Loading...
R-2020-0059 - 3/12/2020 RESOLUTION NO. R-2020-0059 WHEREAS, the City of Round Rock has previously entered into a "City of Round Rock Agreement for Landscape Architectural Services related to the South Mays Gateway Enhancement Project with Studio)16:19, LLC" ("Agreement"); and WHEREAS, Studio)16:19, LLC has submitted Supplemental Agreement No. 1 to amend the scope of services and to increase the compensation; and WHEREAS, the City Council desires to enter into said Supplemental Agreement No. 1 with Studio)16:19, LLC,Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Agreement No. 1 to "City of Round Rock Agreement for Landscape Architectural Services Related to the South Mays Gateway Enhancement Project with Studio)16:19, LLC," a copy of same being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 12th day of March, 2020. 1 __Z /"/ CRAI MOR N, Mayor City of Roun ock, Texas ATTEST: SARA L. WHITE, City Clerk 0112 20202;00440788 EXHIBIT 1,A„ SUPPLEMENTAL AGREEMENT NO. 1 TO "CITY OF ROUND ROCK AGREEMENT FOR LANDSCAPE ARCHITECTURAL SERVICES RELATED TO THE SOUTH MAYS GATEWAY ENHANCEMENT PROJECT WITH STUDIO 116:19, LLC" CITY OF ROUND ROCK § STATE OF TEXAS § KNOW ALL BY THESE PRESENTS: COUNTY OF TRAVIS § COUNTY OF WILLIAMSON § THIS SUPPLEMENTAL AGREEMENT NO. 1 to "City of Round Rock Agreement for Landscape Architectural Services related to the South Mays Gateway Enhancement Project with Studio 1 1.6:19, LLC," hereinafter called "Supplemental .Agreement No. 1," is made by and between the City of Round Rock, Texas, a home-rule municipality, whose offices are located at 221 East Main Street, Round Rock, Texas 78664 (hereinafter referred to as the "City") and Studio 1 16:19, LLC, whose offices are located at 1717 North IH-35, Suite 308, Round Rock, Texas 78664(hereinafter referred to as "Consultant"). WHEREAS, the City and Consultant executed the referenced "City of Round Rock Agreement for Landscape Architectural Services related to the South Mays Gateway Enhancement Project,"hereinafter called the"Agreement"on December 7, 2018; and WHEREAS, it has become necessary to amend the Agreement to modify the provisions for the scope of services and to increase the compensation by$103,937.00 to $127,087.00; NOW THEREFORE, premises considered, and in consideration of the mutual promises and obligations in the Agreement and this Supplemental Agreement, the City and Consultant agree as follows: I. Section 2.0 PROPOSAL FOR SERVICES shall be amended as follows: For the purposes of this Agreement, the City agrees to furnish the Consultant the information set forth and appended to this Agreement as Exhibit "A" and the Addendum to Exhibit "A" titled "City Services," incorporated here in. by reference for all purposes. For purposes of this Agreement Consultant issued its proposal for services, such proposal for services being attached to this Agreement as Exhibit"B"and the Addendum to Exhibit"B" titled "Scope of Services," incorporated herein by reference for all purposes. 00440294/ss2 II. Section 3.0 SCOPE OF SERVICES shall be amended as follows: Consultant shall satisfactorily provide all services described herein and as set forth in Exhibit"B" and the Addendum to Exhibit"B." Consultant shall perform the Scope of Services in accordance to the Work Schedule set forth in Exhibit "C" and the Addendum to Exhibit "C," attached hereto and incorporated herein for all purposes. III. Section 4.0 LIMITATIONS TO SCOPE OF SERVICES shall be amended as follows: Consultant's undertakings shall be limited to performing services for City and/or advising City concerning those matters on which Consultant has been specifically engaged. Consultant and City agree that the Scope of Services to be performed is enumerated in Exhibit ".B" and the Addendum to Exhibit"B." IV. Section 5.0 CONTRACT AMOUNT shall be amended as follows: Not-to-Exceed Fee: In consideration for the professional consulting services to be performed by Consultant, City agrees to pay Consultant a afne nt not to exeeed Twenty-Three Thousand One Hundred Fifty and No/100 (23,150.00) plus an additional One Hundred Three Thousand Nine Hundred Thirty-Seven and No/100 ($103,937.00) added by this Supplemental Agreement No. 1, for a total not-to-exceed amount of One Hundred Twenty-Seven Thousand Eighty Seven and No/100 Dollars ($127,087.00), in accordance with Exhibit "D" and the Addendum to Exhibit "D," entitled "Fee Schedule," which document is attached hereto and incorporated herein by reference for all purposes, in payment for services and the Scope of Services deliverables as delineated in Exhibit"B"and the Addendum to Exhibit"B." V. This First Supplemental Agreement shall amend the original Agreement only as set forth herein with no other changes in terms of conditions of the original Agreement. [Signatures on the following page.] 2 IN WITNESS WHEREOF, the City and Consultant have executed this Supplemental Agreement No. 1. to be effective as of the last date of due execution by both parties. CITY OF ROUND ROCK,TEXAS STUDIO 116:19, LLC By: By: Printed Name: Printed Na7'�w Title: Title: — ' L. Date Signed: Date Signed: 0 •24 ATTEST: By: Sara L. White, City Clerk FOR CITY, APPROVED AS TO FORM: By: Stephan L. Sheets, City Attorney 3 f EXHIBIT A Round Rock S. Mays Gateway Enhancements CITY SERVICES A.I. Information The Client shall provide available data about the site and other information on which the design is to be based as well as Client's budget parameters for the Project.The Consultant shall be entitled to rely on the accuracy and completeness of information provided by the Client.Available data is including,but not limited to,ALL Project information,prior work/studies,boundary surveys,tree surveys,AutoCAD base files,reports(geological,geotechnical,&/or environmental),and any other related items requested by the Consultant. A.2 Budget The Consultant shall reasonably strive to propose designs and prepare documents consistent with the Client's budget parameters. If provided by the Consultant as a part of the Scope of Services, opinions of probable construction costs are based on the Consultant's familiarity with the construction industry and are provided only to assist the Client's budget planning.Such opinions shall not be construed to provide a guarantee or warranty that the actual construction costs will be within the Project budget parameters at the time construction bids are solicited or construction contracts negotiated. A.3 Approvals The Client's decisions,approvals,reviews,and responses shall be communicated to the Consultant in a timely manner so as not to delay the performance of the Consultant Services. A.4 Project Permit and Review Fees Permit&Agency Review Fees are NOT included in Consultant Compensation. The Client shall pay ALL permit&agency review fees,if required,to secure jurisdictional approvals for the Project. A.5 Engineering Review&Support Transportation Engineering Design/ Review is NOT included in Consultant Scope and/or Compensation. The Client shall provide internal resources/support for the Consultant shall these services become required to secure approvals for the Project or issue a supplemental agreement for Consultant to secure these services on behalf of the for this Project. The Client shall provide,if required, coordination and support to Consultant with application and submittal of a Small Site Notice&Notice of Intent(NOI)for compliance with TCEQ requirements if required for the Project. i Ad 16:1q EXHIBIT B Round Rock S. Mays Gateway Enhancements PLANNING & LANDSCAPE ARCHITECTURE SERVICES This Supplemental Number 01 is made effective upon execution of this Agreement under the terms and conditions established in the PROFESSIONAL CONSULTING SERVICES AGREEMENT.,effective December 07 2018 by and between studiol 6:19, LLC, (the"Consultant")and City of Round Rock Texas (the"Client"),and S. Mays Gateway Enhancements (Nash to Nesters Crossing) - Round Rock, TX (the "Project"). This Supplement is made for the Scope of Work as identified in "EXHIBIT B", herein and supersedes all other agreements pertaining to this Project,either written or oral. B.1. Standard of Care Landscape Architectural & Planning Services shall be performed with care and diligence in accordance with the professional standards applicable at the time and in the location of the Project and appropriate for the nature and scope of this Project. 13.2. Scope of Supplemental Services Consultant Services to be provided under this Agreement are: In collaboration with the Client, the Consultant will provide landscape architecture and planning services for the Project. ■ The Consultant will utilize the scope of work and deliverables from the Preliminary Vision Phase including the following: • Preliminary Visioning Package-South Mays Gateway Enhancements(Mar 2019) • Preliminary Visioning Priority Ranking Matrix(fun 2019) • Priority Ranking Budget Development(Tierl&.Tier 2-July 2019) • Priority Ranking Budget Refinement(Tier 1B-Dec 2019) to further develop schematic/design development plans for the"kit-of-parts"for the items identified below for the gateway corridor enhancements for the proposed Project limits within the CORR R.O.W from Nash Street to Hester's Crossing along the S.Mays Corridor: PHASE PRIORITY RANKING: TIER 18 BUDGETGOAL- appMX$1.5M ITEM I rrEM DESCRIPTION APPROX UNIT I i I QUAN 1.0 Bus Stops(enhanced pedestrian respite from elements) 1 1 5 EA ................. ........... ........... Screen Ground Mounted Utilities li 2.0 ij W/Art Screen and/or Landscape Plantings 19 EA ........... ................... 3.0 Provide Enclosed Dumpster Screens PPP 11 i EA 0 ............... r 4. Replace Dilapidated Wood Fence(s)at ROW(various locations) i. PPP 200 LF A Gateway Entrance Feature @ Hester's Crossing including hardscape,public art,and 5.0 1 LS landscape planting elements-(a shift from TIER 2) ... ................. .............. S locations) 6.0 Remove Damaged Trees under power lines(variou ns) 0 63 EA r ........... 7.0 Provide New Overhead Utility compatable Shade Trees in R.O.W. 85 EA .......... 8.0 Provide Limestone Column(s)unifying element-(a shift from TIER 2) 32 EA .......... Improvements to rear of Renaissance Square: 9.0 Screen Wall additional w/Enhanced Landsacpe Plantings LF PPP 820 ................... at j:;_JarV 31 2021.) desigri coHaboraire 17 /J d In conjunction with the performance of the foregoing Services, The Consultant shall provide the following submittals/deliverables/documents to the Client/Client's Representative: SA01_04: Project Management o The Consultant will manage the Project design team activities associated with the Project. The Consultant shall secure resources necessary to produce the Project deliverables and meet the Project schedule. All communications associated with the Project will be directly channeled through the Consultant Project Manager for distribution to the Project team as appropriate.The Consultant's Project Manager will be responsible throughout the Project for Project management and all communications, with the Client's Project Manager. The Consultant also employs a reputable QA/QC process and requires that a portion of every Project budget be dedicated to this explicit service to ensure that the Client receives quality work and a quality product that meets and exceeds their expectation. SA01_05: Schematic/Design Development(30%) ■ The Consultant will create schematic/design development plans for the"Kit of Parts". The level of design is characterized as 30% complete design plans. The schematic/ design development plans will further define the character of the improvements and essentials of the S. Mays Corridor, including further description of limits, size, shape, form, materials, and finishes.During this Project task the Consultant shall: o Conduct preliminary meeting(s) and/or discussions with Client including Pre- development meeting with City Engineering/ Transportation Services/ Planning Department&DSO as required. o Prepare preliminary schematic/ design development plan set drawings. Design will utilize acquired survey&subsurface utility data within the defined Project limits as well as utilize TxDOT standard specifications supplemented with City of Round Rock details. o Prepare schematic/design development imagery and graphics of proposed"kit of parts" for the Project elements to compliment schematic/design development plans. o Participate in two working sessions with City staff. o Refine the Project Budget based Schematic/ Design Development drawing and will coordinate with Client on a final Project Budget for implementation. o Review 30%Schematic/Design Development document and Project budget with Client. SA01_06: Meetings/Public Engagement ■ The Consultant will assist the Client on the following: o Coordination meetings with Client/public stake-holder designees, and Client/Staff to discuss, evaluate, and coordinate on the Client's program to ensure the Preliminary Vision Document and Tier Ranking program elements are incorporated in the Schematic/Design Development documentation. Two(2)meetings are included. piojec4l 18852 '_-A0*1 o Formal Presentations of Design Progress & 30% Schematic/ Design Development documentation to Client, public stake-holder designees, Client/ Staff, and/ or Client/ Citizen Leadership. Two(2)meetings are included. SA01 Task 300: Land Surveying ■ Land Surveying Services, as required, to be provided by Inland Geodetics, LLC as a sub- consultant to the Consultant. The Project Surveyor scope of service shall include the following,but not limited to ROW to ROW plus 15 feet per side along South Mays Street from Hester's Crossing Blvd.to 200 feet north of Nash Street.The topographic design survey and ROW delineation will be further limited to augment and update previous survey work for the City of Round Rock in 2015 as part of the Gattis School Road intersection improvements.The Project will also utilize the ROW delineation surveys performed for the City of Round Rock for the transfer from State of Texas,TxDOT holdings to CORR jurisdiction. This survey will be updated and verified with research and field survey for any changes or additions to the existing ROW condition. SA01 Task 301: Subsurface Utility Location • Subsurface Utility Location Services,as required,to be provided by T2 Utility Engineers as a sub-consultant to the Consultant. The Project Subsurface Utility Location Consultant scope of service shall include Quality Level D&Level C for the entire corridor but limit the Quality Level B designation to areas only where intensive subsurface activity is proposed to occur. The quality levels proposed are defined below: o Quality Level D-Records research ofexisting subsurface utilities within theProjectlimits compiled by contacting each utility owner and obtaining their existing facility records. QLD mapping-is based upon information obtained from record drawings and typically will depict the utility type, ownership,size and material composition. o Quality Level C-A QLCfeld investigation ofthe Projectsite incorporates the QLD records research and further attempts to depict unobservable subsurface utility features by correlating them with surveyed surface utility features and attributes. QLC mapping typically includes utility type, ownership, size and material composition as.indicated by a vailable record information. o Quality Level B-Incorporates the results ofQLCand QLD methods ofutilityinvestigation and the use of surface geophysical techniques under the direction of a Professional Engineerlicensed in the State of Texas to determine the existence and horizontal position of underground utilities. This activity is referred to as QLB, "Utility Designating" The information obtained in this manneris surveyed to Project control. Two-dimensional(2D) mapping information is obtained from the QI.B designating effort, ), � B.3 Supplemental Services Supplemental Services are in addition to the Scope of Services identified in Section B.2 and,when requested by the Client, either written or oral, shall entitle the Consultant to additional compensation beyond the Compensation stated below.The following Supplemental Services under this Agreement include but are not limited to: ■ ANY Sub-Consultant services not currently identified in Basic Services. ■ ANY professional service or task not currently identified in Basic Services. ■ Detailed inventory or recordation of existing structures,site surveys,etc.outside of the ROW. ■ Development of As-Built Drawings post design/construction phase services. ■ TCEQ-coordination and submittal of WPAP for Edwards Aquifer Recharge protection. • Storm Water Pollution Protection Plan(SWPPP) ■ Traffic Impact Analysis • Flood Plain Studies or Flood Plain Modeling • Construction Staking ■ Storm Water System Modeling • Geotechnical Construction/Testing Lab Services • Environmental Studies • Governmental Fees&Fiscal • Preparation&Processing of Waivers,or Variances B.4 Changes to Approved Services Revisions to drawings or other documents shall constitute Supplemental Services when made necessary because of Client-requested changes to previously approved drawings or other documents, or because of Client changes to previous Project budget parameters or Project requirements. 8.5 Schedule of Performance The Client's signature on this Agreement shall be the basis for the Consultant to begin providing services for the Project.The Consultant shall perform the services as expeditiously as is consistent with the standard of care described in section B.1,above. r?c EXHIBIT C ... Round Rock S. Mays Gateway Enhancements WORK SCHEDULE The Consultant shall complete the scope of services with in approx. 6 months, commencing upon the issuance or Notice to Proceed via signed agreement, and receipt of documents to be provided by the Client/ Client's Representative as specified in Exhibit A,above. ■ Schedule ofAnticipate Milestones ■ Surveying/Data Collection.............................................................. 60 days ■ Schematic/Design Development-30%.............................. y ............... 90 days ■ Public Engagement........................................................................ 60 days ■ Proposed ProjectAnticrpate Timeline CARR S.Mays Street Gateway Enhancements Major Milestones> Notice to Proceed Start Survey 30%Review ...................................._-___...... _._ Y enr Month ,ion Feb Mar Apr May Jun Jul Au Service Description: Task 4 Project Management r Teak 5 Schematic/Design Development Trask 6 Public Engagement NIC FinW Design PS&B, MC Bid Phase SeMc es i'.dICC Construction Phan services 300(s) Surer &Data Collection l;..{,on/3', !0)20 ciesif^fin ( "Hoot ! ., is per'.,..,' m EXHIBIT D Round Rock S. Mays Gateway Enhancements FEE SCHEDULE D.1 Compensation for the Consultant Services performed under this Agreement shall be paid according to the following,plus Reimbursable Expenses as defined below: ■ REFER to BELOW-S.Mays Gateway Enhancements Fee Schedule(s) Consultant may alter compensation distributions between individual services and/ or subconsultants services to be consistent with the Services actually rendered, within the contract maximum. Supplemental Services when requested by the Client, either written or oral, shall entitle the Consultant to additional compensation to be determined on an hourly basis or on the basis of a negotiated fee. D.2 Reimbursable Expenses are expenditures made by the Consultant, its employees, and sub- Consultants in the interest of the Project. Reimbursable Expenses include but are not limited to travel expenses,costs of reproduction of documents,postage,services of professional Consultants which cannot be quantified at the time of contracting, and other, similar, direct Project-related expenditures and will be itemized per Consultant/Sub-consultant when expensed are present for payment within Monthly invoices. D.3 Monthly payments to the Consultant shall be based on(1)the percentage of the Scope of Services completed; and shall include payments for (2) Supplemental Services performed, and (3) Reimbursable Expenses incurred. DA Monthly Payments will be processed in accordance with Texas Prompt Payment Act, Texas Government Code, Subchapter B, Chapter 2251. The Client will make every effort to pay the Consultant within thirty days after the later of:acceptance of deliverables;the day of performance of services/deliverables were completed;or the day of receipt of a correct invoice for deliverables or professional services. At the Consultant's option, overdue payments may be grounds for termination or suspension of services. D.5 The Scope of Services to be provided under this Supplemental Agreement has been estimated to be completed within 180 calendar days of the initial NTP.In the event the Project time line is extended, compensation for services rendered after that time period shall be equitably adjusted. D.6 The parties agree to the following provisions with respect to this specific Agreement: Suimlemental Services-Current 2020 Rates are as noted herein: ■ Principal Planner/Landscape Architect: $185.00/hr. ■ Associate Principal Planner/Landscape Architect: $145.00/hr. ■ Senior Associate Planner: $115.00/hr. ■ Senior Associate Landscape Architect: $100.00/hr ■ Associate Planner/Landscape Architect: $ 90.00/hr. ■ Staff Planner/Landscape Designer: $ 75.00/hr. ■ Administrative $ 65.00/hr. '.i EXHIBIT D_1 Round Rock S. Mays Gateway Enhancements FEE SCHEDULE — PRIME CONSULTANT studies rincipal associate senior senior P associate associate total hes i total fee/ P111 principal associate associate admin PLA planner designer designer planner task task SA01_05 Project Management total hrs 8 24 0 0 0 0 12 44 S 5,740 SA01_06 Schematic J Design Development total hn 7777 " 96 32 52 b4 35 US $ 4B,i,00 SA01�07 Meetings/Public Engagement total hrs 12 1sx a ly a o a 48 S 6,nao NIC Final Design: Plans,Specs,&Estimates(P5&E) total hrs 0 0 1 0 1 0 1 0 1 0 1 0 p Is NIC Agency Review j Permitting total hrs 0 F 0 0 0 1 0 0 0 0 S NIC Bid Phase Services total hrs 0 0 0 0 0 0 0 0 S NIC Construction Phase Services total hrs 0 D 0 0 0 0. 0 0 $ TOTAL PROJECT LABOR HOURS: 76 i0t 104 32 60 64 56 Soo Labor Cost Totals $la,oeo $is,5aft $1l,MM0 $9,200 $5,100 $4,a0o $a,"0 $58, Reimbursable Expenses $1, 900 SubConsuitant Expenses 300 Land Surveyor-(inland Geodetics) $23,912 301 Subsurface Utility Locator-92 Utility Engineers) $14, 302 Structural Engineering-NIC so 309 MEP Engineering-NIC 304 Geatechinal Enghwerit -NIC $0 Totill SA01,Soft Cost r s tO x.,;. "n M CITY OF ROUND ROCK m c SOUTH MAYS TOPOIROW y n �+ INLAND GEODETICS,LLC = o� Ono tz v0 � m la � � N cn C �y o" a 0 -� 0 � z� ca m f... :3 m SERVICE 2CREW SCREW 4CRRV iGPS KIK RPLS MTEC TECH LSCS ADMIN DIRECT PSREC.1$151ka EwICL.EStS6Q!11 4 kTVsE 1 r§bU 'i INDIRECT TOTAL RATEIHOUR $148 $172 $191 $125 $146 $140 $102 $96 $156 $56 MUMS Won Writs #d #dU»i #dO s ch 3 C a S $ $ - MIWM088lZATIONN 4HRS 2HRS 6HRS 4HRS S 1:700.00 $ S 1300 OD OE CONTACTS AND COORD 2 HRS 2HRS 16 HRS 4 HRS S 1,428.OD $ $ 2.428.40 {Q iARYCNTLRECOVER 2HRS 2HRS $ 154.00 S b � ONDARYCONTROL 16HRS 4HRS 1 HRS 2HRS 2HRS $ 3,324.OD S $ 3,324.00 -EVELS 8HRS 1 HRS 1 HRS $ 1,618.00 $ $ 1,618.00 IELDSUR'hY 40HRS 24 HRS 4HRS 2HRS 2HRS042=20D S $ 9,796.00 kTAPROCESSlNG 2HRS 40 HRS S b 4360.002iiRS 2HRS 2HRS4HRS $ $ 100000 5 $OW SURVEY 8HRS 8HRS 8HRS 8HRS 2HRS $ $ 4:232.00 b - S b - 61HRS 8HRS OHRS 38HRS 8HRS 22 HRS 79HR5 OHRS OHRS 18 HRS $ 2BKOD OHRS 0DAYS 0DAYS '$ $ 2891200 $ - S - $ UB-TOTAL 64HRS 8HRS OHRS 38HRS 84RS 22HRS 79HRS 0HRS 0HRS 18 HRS $ 28,91200 TOTAL. OHRS TOTAL MAYS TOTAi GRAYS $ $ 2$912.00 ZEIMBURSEABLE ITEMS $ - tFJMBURSEABLE SERVICES $ S t ATEDFEE $R472 $1376 LID 34<750 51,16d 53060 $8,068 so 50 S1,00B so $L1 1$ 28,952.00 $2$912 Casa Vases Rambwse&e Sery om Induce: Rambwsetle Fan hd", CPS Reoei n $15 $04D x.00 .4. Vebde S60 WWI) $000 ATV $55 $O.00 $0.00 Tod: $0.00 Tauri: $0.00 r✓' ar�n lb EXHIBIT D_3 Round Rock S. Mays Gateway Enhancements FEE SCHEDULE -SUBCONSULTANT-Subsurface Utility Engineering S. Mays Street - Utility Investigation Prepared for Studio 1619, LLC. engineers PROJECT ESTIMATE T2 proposes to perform this work utilizing our standard rates for a not-to-exceed amount of$14,805.00 as detailed below in Exhibit"B", Fee Schedule. PROJECT SR PROS ASST..FROJ, SUE SURVEY 6ADf7 ADi4fNr TOTAL LABOR COSTS C-f4GINE R MANAGER MANAGER A+tANAGER MANAGER TECH CLERICAL HOUF$ $200.00 $165.00 $12500 $110.00 $16500 #90.00 STS 00 Fecorcis Fbesearch 20 8 0 10.0 ftducbonfiReview of Flan Detverables Sol 8.0 320 45.0 Survey Production RevewiControl Research R gect NBetings I Safety Orentatlm -1-0 0 0 2.0 30 Ftvnit2.0 40 _ 60 Contract Adinimtration 20 60 80 SUBTOTAL 50 5.0 8.0 80 00 400 6.( 72.11 SUBTOTAL DOLLAM S1,000.0ol $a25.DC $1,000.0 $889.40 $0.00 $3,600.00 $7,755.80 St�S1.13tFACELMLFTYQXa1�MCOSTS QTY RATE 1W TOTAL signattng&GPRInvestigation12-Man Crew&Equipment) 18 $ 235.00 per hour $4,=00 Field Verification Crew(Quality Level"C")(2-Man Crew&Equipment) 12 S 2;1500 per hour g For fieU autd recrxds vefdicatinn Traffic20 00 Control ,WL,Lane Cbsure-Dally Prate(hckAes wanvng Signs&Cares.Affow Board,Delvery S PEc") S 501.00 each $000 Single Lane(7o6tae-I�rxNiWOW(hctudeg Wai'nn9 Sxjns 8 Gorses,Arrow Board,t7elvery&Plclu;t) $-.9m.00 each —00 lo Lane C3os19e-wf Ragging(hckxles Warning Signs&Crates,Arrow Board,DoWery&Ftckup) S 1,350.00 each Dar%Larne Closure(8,intersection)-SehV Fer Day(hcludes Aarniig Signs A Cones, S 2,450.00 each g0 Arrow Board,�iuery&Pklasp) 00 Fbiice Escort(regsared for lam closures on TxQOT roadw ays) 3 42.00 hour SUBTOTAL DOLLARS $7,050.00 ISIi�T EXPENSES OTY CST TOTAL FIN Ciern(hckAles Lodgny) 5 165.00 per day $0.00 Flerrte i Inspection Fees $ 7m,00 each I)00 SUBT0TAL WLLARS TOTALESTlMATED FEE] $14,805.04 No Text