CM-2020-060 - 2/28/2020Page I of 3 Contract Quantity Adjustment/Change Order rev, =12 Department: Transportation Department Project City of Round Rock - Streetscapes Name: Improvements City Project ID Number Justification Date: 1/17/20 Change Order/Quantity Adjustment No. i 1. Extra concrete and excavation for wall footings per drawing dated 1/10/20. Footing width changed from 1'6" to 2'6". !. Add 102 LF of 20" high x 6" wide cast in place concrete wall 1. Additional curb & gutter and asphalt removal and replacement on Lampasas street (BLF of curb/gutter & 65 5F of asphalt. 1. Additional work @ Parklets B&C. Remove,stockpile & re -set pavers, remove & replace curb/gutter, etc. S. Credit SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price (Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan, Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Submitted for Approval Amount % Change $2,390,391.58 $0.00 $19,842.20 $19,842.20 $2,410,233.78 0.00 0.00 $0.00 0.00 $2,410,233.78 $19,842.20 275 14 289 Prepared By: Signature Printed Name, Title, Company Date I f A rovals _ _.... ..r., ..i pp ............ Contractor: Justin Hyatt, Presidentr G. Hyatt Construction, Inc. 2/4 20 u Printed Name, Title, Company Date City Project Manager:1Y1 ature k1i Printed Name, Title ry Manager}i�- k fDate p Signature f ! t} Printed Name, Page 2 or 3 Contract Quantity Adjustment/Change Order rev, 00/12 Project Name: City of Round Rock - Streetscapes Improvements Quan. Adj.Xhange Order No.: Chance Order Data Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment (Davs] 1.35 Concrete Wall Footing m # LF 218.21 $20.00 $4,364.20 5 -$0.00 1.3 102' of 6" wide cast In place wall added to PC concrete sidewalk SF 2958 $5.00 $14,790.00 5 1.3 Credit for sidewalk SF -215 $5.00 -$1,075.00 a 0.00 S0.00 1.32 P ncrete Curb &Gutter I LF 8 $20.00 $160.00 4 1.08 T D Aspha t - Demolish & New TON 3.243478 $115.00 $373.00 _ $0.00 1.43 Remove, stoc pl e, & Re -Set brick pavers @ Parklet B - Added to Item 1.43 Concrete pavers SF 67 $15,00 $1,005.00 1.33 Remove additional. curb & gutter @ parklets B & C and replace with new Square Curb :& Vutter LF 73.75 $20,00 $1475.00 $0.00 1.5 Credit r City provided mulch SF -450.45 $3.33 -$1,500.00 $0.00 1.2 Credit for GreenBlue Root System SF -113.071 $44.22 -$5,000.00 $0.00 1.45 Change from B&B Lacey Elm to 6" box grown Shumard Oak EA 15 $350.00 $5,250.00 $0.00 _ $0.00 $0.00 $0.00 �0.00 $0.00 $0.00 G. HYATT CONSTRUCTION, INC. CHANGE PROPOSAL PROJECT: Round Rock Streetscapes PROPOSAL #: 1 DATE: Changes to QCP Wall Footings DESCRIPTION: Extra concrete and excavation for wall footings per drawing dated 1/10/20. Footing width changed from 1'6" to 2'6". MATERIALS 1 TOTAL DIRECT COST 2 SALES TAX 3 OVERHEAD & PROFIT LABOR 4 ADDITIONAL SUPERV. x $ - 5 ADDITIONAL LABOR 0 MH x $ - $ 6 LABOR BURDEN (25%) $ 7 OVERHEAD & PROFIT (15%) $ EQUIPMENT 8 RENT 9 OVERHEAD & PROFIT SUBCONTRACTORS 10 SUBCONTRACTORS 11 OVERHEAD & PROFIT (1S%) UNIT PRICES 12 UNIT PRICE WORK OVERHEAD & PROFIT (10%) $ 4,364.20 SUBTOTALS v d $ 4,364.20 SUBTOTAL OF PROPOSAL $ 4,364.20 BOND $ _ TOTAL OF PROPOSAL $ 4,364.20 G. Hyatt hereby agrees to perform the work outllned in this proposal per the amount specified and in accordance with the contract documents after the work is in an approved change order. TIME EXTENSION REQUEST: 5 Days 1819 Cross Draw Trail Leander, TX 78641 Phone: (512) 650-5637 Fax: 866-767-4055 Email: ghyattconstruction@gmall.com I�I�IYIIIIII IlAlll'I�IINIIIII III i�i�mii iiniin iuiiini�iin �i�mi IINIIYIIYIIIIIIaIIINI �INIIII IIYII�I IIIIIIIII�IIIII G. HYATT CONSTRUCTION, INC. CHANGE PROPOSAL PROJECT: Round Rock Streetscapes PROPOSAL M 2 DATE: 2/4/2020 DESCRIPTION:102' long x 6" wide concrete retaininig wall at Lampasas street. Credit for sidewalk removed from scope. MATERIALS SUBTOTALS. 1 TOTAL DIRECT COST 2 SALES TAX 3 OVERHEAD & PROFIT - LABOR 4 ADDITIONAL SUPERV. - x 5 ADDITIONAL LABOR 0 MH x 6 LABOR BURDEN (25%) 7 OVERHEAD & PROFIT (15%) $ - � + � .<' �` �► � EQUIPMENT 8 RENT $ 9 OVERHEAD & PROFIT :t- SUBCONTRACTORS 10 SUBCONTRACTORS 11 OVERHEAD & PROFIT (15%) x- UNIT PRICES 12 UNIT PRICE WORK OVERHEAD & PROFIT (10%) $ 13,715.00 $ 13,715.00 SUBTOTAL OF PROPOSAL $ 13,715.00 BOND $ _ TOTAL OF PROPOSAL $ 13,715.00 G. Hyatt hereby agrees to perform the work outlined in this proposal per the amount specified and in accordance with the contract documents after the work is in an approved change order. TIME EXTENSION REQUEST: 5 Days 1819 Cross Draw Trail Leander, TX 78641 Phone: (512) 650-5637 Fax: 866-767-4055 Emalk ghyattconstruction@gmail.com ���� IIYIIAIIYII111AlIYIIII�NIII i��ll�nemmnnmi�i�nmmm i�unuiiuiimiuiiii�uii iii� G. HYATT CONSTRUCTION, INC. CHANGE PROPOSAL PROJECT: Round Rock Streetscapes PROPOSALM 3 DATE: 2/4/2020 DESCRIPTION: Additional curb & gutter, asphalt demolition and new asphalt @ Lampasas Street MATERIALS SUBTOTALS 1 TOTAL DIRECT COST 7. - 2 SALES TAX $ 3 OVERHEAD & PROFIT $ _ tLk L►_.:.� n LABOR 4 ADDITIONAL SUPERV. - x $ - 5 ADDITIONAL LABOR 0 MH x- 6 LABOR BURDEN (25%) 7 OVERHEAD & PROFIT (15%) EQUIPMENT 8 RENT 9 OVERHEAD & PROFIT $ _ rtgm.M SUBCONTRACTORS 10 SUBCONTRACTORS 11 OVERHEAD & PROFIT (15%) UNIT PRICES 12 UNIT PRICE WORK $ 533.00 OVERHEAD & PROFIT (10%)-- $ S33.00 SUBTOTAL OF PROPOSAL $ 533.00 BOND $ _ TOTAL OF PROPOSAL $ S33.00 G. Hyatt hereby agrees to perform the work outlined in this proposal per the amount specified and in accordance with the contract documents after the work is in an approved change order. TIME EXTENSION REQUEST: 4 Days 1819 Cross Draw Trail Leander, TX 78641 Phone: (512) 650-5637 Fax: 866-767-4055 Email: ghyattconstruction@gmail.com �AII�IIVIIIIII���AIIAllllllllll ����Niiiinu�uni i'iuneii iii ins��mnnAimn�nr mnni m l�IWIIIIIIIIIII�II IIIIIIIII IY G. HYATT CONSTRUCTION, INC. CHANGE PROPOSAL PROJECT: Round Rock Streetscapes PROPOSALM 4 DATE: 2/4/2020 DESCRIPTION: Remove, stockpile & re -set pavers @ Parklet B, remove additional curb & gutter @ Parklets B&C, New square curb & gutter @ Parklets B&C, Backfill & Compact to grade for pavers @ Parklet B MATERIALS LABOR EQUIPMENT 1 TOTAL DIRECT COST $ 2 SALES TAX $ 3 OVERHEAD & PROFIT $ 4 ADDITIONAL SUPERV. - x $ - 5 ADDITIONAL LABOR 0 MH x $ $ 6 LABOR BURDEN (25%) $ 7 OVERHEAD & PROFIT (15%) $ 8 RENT 9 OVERHEAD & PROFIT SUBCONTRACTORS 10 SUBCONTRACTORS 11 OVERHEAD & PROFIT (15%) UNIT PRICES 12 UNIT PRICE WORK OVERHEAD & PROFIT (10%) $ 2,475.05 SUBTOTALS $ 2,475.05 SUBTOTAL OF PROPOSAL $ 2,475.05 BOND $ _ TOTAL OF PROPOSAL $ 2,475,05 G. Hyatt hereby agrees to perform the work outlined in this proposal per the amount specified and in accordance with the contract documents after the work is in an approved change order. TIME EXTENSION REQUEST: 0 Days 1819 Cross Draw Trail Leander, TX 78641 Phone: (512) 650-5637 Fax: 866-767-4055 Email: ghyattconstruction@gmail.com Q O O G O kngd tA 0 Ln c LM CV~ N N N N 4pp/� N U O d d - a N ui C N N Y_ �C r—i ttm �L J N �o Ln M rrn tc c `O ak G �5 F u A � u m m Icy � N a Q7 e� -e ; to + � t; 7# 0 e a7 �3 N tM E E cr a m a Z m m G. HYATT CONSTRUCTION, INC. CHANGE PROPOSAL PROJECT: Round Rock Streetscapes PROPOSALM 5 DATE: 2/4/2020 DESCRIPTION: Credit for City of Round Rock provided mulch for planters MATERIALS LABOR EQUIPMENT 1 TOTAL DIRECT COST 2 SALES TAX 3 OVERHEAD & PROFIT 4 ADDITIONAL SUPERV. - x $ 5 ADDITIONAL LABOR 0 MH x $ - $ 6 LABOR BURDEN (25%) $ 7 OVERHEAD & PROFIT (15%) $ 8 RENT 9 OVERHEAD & PROFIT SUBCONTRACTORS 10 SUBCONTRACTORS 11 OVERHEAD & PROFIT (15%) UNIT PRICES SUBTOTALS 3 � 4iti� `:gip � ��. �, 12 UNIT PRICE WORK $ (1,500.00) '� 2 T,. ,OVERHEAD & PROFIT (10%) ' $ (1,500.00) SUBTOTAL OF PROPOSAL $ (11500.00) BOND $ _ TOTAL OF PROPOSAL $ (1,500.00) G. Hyatt hereby agrees to perform the work outlined in this proposal per the amount specified and in accordance with the contract documents after the work is in an approved change order. TIME EXTENSION REQUEST: 0 Days 1819 Cross Draw Trail Leander, TX 78641 Phone: (512) 650-5637 Fax. 866-767-4055 Email: ghyattconstruction@gmail.corn I�I�IAIII IIIIIIY'�IIIIIIAIIN I� �i� inii�IlNl IlAmiii ��iii 0�i�i Nn�nuiumiun�n m �i�i iii Minn eimi iiiii G. HYATT CONSTRUCTION, INC. CHANGE PROPOSAL PROJECT: Round Rock Streetscapes PROPOSALM 6 DATE: 2/4/2020 DESCRIPTION: Credit for changes made to Green Blue root system in submittal review/revisions. !MATERIALS LABOR EQUIPMENT 1 TOTAL DIRECT COST 2 SALES TAX 3 OVERHEAD & PROFIT 4 ADDITIONAL SUPERV. - x $ - 5 ADDITIONAL LABOR 0 MH x $ - $ 6 LABOR BURDEN (25%) $ 7 OVERHEAD & PROFIT (15%) $ 8 RENT 9 OVERHEAD & PROFIT SUBCONTRACTORS 10 SUBCONTRACTORS 11 OVERHEAD & PROFIT (15%) UNIT PRICES SUBTOTALS 12 UNIT PRICE WORK $ (5,000.00) OVERHEAD & PROFIT (10%) x: = $ (5,000.00) SUBTOTAL OF PROPOSAL $ (5,000.00) BOND $ _ TOTAL OF PROPOSAL $ (5,000.00) G. Hyatt hereby agrees to perform the work outlined in this proposal per the amount specified and in accordance with the contract documents after the work is in an approved change order. TIME EXTENSION REQUEST: 0 Days 1819 Cross Draw Trail Leander, TX 78641 Phone: (512) 650-5637 Fax: 866-767-4055 Email: ghyattconstruction@gmail.com ���niiN�i�� °uiinii�{ieiin° ii ��umi�i nmunNnunmi i �Nniui� �ii�iu mini ii G. HYATT CONSTRUCTION, INC. CHANGE PROPOSAL PROJECT: Round Rock Streetscapes PROPOSALM 7 DATE: 2/4/2020 DESCRIPTION: Change from 6" B&B Lace bark elms to 6" caliper box grown shumard oaks MATERIALS LABOR EQUIPMENT 1 TOTAL DIRECT COST 2 SALES TAX 3 OVERHEAD & PROFIT 4 ADDITIONAL SUPERV. - x $ - 5 ADDITIONAL LABOR 0 MH x $ $ 6 LABOR BURDEN (25%) $ 7 OVERHEAD & PROFIT (15%) $ 8 RENT 9 OVERHEAD & PROFIT SUBCONTRACTORS 10 SUBCONTRACTORS 11 OVERHEAD & PROFIT (15%) UNIT PRICES SUBTOTALS $ - an �� cat 12 UNIT PRICE WORK $ 5,250.00 OVERHEAD & PROFIT (10%) $ 5,250.00 SUBTOTAL OF PROPOSAL $ 5,250.00 BOND $ _ TOTAL OF PROPOSAL $ 5,250.00 G. Hyatt hereby agrees to perform the work outlined in this proposal per the amount specified and in T accordance with the contract documents after the work is in an approved change order. TIME EXTENSION REQUEST: 0 Days 1819 Cross Draw Trail Leander, TX 78641 Phone: (512) 650-5637 Fax: 866-767-4055 Email: ghyattconstruction@gmail.com I����� u� iinii�ii�iuiiull01l°ui iNnm�nnnnnennnni uiiiniimuiii iiiiiuii City of Round Rock REXAS OUND ROCK Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 1 with G. Hyatt Construction, Inc. for the Downtown Round Rock Streetscape Improvements Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 2/28/2020 Dept Director: Gary Hudder, Transportation Director Cost: $19,842.20 Indexes: RR Transportation and Economic Development Corporation (Type B) Attachments: QA-CO #1.pdf Department: Transportation Department Text of legislative File CM-2020-060 The Transportation Department requests City Manager approval for Change Order #1 for the Downtown Streetscapes Improvement Project. Change Order #1 encompasses a number of revisions to the project including: 1. Extra excavation and concrete for revisions to the concrete footings for the QCP walls. 2. Additional 102 LF of 20" high 6" wide cast in place concrete wall to accommodate the ADA requirements for the sidewalk on the west side of Lampasas Street. 3. Asphalt removal and replacement and removal and replacement of curb and gutter to ensure proper drainage along the west side of Lampasas Street. 4. Removal, stockpiling and replacement of pavers and removal and replacement of curb and gutter at parklets B&C to accommodate QCP installation. 5. Credit for 100 CY of mulch to be provided by the CORR. 6. Credit for the Green/Blue system due to revisions to the inlet grates for trees. 7. Change from 6" balled and burlapped Lace Bark Elms to 6" caliper box grown Shumard Oaks. These changes are necessary to accommodate existing conditions in the field. The original contract value is $2,380,391.58. Change Oder #1 is for $19,842.20 for a new total amount of $2,400,233.78. CityoI Round Rock Page 7 Printed on 217/2wo A ends Item SUMMOM Continued o-2020.000 Cost: $19,842.20 Source of Funds: RR Transportation and Economic Development Corporation Cityof Round Rock Page 2 Pdnted on 2/27/2020