; AMJ ) .••..:* 2600 Vb Fortuna,Terrace I.Suite 300,Austin Cl.78746 P:812-646-2237 GENERAL NOTES II y WASTEWATER SEAN MASON No. Revision 6y Dote CHECKED: ROUND ROCKTEXA_ /b: 110102 �.. NI'l KHA NO.: 063895109 IMPROVEMENTS /4:\��110102c)...:=r ,ftf1S l 1:..�?C -'P ,N3lt+N SS.2i„ C•�.��5N3j/1,., 0 S,LNRIAIRAOIMIAII 601568£90 ,ON 11HN M am] Ag uOlslnaa 'DN ice: ZOLOLI :o SVX31>I002H(winos inOAVi :03)iO3H0 W • L£ZZ-909-ZISd 9►LBL'XL 47o^Y'DOC oil^S'I roo...l'^urt.Poj W1 D09Z r.NOSVW NV35 r ')(�) T VVMT S!�'TM7�]�7 �f / �, T 1O_T�,TO^ T^��O_T T rwv :NMvaa BZB-j'oN"' r' •r"' T T `d O 1-llH�Q�MI VI 1 N V/ l,Jl Ill J ILJ C�Jl loll C... �i 'ay:= L I NHS N91S30 UJO <<<An WI �4�1 jo�':A: I 2O,ZL 6WOZ 83E113330 :31v0 • sloz/tio�zl / 0 +o -../ co N / �0.8 -- ` / 6Z 8 Z O I 0. U ❑ ,U,^ �l�tp ��(O MO^ N�I� O�d'N N�� ��� NOO O>M� Q ®: VI OjNO) i+j'';N 00[O '..� rOh ^-.M tO�r, aNN 'nM F O W nN6 N.06 om6 ,n�o; ui SON ..6 N ria tea„3 W CL z` O ,.. ... O.N ,. ... NNMN NONM Mvto, onNN W K_N.N-n d'No^ WO, �N�n �tn�^ ViAMN UNMN Ud'MN)� U'�tMN L U I— VOM> Os,> VO�> VOM> VO�> �O2> wO.-> mo.-> wO W FBI / BMW -nW i •-MW ",,W -Mw -nw a MW -,..,LA i Z YX'zww �?R^zww 'Ozww vk^zww *zww vk°zww v�}-°zww v�zww °zww tl) O 8 / a I I I I I I I I !1 N N 4b�1ls-_j o : a 4. 0s \ re Z 1 U U U U U U U U U 0 o + 0 N \ p \ O + Ol J. MATCHLINL 0 0 is 8 N ! \ ,)•• ( \,.• 1" .,• +\ -.___.......> '*( '1' 8 4'.4!. P'16°. �i9 \� \ • C.) QO..) E-1 it + U W w ,r: , N S \ W a U � = z Ln x v� mN �i I ❑ , r \ '8 ----I F \ MATCHLINE..1 I-- ' n / 8 7 MATCHLINE I I — — a U O' 7.. . P}} ,r.__ __ _________ •t \. / ______I =t___________e____ ,,r) .... \,0 0 vi , r ip V i V 4 SPGEO — [-1 I^� O \ O -.7----;_(_____I W o \ W - - -� 0 o 0 r--- i -� _ 1_ Et a 0- I..- ve — 0 N r W W W 18L w ce re o \ W oo+l 1 oo+c W -I OVOH ONISSO230 SH31S3H Q —IJ 0 o— wN 0 Lai I-WN Z_ W Z JO H0.1:101'1 N0 H�`yON 'II '414 1 'Y° 0 . 0 Yid SL:£610Z/P/Zl 6MP1OLLLNOD 1D3r021d\B7•o4S\OIIYD\Ll V DL'1 -0 olol LR!-6OLS6@C90\riM nrs\,N K:\SAU_WR\063895109-RR lace Creek 10&11\CADD\Shasta\EXISTING WW LINES AND BYPASS.dwg 12/4/2019 3:15 PM loompriiiiiiiiiitgiliiiiillirml,„ !G/�16YF/ rr11 � k, p��ZODO�zDmn� �v -�-IXCp�m �� +i `. \1111111ik *>*zoO Z � x p4m m� DV1�Z0�.l�I�n 111 xOtnOo� NOS rn m ZOTt �N O��tn�yistadsimilivQ�JJ11� �' - rM*mzb :Bo o'nr- oN +GZ)0MtoW o�mhA rn rnm*1 m m �mO ) � o*�gtn� w 610509 illi ir4p..-. Hi ilia ci O 11110111111110' 1 D-. 6 53OD�v Ira -ININIFIT.p p ��-x� �,rn W.f. D o, vier -,1 W Z Z nvO O 111111111 or • o I:: ro timporilar .... . co m m to coE CD 1431 oe W W. IP .7 iiiiiiii Ilirdpk _ O " I WW iiin II AD Idlailmilriti , 0 O - 'Oa \,...,.. O .. Air "..„. i 1.00•:it 0 ,_ _. 1--1 i' ila r .,' li W, 1 .(... . 3030� w 438201 00 ,, •**' �'M o _6 ;\Q 'A co 1 1430298 i ,� --.01 32141 \ 00al oWo % b 161053 00 i w 1 co 0 W w_ w 438194 , - § a, Ar ØØ ' y' T, W co p dil , Iti N o co O _, W N co P • el W Co +. 4, ': 1431201 co, aD (c)(0, wo -`oo ® N co W W • O • ( 11111111 N(�� .J d) r 1111111111111111 IIIW - CO CD N CD N 4 _. - N a.1,38190 4, - w N 437227 s cNn W �.Iv 1 3 Ill •. CO CO '1 • w\611479 w N N CO • A O W ii i'll. o "`:. Illp 1611481 O � .a,▪,, w\ u � \ u N i.., —, a 1611482 t,>i�:_ � o co ®/�w .. 1437237 111111111 ' r rn OD .o_ W s+ x + I< � rn �� � + yxI. * � 'J .A, i � 4\ - o 437239 4.. ,-,, jfii,*a, alir, N a,. 0 , ," 3 508 rn 1 i,*kI ..z ... p 111111 . 37241 4 cn 4, r\Oil 0.,: w N N w.r4,,,' .iiii, ...v.t „.•# ,.• 44 - ' 1437242 00 ~ 1 kR« DATE: DECEMBER 2019 `"`f 11/2019 Kim e >>>H o r n DESIGN: SRM �4"'��.�F.TF 14 LAKE CREEK 10& 11 =1.?.. •' ,'Ill �,F-928 1 `£ DRAWN: AMJ EXISTING WASTEWA 1'�,R :.: :.. 26�0,i Fake,Terrace I,Sults 300,Auath TX,78746 P:512-646-2237 LINES AND BYPASS WASTEWATER SEAN MASON No. Revision CHECKED: ROUND RO[KTEXAS 0-o: 110102 1� By Date KHA NO.: 063895109 IMPROVEMENTS ,���F /CEtJSF���� SSeG �3l`VN SS�,I „ 0%�SN3,jj)•.,,o,0 SINHIAIRA02IdIAII 601S6B£90 ,ON VHN a}o0 .(8 u0ls!Aaa -ON ice: Z010ll ;a.� SVX31)IJOHONf1O1i I JNI'I :03)103H0 W NOSVVI NV3S . liaL AkaLSVM U LCZZ-9Y9-ZIS:d 9fL9L'XL LIMY'OOC•NIBS'1•.1L•1' 4,0j•IA 009Z 1-' MM OZ xaaup mIvZ rim/ :NMVaO BZB-j',IN w'� �r• r.�. U J O (< AIWiN I1�i41)�o�i'•`� ZZ OZ�I �2I� I�'"I�O,""` 6LOZ a38w3030 :31V0 r 6lOZ/170/Z l 0 ,m w w w z Milk 1 N U =0 aN Q w in+�'dl NI1H dW I N. ^ ^ n n tO 0 S 3 �1 2 i + p9 0 • • I 1 ct fIfI / 2I>N� _ .I ... ...- ... .... _. . _ Ou) I I c j x�� I a' OV t) i. (N)11 lO :I� .,Z l . 1 +�' o> 1 /Lk 0 9£'l8L _(3) NI..1J, 8 n \ 1 rt m> m o I o ® 96'0SL. (S) NI 7J Z l I ,—_,[1Fm /j `�- -' I ha" .i. 96ZL+9 Vi5 \ I cn0-?3E // lu..m • 1 - / / 1 F_. a r xw i /i o' /1 / N.--a �0 •r /mo- t— mOd 11 /¢ / 1 I o0..m Mew® 11 ram,- �N^o„l �I I wit �/ azo°'Q_ I1 n I co- _o - w. -�` rix��nl \ gI1 /�/ w�• o� 11 \� 1 ma�j -6'fitiL (N)ino 1J„ZL �JmJ 'S11 = IX l nk'm O• OS 6tiL (S))NNI-1J' 9 1�`� Jowl 0�am 11 1 I �xQ Zloo 1 � cAm3E 1 1 111 ioan EL oax=a / , ill t� oo3m SL'S6tS :V1S� 1 1 • 11'mli.-.pom'i in /. .. = I 1 .�xvwNco 1 49`trbL' (N)1f10 -1..'„Zl 1 i ',W J N 2 /II 1 I 9S'9-fL =-(3),NI--IA:„9 U W 1 1 +�`' im�� iii 1 pz� I o� o� /Ia, F __ z w w P 1 m z z w _ �'' - I: £'L5t WIN -- V s v w x -o0ce, IL-- jiw � !� - \\ \ .i.,,, . Fi 58z"`4 m x CL II 1 JaOM 'Y /I\ m=,rnz \ Uza o I I I I z,,e �. 1 wp \ , 14- b. O< 1 z J w W 4:II I ¢ aZ 1 1 et,., omo3 •�s /1 w r j �Z II I �oo� /I 1�3 CLa N3 : \\ aJper¢ J w3aw / >r1.i� tL:= Na01 Wa } \ m I aop0¢�Qa II )Iz �� \ W-0<pEE/ poiI111 N� Z\ �N� 00 • 'FL �Xaxo �xaI � -- 1 _ H �\ 0.g¢.:z �+W Uw3w1- cDw3 1 - o a_ \ Y N W LL I »Q \\ L�,-- n �1-0 c9 I c�aM \\ wz \ z N X Z I Wz(0NW \\ Fw: UW -\ 030] W W i ou9 FEU \\\ 1g �Z II 0^3 \\\ LU :!: / \\ J o i - - II \I o� _� \\ 0 1 t�awo }%n O d'W-(O y 0 atr. U' "_..I • H. • z OW r7 l LNI,Im- r N J m to ! 11+�+ W :., ._,_{il ............- .�. a VI.R.N:Z Q.. .:... �� o z o��m ' I Qv~i1-�n �_y �N3:m� £Z'Zt:L (�N).1f10 13 „Zl. > �� ¢p w -' mo<>— to_ 3zl;i Q _ -" £Z'ZtiL (8) NI lJ „Zl 1 `J` LI 1 v'd L� �= uJi w 1 I I O6'b£tZ :V1IS 0 . N: . R zz.z. 0-0 1 I 1 l� Imo' SP`c'� \\ _ M r ��o xaxo o w3 J y / I• �RpP�ppV1NG�/� ; S'lbt - (IN)1(10 1J „St+ 0 o w w / 1 11 l p p,SPN / , SL".ltrL=_(MS) NI`]J „Z l C4 1 11/ tV (0....„------c o ; , 69'Zt+L = (M)'NI 1J „9 1!l f-., 5,,�� ' " I I O 'S5L Wla 2 '►hit 1 , r` ° 1 �o ..., J //- 1 1 i ----------• OwFF l l J ¢ irj >o Zmw zW �\. e-s• __ocnmo 1 I I I 11: a 0� N' on F > �1w pmoQ R 11 zm ++oc0m �o�o Nr `\ 1 ��a� I 1 fir, 11 a Wa avpo ww� � • o0 �wr- I I I -g (1 .-- 3 ••J= o�zm {I ' j it k' N¢m..,;\ ~ \ �w \ ▪`° + zpcoix I ' 1 a Z-z \ La0 Fo _.wrN i. • � .a� I ..m 3 NH I JN �� I I -3 Fz viz m.c,�� \ n NaF LS'ObL m J �' s' ¢§ W cn o-o , 'n mU-. _ (3(S)nNI-IA Sl �.-� Vn �.UQ I I U..n Q OS'9tiL'=-wIa �.r- - -- I m p1 ---.. �.a W= Q k1�4\ w 89'L9+0 :V1S N Nr')3�V 1 I r 1-m W0W 1-^ ....,�'nQW� •.1¢-z1_...\\ .... 0. Q.� .-.. ... n- OnM ill NW 0ZQW.- i� (n tl (nO3 UO�m u»Un^ w, JFc�x ' zw, o ;Li' ,z \- U o+ N 'II�• _ oIn mo o O } _o y _ SS'6£L = (3N)1f10 lJ ,.81 id �m cnQom� I y1 ,..� m -l+wxo�z m 11)0 �l SO`OtiG (MS)'NI lJ ..BI J 1-• z I ,- o w 3 Q _ 6L'6£L = (M) NI 1J „St p f U HO 7 W I 1 " i 8;, - 3 ti ram ,Uz omzw N lyw ��,,�" 1M o=H-m^e-rn »a o ace c6iz.7 -1*..,. , 'a�1- _ ouzoonn 0a� mopJ ?�,��� z<n_ �4 } it + •WCt I no'. zc0, p 2', �z Li CoiU� .. 11,.i3 I / 1 °WN1-3allon acjr ��pm >�oo _ ._- - • • • µ1'a I ¢o�?wr,r� 003 iQc0 � Wa-rin' '� L' �i I cn�pomor) pmw x m 0 z • in N I ‹z m. W N In o In o In o In 0U �� �` �/ Z�QoZI or^3 ,1 N n n h N N N 1 s ? 1-1-� 0 Q cc 1 I I c�o 0 a r----- zww 1/' : >3� n �� ... . wov z:F6 I 0O • IJ1> M `v � OW1ytP1 II UGC V\N G) .. /� } iz // 11 ��I�I VPSP fY 3 I 1 M "II I �°b w zo F., k-`' 1� I. SS/�� / `1 111� \ \\ o� �: ,k Y W w m o w pd p .id �. \ \\\ \ N i oo <>.-io �' ¢w W ww rxor \ z 'So ' �°�u w \ \ d m \i o 0 rn orn \ i �<'W •3 0� \\ \ K 0 �0 0 1=0 01 Zwa nth' \\ \ U 0 c�R zo p O� 1 oz \\\ tl,ic7,c.72 \ \ \ \ c N> Xm 0> ti' \ \ \ \ / of RP wn o 1-}\,. :. U F- o Q OZzo (Lin oO, W D _ID w O N 16 4 z Yid SIC 610Z/i/Zl 6MP-V 3Nil MM 01 X3353 3)IY1\sl•,4S\OOVO\I1 V 01 IM•ro•nol ss-601569590\0M nvs\:N K:\SAU-WR\063895109-RR Lake Creek 10&11\CA00\Sheets\LAKE CREEK 10 WW UNE A.dwg 12/4/2019 3:15 PM EsTA•7+5° \ r- +0 0 o ccn o 01 0 MATCHI-IN \ o lL 0 I *oX A y 1- I. _._t o __I n1 oA o c o -o\ Q p \' • . . . � 1 I, \\� Z N OW oQIR "" C' ill qL A COZI • fl • \ r �lN.,t� I — c1 rn \ 1 rn rna2� I oLx-il-n - \\ \ r,o°ro • CO-I • I Z \\ \ �\ moF<� \..,..2,1\-- ,\ ' -4x to ®rn• oo \ ro \\ O \ rno�-1�. E � .. ��'\, \ ':} \ mKKm 0D \ ; L T1 m /�� \\ O \ mcn.x o� \ \ STA: 9+36.81 1 1 w �..� o z v \\\ .-/ RIM =.763.64. _ 1 ' -i a; _j • m o \\�. \ \ 12"FL IN (S) = 754.34 I; r� t" -i n \ \ 6" FL IN•(E) = 754.54 I A•N cn D m y m m x C 12 FL OUT(N) 754 08 i- • z N' v 0 iii \\\` \ _ m / `dmco�1 \ a�<n /� z m \ <- ....-.. ......,,, \ _�xo' r o \ z % \\ \ /� _.._ / : +.- §o mm�vo \\ i > cn --- m'O yNorno P m \ • \ ; i -\ -. cn m \\ Ile"'/\''. QQ \ STA: 10+68.42 ,, r oo:mNC -.om / P \_ \\\ RIM 765.56 L- + m1D \ \ 10" FL IN.(S).=__756.17 ' ! :_ ...... ......: m��icgtn /p / \ a".' 8" FL IN (E);= 756.21 1'sa' m =.8"-FL IN (W) = 756.16 ' , m c ` / aS$ \O 4\ 0 12"FL OUT(N) = 755.88 // p � O aye • ,---- . \ \ , \ \ 0 0 (11 O Cll O (T O \ \\\ x N \ \\\ z \ // mJ \\\ / xA \ . 2 ..,- v.-, m N \ \ / / \ ,* e VrH \ .-- .„ 0 20 a N 0. tw 0 m NpRTH z m m m oo� 0 DATE: DECEMBER 2019 `"\,;4/2019 Ki m l e >>>H o r n DESIGN: SRM +,;:C �F.TFIII LAKE CREEK 10&11 =;;P'' '":I'�, Fw,,�,F-92B (11) DRAWN:141 AMJ LAKE CREEK 10 WW .: � 2600 Via Fortuna,Tertoce I,Suite 300,Aualin TX,767l6 P:512-646-2237 WAS'1'hWA'1'hR � :EANs.11;Mt.4.10:27...i..„:„.c,....\+...:471:11.! LINE IINo. Revision 6y Date CHECKED: ROUND ROCKTEXAS /-a:N IMPROVEMENTS / 4KHA NO.: 063895109I F '19 .:�D� • s�ij 60LS68£90 :'ON `dHN ?;� N▪3jj�,•d o S.LI�Igwan02IdLATI M plop Ae uolsiA9N •ON �z. zolott •..o-e, SVX31NJO8 ONfl02i I INI'-I Mrn :03NO3HO LT, \ / L£ZZ-9Y9-ZIG.:19►LIM la Mlsmr'DOC.11c5'I o..++ol' 3 W1 009Z ..:Nosvw NY3S 2T�T,�'LY�"d.T,S�d�1c1 f , x���� ���,I rwv :NMvap L Li) ��O ii(��AN � �' ii�N if� „ d'�` TT 0T�IHH2ID IV"I _waS :N0iS30 �70,Z L 61.0Z a38w3030 :31yp ■ sloz/to1zl 0 1-00 w w z y'I&ON La ` 0* =0 EL 09+0I. b'1S 3NI1H3IVW 00 05+O1•'d1S 3N�H�1t�W `n o 0 0 0 0 M N N .- m m 1 m m m m + • 1 Q- o I •I ® _Q W�s.. 1 99.9L8. :(d1N).1n0 1J „ZL Y ~-a CS I 1 . 8L 9l8 :(3S)NI•Li .,Z L Q 1 I oo �'ozaarn3 I Z I m �1�y��WND (Z01 8 :wia 0 6'9l8 rI $:I ' <N vU a i j" _ lL'90+0l :V1S + W I `�� s o rrnn 7 Q I i na4 1&-IFxl toL `; afM xzom Z Z I I o 1.i' O+m m D w O O .,...-.- _...Z.J _ _ ...- O I . I 1/)Z N / It 1 bxw':: WN x3 %II, m w CO . R_t w •, 1 ' 1 a \I„I r 14%.'" I' ---•-____ ---_.... o Ca \J I I• t.' �� 0 a Q• ^ cam ` ``�•.... I I/70:m U �` 1 NaLiJw •• ul L.f •� �' N F a • • / I . 1-a3a t�m = L 1 1, \, `� wa- razr,' / \ Z- u, U F V U F Q Z Q / /.../ 1 U O o x F o / / 1 0 80-918 :(MN)'1f10 l3 ZL 00 rn N w a i ~oc / / I £9`lZS :(S NI 1J„� mw ,- U b ww�a cD w o / / 1 ZL9,18 ) I Z 3 Z < v,� II _ ZZ'9ZQ :wla aaF=� CI Y5>�z 1 I 9 'Z8+ :VIS r. \ o ern F ao�xo� 3 / ;.\\ amw3 �� �� �jWZ''a // / • . Dunn uaa / / ro6x�' \ m�� cQi / I • • Nm�a� I \ /// .•1 +1n m \\ / / 1 J _? Q W .. \ \ ; J/// le . . : : . HO Z r-,. r 1 `.;'A\''*.:'\\\ 1 : . \ / \`',,,,, V/) \\- , • • \ ‘ g ‘"\ : - o I- cc Z \ \ xx� CO X \ w \4. \ i• N 2 �Z \ FaDo 6� `� W �l\,\ tiNwD z 6, \ Nix'-°D -Q 5> - c-i !— Eirw�Q� \ 0 +w•w pU mm�,IQ �m3 J .-_ I.. _.. ZZ�wC7 ` , \\\ V.�QW J x0l!)UW K CC IRJoo Q.I- m wN t � a m� m / mwzaa p �1\ Q 0 ww0� •\ `\\ / 0 y \fi • 8S'+LB (N)1Fl0 ld�,ZL U) - \ L Q £9'7L8 :(3S) NI 1J„ZL • l I ll'£L+ti :d1S • II. �� 1 I OY 10. m 0 N Z F Q 1:II d I !! < �F > AZ�U • ° O d I o v)0 -IFmou,o'o i • cifl m Z ± I w3am � m Na I- o= _ �. cs, z r O in 1. I I I -- __ .. i. ,.._ - U 0.. 0 —_. O Z l° / ._. _ \ ?• 0 ��pyC Z O I I� )i• M CO I 11 F 7_151 1paI z wa 1""-* w� 01-- Ib I (LW I I I ac O/ ,.. .I _ 0> o O 0 0 ., • I oca • .1. �, + LTiLL+Jjr2r13 I: L.LI M 1.-1 Ilr 1 • =:Oaa� �� I x� ..mow ;. I _. __ .... ...._ _.. ¢ OZ .� UFVU� 1 — — _ 0 °� y w o I n r` SZ'+618. (M)1no`Li.Z L N n E w U 1 0£'i.LP :(S) NI lJ,,Z L+ F - i 1 "Wr. 00+L oo+o : L • I _ gs LZB:vs 6 / ad02�JNISSO lin °S2�31S3H \, 3 1. Jm x mo m et m oz .. :-. 1 Maaa . m ' w 1 r- a U z�F O av) ..xxn ; zrxF- iris, \ 00,0 0 w ao • m m 0�01 ».A�M� \ x�Wit' + 1a,U x- ,� I a (.7HE MJ �� csi F- L=I W Lu : tea ,..::..,.., • 1 0 0 3:. re r I-. Wpm ,\ • 0o DcZa _.\ • m Q� \ z3 z a • N 0 LB'Z l8 :(S)1f10 3J:,,B 0.; 0 11 1\1x ZL'Z LB :(MS)1f10'33.„8 0 fiZ L l6 :(3) NI 1J,,Z I. z • 05'6L8 :Wla 0 � I j0b•00+0j d SI:C 610Z/f/Zl 6MP'8 3NIl MM LI H33o0 3NV'1\sCN4S\OUV #'0\11,P 01' O"i i UL-601S69£90\!!M-11VS\:H` Yid K:\SAU_WR\063895109-RR Lake Creek 10&11\CADD\Sheen\LAKE CREEK 11 NW UNE B.dwg 12/4/2019 3:15 PM En W N m m �X - p 1 _ Z ri I z 0 oMATCHLINE STA. 10+50 p Z O O CO CO CO CO W .1DO cn O cn o cn O 0r_ v I 84 o I MATCHLINE IIT^IA1 +50,m o cn G((( . _... v 0 90 {I ` Z m m 00 m_m 0,,-,_,zz \ Zm-cc - .� co— mN I mCn q Z]L i ='2 5Z m°ZIo,�� I II z 3Noc�DSn � • I O x I i cm O 3ii W I : _ )3 O _ fl• ,. �m z I vZ I 4ni m » mm� Os 0 m v 3D3m 1 { ) v -cmv°' zme I ,44 _aO,m 0 oAr yx z D< o m1 / m� I I o r m -I Ill•• Ea x I I I e NrnA CO o — A O STA:12 102.86 • ( �J 2 m cn I [1 m o RIM: 824.99: I T z 3 to y I T.o v v o xi 12".FL IN (SE): 817.11 i I v to >o•" b too D m 12 FL'OUT(NIA) 817:10 rh I m z m m m m m m • -1 ( I rnD r, < N I 1 + C vim A o pi >-1 2 �.x. • 1 • e ZED rf ^xo �Z p 33 C �"I CO D? . ., ' " , '! (.0 3 2 I 1` 0 f , a> 0 0 � _ x li • • it 0 ,d yxN_m'• .z `(A . • m o. .(4o : m-{ � ?j .-• � • , ` f 0rim mm om m1 cz I I om CTt v+ , --I N aMoz • o 'Tl coo ; 1 0o m. o{z m m . �_ • I I • m a n A 0N ,stitititit fl3 �� . Wx l • T.• �<t0 Si'O 8O I c)m UJ. m-v? . � ' _ OT -I k.P - -D--1 mZA� ' po I� �z T; `'a D�vam \ U, • • 50 I f I o f I \ • 3-CO • D _ ` _ ,_. _ - . _. ..-. Zm .. I 1 / I • nE^m , I 73 LO •• • m\ 732 a _ . 1 I mo A 7o N m m_. . D.-v) 03 / � xF)A oI - opD ` V'OmI .1a y 0`(1 �� mO 1 r0— I CO zmot (7 2 02 z- �m3 m 1 • STA:15+45.01 m-o !..1..._ j I D -c° 13 RIM:.828.60:_ .. ( I] O 1 m cn 0 •D ,` 12" FL IN (SE): 817.61 Iffl 33 0 1 12" FL OUT(NIA): 817.61 I m m 7m A jX- za -,1 Z ; ts" ?-I I- a Z m ,TM Al 90 cn - !mI OtoO • v*-0-i �Dmt I ZZ S MiO " cW., l d.0 Zo mm�n \ Ii m mvm-Im_.-n i \\ - tntn o ... - ----,"-- - ._ _ 73 D 0 m coil : : mmm rn I ; m I 0 mr-0 �wAv A e I. > �-I -IwM . I I' STA: 16+78 50 z rn o y RIM 82941• I — m�0 No r mr zwcziDD° �. xtn j 12 FG.IN.(S):..d18 21. r 00 <g2Spr50 o- I J \ P-1D 6',FL IN (W): 819.21 v.�oy z n O 12 FL OUT(NN): 818.20. -1r ANC-o >> I"I 1 O ,. o= - z I,.; I oo ., ® • I� DZm 00 N ,:m �"` In I I '3• mcn aX�� I >I I z t. � am • I. cn�mo 1� ,#1. e • mg1.1 m� • I'_ ��vo I I Imn, WziNa, • I �°' I ; • �vv� oN= 1 h • ` m I zns c n j ; r jI ' . I+ IO o _ I • J I, I t m m Ib b 11 pi : 1.• ' ' -u)mm -IK m=T 111., Im _ i l I A i�mm �� mr <� ISII1 t ij �z2m_o�' 00� 00 1r ilk 0 I AamDov p I • I -t�R AS '� Dm m rnDrn III lU moom� z 0 O • I 0—Dwm O rntn cn_rn �' >Drn O • • - or n,2 ,24, i I i LZf.-.u) I Z I ea Zl 07C `i • Im 1 • I ' STA: 19+S6.S4 '/ i -; 't tri ,`� D RIM: 826.57' I" _ _ r*, / Ne o o rAi 6^ FL IN (W): 820.86 a 6".FL IN (W): 821.86 ® : m <1)i, I �2 a o o' �'12" FL IN (S): 913.35' p oen tCr zc-<D iI .i1,11111111q rIJ �10 O�ZLz7 ,.,.• C1Cm �� i iOD-� fV 12` FL OUT(N) 819.37, v _,.z • .z. K›,mN P p cZc,�Dc, O :Q`<:N N W \ / D Z1,i7 2 x+ II Ic riO I v � '"o {l4occi• av I -- - ,�- m o,�n ooDo II ID oN °zv-t z. to*, I X m - -�m� Comm .. Az mm -, mmovmi� I 1,-- r m= mr�vo movm 1 v �'�g�mo�t� or I PI I Z ��� I co z X.tnp z� r cis czir5* mvvm amm I �� moos I m �D to ,,m I Dm +!= z�;1 Dl I �< \ N D•�wO b 1 I \ ~ • O I� I Aril D N - 1 j • MATCHLINE STA.21+00 0= • A /\ O p co W • I N W co 0 0 cn o cno cn o 4.m /Il oRTh MATCHLINE STA.21+00 Z rn to 0 DATE: DECEMBER 2019 12f04/2019 r DESIGN: SRM �,............ Ki m l e *H o r n LAKE CREEK 10& 11 - P: F�9,/, y CI) LAKE CREEK 11 =��- � DRAWN: AMJ ��]A(� L�,��]A ��;: * ••;#.� Firm No.F-928 �'i YY L�vr�L VY L""�I �R % SEAN MASON % N . Ma Fortuna,Terrace I.Sulte 300,Austin TX,787t8 P:512-546-2237 CHECKED: yy w LINE II ROUND ROCKTEXAS j�; 110102 ; .�•, No. Revision By Date KHA NO.: 063895109 IMPROVEMENTS �;� ��CENF�'•�`��= ,e fss••NAl_E�O-� 9,, wd '1VIV SS�II,� ••SN3j�• .d 601568£90 ON dHN =�: >••:00// SIN1YAIEAO HdINII Li") ow() �Cg uolslnea •oN i�' Zot011 :k SHX31N30M ONnotl III gNI 1 LY M :03NO3H0 w NOSVW NV3S 2I�.T,Vtk1�.TSV�1c� ` w LCZZ-9►9-ZlS:d BtLBL'xL u1811r'OM.11^5•�o�++�l•0�^7�°�an oo9z / f TT)1ga l3 mxV� f wv :NM% M BZ6-��(, /��:.. .�; T T 7g OI 3THHITJ'DIV'I a Q �n v U�O <���� �I 4�6��;•.......yd� was N�Is3p t/i'O J t 6 LOZ a3BW3330 :MVO H . 6lOZ,bO�Z f O w w w z w ki14€1/0/v a o / U =O 0_N Q m U O z_ Q / wmo N O 0 O In O O M m N I �o o I I / T ro m m m �}. Nm w 1 I / 11 i'4 LZ8 (N,1f10 ld ,OL N r W 1 ), LS'I.Z9 )(M) NI 1J 8 a � ,< 60 SZ8 Wla (~il w� -_-_---1----____' /7 // .......Q (� , co'81+9Z tl1S O hP: 1 �., mow .ice ``�.- .Z w)4,„gz i 1 'IT--- 3 .. _ ... PB t t: 7�a0o 1 0 ```` 1 -- .:i.' I iy II./ b w 5(_ / 0 Ii!,' ' 0G�w in CO , mC9= Z 1�,� (n N� I � w gym= r x6 W N J U...�a.. .X� 1. -... M.�.a w.. w m¢ ¢a�..w zma a-a W I oaaZ,3, ce (�&}Na aY Uo� w 1-=rm LL El- �O ZN��CC Q .__.. /..__ 3E.E 0 r Jm min I-WO- 1- \ �OeiM O Z (nW0 JZ 1 zt�QO 't - 3 -......-.. O -z� m f" \.. ca 0030 N mm ¢ USF Ow0 c> \ w , d, . 1 zm¢ Q ❑ U :1 8 u'3 z 3 1 cc l 1 O cc (uj; I , , \) ti ., mz�Q II \ / o WNom 0 1 � > + po ccw w I N o m LLI < t t I a L� JNci.EFF I :I �Y LOZm �Q� j F:w cc}Ra of L1 rca ww U1+4 I: N!a amw3 bl II I Cro N _.J 1 i. J -il 1 �Lo ��.cc 1\__ 8 �°Wz AN,' ; ,T -- z - I ._iSwo _m \ + ¢ U I N �O wl-OO W e` .. wa wrn e:wzo�o \ ��__ W1.� �1 V NOS jzdZ o 1 _�N J ..7..... Q C �w mEFF, `I � '1 1_ LL'.6L8 �(N)1110 1.J „ZL (n x U(6i m 1T SS'6l8 :.MS)1l0 13 „8 �w c W Z) ,)1 C J��J/� \ J� Ls•619 :(S) NI 1J Ol 1 �, - b"Q� bey �\ / 1 , 9Z+LZ :VIS 1 tjj 1 �� �� 1 ZC'9Z+LZ V1S 1 s: I6 (' , ,, I In o In o In o 0 I ::i ' I M W W W 0o c3 m 0 OO+I Z'b'1S 3NIlHOIV...i..i.iiniiii.,..,.............L.................. OO+IZ'`d1S JNIlHa1`dW Fs, (n a W Li m U L. 2 m U V=1 0 o w m 0 z zo Pc, m- D CO w Q W m aF az z� La im a mo Z r- o_3 ('o S3 cca ax m mm a- mz Wa U m w Z m W W ¢3 om (-a cc ow U F Q CC w 1-m Z W 603 W r- O .- z lid 91:c 610Z/ti/Zl B.P•9 3Nn MM 11 MAP 3)M\8).uS\OOVo\ll VP 0l #. .V.1 M-601S69f90\2!M-OVS\:0 (n K:\SAU_WR\063895109-RR Lake Creek 10&11\CADD\Sh.et8\WASTEWATER DETANS.dwg 12/4/2019 3:16 PM q z I VARIES I WIDTH O W_N' ; r T i0 z IxN P _ ill i y►yo `7 Y{t++yy+��{p�i /�`Q;,/`�'et r�'`�C`I'U�..�m r]fai 01V;I Cl.gt 21P, C N�>Z $ .f 35 y } /4 O el ii bl e0 10�1, e a.go oigcsA ill 7 ✓"'i �; 1 I• G / io +:F O'tli ;irq ll IN 34 ,"33• F1•g !� iNI a iIIL.iillPI / o a .g . ' ....'s illrldfikr4 [.''.7 — *1 2' )-< O m g o� ;.: s N . o -s, eo PI 1 m ` m ' m + n 1-.., ;: � pg z .4 ,,, !, . a,- ', . . . A i 1 1 il 1 > (v 1 7 m n :$ 7DA nz '4 9e ° g Fg z O 4 °-C w mz i cz ,m ,,O o v C 1 P ! a - mz -< Z , l 0 b A - Z ii o c;fr D _ 'QcDOS2 o O--1 ^ ou°i m � r M C D m ° 2 N ; ...�.� Fi'l ->im /d ,,n m m c O ,PROPERT-Y LINE `-1>'o 1. 1; v_ i! q 1 l l m A m 9 n x 4 Z '. I1 NZ = A I ON m A Z 2 .... • Ii: o A z•-0'exww ''' n• x f >o ?;...t. o mQom mz c 4 -�. p °m o � D F o 0 0 i _ f -Nt 1 z m rn ! O m I: I I oA rrr-r�>�SJJ W N W : A�O�ZZZZ1' y >> CC v y 1>U'+fix oZ F i nll , � 4Pa \\ 1: - b'_o8Q� � li xJ GO o v' m! = ni N °i= AFA • /�� z 6Zm ® ►o vc nyZ Q ng�Gl ►� � m z =�— $vD glq j$ > AS PER R I2-O iii .3 �yoi o� . q .ycI n °a> o n i n m _COEP o o n m K-.^m � F v $mug N- 1. ivg 'Od , n t) A A Z2 vp:E ^ay II a g.z svoO .y p,§1 7v v A'Po Rdi'. o❑!6 P ° 8 >°� 88n p,'"z[AE'20 z� sNo+ z � A Av o i m r r s 1 rrD Fy1✓I�f-�tiI�1 zY�_'»Zyi � c mt'., =♦^ q om z 4618 ; 98 CC °irC ; m og I osm g Daon v° 6 z oa _ Rm omcv s A m N z() z ° 9- ,-, 216, 1 wiz av m;o q $°a1 , . A .) Ri — . 8 Z'. , ir � Co. ] Z omi z \ o FOD ,, z> 4ovTu A % o�Z , 1 rl Q> �..Z momg nn ral '� �J� 3 O i < v v 6> ° ' A I AZpZ2 O o omMs 1r.;3C� �,Z ! _ oo f f N 4 zr m :p r 1..1 m1m m 1J qR-n _ T Nc; WIIIIi„_ Z Po O r SQ Inm Z 2oN5ioz o v rTi< vASI^vi oiC 7f*11Jm rm CO. ZR3 z o n m E.rn;\.1 E ggO rzmO 9'8 _ ; ; O A F, i° DF ^ : Q I 11_,- 00 ''vM p ti a r Dcm yr z0pm oQ,J i 9 m D 0 x Of � PI S oo c;I ? Iti�D OO $„,-x- go c t7 .� l PZ 5 4. %,,,,,2, i:A ` '0 � 6 ir ` -1- , � q, pImo 3 D< o'a g o$O +" i AN)aufv • ai : D- - , szi Q, xgm m PuiR DOo Z>! m-�+6y- ° N B 0 m I 121' r A Q O m m T Oz' i0mi ^ Zm O gn;0 '''IN mq ^ O9 r xo� ozgm m 82 A m °oj f go z vm Z u ` 8ui2Ao o4 g 1 o mv H E = oA Q O, rn OTC1. 3A Fm N pOA +4 ac N 2▪ 6 Z i m o 6 Pill _ y(y° ,�„o�cgMFo9� m Fv �� � _MIn=> �p�r= /ii e.C� n._t '^vn�s= :-,:nFiglzo0 ':1 �� 12• !f L,` 'S,�.'17Z� mr0 / $ w@v = ��� �m�oKo�.o�mm rn A, T �,. '3 O _I800 (��Z I ` n�`I q aom� o-z 5Pc ♦-'1.£�p S9 I— 555 9 y iZ i�j, {m �j," I�I�� 1 a o g. g'=pe$n r�omA E -,,,,,� gal:.. I W �Q - I AL- L- _-_1 f ■i1.Ti'ID.•� , a3, �44 8 o ozim pzF,R, mz xvmm cx xsli .. a 2 f.1 .�^s1 lmg.1 /•. .. n Soov['f ro<r1n mcox m�s'1 v �%]I Y `�Z� I• •�\ ,�••'' 8ZT1'� U1p B0 `mr,��'rm Bl/1= mU1A NrOi,� 'u3 '11 Z In" �: -1� 1'.•. �+ �_ „-Hll Oz 1'1OgC y i▪ A YI]I q a7 G�� P'• > l4•: A D-ApF „ mps ;Er,2,FI' 1 8 mti &$I 1r: Vili 3 r...• rODA. :\ kr,.. I $g%F y , Ill��--.]1I 9LiN'T4a oo" r"dNv voQ = //s" .ice1 NNDOFyv - rJclIf"vleccg o z- 5-o �, \\\`kC_ �.� ! r r Z '� rf �g�' cln �-Qz g`rc /P- r- f• \ . I 0Orn"r00 (7 '-< Fcl!9$- 'Jrzirrr7'AL'. 'n g '�OZ i �' .zt*00'�j D V m=2 c.8 "_oL � v.5i 0,,- g 4 ::tl „1 Z- , _( �• ��_ ZD_-'_ fn o c� cFo G Tz;r�'m m.. 32 mnz `r. tP: -:. mi-w-aT� - P," Ia *° v'" m`9" .1i D a o�� k: � �I t�t'�. PL,oz O9� m ! � sz J .... '^.1IF� t:/�nn .,m to .'.- m f. m i •oA Tr t'. , v.: I ma�� D 12 oo�� � ccn _ Pit n gg,,, z>y D O S \• a� am-IOZ zv.. < ' g> oz v o o `;,7f;• A m= D �)Z7 t �� ,i'mmO ��•��_ G7CO2.�1v ��zg�x �v =m v v ? :..: :. , I y Qrr� pOZ \ k, ./ X 4':• r.Zl oczc xN pm `6 o c 1 it n O� O ZO• i.. a ./ � .;,; i m m O �2o Ro o f Fu Q= � _ Y �„`� p �� C _ a La -mi� Z �f� \V.. ..✓/ Z Iw " p r1T g$og!'81 z� c ET,Ft c g t r. 1" `\/ GE r nr Y. 61 .:i Ov 1j�.. f*I m- �� r'1 zz o o ,.€ ///. A - 'aK �, 'a-° 'iF 1� ---I °mp s oc oA'ao 1.--.1 ' \/„ � Z 3 N ��� l4 D z�$ �g z $s �nN� i v • /� •' z m 4-� vc •..11� D s� ;n NO 3, - $ T o s m c. m c� z z 3 � I-� A iii -. = m o g a' . /r ¢ r'' 651111% ; illi 9: F; 3: L' ' - " nr�Aic l 4 ozi 11 8� I IY 0 q �z)? 5gMas !g. "OZ i �g@@ R 2 x g O >as I i o Enm9 o o F�Y AA a$ o G I 1 i s! oii 11 a)(/) = D z s -D N zitlr m P-1 10 rn D _ m • e P-1 DATE: DECEMBER 2019 `"`�,,/2019 IIr m l e >>>H o r n DESIGN: SRM �p"CE.�F.TF►►► IZ) T LAKE CREEK 10&11 ••��:'�i Firm N..F-928 DRAWN: AMJ WASTEWA 1 ER pi': :* 260a it Fortuna,Te ri.I,Sint.Sao,Austin TX,78744 P:512-646-2237 WASTEWA'1'hR sev MASON i CHECKED: DETAILS I ROUND ROCKTEXAS j-o; 110102 :a No. Revision By Date KHA ND.: 063895109 IMPROVEMENTS ��'I,+ls NAS,e..7 i� \\ ,n 903'1dN,.ss�?/ ;,.;_,SN3,j;,,b, SINR HnO�d I 601S68£90 ON VI-IN ^l a}o0 '9 uoIsInaa •oN ram: aolOtl :al N `V�M M SbX31N7021 ONno i II S'II`d.L�Q :03NO3H0 17, ` , LfZZ-9►9-Z15 d 9YLBL'XI 47�nV'OL1C�71nS 1 o�++ol'o�^i�3 NA 009Z �• NOSVY) T4T,•` '4.I.SV 1.. .` II'T i"i \ Ilse •: •� �J J rwv :Nnndaa TT OT NaHID MI IWO <((AiwiSi /4:•' j0 3y.`' was :N�is3a ■ s�oz/to z� 6LOZ a3ew303o :MVO µ�7 o !I \n �o o 'l F Q oZgU N ) o vi 8 VI ii JCD 2 LA O 1 al w 1 g g r i o 5 o•g o� 3 a . <e ,r z ,, 04'9 --q .qa xti 'Q �i Li-Ng zo zo-g O 9 gN F < O In eo ��S ,qk' m, 6 L9'' <'?�o: EtgAg Q p :::,:: cr ' g<'.U� ' zi' z a La ..II 141 ai 2�W s vn' N N `K3N yd4'44 [j Q 3 "- .. I Y 2 =p[Ng I B3I OR O rc�m rcg oi.W". Pao n, ,d2E zgieimio p i md' F6 3 <r� � V O �i i � E eoE IEWV,gE. O H W V L ,_,.�.'_ _•tJi_, � � �� 3.� �1 N 9 'po�ao 3 z nti J> - nn3�n �o K _ / I I I NI io �z > - E� i =no � Z i\ s � M"I J=goNP"V1gl m '=E-g R.g ram`' O I 3 u.9 L �s J 00323a<' J L? <NVm U Z �� .Nwl.el 1� u<F rcn' vximE28z� �.T'�� W tZfWYm[OJ - g — ,o � = 7�-, u 'e o ti I@ ann wfldoad aNn u713aoadll z'nz ° - 16! " R 111 j 'F m Qarc 3 �'1�.o: '^mv'mo e$go�Bm 41 g� W im n �' n a & 6olrg �c�q yS�oL� d • ��': NiiiiimL, M7 ro - �Yi� �5��� �•<o O in Q II ml„zo4+or'.'oo03'<.. cF.91 L Z x a'oxxo' m O< 1 �i n n N N ,,i 4 66, m Gi,. G ^ 6 ' • Z B O E A`0j, o o �o z n p1 o Z^ 1 5 —IL. F�4 ai i o 33 d _� g ,z 4 i Z I pSgl o o 3el,q1 .., • Z F ,= w o Ir &W o �, tli 'NM.ti-.Z m {F5 `.3 .}i w • —Il J!I 'a N,p - k w a o _ L1 `� \¢ II w + I I = ag c'o m i '/ i z o \\__ ..g n .� w n n _ ,¢ o o �4 h rg •11/4404%11 IP O < 6 P<LN.,u) ' IzYY �y>;VI "�x� ma �y j �eLZI pm g [ympl �� u 1 p3PW� m' 3a �1 ! mnz! ?O 4 3 < pp €€iV - O € 34 U " , 3 'xi' kn3 .n3<:o QKF�o 40 = 3 3� 3 ' ,?, Syyn��h k',� g, N z it ='Jz ize x O W <z Fo 4o Z 8< BY1a (ng r.'Z Li- 6 nda h&d' C& aBW8 y�^9p F L'] -,65 i2 smvassya�^+` •Q �Ep S' 3 O 0 Q �U.i 'Vp �� II a 1eaiA' ' U 1Nx'"=U'F Q Q I.: mg •';-.• Q c.ei = '_ w U �R • = 9 49 " 78 BE= m w�VNsmo w 3 L7 '. o � n m ow :1-: W i n- 2120g om ="p°.�o:61E:E O wb6 l Fo_$oa '-' <� T� z � �qq��2��:12: � x:1; x•_ �"� JOBR 5 ��n = •;';it=..�;.�r:.rC:,: og �- 1y, W Zi. �•�' `*I5aoU €� FZO::7:1°:'?5:::E::: Z" QUI'NIW.Y-.Z VoaQ,I 3 pgE Eps- , N6 :5® ► 5 /i/ Zxrc ;opi13 : .": m1N h o im CoC g1�13I 3d x� V� ` aIUo f 'Ed . U G �1 y .B L ocgF5�� I ` P_2. Enc+< Y W ynpy¢ / = a `zm mo ¢ l�<o oe,�- ij U ti 1/ 3 ry h $, K lei -• U CI'Ll . Q-OU� g I (! 7� 2 U zW I 5 Z �` ° * eLtlJ/() % � T_��i � �w��Z � •m &i �d �R � , � � � 1 ="mo � o� ili �- " 7k :IO M• m'xi'z ,ano �W>rc ;.g" u �_om E.zx c�i9 R.7N111- •``�+00� =m� 2 11-. _ ^ �1 n a ggg6 ,E. g1goo El"S i, A �n�v' ��s� t9 14. ov1 p 3 3� �� � � � n - �F�'3�0'33 3"�'3333 "3E�� �F 7 0lip ' i og3r 33gy�� �'o, i c g - Li a .9l L Z o .J3�13 3ia.3S3 3.m3iFTF P @ QII 0§55i3'n S<�O tt77 R yO`�]� U Y O 0., % P &JI 'Al " gi 0 ‘1 3e , ii � oo �ZU Oo 1 !I 1 — /hi ---,- g 'Ai`,.' C.) !I . :_-A 1 U 12 0 I 0 "� v g �5 (n 3 3s _�, IYF�a g W J y.'' < am ^7 a W J i i I 1 Q F l K 3 *O !—+ Lb N G' ;rF 1 N W -, ...� ..i- m g W W mzd I / p O r .z/1. RR 1 2 . J u ci a • Z q 1 2 /4,.-.;_�_ d o o� II II o O w0 g i lip g R s. g6,_ .2 o ,, `:'rpi� =: _ , W �aa 1p 6l % S ii B`g ez V U �g2 a Pd..' i ■ ■e■ 1; 9 a �ciri + vi.c c Oh R. 6 F 6 rid 91:£6toZ/Y/ZL 6MP'SlIV130 N31VM31SVM\B11.4S\ODVO\1.l AT DI)1 .j3.101 LIN-601S6gE90\EIM-flYSVN K:\SAU_WR\063895109-RR Lake Creek 10&11\CADO\Sh..ts\WASTEWATER OETAILS.dwg 12/4/2019 3:16 PM i i qr1:Q �Kla® c y Eg� �9nm-c ~i? Ay mF Mp p 0 11i ill p � r 0511. o sg z AF �r �\5;$;' 4i N ' AI Mt: ill IN i4uI ! 0 m 1^ \\\ ..•,_..t,fit c z� i u7m o zm�' �\ `S[) `` ti Iz c q 5 �: 2 o m NE �o� MIN. 12• oiiv*.� i; A •' L N PP P 8 ^d h•-i a5 g .-q /\/\\/\\'\�\\,`G.1"i 1--1 _ y Y m?i rl<i //Ih.4i,.4`,i�r,iO4a4h1 88 vCiIal tr -.C m 0 2E i�Fo mm /il \�t..I,.�ryafi .... mm 3F �� D 1 m2i^ mg cA ' oo Villi r/P :\ MS T.m y IO,.� ma cliz ,�1 ,�� D.D m lm L 0 ,� AK .�i P $ vl� p Ip M O Nm 11, }',. �A m Z O eir., - oq 2 .t \�0�.�'�;'(,'i/�r'�,'(., - - 5r 1 s:., \ �i c C m q €'0 c 5 z to Zt m =Sdi 9y i 5i5o • `//\�/\�/\j/\�\//\j/\v.r y r\ z ,v y .. n tT, n m O m PAN k O\\\\\\\\/.4: ^r Y D m m , ao .v v II-�-I a 2 8 N \\i�i"f`c o`s'' a.• • t7 v� , $ r;: C B S D 0 V no c2 „ /\\/•;� f�',4.1f,e v D< % :..: m mpg t7 D Z a //\�'",y Y<'�3i1 r n 0 0 0 D O ��o u,mg• E<8 f888 /`�//s;;iVif }1rt \1 %vOJ Soma Z 0 o m R Ta % /\�t r• Tilt 4., m v mFfep oriQ vT a € ,� //,':�,1a1j$�{hrS Q $ off. PIu �0 2v mg-� m t z yxi8 //�/`r145,',''"?y'✓�j i "g y��.� F.'0Zr 4 pig El z Nis" �'p(o o Q/�.+'( SS`}�F�''t n 1�V gr¢� C O F F= > om T g i .m /.iyS;:;£r t2, o `^ Q f IN ''L= o z d �0,epim e g F �zS f I 1§OP ›F 21 A=m op L7 e v z gF z .. mq '� z H S o u y <''z It O It ■ z" m G ■ a �"�"�G�� SI-; 8 r�1,Z a p +� q n >m Rt o C as ill - Llfot)=fj r1 O pap O m rig u P O �_ e o DEPTN ro PIPE BEDD Nc c��,i f� c ®®-m d 0, o r +18 MIN. W.MINIMUM IN UNPAVED AREAS ..moz=2p > q• �o g got ■ 4 16'MINIMUM BELOW SUBGRADE y „� i3 ill c aAr 4y x 8•MIN. 12• „Zf^�� r m ■ I c A 0 a 6 ill �n ///\// • ulk FI _� ... Q g g gg' 8 /1 ri / / \ /\/\/\/\/, 'J /\ e -,...,,,,Ivel:::7::,,.-.-:-:,.,.,,, :I:-,..,<4011t n m. 2 0 - zO ny O Ill IF /OE + Vie( II 1ry '+ \%'' lu1 I1 ' 7/' om Z m u, Fyg \R.D ' t ► :1 I -J • p /giy( i � .O f. -,,,rri z 0 g V4?tkWA I t':: sn �m y a: -. it m !!�� g 1 voy � rt Fig `•J y D< v e O Z M itcc n7 -7 r C7 2 0A�0u c r A�r�im i ,^z■"�zA 9x kg c. .mi m /� m 00'E 't D n 0 g a 1, 2 `�,`C0o2n 6' ' 0^ z c m v v o m m O p 99 v 1 1 ��8 u tx P 2 My A ;,i11_9 '� o9 $ >gp m f'1 nm`� td n p x`a 0 p> poem ; gg�WE �5 $ _ C 9 a I! n A 1q 1 ZZ PP V a N,uN, gZ' N m 'IR °N m4,1NTgg B� 15 $ C r -gg ,A81:§b F 9 0c H O 1 � 2 Z0 n d1 FmF Bmp qo N o m WPlin ® n x m 5 eo Z 9 4dmv 9p2,;0 .9 � O 4 m Oq • 1) O iir '� t - -• Z r'a f_4 =�� -. -1 D F—) �� yFn$z�98m in= i �A tl ` m ~yl n t L (i 12•. 12., py y F� p mQ mm"'>o m rig �^ e z t,_ MMIMUN• MNIMUM m m cE,,o,, g so�-i S / v v ,� nZ m y- ., 8 .i�i. 1m O ,13 a 4-mcz,i R u. v g czi z2 O m z VIEW°' ��� 'I I �� 'T1 >gmo . AP Z , \ r k 119W m ! c 1 m /v Q A O ,;:, .'..,• F,1 z czi I I `a 4�Fi D IrliiD/l m,O F F^ ? / �� ZD �1 z ''• - 8 0 r�, 041 q qi g 0 5 I s� m z C7 a �9 B0> -7; 0 g '\ ill I P y y m M1c�4) p o`. m m`2m m8F' .'0* P N�,: np----,1-oz oDim0 eA so29 Z L � o R ✓`1 S€ �m `"4xSiR Z ~ o tiom £�n> Q- pzm z� o =o;o adz _ of QF 0 czi zz o o Ur i��oa�x 0A �inm> S >InF>9r>££r�� �m0m =,� g�=z��;" MR uR� 5 A'pz. 1*.oi"zt'�I 8 O'e0m fi 0 �'m vzi c4 0 ovzi E it f z 'i' S� r 1; gmr�ii ,'o0z g01.@mi . Nzz4� wNB m F-n^$ym�r.1 y O 1 I a " o >o o `� ogpPTr 2 O 0, a u� i 1> J o xg S � I 2 q2m.= u i �0 'g zo K zf 1 DATE: DECEMBER 2019 `"F 7,/2019 Kimley>>>Horn DESIGN: SRM ��.A....F...... LAKE CREEK 10&11 EA, %-.. DRAWN: AMJ WASTEWA IER +: :;�, ��Na.F-926 WAS'I'EWA'I'ER 2600 MG Fortuna,Terrace I,Suit.300,Austin TX,76746 P:512-646-2237 / SEAN MASON / DETAILS IIINo. Revision By Date CHECKED: ROUND ROCKTEXAS /-a: 110102 r'e, W IMPROVEMENTS 23taLii%/P-N.CANIS.f.:\.cr, `KHA NO.: 063895109 II/ +$9,,,..-••SST 601S69£90 ,ON VHN r 7e.-0�5N3jj);'wo° SINHIAIHAOIMIAII 94o0 (8 uaslnaa 'ON r�•• ZOMil •di SVX31)I3oU UNIlo21 :03)03HO Al1- s��i�Q W Nosrir rrv3s 5. 2I'4.TWAqT.SVM f .') ua�nkgisvm my :KIMVaa CCU-9Y9-ZlS:d 9YL9L'%L 47s�r'ODC NI^S'I 8.+m1'0�^i�j WA 009Z /•.,• •Y+ 111 9z8-4 a+ ��,It `1 ```� TT 7g OZ x`�'32T3 'NI V I t,�o <o ika w' W21S N91S30 I O, ��� 6LOZ 2138W3330 :31V0 ■ 6lOZ/tiO/ZI J W Q a- U wW aa_ wtl- w 3_1 a/n� F a_ -J d pH=(n 1n'�` �wW D_w aHa Z ¢ 0 Q W W J 0 _I W Q �, QQ� w U Z z '' In oFm m 0 U) Z 1� J I H Zo J N 0W0 O 0 O 0_ U H Z 1'"' W H H W O E_ 0 1_I_ Q �, Q U O !-1 Jw O ace i Q Im-d' O u) •• Q � 0Ul z Q V7 J H Z Z 0_ O < o 0_ W Q O U 0 J H 0 O aw0 - w 1 j U W 0_ U O 0_ X 0 F W W O m 0 00 (Z W Z 1- NFU HQ 0 co O� (n Z Ut�N Ww W Q Ja_ N 0z0 H. w _I aC W aw z r Z WOD ..."F=-- U Q Cc1n Lu I- 0 JNU Qli W W W E_ O W W V1 H 0 U) 2 0 CD CO H 0_ WZ_.Z . U.ZIX COJ JJ N Q QQO_ OWQ0_ F- W r- - O aa�W Z * r J O- W QN to O_Q 3H Q Cl) CC W Z CC 0 -p+- 0 U- LL J p W i I■'! 0-- p J Q 2 a SIN ri, Q w r I.. Z 1 / A 0 W 111 • I— � .. \Io — �'1_, "--IN0 LL tli Ii.a 4TIlT a Q LP 2 Z N o C H - ZWpJ - W i•} i2 Q 0I H U) Z Z:, Z UJ -I ❑c c7r W W W cc Z 1-a p B i u 2- awa a a 8 z1 pO�W kS f` � W g 2 I K W OF- g l.) Ci .. Cis i 3 .i.i.1 aa.N=r 1- �.O z g iE o E2 6- Ez aviFg tZ In „, �J v . 0 �o_o § Ei 6E E5_ �aZo 0 2 7 ax o 8 o^u ao0,3 in• awzo el �o� g H=a wLJ w ii 014 . n� ` w i awaow H <$ g id6 g i Q e w , .or ?c m u i,8 ;oo z H r O.go. E E U. c2< ;�•,.r ••vt 3 �„n�� g z� i �3¢ � Z f.:r I a o E E Z w�oa fir' i'r., u.. i Fy IT0o3L'i r 1 F. jj 1'° Z u.3 coo � y, N Q ?'.. +^+„ xP. .:f. ! q � ,0141 4 finmw� rrTT Z ;°� O.N-.Dv < S--10 K.�i �� O W !f.♦ °tr, Oo -3't W W rc . �' .m a`0 NZOG - m U Y owmZwEl Z '. a ER• •7 7Vg,*8 8� �m a U Wags m /,1�1 u a vio� a�r �¢ i v , o�rz g � iii m w aPJ o OF- R F kk n a ,:n 2, t u w c�i �w uHHr 4 $�pp. R w a zo o� zd jpo �r w W �P W ¢°� <:lb ggig g i n m n2 o Rg: � , Ys �1•,1 1 u8 � 3� pi Zo OF an LS � � rnrcu u w v~ip�—WN `I' m V rid 9tIf 6lOZ/i/Zl 6.P'S11V130 a31YM31SYM\sl..ls\aayo\Li iP Ol)Mu'J oiro-I aa-sotssgf9o\aM-nrs\:)1 K:\SAU_WR\063895109—RR Lake Creek 10 do 11\CAOD\Sheets\EROSION C0NTR0Ldwg 12/4/2019 3:16 PM Al 1 /1 0 1 / l 2X 1 1 vN --j i r 111 -T z i E 0 —%" 1 4-1 �/f 111`. I 1i i-- ,-.\ /l. 1 ---- \ 1 ,, t II(7;7 ii II .: : T-1� 0 Sn��° _ //// i ll�/ ri $• 11°11 1i1t it i + /1 11 — \� I i 1 \\ 11 \\ I 11 \\ I /i \\ i1 1 i 1/ I r1 // !i / r/ ! I—Ili1 1 i. 1 l 1/ jI/ I i 1 // // .. i/ 1 // I // \ JI —— _-- .J 1 - 0 I av , ! N I ; • iI I D fi Z II $ l 1 1 I . tl /yy(1 3xyl 1 _ 7 • 1' 1 ! 1i V. I .______ - r f I vZ i I i ! I cy 1 ! I 1 �_, Z'1 i i 0Z I I ! m0 I I nZ Dv 1 i f 4 I Z0 Ca m it + ii m ! I A c \'\ lkl` i ' ll \ \ /' / '"`� -- m-tni zi to -\.. \', I 0 \ \ \\ \ )e �\\` / —o i 0 \ \,_ , ,/� r. \\\\ o= (W, �d�\dd OQ \ $rn NORTH d d L �IV-1 �' z QDN�O LS ' / m rliDATE: DECEMBER 2019 12�04/2019 DESIGN: SRM ����E.a 1��t!' Kimley>>>Horn LAKE CREEK 10& 11 ` `P'„e.�'' n TEROSION CONTROL '. 9 DRAWN: AMJ Firm Na.F-928 *'• •t, 2600 Via Fortuna,Terrace I,Suite 300,Austin TX,78746 P:512-646-2237 m ROUND ROCI<TEXAS WAS 1 LWA 1 R i BEAN MASON No. Revision ByDote )." - CHECKED: PLAN 0 110102 �r KHA NO.: 063895109 IMPROVEMENTS �j�� �(CENSF�'��'��r II fss•.NAL gce `���VN S��l 601S68c90 :'ON VHN zt.�%,SN3°/5;.r01 SINHIATHAOIMIAII a o ( uoisina o ZOL011 a/ SVX31N om UNnos I S'TI�',L�Q 03NO3H0 W U cZZ-9r9-Zte9.d 91MM'xi 41•^V'�£•l1a'I• •1' •J DIn ;,.NDSVI�fN ..• T )2()T�.T,Vv�1AH.vLS�!'��1�(�,�J�7 ,TOILNO3 NOISOiE rwV :NMVHO th 9Z8-3'oN...id ��rr► y.4 T I- `Q OT NU MID i V 1 wo <`<A� w r-"'••......'d was N:MVO H ■� 6LO /i'o1z 6LO 2139W3030 :31V0 K Sw i 17R ztZ Ciim F O 1Oo p L O O d ,<W< U U FZ- R < Z 11-O m� FOFp w U1O KC� W gU U . 2 m� W �� N. . g< 4 rc � db. RT. U 4g� N o �Fo 0 ao as u L,' :N • - 4#. `N E�+ .Nu w ` ffEE z_ ywy g q Elbb 0 oq r zoo o �V'� U In�.w 3:.� '" A .g 3 a p wso U UU H� W �� •<z Rm W " IIVO 3 z �/\ �aa ; � rc o �~8 pO/ 8uR j \ xdi mwo � c17i 1 a i i■i,�/�` �.-.�y�o sm W pO PER J_ j c- _ LA; K p` ZN i U? 5L,-,j O ¢ N ZER Q II I W ZO ° -. R i 7 ti 7 41 / s - � w • <¢ .i 'GP O IN/r//// �/� `I o o�p p N tin (`-� O 00 IV<F! Ro "�! W Q = //// //// �� oow w o- 1---�1 <LL Fes' H U Ill�llrll/llr /\� 62,on g5a rn �8 W loz+ o O d'JO Z ll"I/I////���/� �'����� �<<zzE?3 m$m d <3ao n/ W .. L6' u W U O - mgEg3 4N I z x3g 1-`i ~ ��� 0 0 fi3g U 4-4 LC'ejLJ O 4 z `�4/ mwU°,v p. g .0 61-9 O j o \ HI \\ U�EI b M w NE ?1. -21, j O 'a 4.8. [+101 I InU U U gndU2 J N< 7 4E4 FF w o q J o C[,JZZR �V lGC OI OWJ U�Z�W�g'W�W, =°, $ F VI 7=�O V UCy Z m WZWmJmI/1 JO IR/IJ � B p o y0. 9xFp mo�l<..v'v_'iv'rnZi v' z li < � � g _ ; U O U O U lV .7 � N .O I� m O Pt' .- °�p p R duo z ��ti �Qzpo m �� I.Q °D. Q w f'': a� r�1j 5� .ozp .o' Ko 1 z p3� i i w r 038 a� 1j Y a .^n'lE'� R Eli U m6 M O m = �d F S o� WUm O �� O �4 Z O \,\ RR< F Z W 2 R ,_c_2z v, 1 O $2s FL U p/ Z 01 E o T_ w Wg Sfrk I3iJ1: \ \ m 85 U '.�' , i\ �__�/e R O N 44 Y 4 �C�� $am J`11Z Fcci zaI EN oi. Z :*. ggmg Q-= Bw .4 In f •< W zP d mm �< �o�_o cwiw c°i� pi 6 poi $w�wz �� �- F q 2W U® I W� �amOm mp0 iW � F Z :K NU PE 9 N/ C� Um tT3i a� UU UoW ¢q Z<6'J M I G1 ,u� p} ',� L i4 G~z cp!•�a 11! � rc gz} O�rc1cwizr33� 9pW11155o.f.wmOw $o Ci g3 IWvm awn OLL ° vR a N<iEi Vl� F� jvgJ1 p l� 11 IA rNWi 1\nv °gliCOn�66g 'A E Pl o I Ro 4 OP cd�o 'Ph rn�8? �Tirc�3 M o it, z it�N.6 YN .O O Li �F .' u goo So $6 y u 8 i Z o, , \ 4 9 o f i GI o c2i- 3�1 oz B wz B 2 p 7D m z I ppp��� g �' Qz Cl °B g 6 o W °$ gj�� `8yy g3Wg�� `xF LS rNy 3 w ?y ���\\\\,,�\\ ¢W 1� �x 1 gfj $ �_ � �a � � Z� ZN ❑ 30n �d ij � z � �� � Ry'G � � � ir v� wW \ \\\ aF i Z 5 k�1T€T 08 Wg22 a h Pi o 9i; <H ooUU E IS oZ N 1 `J.-, 1/0� �I �o l�il ��, FZ 0 Zm Z F % 3 G 3 < a <•U 2O .4 < !\4 _ L ad,,Rw o Ogg �m RZZZa �` �4w �� � & $ �i �rii � € �ol�I z 8 F�1 Li p�-{ �, gW8 o° e m <' W� N= o B 7 zs<o ff �j� W U 1 oWpw az• o & R.6 1 o- ((���]] d 0 yW� .2W IMP] ?g 3 g�F xd $u 8 fij46 g 04 g O 1 Z o ? O 1-04 W 'N Z ,4 K y VROI N ¢ 4, mU Rt/,�OO OR O. O ' p �C O2 Z '1.9 W \ N ,/ Z �m ZW 1111/ O� W VI Q ' ..o x ou p I & : �a 8 ;EP R ;'° °o N hah k $ m goVg E Oh— Z N /� W �� fP � = E pz rc ';pkk� zr ISz `Ku 5 i p Riw I R . a o.. pk ° u�i Wu " I.t Wm g "m 8- �' R $mw Z N z � d V Z w5 L M< b't h tow E re z elm ly mp ¢ /NR o i Zi W EN zd c 0�o�i �Gu �� G "o �y` �la'di� "� 3g h1�3 �~u�v n� OE O u �il- o 00 "'o I` O S _§ �� o !N Er hia� g F E H< z 33� N - O 2 0 0 ou 5z i' G i I:84� ' A <ww Iz o$m A Ebel O W 4 8 08 n/ d �� � � o� � 4 ox w�� g5< o o� � � 33 � z° om�E z 3 o OE ^ zo 8'$'1 6 gin �'x'a 'Jri gy FoWW SON o oaSmm <S < O F ' ~ i� = W U I Oaq inL - n W °°8DT SON y 'g' 1iW � _ I FZNY; 2 �E =W w z �yy�'F 32 t)� m K U aZ ptli >Ir� �p < NW Oj ZjO-� ZUR 2 q I-11 t0.:0 PW OZBg16 WNF m ZZ' 1�yd! O W U S S^ O`2 , 88rO,.iiu -2.F`% PJd &ozUi R8�op O :i▪ w&W F< g Z 8 JZ O �jK� f- J�I '"f`z ° � Y�,� a $ of�.'J9 iF � oWw 1� __- azRx� <m 6gh g:< o 08 0iE z WWO.y° n E. •: Ci0 ri'o �p�mGc �08 &o a $ R8 ou1J •.iN ov'1' z J ozpzd iP ig Y� 0 5R � g zg�z $ kk� i 1--1 k p� �' ofe8g �uo rn fa�w zg o v' U ••� ��_ m �} ' W9�9 ¢6¢ Z '1!� Gki YGGG Gkl Eg <<< IP �2Yy0.� i12V/� X 7 7 KW aa�j ��¢�ti� �U 23vOiO�=p ��� �< U �ULSm�ISO � �O-Yy4U O �� WK ZWOn� :AXE U �^ � i•••i> p� Z�W °'g,'zz�"I:I"Ih ,iia p o Wei < e� � uw'q' ou9 " J I RIE gg k'' zL' p II! !S'_ _ z5 wo h : ; 1b � mo�ao 0 VR Q WW zw oo � z m $iiiiii __ S 8F El Q a u 6.nE .��9.,_,. : N W aw R so °u V1z t� - _ R ° I N • ZZ kQoy'oCt'�Fo¢m¢ � o�n g... oo cd LL`�' o d%S%-zx R611 q"�yu Y.I Ko PC' pp�y ®�`. __- F Inc= w 1 I 8 h.7I 20 0F6 v(� UZ?J��3���oggS�9W o VO Zp 2W03W��m0 ��V2 0O4W WF0 �6 $ 4N ZO~mF p.I'O C� Te iiiiiiii LL �N FO�e 0.11 A C FUU 11aal!pp ws < ZQxoQ �3aa}}pp FFSS 'L' VF1 {{�� >> 22V' 1y2v�6r{. pp N< C O fpL p<. SSS �=WKUKZ gOgEllOi Rtm31- z gEft'"n' Z�WOO�r1` ^K tFL000 Dip ' . --• 8 WU V p8pE �i coo„§ �8 :0K11� I5 4zyI ovi-i��z�P=wagmW kF�F D o R �`  •6 Eg 13 " <$wwhOW.I 6'1� ou�a.�m .uom nn n n Ei�K WY� ��S4��tl'y"L�i- 8 0� wzGi�� s�s �w u� �' a °� g gagircb'�� iS €F $<Rr'zzgi$an�rcNil�'i2<�zoaR �ctaniidi o Mz a is ia_ al. o 4 1 eJ H vi c ci 0._ ° P g __-_ -""_-_ � 8R I • N n a n m n m a - - � - - N N N tLR Pod 91:£6LOZ/i/ZL 6LP'S11V13O Ll31VM31SVM\g3••15\OOVD\Li VP OL'N••9'P1 L121-6OLS69£90\NM 11VS\:N K:\SAU_WR\063895109-RR Lake Creek 10&11\CADD\Sheet.\WASTEWATER DETAILS.dwg 12/4/2019 3:16 PM lg I.5 u N ' 1 RI > �/ �e�1�R 2gfir � �9P Ef� �0 VN p��;mm � � �j ��11 C I\ y s Auzi �.q Q ►C Nz�e gFp;Oz m A' t3 E gp'nm9 1,,> ary�'�zOq or-i A�� mm$ -s118'MIN '� ® �O N FNZ .�-tl CO YZy_ I�S;O;Z Ep Lon-w p nn ZNp22�m .. 04 (� mom m IC� ,^7 tSi<.•IIz ��nz ilbilt i D X •F-1 � nm� m �aeeivot�. A Bfm 2 2, a ` _ 8-1 CD 2,9mp �A zp y1FN nm< so , eNz n 2844: z ,., * 1� , ' � /r m8� o '7mo� G'~ to y..1 or�T��t^ mZA � �:�`,,, o Q com m m fg 'rl m /v ;NFnpc 2 TF I. c C7 LJ� Mb i. OO�� C N pS SIA fib*. Z ; Z S J O m 2 VNI Z . fe\�e4��� tZn y .. 1 D D m At m O � . .fie A O (II l] ; =m Z Pd 4.ppx X /1 fee : Z x c z xo �N in �m y,,��e�� 1- r P z m oN .:::) iz CD m o N H gg ;og n F 'mz- Z 8 F H i Slo z �4 I. 1�1 m " '2 "IoIL m zt' i 4 �18•MIN D p zAp(11� Z 1� 1141 m D � �p �i � a � n� oIF tzz o m Q N Z Ip A W N z •♦♦ ♦ y A V lq ��pzi 4 zco g161 N 9 p z� C m�g�m $ E!' N r�II2 !AU Kpp2 Or ♦A♦♦ .. NN {' •��Te.G Cn Ryl]IyN��m g r O i E 2 9 m • A z x ££ rz (j •�♦A��i\. 9 mzp ^''Job :; oa D Hn tom 6 8 ; ,A%�:�\!%� : A�m mom o �S1 \ m� 6� :0 `!�: ��' gom o 'n o m 0,2 m `rqo m n H ;V �2.'; o 00 ♦' z uO nz InD mm1 O O ._ f O2 41 "Ag o O o p _ T P i-). r tq" m m A o O zy1p gtF o n � m �1Em z v Z Z mV3 Dom m -COZ oov g p'H oREm O-�1 1J Mb g9Q$ P `' , o� m71 ot 'a Q$ f :-.3 01 O n. y m$ na r-n rani E , o.o k �" p A. gg c ; A�m r•'I N0z -01 Q,N D O x F�m 4m7 m ��'1 �ln ;zoo 'p 5 1,, can S'n pN 2 Cn O Z AN 09� O r-= io m �=p m�z e • mm D* /d �� P P$ ym pop u� n c m a$� A t�: r= ^ -gyp,p Mpg mp �� �� p Pma EhE „'• rr" l, Y itij qy oa zo y:: F�1 .0 � � �r�� o � ,Ti 602 o00 b15 I o li ;S 5,, e� C N A 4 N z� K �S o� Z L o 3 ea ill A Ha!rhn sas o i "m 6AA4 � In d� ee osA22 ' N �4 4 P blod . S II !s� a r� e�N �o �mmx�yAo�a�pc m' gg tltl FF o_ a 80 8 ' �� p a lb NgFp� �c� mn rA-ip 4t o G �•J v I.. LS~oobm ; ar��cmcf F,� s$Fj ., scyR ���e9 �� mi F�oDp$>�zm ,:- Y�agI "'N �c� `� _ m=A mZAr)gel AA$ — ��BF, - �Go z�� Pi gapn mm o ►-� - Aga 1'�I ��� , - i 0 H gA T LqcArn ^1 \ 00° S ;og X gain Mimi ■0000$ Z,oSIN - Pt m z n WV, y1 I A z ���il ■'��/ Z o Q u a uu ' 9 8- ' it I it I _ Z Q Z„m irlia o ...1. wo# * T? Z �: g9apxEnpi2iL R ' I � Y 3 , om c� n� 5 // m zo IA TTT •■■■,It■I � ma a cio n_ ����I �� ;_ g CD Lii rXoggpa mN T. ^ : F m �--I mm y Hen op r5 ; LL _� n $mz 2 r'1 o �rN�O�Ia�n ;`?i�z F I .•�.:— "! ''eN � 'n Eio ; m �m�m oN n; oN /pE� D��� �$8�� o$ a g§ o Z Bpi S 8 �mcmim5oG " �o mwag oen W, ` sa= n� pon u• c mvo0 1 MnP 6:v Bg G 8y '�...-'., $ sU (�-� P ' z A048 I m vp .^ L. N� O 6 po'RF- n i, .cw N gm$ D Q t�� `a ggico II',� l§ ••- $l��r r HmP o po O 'Jn ✓r p ;1Q18 e4, m n z , - L.� :F x •2F o ' PI' '�I p S {Z? A"1 n z x v n c c " c' o i A t° n Vz 4 i q ... 41 1.-cz'� j�a DATE: DECEMBER 2019 `"\.;;i 2019 Kimley>>>Horn til DESIGN: sRM LAKE CREEK 10&11 =�P��°F TF+;s'', F�N,,F-928 T DRAWN: AMJ EROSION CONTROL , .•: '':.. 2600 Via Fortuna,Terrac.I,Suit.300,Austin T7f,76„6 P:512-646-2237 CI) rii WAS I EWA I ER ; SEAN MASON No. Revision By Date CHECKED: DETAILS II ROUND ROCKTEXA5 IMPROVEMENTS '�i;2 �;�ENs��:�`�_�- WKHA NO.: 063895109 I�4 is••....•.:G`... J•_ + 11�;;?h 1 / . t ,�;�.SN3jj�,old, S�LN'TYAI�A02T TT TT � 601S69f90 ,ON VH>i �\ - GIN] A9 uoisInaa •ON' r^':' ZolOII o..S SVX31NJOH ONf1OH I S lI�JJaQ :03NO3H0 W r 1 LCZZ9Y9ZIS d 9YLBL•Xl Nia°tl•OOf/71B Y°��l ��°N 009Z %^ NDSVYI NV3S � v asv U v V t "V :NMVao' ®Z6-'.,N e.... * .__ I1 7g or xHHxD MWZ 'IO2I�LI�IO DI33V2I,L �� '�� INNS :N91S30' H UJOH<onalw1)1• 6lOZ/ti0 Zl 610Z H39N3030 :31V0 N Z Wg I O OLAK) NF �o H WW�W U' JNQ�� F W< 0r4�6� og w0Tce'"O z vlc�% 'o�cz6 �+avl CO >3 o LlgU W 5 w o � pZ tx j =w� ��o}aw • y� ILF r� vii RI: �c hLui,. g�e�[ O_Xw. �a �W in Z „, o Ifl g I__. 30tldS E Eod a333ne x x x o z g �fS ' 4 'I <w Jr a" �Z chi to I, %El /� G= C=1rV0 O Y g a a a 30VdS 6�'�W6� ��; o X X 2133df1: aW��uo m1FmZ mg ���WgZI= o9czoa O f� z Sy,I =O�4�W MWaJW' }y S ��.� � a,UQ>'COJ SJ W 3 o gi lay. 01:yO • UJpap M c� o } N '$ w N wi Y w w p3 g �^ W v i r Z ui w > w ¢ fn` _ •6z v > (!)m Nw < 036 3z i wd z rl�o o c e 0 0 0 0 0 0 0 0 0 9,^�x > 00V.f-o Q:-IJ WOU VI VI O 3 W < ,, 00 n O W X.0 . .N. M N b ^O m NUJ 3• Ci Z L t(J ��� 3�0 o Uj�' 4 v Z �y N r P u ' o v ,s n ? N h m N N s §P �Z = U C�ZN 00 -1w o rUF U} a J O O J N L) N N _ WCJ 6 O Q {w/1 La,w UZ� ~�J jiO 4m w 4 u O < N N. Q! a n NOOI MQ Mr M�MIN♦O n�Vln mW� 6 W = ~ Qw N K]Vl j ONm QW U p W O _^ 1w x O ICi ou Tr..- Q N -O `O 1� >Q aW WyO�•� (/lw fS�W m_�2 O 1 F1/� QJ Z Z F.+ O O ift u�8 1 Z u C Io:tr- v70 Y70 vlp 00 l0' Op O.vl0 QK >Y h m �y U' N& I-WIn ZO 7 a O W O ' O pfl V1 N O O N D] M N LL 0"a O O o ff" �O Nf�rig;NOI MO M�ac'Y'a� -= O VI 4 WW_J ZOZ W0�t3LFZ • Z W 3 < Z_O M �fl N N N M < Q W `� O O YVa1 '� .. .. .. _O tU�? }W{OO �[O Ow-a m<U W0VI < Z N In Jv 7 it L U c o.^^ - IO< '(O C S O Wg d¢Ftn q w owo °d o � � r � c v, c n...Y rn � n?m mo m� o Y � Fw<W 3p vt to r `'� g F-c g** m f- . ¢ 3 S w I W 44 o �'J Y p .._ ev•-''v �c �D Fig ¢O ¢J t, v 6.Z Z .4'4 �3� aY� o» z ' o (o(ff� in _ >o •a N p 'v s tic,Sao t `o., w -12 > Zw O WO <Y- 7 Z ~ } < = U'Y V] b b Y 1C1 �p W Wry '1(n B w��^O N�00�O p0 00 OO�^O h0 p O �W FWW fA W O W �.Ui� m0 U32 J�U Vl < if r ZO N M ill »O D] O N O Lodi' W •¢�N O Y crlph�INN 4M:VI Wt004 N V N0N� Z C OOE FN (DWW gNF J (1J N JJ� < 2 OI^W O , J 3 z JE (� t Q �.J.« M`p - H Pi- d2n'ed 7Z O ; VI J JrU gput Y �z E o 3" • � O I- Q: U LP4Wed ww W r ~ O W _ W '-' 7 m ^ u f�2 m vl O �- �. 3 >= o a>x � < I-^ 3 cd -� -p Q ar J c � OU W C7 Z oY lg el fF O S H FW.. CL FPW 'C.E O d.4 Y.. N 2O� OI ill 0 0� MF U 1t.1 po W U } ;Er: J O 1- K O n`YY nip� N � m �� S S � O< �} So rT0 J WWp (^a 30 3 UI CO x C Y M.....Y O N N .N. m Nip NV NV .0 00 S WO 3�W >U W U r �r.UOo Z p, O = � Y uwi O aw Ot O l0 0 �� rim Y� U I-cn w yl¢a �f p� tit?_)- �< J W a. c6 W Q O L(I O Yl O ill O N O 2 a O r 02._. O: Z W 2_ >V1< U O W .=VIO VINO O W N N M M a ♦ N ill V7 10 W _� Y J 1- W w �^>�z w w -' O o r E `o i4 N p O . in g i- 0 V < .aTin 4 3 c^ o w vi-- M~ o v o Y Y avoal eo®e,-a,-o evoi ?-,w.voi'no p p.z�<z "J �d , w JI O 3 p vi z 4 u o�..Y V. n ��� n m.-m Nn t- a c7 W a: \O ant-- Z J V1ZW .{p Q O p p • Y .!• O.N MO� � rO Z K*� __:m � 3 L-.'c ' <O5 J~} K K 7 a OL Zr�+3 r Ol d 3 VIA VI W Iw- 3 < O LAO Q=Wl., U Zw< WW W O W O O O �^ ifl O O 0 ill UI N- FN . ��> ol^� as a w m wE M Y ul N In N m m m o U E J z w� HY = JJ U Na O W 0 O O }Z L ;31 �II J�J N I. J In O�Zj U W W W W Vi Z•ZZaJ ~�aWU ^gym ll1W� Z O Q:O W O �V `6 H as KK<�y~j C'!r Z Z �•t� ��W� WO JZZ JO J �~ m �°Y a M M < O 1^ ID t0 1� O W�VIVI} a'�j 0 �O I- �'?d' W U 7s U O O lY.� Y O i^ O �^ O �^ O O Z O 7 J OS O, Wig OU p Z ¢ = O < 3tl<W� p w �< � }o �w UI = ao In� K vl �O�O�� z Uf 7 Z� O J SNO SJ 2 <U 22 t }� V=. O VO�fW�Z Q0.0 � < o�� In�� rnw vl �} LT?, F, �2>¢� > Inz= vlp vl} ulU In (j a i vpi N m np m 8 P. o V p uW WWa zW w Ua p .Wz 0 J!O �Z � Ug, h o �' Y u it, ola7�a o�a2 m o ��Jw? (Q� U po c7� coo cl� C)w O C\ k' I^Z r¢r$1<a i L'I 4,, W W�l OJS J<< JW JZ Jf JIB �>a'(7Q 4.4.- li?a Wm w0 WW WO li N r $ I } gN Z LI �o J W Vp .4-6 Zo U $ vl at,,,, ''&s��,I yN �M' w w 10 Z< a� 2 O 40U)W j O .coW Zu oL� @ w� U J ��' i, ( \ >i w O �3 OW .. Z w r— I I-,, i rn 00 �W Wo r:-r < �w BSI Ir0 vo w I I '"i-. '��'*... toa �K ICU ••j1) 1. \z W ,7.. i ■ W� z�3 rO J % i W ZOp (XVII,001 UW �" E., C C^ , W OU 0 W>pZQ ZI pm 8011111.W �• J W-N E� 21 S l.. w _ Vr< XVII w OE W S" x d % 4 O u l„ my E:a Ea O �N U *l6Y En Et, r- _ gr a a �¢ �aY °° L IO w !- w o I/�/8 W Z 3 O ` r • .424 =1 WW � ��Q C a_ I. 1f �W mg E3� Z OZWUa w 0 �i/ `''� WO �r ll U MWJm� ? OZ `0 w UZ Ma' !^ ¢� O w¢�w> Uo �(�,� �n WU LLO~ 2J SW µwj< q caw a I�II�I-Np Eoo S �� jp w¢ow¢ E^ iTLL C\ xoZZwo 4U ON U1 t�¢In la. � SO a an w Old LI.£610Z/t/Z1 NIP'd01\D1DDoS\O0Y0\II'6 01'I' Ylw1 aa-601S69£90\aM-11vS\Ix K:\SAU_HR\063895109-RR Lake Creek 10 h 11\CADD\Sheets\TCP.dwg 12/4/2019 3:17 PM DISCLAIMER: The use of this standard is governed by the "Texas Engineering Practice Act". No warranty of any DATE: kind is made by TxDOT for any purpose whatsoever. TxDOT assumes no responsibility for the conversion FILE: of this standard to other formats or for incorrect results or damages resulting from its use. 1/3 L L B Work Spoce > Shoulder c) 0 m C> * m x H X Min. le-e - ••• ■L ■ '7—i' ■ • • 'T• • I. ■—i—a • ■ li .. • �•` Shoulder 000,� - 07N3 XQ t X N T LA O O. .-0 I- r,o r m xi o -O o- m ° X o ' m m-ii v X CD v n O N =p / X X x, • X N N to m to (n R7 D�� — + yXX ,� i- - yX CI o X a1. s. < m N m -1 X D 7,n m X7 . Dm IL/ X m n (�1 1n m N mm*\0 ._ `r CD O m -i -1 m O ✓ •--F -4 .+ --I X X X 03 X a X mw :o s 1/3 L L 8 Work Spoce Shoulder 0 14> In C> Cs> 30 X • Min. �+^\ •i�—■ a a �i—■ • • ■—i—••• • ■ ■ ■ ■ • ■ ■ ■Ti ■ F••e —1 c./ •••• � 1'�T•:t:^`�;�.?ci •• .♦ INEND •Y'.'i:.�i ?�, • • • 4..;; c,• .., 5 1•tT.. Shou I der 2 Cr) tnnvrtn 30' h -•aCD o m Min, m ut n, m w 0-•0(0 [ : * 1D CO la v L 9sNo O , I .o+ .o+ 0+13 OO tom XN X-' N O 1J£-to n m Z nno° -io cn o-•too 77a o xoXa-a+ + x -•tD Z Cr -0 a-7-, O O N ICI 0 307 co O + 1 K N A N 0 * N -an Z p u 0 * N 7 a1 - m co r>7 N D - U lOD N�[ n N +O .-o v rn m J++ io rOOto O 0O 3 n o a a o r mm�'�m o NJn O2 o J '.' - � N •c V r O C X O C O (� O); V7 A 0 1A N O O 7 0 , W o n (1, o 0 < m , -. m m Ln to a 9, m.o ~ . ]'\ O 7 fD N O O~ fp O lP O t7• O 111 O l.11 -' O O, O al m o o ry3 c van o -a = -n o 0 0 0 0 0 0 0. . . DO X -I ru m O ` ]-44 2 N D C to ]tD w. -y - ,a ri '� to eE O rn v I ct,- ` O~ .--. a C O 7 3 O - .3 32. 'r7 ,c Z.'- +] _ 0- - z ti f7 +] t0 tD CO v m m Ut _ N O O N r m e..e O r�D n n 7 o N 3 i r O n m O a m N m o a µ e.e.e /� O O O O O O O O ni r a m I�1 i?�� la Fi' (On O U N C O't+0 V1 O-h y p C I °„ a C 0 O N 0 0 n m z n 9;' co (I O 01 cr.Q UI i. a ] 0., .0 Y. g 'Q S O -• .c D a 11 G7 to o to N O Ut O to m o o°o v1Di �, rD —C 8 . s m r, e� — O nN °oaC ' v� + <mD.A - -I M-050 - , r,a x r+D 7 M. S ;it.m ` n m Ti ti n-�0 O O (O/� '+t'C o 0 �I y, a s 0-a s a C -- -t 3 D a~•O o O -+• to+ tD 0 to] ~ o O Co - E O D m tr a tom•N - o OD�O O 9.x t0 -h t0 Q C x ..N •� X 0 ' ti' �a o'n .n m Dm 00000000 �a o m- �O - +o < + >t7 A * to O O C N or e� r ° ; �o cot o m ` 0 - -`n n] - mei O N a)0 C -� N m r O t0 7 + ] _ m N-I O C �N oono �� m �� F ]j i'a m ., e... �•� r a_ -r• a m Ut a a W N N (0 ,rD •O TO > O > H. �'to t7 O a N - to 00 a ui -'�+'O '0 ID n N '1,O fD O N W to „�„C'• O ll• O U1 O O l.n O In m N O. 3 cr i `w - N D N- 0 Z O n� a ooa -o m x N . O 12 0 Kimle >>>Horn DATE: DECEMBER 2019 // ............T I DESIGN: SRM +��•,.� .,F H LAKE CREEK 10&11 =�`P• ' 9�00� = DRAWN: AMJ TRAFFIC CONTROL :.: :,�, F�No.F-928 �/ [xjAS,I EWA I�R2600 Vla Fortuna,Terrace I,Sulte 300,Austh Tx,78746 P:512-646-2237 CI) '-' DETAILS II VV SEAN MASON No. Revision By Date CHECKED: ROUND ROCKTEXAS /o:• t10102 ;��, N KHA NO.: 063895109 IMPROVEMENTS �4j��;-<.!CENSF°' -,sir G� II� 4,•,O••••••.SS'!! 60LS68£90 :'ON VHN Cr) ;,�;p�S(3Oj5;sti, S,.LNHIAIHAONdIAII U a}op A9 uolslna8 -•oN ram:• zotoit ..o-� SVX31)OO J IiNflO III S'IIVI I CI :O3)103H0 Wri NOSVIN NV3S l NJI,V.W4Is�nA -r w L£ZZ-91,9-ZIS:d 91.L9L'XL 41s.Y'00f•11"S•I.�•„•1• 1�,NA DD9Z i; y rWV :NMVap X 9Z6-A.,L, �,s... = IT OT)1HaND MIVIH "IO2I,IJI�IO� �I3,�d?I.L U.10H<oikaiw!)1 II.30.3,1n` WaS :N01S30 f<<����� 6L0Z 2f38W3030 :31V06L0Z,ti0�Zl O TiU dfl z T N i .9i1 o o in in b rnN 0 CT �o wQ 40y z C rnrn If!F O N In O) N M in 1-Z a L O 11 11 H o c E co,'u jc a O O O O O O O O O O v n --:-`1". c a' a"' J .. O, v L.�' c i7°' N to .3 N 0 0 0 0 0 0 a > m u o c v� O 2, 0 z c E U to 3 -s to 9 ,_ N M - a) tO N c0 O) to w 0' o)r •=> °E•- J v a N o .m li o a '-z a) c .o S o m 2 a 2 U a) m u-°v-c 0 Q ..\ • o a, ¢O v. _ a..-c o v n u Z- rn E •g R. '0 a� z c s o ,emu o, E m o m �,`m u m m Ul cn ¢ c c °i ai C U N N •.- O, O O C O 2 H O N "' J] °O a, y J° L 0 U .- 7 w' o N O O E p, o o o o 0 0 0 0 0 d o_N J 3 w c ,., ,�s -v n-' o+rn ='H O W 0 I o S O F Q o_ I` 'o o c° D a c0 I� 00 m O N M in N ~ u°'i w 3 a`, a o o ° w cmi o o H m a O Nf•�� v, 'v ,- w ZD' m m a °' ,= ws u E v E-2 .0 o 'u o L �/ ■ K .� O I''c w L, C' .10"J E. E O 3 a� o'a rJ y, aci c ua+2-3 W L/1_� L. CJJ v o o Q >,° E o.w o.0 •3 `n J7 a, . a a u',- a (� V a' • rn, U v a O to O to O in O to O if) UJ [n Ow o .Y a>, .w-.. c,- u:g a- "- z c M M ,t to to c0 LO N N w -' 2> I w �^v °w c °v o N o o a, m O z I- $o O tr O' O c a,.n a, ° 3 o.. n 3 Lu, va, c �' - w W N .. O J w¢ O O a T 'O tr'3 C a,0 U N - .. U O Q CD O aE O Q ~Z t'',0. a E o va,i ° m'N D o_ o c a`, ° L 4- 2 1,1 -0 o _U t&E .'v o E- v o-'e 2 'o 3 6 u o a;0. • IE U o s -O y p 4'0 0 0 0 p O p 0 m c y Q c v a, o u o,c J [N � d� N C O [0 N C,0 7 O -OO� w �� °�' c rn c J7 y o�' a E v t- � a`,;,_, ~ W •- �m�m N o rn N N if) c0 t0 N N co O) c U ) to N o w'u v J= w d ° v 3 3 U 1 o 7 C E s .J=• O to U ¢ U �'a, O _° f„ p, <N N a lc co E m°' p 3 o m ° 3 0 'o m._ o li o y H u p a,.c u L s Q o o O 1.,„ E o ac m 11')in n O II) O in O to II m a n'w a cu,- `r¢.0 c __- N" >,v o~ -J o rn m O > c O .c.-, w co N m Ot in O c0 I-- N >,C Z m n °= w v o c o o v u o I m m • y d m* O _ N N da to O t0 N I, CO c 1-O v o 3¢ ¢o 0 0 '3 3 a °'r o LE a E c N m mo o¢ a O,L o ` J - E U g'm~ ca', a,y °O I,L '.' c9i°c a�. E E a' ° ¢ ) 'a a _ M >, E ~ o ai N O N II)In tn O O O ID � O to o a a In N (n c ca'i n° °3 i°v L > a 3 v 'r m v 0 3")c'U O > L N N d' tf) to w tD N r v,> u .,_,v E o u v • o °a u u o c a a •O N C tT Q O t O w •tn a, O Y'3 O 0- >L a) O `, O N° a N O IT O 0_ H L- v ..O¢O o c o E> >. -o 2 ''a - ; o n u F S H L in E N L J o 1,,E 3 ''_ o m 0 o i• ° - a a `oO O o C 7 -a C .O g,J= nuO" O-.8_ m.J ° L N v "a'm o.4 >.'' rI 1- FNO m▪ /I©: • 6 II1 J > a) O Q u- a O o .0 N- c EL,o a p L. N o o t` a 'N>=.oO 'Pc.H2o °' `. f-f•- O 2'd(n 0 a II g w o Z rn"'t U _ oy- wU - °• a_ t N y, o m J= o m O o O to O o O to O LC) U 1 _:I* V V t) L 0 O , I 3o O n a o+uH33, * _ I * N M 4 u1 to r j c. N N K, -N.0+ H Nam]16, t1D D_ a) pDD �. O O O J�' N O �' _1- I x '`)xc I'"c fi x Mxc ox ox�° •�.. �N� 3ioN /\ ao 3,-� /\ 3m 3m°m Wo NN \ X M / X M it '0 10) �3= 7/ 'u!W 'u!W t 8 a<-I Z/L>1 aood S Jo M c 9 Z/l a 1 1 > X '< X >< X a X • uIW OOZ aoJdd'V p£ '7 l l 9 4 aw JapinoyS V '.',;:-',1•-c47,' \ • ,••°.0 • °,,,...,,,,,,..0:‘, a a< .• • -___._•- ,4- .;,!.: Z ♦♦ ■ �� _ . ■♦ ■■. .-.-N■ ■■ ■• -.- • <C ~ J L LL LL JapinoyS O r r 111 I< X X> ' X 3< X " > I o; N - Z. in se W .c c N W C N IxLi_go\ 3nv =/ -W� J �` a L`m�C Et �7 ♦ _ \ - ntf,OO IiI O I:l o w� o 0 3o°'_.N w Ox ac o x �, -� ___0 O N N_ 3 O O¢O UL U��,, U U M In O'�' • C]Cin vN�. �I cc to .3 I se O xN/G Ox ; WW p ZNJ� w ��J / � Q x � 3oo ct 101, >< >•< '.< >< r< 1goods ,IJoM 8 1 X X X 1 - -xojddy •uiw,001-a F ' ,0£< H £7 ali JapinoyS i: ♦• JapinoyS W a • • •''• �' _.Ia • a w U I— W JaPIno4S I JaPIno4S Z l< ydw OS Jano Joj x£ 0 1\. ssal Jo ydw 05 Jol x . 0 he a\ ,. a 3 C F°U) \;/ U YN O ♦ L.-O O C al J=w �Q _ gm O c cv'y.v N Z ox m o o o u W G N N_ O N o¢0' L C p x U��(3),) In H O NO lT c N co :3l ld -asn sli wall buglnsaJ Sabowop Jo s;lnsaJ loaJJoou!Jol Jo S)DwJDl Ja4)o of pJopuols ON)to :31V0 uols)anuoo a4)Jol l)9Ilglsuodsa)ou sawnssa 1Oa.' 'Janaos)Da)M asodJnd Au°Jol 100x1 Xq appal sl pwnc ALID JO AIUDJJOM ON ...Pt,aoijooJd 6uuaauIbu3 soxal a4l Fq pawano6 s!pJopuols siy}to asn a41 :83)NIV1OSId L lld LII£610Z/1/Zl 6MP•d01\sl..4S\0OYD\11)P DI JD•'Pl L!a-6DLS69£90\aM-nVS\IN K:\SAU_WR\063895109-RR Ladle Creek 10&11\CAOO\Sheet,\TCP.dwg 12/4/2019 3:17 PM fl3arylYEP, i GISCI.IK�. v I�iF2," ma w[n:F. Prue•v+ .r'" oar[• .Irani: +�+I.w ra.+o: .�Ye.w°r+timi....lroPrx+la oral: ..r.,+ rlr.e •I+n•a a+mm�.fa uf+v rarwo+a d for rne.rr•r•r•ul+a>mippn r.tul lirN liw i1•uN. • I[F: a 1• • Ar•11'v far:t.:4• +a 4.7 45:1np I c+I we.an.•r•lo. £m ' °Rg=.T I",._ '41' n1N 5 S I 9 99 w ti F. s _ �Pli.;,�� 4i i'•m 1 R'@' R u a g-Y+ IOW no':'_ `cmn n: i' i m 2481, s 112.7. ��o»$ atm `�fl__ & c, 3- p8am R 33 g qq Rn- g I�Q ,� '',1 X'�g� q �q�g 'R #��R � D O-o I g9�Rig I "•�,ir � om�:K = +io =,9 $ 14I� < <g _nm`. „� m mS g'Sym �cg °' m y � _° g'S� gn° i Z �._"''g- _ °" a ."n "me aer� an' m R � mR�"a !Nil a' 3 -rim v ss F9 m n R'9q -g;m 8 _. -o '3 - §r 9 nR.R`^6'o gci»8- 8-g'. ��9R �oU>sR s $ 3:i4; oa3 iiiig4 Ina m I n 'mn9 y ,o"m m'm n, mW-U;3 m»3 °3°+. .7g or.R R o"Rm° "mom - m I R1,- y .R@ R R R.1.,77 ,...1a u.R S..RP.omv :g°.RA g8 OR g=R➢ _ R $ R° R oR�sa °$ - I Rym.38 K -3- g 9- a _ gran3 gg li5' <9 " I0 9ga ,1 y �• s;;s;4 ' alas -,i ii mNiu ma.' __ '9w•. '°a:a? Rq I^s9 n'm- 9'9 o' Q9�o 0 s$fla o � m g$x 3g=44g v gaN� " 'oR m9. :1:'. :gcs 91m $i.i.a $o" g gum46 - gq o^ .gW, 12 _.� °g"-•`-•: - in ' 4 I, 3 �1 m8�°`� :8 o g Room�Rg "� g �' oA1g=A3 �os' ogr'g R � z"i�8 �n !q'.y 3,•g3.yo 5$ '''"o .�,dr°_.3' 2 ? _ yR'm" m o'_�E 3 Vo e$9m_m O_ri`T. o'_' ^c !_m mm�m9 RH1,7. oat °RS a.`�' °_°SmR ti i," s Ao ,3 0.-.%1 F$gl A i `o-m 'T 2 3go>r S o' m1,$n^: 3_ 8os- 9n ° gg ''9F 3 a"' gq n no ..». Ai," :' r -"a g Rg3s P. >< :- a u8 i y"`_.m; mama o a e 4tilA'm '',38m -g. EX • ggg v9 g 'g 0ta c _i ��°514: a g r.' g 3:"R4� ',II g R° gg-°oz o < SRC Ira .s844i' ` °gg RoR ^4m, ,g ;;'11R 'A -'��'-' f4 . vi _� � !a$o- R." 3 �"_ _;Sg'=U aRw gS�R .` NI- ' �99° -g' �g �$ $s g'" " gi43 3.9 m NMI 14,1 .n' °gi; g yo a="Mgg.N Raq 5 3"1 Ri ,og'ti a!'! eg2.°_ ,Rg gSa^a ° o ° ox-'r °.,. " m minim: m .9 ° .3 g$ ad, 1 a R ;4 4ag°2 . - S "na: R € R os � _ :g. kd gsq" 3m � a�39 dn�g mo9 3 iE� .1:' 1V9 - - a3Ro 4 r 4 ! RgogEo» o � $° >a,','$'" 8= mo:i ''� rap R..:m' :Rm 'G ° o' n la o xmma»° ao ^ $gfr m ' '8 8n° " Rg° a 39 ; ggg Nn"n o o $Rg o' •_ $9og9 KsRigo R ggig gn 9 ogxoR��" al Ra s'_0+ 37s N o 1 a.76 4: 4w,- o a,fi a_R`9 il 1'3R 'g P,='4g -m3 °li g.g. °-.. °y $ E CD o.,n 3"8' 9 R _il N os8 _ p" R.°M m -Wigm >g8 =30' 4 o ugNmn m n n r- ` v,m-g �V. = 4 oBmN_ W'a a9 .5 Sich- $ ' R3 R� , 3 0 7r N R la: n g' 3i o 3'a11 4 •0_9 i -F= .2 o a 7 1 '011 °gn 9 is I"A A� __ R Rg;'71.'+ 9 �o+ m i 0 ,R° j 4,<m g$ ii a . m m $ ° g m mE-•a lsc', . m 9 a N m / n R c in o R D IF 3i`� ;rg 5 x a; . _ agia;aQ > G1 8 •y 90 aWo 1V n 5 8 ,EA $$ Mtn! t �'f 9 a' P. °'4 O`=o •0 a m a C B'Z gg'y: na'' _ aa,sa fa I n 8 9 ".4 29 €_9 _ ,m +T 3 0 ; 0 o c a O .a ;i.: �u r� `�I ..I i• 5$, s q4 a a'_ ?,'R .� y 5 :4 N - g 1 / m o f 3 -n F o Rgiq - /r I ;I I II I T aE 'it o 3 `a sm °i gn +- R' _ _ 44 sr3 i 000o i 1 - 3. r. 8 , gg"Ng_i - g g-9 a" 4 9 nIF 1 `"m Z'< 3R 2 ?_ m _»i 8"-- O O s g E.� RRSd m � � g `9 v8 3� G ��c [qc $ ^E. 8 F$ 3 gm o r r O - ori ;(1 m'ygm �Sd' �' ma '03 a , ,°1,,, RR.N 6$ z . » 'e. m m : "` Y '; 95_'°_9 _°3 a� i + O O O -$ :9 iOgaR 3 1 __ �y $-• - m Lg3,c [n _ v_ - g$ g9 � �� _' wa +Q m €_ _ 9: gig 00004, , J r ash a - R s'» ,R € o o g p,� n„ - 1,y g 5 - ° i-, J S'� @» 5gg o-e -ggr - B g `g °7.N O . F�7 - z $ m mR R --' ly; r I.I4 e.Sr i,1,4 Mr.,,,X• IR Ry R3vm _3 5 Rg - v+ 0 90 M .e1•' I.• .s1�1�:.u•. Via o as o w 4 3�' g I n ' 3 N -F = m Sam a5's:m�i 9 B a 5 gw '' 5 x' I c1i < .2 E 8a9n r„ s' 05 2 S tf 3. C7 4 qT V z m y R H I. �zm I r N �a� p ^r V,r I .- $ ono n ay I ;�g o s$Fi I.x # , 3E ! I 71i 54 9::-',.:; 1t,r �` + r ! " %T O-z'.�' 3-'y I fl.a4 :s ac 6 `*. �Ta 7 iT7 [i[., _ #I...S I� np a w I O.0= 8p6 a _ 39 9 - x ri-1 N il qR t ffj�� . 9 9 P m.i. [-�-i J=$ eka =mom[ II I _._:1" �•� Ohm - ^! �N _ rk- , if- x.1I.9�'o - s 17 "'~ flh ° I i j 11 +i.xi or rrM°P'...+'• 711 a 4iii iilir rar •Ira slwawfc. _ GaiCr nil MI.a:E r r.-61C-•f> •i•yI ,aroilY IOr Mm+ "' F ICF+ u++,,,.•+.u••r...+„rr r.••.ra a.ru liuv.va•reu,e,.w.n1••r•.ul l+N xm If•I"un°0P PM IM 1.04Qii "I.N r••"nr Crglal,roPr.rl.. 11 Fl n •cf r• f•>osmgs r• ifl Irm Ifs uu [-. F g i i.= ,,,„,. ..... g9 �/� es' z Y- '47-a a la,' kil �� Ea � gih'q"ay" iC%s1' r� � /\ L_a I gga_11 id_ 'R L5 M Yi.; t2a :11:::;:::: � Yga_xg£Y 'sas$T • dYy7 @A 7g8 N Y$ „ � � _i - b° _ I2 �»�E9Y8 O g �d,/ Ygg si„x '"igyvs@a i5.9 $ g;� R q$�j 8a�� . N , ° $sa - i.V £„gY '� r^-+n -34rg '� 3� i$= Pgu 41 :i N 97it59 ,� �€'gs9. a .:i -iis aiglig@ - '-a' . r, iE6 :� P'-i _ ix3.9Pa " /- k-I-A Ea39ga4 uipigagg?9 - 9�� 9 ug• s Y 1= - �g eq € ..I - e m _co s =ail ' ���it--= * ICI! ! a° gPi3_rsa s = q 1 U g3 x i W., I �`\ a'2sg aa$vi ;9g,ss 114-T R_` - 9 'iH ii?giYlgb - ego-°»�Im< i 9 ` i. 0 14:2 piegl R ' -.' - �..., -L tlit 9 _ $;;Y �� � xa i ^/!p 1 :;gg a - illy i/ i }i ip � K��%/ �y,44,/,;%' o i I` - YS.x� D N® ` ag +,i 9a ; m I " � �a R ' q$gs i R;i sazi= :% i�i��i �\ t i C gi1R \� , is I i : :4, 27-h! OKI :g,'.$� g 4 1 a--`e. .✓ ! e ig s" �xi x N = 93 ii 9 `e 9 -ii k m I z ? Y I Q i 111 '§ gys� $ �� if a���gRsg._„Ra_�igp i4;Y 9• s 3a 3 >r °-! $ I m;gsE is ; N g?a ;i &':It at im 1 a 9° - ;Ga;5 € g� 999 - -• -y3 is :. R - _i p 4 9; az g; .Y' _ 99 y g -e_' fa ya, g -' =.p 9'+ n ?' s Y3 R i $ 2$ aids s sd9q +1•iya :9q,E;xi9 : is as - I $�.c 9 i- $1 WI ae„is 9 +3 y alg; �y1 1-3ay ? eg i P i :i i #a?9 3s9 x I N h g$i�gi q$q g 3$� Q \ gg fi L [°. ¢ :i S N a;¢ • si a 41i ai�a = 4> 39 9i i 4' .a �a3S" :�& I ;iR 4` 1i ; a y gg9 gih qi s r'"-+i R F. i gII 9 3 i61-9-iY4 @_�+rik av-a'gia ^_p If. ii i i'/.. / i6 yx - .�/419!(� E S g ,`\ Fa `rx 2 _& 9 $ q - 8 0 i.P�-ei !i:iil 3_3il'g'� CI" 4 • , . ;9 a � ° Ra. s Q '-y _ ! � e21 R.,a�1 li i yg! .1 9i I "� ¢I EX- '$ �€gft gY" n i.'9f g :gg99g �1 i�YY F q ; m ! :X - i a •nj ,. _ �ivi� Ei ggvol� 1$ - a i� / I -/ °� PlPii . g �iR aqi z 5 !s :3i ai=a�g 1Y 'iR°-@Y ' R R=$gg 0 X m a t g n$E i;i r 3R�ai gi g rid: ii �2}Rq ; os g 9 R maN .; fl i3 �' I O �7 I A li ® * =I s 9Ra " i ; �IL • •a 1� �� . 1,1g11. q 292 lg;g�lg`g�8 i!!.i1w2-oR$_5 :4:71 --® i I e g_alsg - 1-= - 2:`£e ,a1 m �9 ow Y�}:i ig; R Ed E4rig "_- ;! � �yg gpp;37.41 4■■rr >. - ,��Ty,,�1' _ s 4s1' n ppn _ 5g, ° gr sgq 9 gs ”kia _ eR?R$Q o:g '1 P8§•3a21 F7I is I I .//fir.'G 99i€2 t'Cbs n iNii 9gd Ian^ R Q\ I : Sa R i7 ,, ,7 a YSRR 4n s S ° a °...$ ,3E_a g `i I x o;so =:s =L�ti:,:: _ •3 11 . coil O$ I _ '®` rya= g.� i � : iid8�9„ `89@ „•4 eag±t F�+ 43 9n 5i = •=4?.a= gGe=S'7s a" $ :fi '°" ra•Q3;:-Fv- g1A,+3i➢a"aE �_yF >x X�e I g ay \I ,.g * . pg yg 6gi .y qq _gBgSII1IfI,�2p„,58398- gd � g9 i:�R9i3 =3y ga9Aii'9 y-3i$ dA =�.3a »§i9a9$Qa •'!isa9 a3�' gi9g�� a� ® O _ �� 9�R4s \ ��.\\ \\bf? • 9d IAC3� -� B i$[_ 3q9-_ii IN a _ -- - . s- igi a3ya » A_ P .B -411T 9 ,,, ! $$ orb= °-i 1 -.ifs 9» waXc.� 1.3 . ada= i- - 9'i �V3E�•a 8sg ;rr 9: �9 B;BY_9:9 'j 5s•p oe �_3gppSS�gy._'e$989'7 i-;��gif ai}B i5 g�i i @ 9 i _°i o 1 I tJ, g S m � •9 � :RY'Pgg:gg�i 9 1�;E 46e9ysg 9 :; 53'$ f3Ri~1.14 3p��Ia-gels! Pd �4Ed ie� 7_g9e9@ 432 g9 �9 i�5i�$�3'9 adiE'-9 5R oiR _ R 3,Y:SA ai`Aa3 M . . " B �A 4 //• S�I oI€ � ; g'sg.$° 9gi-eii'gaq'$~5a 3gig�Y 'g Eg gi i9 g f;9� i 9 97A; aid AP9 .�bg�go Y�o YR ys' Rw "'Y,�° �'oF I _ x - R.oA g» / �� ai - A_ p 8E gg i g••a. d iy s4g4 g I i- 9f S , :i3;°� 9 Ov 6-,31 r RR F- •i- SE'Sg8£8;: .9 - f9-=9 1,, i _ E § 4,, 9g-3 tang:, 4%.:3 4.9" yf.0114& - g -" q i" =11% ©A�^ c - = '1' X rs 7I •41 I dPQ3 -9=. A9gg9-e� a `g+f Sd ;Mi. S�`d �R !;f9� g� i' �- Pi .� tog:, g Y5•o$-=� -. €-.E_8 - R3•r9°Rf4gpgg -6€,n. I • '^ c�_ g4 "' '� R9 1i ai1[i eY• z7 aC g9 ;M b-= Ii._.ai g0= . Pi $ .liii 'Ifyi9• -'9 r};ig9S=gi I i'' aY ° . i�idA, i•--i- o Q qt. s ,2,N ii - /I/' 8ga' i4ii;'i9::i8_" 5 a9Y �b9^� i,.i :+�i Alb9� 3:$�;�5 9 Po 9�T �b! b 93.5Fi 33gld��q1a ioy^a��ll"35 I 3= = • °R.3C! E3$��g _y^ -A „E f- I 1 1I� Yai "Ii !399 d^3Y o _ f 3 - 3 9' q p Yi Ia x » - q r _ ° ,i-i) g3 "' 5} „u 00. r .I 3 �•yi S R -sY •' e Y �£a�C �; g� �Rs d'8 -xY 5 Y 5895�p8 I if g °°4 A•�:_-, $� I a fi�3' �yc �� `:'��I��I 41 Y 4 2 gilt; W YY 2 22-.8'=o at el 4-. 1a a 9Y2'71'i , `r: 'a ' ie g 1 �1 9 a3 yy_.a i �_.3'3 s 655 is;s �- �; _ - -yii fat R xi= a _ ±? Al gY_ 2gP 11eZ g- E 9a' 4.$ R& ' k'i_9. Y1 dB . 909'P i _ g2. ?"�-P R # f d� ',Pi A- a;2 y- g3a'E-i ill '9s Ill sa s9-.��$a Z 5z $ � .95 .iF• .; i:9 :4:: b : i ,-;3i .l _ $$ Ya' A dY 1 ;°i Ri a . y sg I5 pii !9 4 5 ..I ! 1 0 - ga ,g. n _, '#3 g - ii• li F_P a 9 3x 9•' 91. g95 Yy! 9?y ;; . 9 9$ � I•59 id.1 ' g199y;� i - i:! °i 3.Rii4# »$R_o° , „ _n 5' ; a 1- i ,72i 'i 7 Ra 2 gB i . $g g i a d :`_92.. i, 'iii» ; a . : W. i g i•o': ..! g ;x ;s l ;i`- 9a °8 4 i g F 3 3 II 412 @-i ' 9 i = P '9 k a I�_ a g s ?3 - E! -9" q„; g ,', i� -,, �aa �w�a� R _ 9 ill 4. ,!. Y"ig,=. L : _ F1 b la.: B :9,, P i7 - 8 - n ...a ERE! Yy » y Cg x -. ,.•... 1gg $ �„y• g 9fh 6'�a ='� v `Z� g a Y+iY $q'q 2 y''93 Y 3 i - '� la.: g 3 ; ee89i g g ;, 3'2' i ' 9' 1 YeP Y lY a A a-1;1 _�� i r- _ 9 (i 5 a4 gq eS 55 S_• N ir:w �'' m ' Ymi 1 d:4 °-i 414' I-P-5 1 2 7 a 9 -2 gy •i ' i .°da."1Z5,1 3 9 f F. - v ;if gI ai v E gg 9 ' .. _ ° iidY'. d d @@ e El:.; ®I - g1 a ; &i 3 „ m. •aFi mq gib yi35 as g3 Q€LA a 9 gzAi1q ti ei i _1 d395 �gg 24 Eli . , m3 _ g Its S Q P 9 E _ ` Rile R { 41 9i i l d b ;gi'K.1 • 9=§9g-3 9ff' a >< ° li 3 i P •R i. �3 n aI 9 S 8 ° •9 I ii o 9 g 2> o f ,Ii a Yak'"d alai'' z g a g4 " g 1.5ge4 tr ` , iN§, 311. w F a I v'9 Ya a s $ is Esq m A i g3 $ g _s$ F.9 g I W qm a o „ = g_ i i Y i9 3 l,g y • c i ao Y� !s ; [i� iS _ p a g IS"- _ a y a�� a" 'n m> m Hii_ a R i9 v '9 € R3 I d' c ,R 1 iiit .0.•n ' 9g i Is 07 g i $:::q ' s.2 : 1 i ;Ii4 ' i ti4WIa ' - aY�nt I 3 ' 3R3da . Z_ ',. a F E E 1 -$ 41. • g I�i E g - •.I" 1' L" 1 o §4s g9 C , 3 g - 1'9 33 11• Ilia # r-s�_ r 2 • g !Ai' 3 v ev A „i f ,3 4 ;4 -g n aka ~ N a i ;� 3 go 9 @ a $ i �a 3 jai ga� r i iil- sin - i9,,,E S a gi 4 i a . %• /$i"r �x m g s 4a i� .4• '% B I iY" P.• , -r �� _... . 3°5. - es 9 Pg� r° mNssa„a n 5g 91 -' m" 31 i 9 a�" i �sv Ig fl - k n ag v •i _ e» . • R $. i �g � s ie o e1 a` a. i' . $aasaasaoso5i %.a A i } Z 9 e J _ a n DATE: DECEMBER 2019 `"•tq�/2019 Ki m l e >>>H o r n DESIGN: SRM .-SE. T 1t TRAFFIC CONTROL LAKE CREEK 10&11 =��P� es4 '...] an DRAWN: AMJ ;*: *j Fkm No.F-928 f•*' ••* 2600 VW Fortuna,Terrace Sono 300,Audin TX,78746 P:512-646-2237 1 DETAILS IV ROUNDWASTEWATER SEAM MASON CHECKED: ROCKTEXAS ?"0'. 110102 ;�,�", No. Revision By Date KHA NO.: 063895109 IMPROVEMENTS �i;� .�/�ENS�o:���= II tjs••NAIzi- i\lam-n , •v ..-.-Ay4 -77 60 LS643£'90 :1:Thl VHA ir) .ee.014,, .0N rt-,,,,1 zowii .1.1, SINHIATHAOIMIAII A si[rviaa :03)103HO IL SVX31N3021 orsinoti GlOO AO OO!SIA OH r.., NOSVVI NV3S .0, IlaINIAMISVM ,,- 1' U rryv :NMV80 i LEZZ-9Y9-ZIS:d gram'Xi 011.0W'00C 10109 1 6.0.1'our,voi,AA 009Z o•-. *a i•r, '1011,11\103 DIJJVILL H 9Z8-4',41../.3 •• Al., /43: rE 2S)0 1 NaHlID MIV1 MIS :NOIS30 woH<0 AalwI 0 N 6 1.0Z/CM l 6109 L13E1113030 :31VCI V 13,J,,,, iwal'E. ..•..1 ..•,.. t2 :--. 1;1 i!f .1 t t . ,-,143 -0 • • 1 • 1,-, 1 lig 5 2 i ! 4W, .1'1' i i It .... a..• 8. *. Zt 1,. :rl 1!f, g ;...igE i" ; ,.. -'-^ tsli..it it - 9 .6.1,n.,i 4 g. 1 Eac.i8 Si '. s 8 ;*I 1 c,la.m r iz i-ii iltit!ai ...t c. ,5 t''' S I, A q PI !!fii!t' 1..... ; ..:m. _ 1 a ,51 ..,glif : ..% a%I !dir •,:,_,;, I.. iiII r:,"_2; R S I : il,'• , I 5 u .5D,A gn .,-.A at 14 Li ey; "Ile.gli .•. ' • i ON,v2ith-fill ill % : _ s Lk,! ° 2 tn.. ii1i w 5 'IS"' n n-e. !- Ad i .L •-- % *• - 1 Wipilig1.1 0 z r'I iiil r 0 It g z- r; N =•. 6 1 !:!ii;111 !--i RPM WhfiglIti5L ..- g -Hi l'.;hog, .-- '7.1 5 r nr ‘ 5, ., 55E 44 m2.7,1 Hit °V ;WO; • e f S.%, Yg.tgl,:g,ttfili , in 6 g.:,.1. Ci5 :LI '‘V,-,- 427. ,g.,144.,!.,h li .6- 21. ,•-,.4- 't Lytki1;, s . .ir. .2. • 2r' _ ..g . • f ,11!ip . . . ... . ,....., .. or rif-At- ,,,,, -_. •:,...-v., ii.• br ‘!:•-`,tz",- k, 1 g .r -,, 4, -- • ,-.,,,i.,,:t.,i F4,;; i iiiivIr .15,,.; 1§55.1,V eggIP N% 4' ,E.W .FIV-45flfii ,-,-,'"tg ' '- i .'4 -- L;1-- 0. ir5t g', 111 1 iiS'Lc-Tn'43.I;.t!44'5.,1.-,, .:'-A1c`,221..'-.l ].!'P-_: i•r0 g !EaI; MH'-'1iEI, ix.,"O,i,.=,=A.E i5„iEE i ;?;;-4tR• -g▪ l;t1irl,:5i ig1I.E.l 5i;18sP....l-.i4tt.f;,.„gyvi br,,A2:iiiii3Oil:t!=c,g t,b g.„•Fi4-,.,.-•g,-li,,•.n::b-g,l`1..11.,,,..,ir.,-,7 F2r.I.v..5":8.''i..' -L..11t... i2ii..,q!.1E.i 8 2 W :: it:;!1:"I!I!.Ii:'1t' :1! j 81 1 2 d:- 39.3--z. N.--1.,..,. •!,=g.• t.ai p. h8.:-- .IA.:,-. a.-i iwm 4d i1=,-Egl,ii,rggItil %. gn ieg.:€• z1 a,(.si.•.:td..„-':1g"0':i-.:g.-.-0,q-:§;,.v!1g:1e i)%.pf., g 1 wI1! FTi4:g'l;! sklg....„, P' li,;1 '.el2i MIiift1!;.g'f1:i4"iblii= ,Pl4p-!1Pgi: aiililgi 2I! t " 1 df i f 1 F , - a . !, 5 9=18 l \ il ! :-, dg...i, •Ev g' :!,4 piM v_.l.g__ti iill.ff, 2 t \ ULI-- d -I'42"t-'tt1,i1,21l4*1iIi1it2i.lt!!Il5 1!I..4)'',1.21l5.!1;0.I'1:04-;‘;'!•=i7;1,gI:0'2, !1g--fi:s.!g'.-..Z1, .i.,I.1ISlriP,1-i' f!1I- .I$Deet.. H •--Alit,,i. ' :i'l • J ' tig1,.#Ea-i ..4....in!,, w ,g-Wtio.k.g1 ,tlb,, WA"-;, 77- Rilirn.!',4 7..141e!!!! g. 5.;,5 ..t! , 0 -479,4-i-„,.. _..,e.f.!1-0-. !1, '..? r.! • . ; ; 6I X. . ;.1...#ii5/ ip ; lit' 1,002;).0._Ni,=ti.SE III pi ,,Iii g-i;gitx; i il! iISE d'...: 0 1.-PV: :iise ! Itt 1. i;.°.°! .i Li., .?s:Piltals .b .Ii' i, .,L1X ;IL 0.0 ,L, - i '1;-Iiii lel 1 i if i i 2 'i P,11441i!! --IT:01 !di.1!;11144 g.Z1 / il ili ; i :Tut z lik) 15,1 ,...t. 2...-,.-5 ..•T __,_. .... , 'it I., t5t - I510 t i?g 11. l';.1,2 ;i* tt ; -6 '4'. .''' 1: l''.at ...1" ' : 1i [2 afiV.;-iif 2§ .- id: 'I..iii.ils,g45 7,1. t ;2 S''' ; .:a.,t-fr-gfligf T• g-; I-0 i g I i #_-• • EgIg'i i : 2 "r#fsg-kilii :i- v 141'1.011) 3.tfE!.g sk F4 i 24„! lb - 11 ' q-itIltrl' I': 14 i - ' . fiid'i "- iii*tilt1 otg!rii2iiitz ,ggole I imIlleitAligtirkk- q 0 gi ti-4F•tga.§413is.f.7.-,p ,Epg-0 ,g!1 2-11,.4 tti! -IAA,A,A,.t. ...!2., Waif'. N;g ek pi e ,. :ig"1nE!aiiiii 1ylg11.i e! tgV"-diAP!t4i"0 ,i.4-AzZgas 1!t i .AIlfgE!ilti ! I;. - !- I!.i.J iIlNlltiiiei:4 il;i 1 iihigr i! l l .1 i ; l on' jii it t p '= .4 I ' gi...g :i/IF'1441:11111!ilit i ;' ligqi ir11;:ieliei)!Wiii/ill&iiii !!11,11§-3 401111411141114,!.0111.1 lini: ..04•:". ' .." 1..:..or - g '..ihg_ ... 7i 4 wii1.1igagelij2;;Pilig .g-Otiev'g..-r 1 Liiiiiifig.Illattttf,,,I 1.1.P.151t4 i .V;ini iihifitigtaititi.itU 0 ' ' -4' '-• ts. 't„ ..„'.'1„. -1:"-s" a-"""' -s'il-"= I' 1: ,... ... • '!. 1 0fg•,:rir'il'lrl!T2ute.,7.1.77F.1:71F11;iali:StEit:': :3::, reg1illn!l7lIfii.:'.' iiaFilelii.IFRt:1:11R,! I ill Y / ik Imfg,. ..4g 1 g je li lin I N i r t 0z 0. 1, g s, it gq ! g' t b • 1YL, :: P .. — ,.3'..,.:1t"f.-,='i . 8 1. i_ Lya_ , • „• l1 Lit !At, iI°..2s.b5 2FA„O2 1, tb_1tgnWy0t.,,r1il -\ f1\ g lii ! !e.1,, ,eiit,l Iz;• ,.7,,, 1 otc.1„.2,,2-1.a1!l au"-,r',.- .ioT! —t , ,..-1-\ \ -5 6-,r. PIM .0- 2:.:Ig ,,F,1, Tg: I h jg • 1 E g.-▪ '=. i., .0.4 ..,ii ag gt ?tf.2.:' q.!..i PH ii Ili .;Fit -,..r. , , 6 i 1•71! tif 1-1t1 ilte:t al CM N. ni ° * ° 4% c•cr I'd,;,2 ...sr, : g ir,-. ...-,ro "to ,m- a :go !in 1'1 lei r,',5 iii'21 -i 55: ,"55 :' z:v, 1 P4" Z' '1 li ligi ;I!; WI NI Ig AIIii 'al ...ili - 2.! 'f • '-'-' '--i; g% 7 lil . 1 \ ! .:i.. 'n il ::.inil f.,„ Sgi'lsigP•it !fd 1 ij'Lib - 1 3 iig - el 85 ite4 1 ..,,,, , i, to if 1 -1 • ' .......--- ,ri o Iri MITIER, 5',,,, F., Z g6,! 111131111111111W '' ° 11 ' 1. i ig • ,5 •I .1.h - g ,7,, 1,i--- Ei r4iii ir \\- -"' IT i4,41 l':•;'f.,.0.; uggigfow- % NI fl 3 g g,-... 1 . '' ;jElli ii ...CSiihi-ii!' 1), gl.:::: E , , ' -I. ildi.:iljn. !',..1;rib 'T 21 1 - 4 P!11.141/11i \ 1 '.1;Ileg qt; )!ItlI 47 ElligiAl_bt g \ 1! M \ 2. ...tri !lagl Wii It / j a , t 4.:411'.. ii qUeillii•" i a i r'thilkillihillh3aii ... a "----- i•-, .: -, .: .:, i i '- .5 [ ;7 5-471 1 „ i ::.._ ..6.5 5 /I -I. 11."--t-'1 ,ff 12 2.§ .1•Ei. • T.E D _, , t . ......e le ,i ,i.. ei 1 5; -, Tt8T6 a m , 7 . fi;1 i :111-. i / '7;.L-11 174-ii 1 3 3;;rg iltki I D La i-I- ,,r 2-717-' 0- I gi 1!gfifil f q 1 • iri.41 I/ !!!ti k-,,i:1 5 I: • - tE. - 2k 2g = ,o LAI 1,5'---:_g .1,1,8k g _...._ , A ri( gi a ''' a 4144''''' lk..: )00.6tiiRP 1 leF `8' -gl qo q '- ' P, g:iiiiii::: : a.i .,. . k . g 4 , o 7..0 7,9 Irt, .bk . Nk\L - -,ia-,-,.igitg-,k_,. "in' -5: , -,i AlkbAi -1,,fe... - _1 11/4,-- ii.1 iii 41 Mi., L.L' A il .111,"gtzt 1 z f o I: <. ccs ; I— :.; —IN" ti.;gfililif:21.21ii 1,a__I-..sis-t1.t. ;7,g L, ,, 8! ! 'Lf . _ , z ti • r ' •01 4 a li .14 i -I- 21.1 1.21 fg. . -1 1 fietril 0611 li 1 -2 era 0 11-4 lil t 1 = 1 ,!';''' i : !I gi * , *, , _ VI I,: 1 1 z! il g 1:- t ..-g g":, St5 ,..•''. s M'- s =- 2 S '2 V" - j /fa' I!! til ii ii rgil:Iiii !i.g ;Ill 11 111;114 .q011 d ! . . 0 ri bll '4 g ,47..? IN . 11 i . . ,,1!! 1-0 i,.5 1, ,.; di!..51iiil%pWi'ssi, !tqt ! ‘',; E.' ';k zIs -- ri Flit ti. .! •• If - 1 1 v, ,. A's/ ',5,g g'f, t. 1 i; 1f; .h, it P, gfIg!.4:.§§1.1' lili tio flial.1 pl.„is nprs. Ix 1,iti 4 il , ! ; .gi. !:i WA !: 1 I i. , IW,,. s ...4 # • = i!"10.18 7.4g =qr.. 2,5!# p!iglfr Ilig ip. r.eigR iihigi p:11i 4 1;g1 Li =. .0,1,:a /..: gs,.12, -ggegI, ,,r!I ., . _...I *fe..g 1 ,•, t. .1 5, is /1^...., s 't i l'3/4'40' -I.' :".g!.g.fi'II.ii4fIllii !:0.iqi N71.!If .P.klEI :"Rp.p e5, rt,f' Ig! lli Zttl -' ' \/ 111111111=='kt I I,..2!te• I, ilifIg'iii:•11! "!!11''illfililqW !!li liZI PiPli ! iiqIii! 1!!0. i;q4111! • '-, .51,-,55 5 i IIIII41124-i' 1111 .-,:';1-14.!!!-Ilt!'. !fl: irie.s[, 3 Iiii"lil WIPP'4-11! "r1-...------.. .2: rrl 1 ,„„,,>-4)\ 41111WW: ;!!!;; iic1101T1101.hliii. iI19P Mili illijii;1;i:11;!!!!: , 111111 4 !Ili , \ .i'lFiEqrPillW!.4hilil'!t21;a!iti•relltrig:1 PLII! d Krill!ii .,111.101id!1-,-!! : r_ g'i''''.1:T44"=i;!' Wii'ffl!ii=rif1;14!il!"" / ;tflAiiti "1' lelelli'Militlii ft; 5 515.11,117, 111t, 1•,1,-,...I. t ,-.....: ...;1 v 7415. -„--5.5,..k‘: li. , , , g, , . : ..,-.; ., .,„ Wgie:i.e.O49t!I'AFEr.T.::::ir.R.1:7:.FieLEiVilERWSIREit: 2ig 324 r.r,lrie2".1.1/4TV',ilefaTiniEgaiiirE.€-TSOSI°V7fe. rid LLT stoz/t/n 6.12.431\21..4s\0093vi 22 01 1..23.1.1 2EI-60109890\8M-0VSV2 K:\SAU_WR\O63895log_RR Loke Creek 10&11\CAD0\Sheets\TCP.dwg 12/4/2019 3:17 PM F:T ;"-.2S.1-1:'qE:;:-77i,:.:-:FFF,',.-07 °':]7,47.:2272 :°7, -,7.';',.?.::•92' il!g_rA AI 7, fisili!I! ;. sl,i 1.r.,;ai!I-141 i4 1" flv I k', :12 W,t1.1!I ti 11 nil TICTI411, ! ii:1'11 511'11' '''1 i0. 4 A el i:11$14 24 Za i21. ! -1-inirAlii AniOniiI7. f ilii!1!fi 0- 1 3 40 Z1 2- ie:Ili ,; !:i 4 r gl 1 g ,i R _ 1 I! lig!2-f . _ 1O4.'9,4Pli..!"-f2lel9i,:i!a-, i!- i 1i i !!-1 R,gE rglr11Eii-'i421', 11Z192a. 10,1..°'i.i if;.gg;ig!N!id''..!2!i15-.4i•-,'4V01,°is2 1,&'2a'. 1g-!;!:--:gbfif4!i-=N1i,;,•'.1a,-2-•!I1a!Z!i12!:"- rAiPi U------I=' 1 •-V,.-W7;! I— _ g I lai 1: .. .2 1,1'N!OP;111511W1 ' KiNOWAN'lqi-0,44 Ei 110 gi T li Ef T!WI 1,I:i ill":s4,1-?,1., X .Nia 41iAVOli-054.i: r ..2. • ,r." 8 'fili',2 g .4.1Tg 11JV jail/ l;I.1iltrii1; 1'"'.1tl!!ii 122. i gal2a1.10 1 12 g 22 a i hi!ii!. "?..' 2 - -...7,,, ,gi.,6-2.,7 A' 4 ill!!°*t:iiiiglii 2 .' ,/')/A,,// • PIP:1111 'i d'02!!:11A i'I!i/1 gi:1! ?''4;Z EA in14!li !i ',1.1fF;, il:1 ifia!iil ii;liii , ;:•^ li ' iF 91412i...1 P Tillin I! i!fi qi.:1! !Ilii;i3'9; gl!!'i• !! '.4.q.;.iiii 4.i gal 1) 1.5r j g , 1 9. piFF.i NO; 1 •II 1" ' 2- .,.;;11:!g§g i 4 1 a' 11 10 ii f i..,T g,... '1 lif0.7 V'. 1 I I. e., 2 1 1 1 Igt 41.12 11;1212 F giqi!!!q i iIi I -f - g g g a H i 41 W111.111t1 6" 24i'lli1J i ;!,1 F1=<.VI „ 4 , 1 1 k F.-2f i!'Aii- 1t-10O41gJf'i15"4i/i".;tgi1g G5 1g,q1Pii.:14!-!.g14;: AA1 7 igit':.1:ilifi. i fl' 2 . .'„. : 044 1 i cs 0 ,.,i a , T 2125 tif“14';Nff:if fl"Y" m Will si;.- @ g iii:Fillf;ii!!1;4;11 qtl!ll :! ,-.-,-:- ..,.-,,,, a,,N,=7.;12 110'iiija! p.4,1 141 = 0 ga.1 I 0.i:Ex:1. ,1! ..k4 iikp.q.3-.;ii. 21q, 1 V c 6 fi b il ".',-VIII! '' ',"-- ..... c 4'...4.-q$.i4 '' "it;'''-11'i;. !1-:g;':1 ;;!! as. 8,',1/ .c,7, ,,,.., ,' g x'1. ile;Fi. =i'. ;f ;1!!i'4-°-9 iifg;-wile," : 21.1:0,%2 g. 11 ''' ' ;. 1%21. '2412 ;! qt 11! ''' P, 2 3 11.- VT.11 ! 13i 15 li " ii.,,,A agg0. . qg!:.!•145 1 q 4 .! I gl i.'Tail.51 '1•il ! PIO' qqi li „ !tfi 11' lil!! i 10!..,;/ !iRr ! &i n ,•. ;''i',r§,2,-i-::: 1r1. 04',i:' 1''' a g'--11 J a , 4. 10 ;!. t W 1 TININ1101"4111t1 III! R E 3,1 A T i? a ig „,-1, -;.W g littgliiiH24,4..g,1,9Ailw i gi f i=, .1. , :ask, isV:,..24411iii-1; 41igia 42g1 i V 3 A 7'3 §-110=11 _gi. 47m aufliviigyip i2k Iii•1r1 .7, ,,,,, .r.,i .11 2...1 —q,,s,-i,itlil L,l,•'i,!t1 Cr:D, trFz1*0n,4 p8;PsZ.). I:F it•. FT=i n!s--v i!g-q-:ln„,-,,••j:i7,. .T..5- F:''d'-.-,,5T'g.......A'10a.,f; Ci•'_„'•.';,'AF!. i * ? ; 9i 01 2 , 1 i M F, Mi'N;I117,iI'iPg-2'gl• IiO:.;,1V-.;1i!°:igE-5iRIi- 09 !1T!0i5il1d.iii::2;ilP!31t42.01iA-t..d,q4-.1Bl ea.il"-ig!q•.l4g2_-!1a- .11-- z' 4ETi4ii 'R t - I.--s Rotnn21 i. z, ::-1:3.F,„.:,..` A6,1•,,,,,g3,,,,,,..4,‘7,1iMMJ-- Eii O , ' ' ‘,1'44,I2 1isl!.i-i-.1 i! 2arqaia4?l 0 4V 0i:1ii1,.2i,q11 1 l.2;0,-9i41942,:i 1i 1W;! ± . t Oh irtii ('----;-4j) .74.TL:7FcTrr7Z4r1-7F.--irzr;:E1.7-17-i .5:°:!1::-FIF:?"'7. 747:41:7iior7, 7,:FE,rm:;;ZT,r,;t7E.4:F:a5. 71-77°' na: 9 , i!•---.7 e '11,19M1Milkiinqrarli.N A. , ,ft 0 0 1 4: 1 fit 1 C)I * '- fd.4ggi'flai4974.kgr,!!1.11 l 1 I i; :.--,1.- i/ ('--- - '-' 6iTell2S"141.1,DiaeaiP.a:111'2 ,e e)— ,,-. L.',Tig , r..,„ 4i1•14721;ii,:hoilii:t1liairl i 4 1111 " I I 1 1111 o !, 1 i lii. ° 4:111.31a;0,.figi v_,,,;;n4Wi. gi, .F.,.>, .“ g-1, a,§10,=,,OVIVinF:sir;plii fil ' ,P .' '' f42.16!!'.4!! IIt';iel:iiW !Wr. 41 ),ii ,-; .: ! !,. 's. g i ii . - i --- `4,-12'91 11 °i iT0.4',040iriq 414 g57-.17,2rin,Y. . i i o i I I 1 it' , 1 I ,I a I I i!, I. I - v. i a d . , .A. 4-af .,,I. . ,31::i=!'::Af;?. 51 •t!i.V,, ,,,i1 `\ /2 1 a P ig i 4 i i lo a 11 R •4 1-%!'1 cii i4;! 11 liiialt215 51 il Elili ' ,ti.i . l' ''' : m,2::-.", -1..wl i 9i 44;.i, 1 i ; ; 3•:-. ' 1 . 1 5 1 'g q ! I ! ' r#1,' t / -. 4 . 1111 t IT -4 4 ) m-,7,, i I I A i. I 2 4 4 , ',1 2 I . 4 .0 0 ' 33 .1 I 0 1 4 F. 5 ';' „ xv.s.., '4 ,.:-.‘Al -1:.i: ) I .74 ilii litTli ,:i IP ° 11111111.1-i.ir=""0--,,,t, :13i 1., , c. 0.. -o F, nt ' ( j_ 3 f; 1----!•.. :; ZS O• .W iRIPtl1'..I9d,s 5;7 I / i 91 5395 3 , 3 g : ,;,,, . : g ? g'''. \ ,' le -,sl MI gi ::!! 1 6 '0,41 '6" r. 00- - r. 4 .'.1 5 ., - 00 c' - -. 0- 'C. I: ,p.i. .. i '4 'l',P . Or\...._ 1--iHH- 1001 \ . t...t.,•%.:t: i i- • "1 • i, 4 1 A g :: .‘ :.,) _. , \ • . g .2 ____ 1 3 ' 1 i 1 . . 2 .. 1 /3 4,,)1, ( i i 6 , 1 , , - ,.. P' V' ! Y. t. , 3i'‘, .. a.- -. 3 /i. a IHTTNigIPPA 3-1 i , bill i i i ..i I - - A i ..., 1," i !,41., •_. l!aliii,ultigfq _ . __f..... \\\i E ' - . , ' - -,- 9 R° ° ',; . 2. .1 i .t !!ItLiiigl .. 2— . ,-° I/i:is , ' , = '..N, 4 1 j ! i'°- 11111! F, ,.. I,' II t, I 1.' F, 0,i4 .:4a4 a 4a4 4> 0 9 I1-,99 g.,,,d112k ,72 g 1 L '': / //"1 vIF ' Yei P-.!!-21 Wis4-X <.",: ,'H4,'3-'.'.g•11,Ai?'a,gl1., 0•,i1uw;1,,ha_i19,,-,/35,1,1,41t1<o.• :I;2'--'i; -11:1i ,0.1 6 F,,•o-• ,, i V1g.•.,1Z-9_-,! Ei, li -c1m1-i31i1 En i O1'e'.0a,s.9 0t10 0ru1 fts.1,.d ru..g awC.l O i i , Z p slii 6 a N ' '- ' " '" gm.3 Oa a 1 auI ,vi'•!!. Wri6f" r.. .i. , ,,i __ ,..2,..2 - ,-, g -' 3-1 1 iii 10 . P4 r! 'ii. 4 r9 g F. ," g i .t..; 2 gAi E.•g il!up (1\ i Plrill 1 1 ,f4i, 2 a ,, -o 11.=*!if A 0rw4 li, 94, •M•44 ,\/1 o :ow i,'•.1';l'' 1°. .4%,. !.'iligiliR= 7.1 ,,,:i 2 W Z' ii, E' ii--(1DV•1 , Eilli< s , '...xi '1. s ; y 1 i_ ooli ' ".;:;-, ,....—,,,,! ii.' - . "-- 1111.... A •,, c''. . . 1-r, . ..g -t rn T. 1* -.; I 1: :'lli :,;E t • i ::.-.:!le,Igqi:1 ,.-,,, "r W f;4 • - ......- 3-,•1 -g.' ,,,,,,,-. ot ....5 rk....,,,, ''' i - 4 ; ' '.i,('' " 'l Arc^ 1 T 7 'IliiiPiV! ' 'g- i 1,ie IW U ' 1 z 8 E _j I :i:!' I ° ..,;.-1 r" I ,• ,E.' a , ao RI 2. 1 gl.q Ii2i-ig ,92V. ,,, : 1. :0 ;,-. -,-----,_. ,..,z ,.: -• ,,,...,1 4.88., _I -12. 1 I -In ' 1 , P1 i ":". r...1';'-i i aV.:1: % 4 .7,' T.11 i .., . 1 - ° a—ii ' si —,.ni co-.' ,i - 1 kJ_' c-,a - nke.7-: - 0 V: U- s 1 -R. -2 - b40,‘-,' ;a _. -- i \ '1 . i 0 - ; ;I .!.. [22. . i 1 3 I I, o ,., VlitP -1-,-1' 13:1 0 I •r, , -c °11 °° :.4 lil 1T, li i: VI 2 DATE: DECEMBER 2019 12/04/2019 wuttil Kimley*Horn ....i DESIGN: T DRAWN: SRM AMJ TRAFFIC CONTROL r- LAKE CREEK 10& 11 17,1'..''*** ****•4:',,,' WASTEWATER .. - • :: * •,..- , Firm No.F-928 ..., sEAN MASON ••.:14 2600 Via Fortuna,Toro.I,Suite 300,Austin 7X,78746 P:512-646-2237 CI) r-9 CHECKED: DETAILS VI ROUND ROCKTEXAS '0 lii,... 110102 iel IMPROVEMENTS cai:•- cENsc°••4'' zr No. Revision By Date CP\ KHA NO.: 063895109 49NAL zy,, No Text Kim1ey>))Horn January 15, 2020 Mr. Eddie Zapata City of Round Rock 3400 Sunrise Road Round Rock, Texas 78665 Re: Lake Creek 10 and 11 Wastewater Improvements KHA No. 063895109 Dear Eddie: On January 15, 2020, the City of Round Rock received a total of three (3) bids for the Lake Creek 10 and 11 Wastewater Improvements project. A summary of the bids is provided in the table below: Firm Total Base Bid PM Construction & Rehab, $ 591,935.00 LLC dba IPR South Central Patin Construction $ 1,393,175.00 National Power Rodding $ 1,442,486.85 Corp. Upon review of each bid for accuracy and completeness, PM Construction & Rehab, LLC dba IPR South Central appears to be the lowest responsive bidder. As such, we recommend awarding the contract to PM Construction & Rehab, LLC dba IPR South Central in the amount of$591,935.00. If you have any questions or comments, please call me at(512)646-2237. Very truly yours, KIMLEY-HORN AND ASSOCIATES, INC. TBPE No. F-928 Sean Mason, P.E. Attachment—Bid Tab Oleo J. TIDE CITY OF ROUND ROCK ��� �•.•' BIDS EXTENDED AND CHECKED Utilities & Environmental Services t� •'`�• dw 3400 Sunrise Dr '"•` �} BY: Sean Mason,P.E. Round Rock, Texas 75664 DATE: 1115/2020 BID TABULATION CONTRACT: Lake Creek 10 and 11 WasteNvater PM Construction&Rehab,LLC Patin Construction National.Power Rodding Corp. Improvements IPR South Central 3800 W 2nd St 9810 FM 969 131 North Richey Street Taylor,TX 76574 Austin,TX 78724 Pasadena,TX 77506 LOCATION: Round Rock,Texas Statement of Safety?Yes Statement of Safety?Yes Statement of Safety?Yes DATE: 1/15/2020 Addendum(s)? N/A Adden.dum(s)? N/A Addendum(s)? N/A Bid Bond? Yes Bid Bond? Yes Bid Bond? Yes APPROX. UNIT UNIT UNIT TEM ITEM DESCRIPTION QTY. UNIT PRICE COST PRICE COST PRICE COST 1 HOT MIX ASPHALTIC CONCREET 60 SY $90.00 $5, PAVEMENT REPAIR 400.00 $250.00 $15,000.00 $139.15 $8,349.00 2 1CONCRETE DRAINAGE REPAIR 30 SY $85.00 $2,550.00 $100.00 $3,000.00 $419.75 $12,592.50 P-C.CONCRETE CURB AND GUTTER 3 EXCAVATING 120 LF $40.00 $4,800.00 $25.00 $3,000.00 $51.57 $6,188.40 NEW P.C.CONCRETE SIDEWALKS 4 TO 4"THICKNESS,INCLUDING 2350 SF $42.50 $99,875.00 $1.0.00 $23,500.00 $12.65 $29,727.50 REMOVAL OF EXISTING SIDEWALK 5 P.C.CONCRETE DRIVEWAY 150 SY $90.00 $13,500.00 $75.00 $11 250.00 253.00 REPAIR (EXCAVATION,MATCH. $ $37,950.00 BORING 24"STEEL PIPE, 6 INCLUDING BORE PITS, 60 LF $425.00 $25,500.00 $600.00 $36,000.00 $1,238.55 $74,31.3.00 EXCAVATION AND BACKFILL 7 CONCRETE ENCASEMENT FOR 12" 150 LF $30.00 $4,500.00 $40.00 $�Ooa.flo 62.1 DIA.PIPE $ 0 $9,315.00 MINOR MANHOLE ADJUSTMENT 8 AND INTERIOR LINING PER DETAL 1 EA $3,250.00 $3,250.00 $500.00 $500.00 $3,644.75 $3,644.75 1W -0L 4'DIA.. 9 REMOVAL OF EXISTING MANHOLE, 10 EA $2,850.00 $28,500.00 $1,500.00 $15 OOO:QQ $3 467.80 4'DIA. $34,678.00 1.0 NEW MANHOLE CONSTRUCTION,4' 14 EA $5,250.00 $73,500.00 EA $11,000.00 $I54,000.00 $13,535.90 $189,502.60 THE CITY OF ROUND ROCK BIDS EXTENDED AND CHECKED Utilities & Environmental Services 3400 Sunrise Dr BY: Sean Mason,P.E. Round Rock, Texas 78664 DATE: 1/15/2020 BID TABULATION CONTRACT : Lake Creek 10 and 11 Wastewater PM Construction&Rehab,LLC Patin Construction National Power Rodding Corp. Improvements IPR South Central 3800 W 2nd St 9810 FM 969 131 North Richey Street Taylor,TX 76574 Austin,TX 78724 Pasadena,TX 77506 LOCATION : Round Rock,Texas Statement of Safety?Yes Statement of Safety?Yes Statement of Safety?Yes DATE: 1/15/2020 Addendum(s)? N/A Addendum(s)? N/A Addendum(s)? N/A Bid Bond? Yes Bid Bond? Yes Bid Bond? Yes 11 DROP MANHOLE,4'DIA. 1 EA $5,750.00 $5,750.00 $12,500.00 $12,500.00 $16,346.60 $16,346.60 12 TRENCH SAFETY SYSTEMS(ALL 2050 LF $1.00 $2,050.00 $3.00 $6,150.00 $11.50 $23,575.00 DEPTHS PIPE, 12"DIA.SDR-26 PVC 13 INSTALLED IN 24" STEEL 60 LF $97.50 $5,850.00 $300.00 $18,000.00 $80.50 $4,830.00 ENCASEMENT WITH SPACERS,WW PIPE, 12"DIA.SDR-26 PVC(ALL 14 DEPTHS),INCLUDING 310 LF $85.00 $26,350.00 $100.00 $31,000.00 $236.90 $73,439.00 EXCAVATION AND BACKFILL,WW PIPE, 15"DIA.SDR-26 PVC(ALL 15 DEPTHS),INCLUDING 185 LF $105.00 $19,425.00 $135.00 $24,975.00 $261.05 $48,294.25 EXCAVATION AND BACKFILL,WW 16 INSPECTION-PRE CONSTRUCTION TV WW 3 160 LF $4.50 $14,220.00 $2.00 $6,320.00 $10.00 $31,600.00 17 INSPECTION-POST 3690 LF $1.25 $4,612.50 $2.00 $7.380.00 $5.00 $18,450.00 CONSTRUCTION CLEANING AND INSTALLING OR RECONNECTING 18 LATERAL SERVICE TO REPLACED 5 EA $645.00 $3,225.00 $5,000.00 $25,000.00 $1,105.15 $5,525.75 PIPE(4"DIA.SERVICE)IN(10"DIA. PIPE OPEN CUT-REHAB/INSTALL OF 12" 19 SEWER LINE(INCLUDING BYPASS 350 LF $175.00 $61,250.00 $200.00 $70,000.00 $150.00 $52,500.00 PUMPING THE CITY OF ROUND ROCK BIDS EXTENDED AND CHECKED Utilities & Environmental Services 3400 Sunrise Dr BY: Sean Mason,P.E. Round Rock, Texas 78664 DATE: 1/15/2020 BID TABULATION CONTRACT : Lake Creek 10 and 11 Wastewater PM Construction&Rehab,LLC Patin Construction National Power Rodding Corp. Improvements IPR South Central 3800 W 2nd St 9810 FM 969 131 North Richey Street Taylor,TX 76574 Austin,TX 78724 Pasadena,TX 77506 LOCATION : Round Rock,Texas Statement of Safety?Yes Statement of Safety?Yes Statement of Safety?Yes DATE: 1/15/2020 Addendum(s)? N/A Addendum(s)? N/A Addendum(s)? N/A Bid Bond? Yes Bid Bond? Yes Bid Bond? Yes 20 NATIVE GRASSLAND SEEDING AND 2050 SY $2.35 $4,817.50 $2.00 $4,100.00 $1.15 $2,357.50 PLANTING 21 STABILIZED CONSTRUCTION 7EA $1,550.00 $10,850.00 $1,500.00 $10,500.00 $1,345.50 $9,418.50 ENTRANCE 22 1 SILT FENCE FOR EROSION 2400 LF $1.50 $3,600.00 $2.50 $6,000.00 $3.45 $8,280.00 23 ITOTAL MOBILIZATION 1 LS $15,000.00 $15,000.00 $69,000.00 $69,000.00 $99,187.50 $99,187.50 24 IWOOD FENCE 70 LF $15.00 $1,050.00 $50.00 $3,500.00 $43.70 $3,059.00 25 BARRICADES,SIGNS,AND TRAFFIC �HANDLING MO $3,000.00 $9,000.00 $2,000.00 $6,000.00 $20,000.00 $60,000.00 26 PIPE BURST-8"TO 10"HDPE IPS DR19(INCLUDING BYPASS 530 LF $42.00 $22,260.00 $250.00 $132,500.00 $195.45 $103,588.50 27 PIPE BURST-8"TO 12"HDPE IPS DR11 (INCLUDING BYPASS 1820 LF $50.00 $91,000.00 $275.00 $500,500.00 $202.35 $368,277.00 PIPE BURST- 10"TO 12"HDPE IPS 28 DR19(INCLUDING BYPASS 550 LF $55.00 $30,250.00 $350.00 $192,500.00 $195.45 $107,497.50 PUMPING),WW TOTAL: $591,935.00 $1,393,175.00 $1,442,486.85 Indicates a correction in the cost due to an error on the Contractor's Bid CERTIFICATE OF INTERESTED PARTIES FORM 1295 } 10f1 is Complete Nos.1-4 and 6 if there are interested parties. OFFICE USE ONLY It Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. 2020-578930 PM Construction&Rehab LLC,dba IPR South Central Pasadena,TX United States Date Filed: t 2 Name of governmental entity or state agency that rs a party to the contract for which the form is 01/20/2020 being filed. Round Rock,TX Date Acknowledged: i 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a description of the services,goods,or other property to be provided under the contract. 000000 Lake Creek 10 and Lake Creek 11 project 4 Nature of interest Name of Interested Parry City,State,Country(place of business) (check applicable) Controlling Intermediary IPR AcquisitionCo,Inc. Conyers,GA United States X 5 Check only if there is NO Interested Party. 6 UNSWORN DECLARATION M name is Greg Baggett My and my dale of birth is My address is 1510 Klondike Rd.Suite 400 Conyers GA 30094 USA (street) (city) (state) (zip code) (country) I dtIjralty of perjury that the foregoing is true and correct. �N Rockdale C 1 ; State a Georgia 20th January 20 ey, ,on the day of ,20 (month) (year) Signature o uthorized agent of contracting business entity I� 5►+ +� (Declarant) Fo s Ethics Commission www.ethics.state.tx.us Version V1.1.3a6aaf7d f11llilitilvl CERTIFICATE OF INTERESTED PARTIES FORM 1295 1 of 1 Complete Nos.1-4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. 2020-578930 PM Construction&Rehab LLC, dba IPR South Central Pasadena,TX United States Date Filed: 2 Name of governmental entity or state agency that is a party to the contract for which the form is 01/20/2020 being filed. Round Rock,TX Date Acknowledged: 01/27/2020 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a description of the services,goods,or other property to be provided under the contract. 000000 Lake Creek 10 and Lake Creek 11 project 4 Nature of interest Name of Interested Party City,State,Country(place of business) (check applicable) Controlling Intermediary IPR AcquisitionCo, Inc. Conyers, GA United States X 5 Check only if there is NO Interested Party. ❑ 6 UNSWORN DECLARATION My name is and my date of birth is My address is (street) (city) (state) (zip code) (country) I declare under penalty of perjury that the foregoing is true and correct. Executed in County, State of on the day of ,20 (month) (year) Signature of authorized agent of contracting business entity (Declarant) Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.1.3a6aaf7d