Loading...
CM-2020-137 - 5/15/2020Page I of 3 �aaucx rev, 01 16 Department: Project Name: City Project ID Number Vendor Contract Quantity Adjustment/Change Order 2300 Clay Madsen Recreation Center Improvement Project 2019 Date: 4/28/2020 Change Order/Quantity Adjustment No. 2 Partners Remodeling, Waterproofing, and 3219 Harpers Ferry Way Restoration Austin, TX 78745 512-825-3950 Company Name Address Phone No. Justification Additional areas of concerns for ADA accessibility were identified during construction and were addressed. Secure mounting supports for mounting additional equipment to shipping containers. Storage pad was added for additional storage at the tennis court. Drainage concerns were identified during severe rain events and were mitigated by adding additional drains and a roof for the containers. SUMMARY Amount % Change Original Contract Price: Previous Quantity Adjustment(s): $366,031.50 , This Quantity Adjustment: Total Quantity Adjustment(s): $0.00 Total Contract Price with Quantity Adjustment(s): $368,031.50 i Previous Change Order(s): $32,425.00 9% This Change Order: $14,728.00 4% Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus $47,153.00 13% Quantity Adjustment(s) Plus Change Order(s)]: $415,184.50 Difference between Original and Adjusted Contract Prices: $47,153.00 Original Contract Time: 90 days Time Adjustment by previous Quan. Adj./Change Order: none Time Adjustment by this Quan. Adj./Change Order: 30 days New Contract Time: 180 days Sub pitted for Ap;proaat =ontractor:. jlnat Se :ity Project +tanager: Signature Mayor/City 4anager Si ature Al, 2-6 �13-7 Michael Chau, Park Developme Printed Name, Title, Company Approvals - Printed Name, Title, Company Printed Name, CORR 4/28/2020 Date -5 - z Date L. Date Page 2 of 3 r — Contract Quantity Adjustment/Change Order anuNO ROCK Project Name: Clay Madsen Recreation Center Improvement Project 2019 Quan. Adj./Change Order No.: charne nreler na— Item # Item Description Unit =�S Qty. Unit Price Amount Contract Time Adjustment (Davs) 1 Demo/install sidewalk pad 1 $750.00 $754.00 2 3 4 5 Additional supports for equipment 15x15.5 pad and retaining wall for storage at tennis court Pipe to divert water Container roofing LS LS LS LS 1 1 1 ! $1,628.00 $5,900.00 $750.00 $5,700.00 $1,628.00 $5,900.00 $750.00 $5,700.00 $0.00 $0.00 0.00 $0.00 $0.00 $0.00 $0:00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 __ 14,7N_ Page 3 of 3 Contract Quantity Adjustment/Change Order rX_ / r -11 Rout Project Name: Clay Madsen Recreation Center Improvement Project 2019 Quan. Adj./Change Order No. sww�rrarc�aa.e - - - Item Descriptiontract /Unit Price Time Adjustment 11 _— __ City of Round Rock ROUTEXASD ROCK Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 2 with Partners Remodeling, Waterproofing, and Restoration for the Clay Madsen Recreation Center Improvement Project, Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 5/15/2020 Dept Director: Rick Atkins, Director Cost: $14, 728.00 Indexes: General Self -Financed Construction; 2017 General Obligation Bonds Attachments: Change Order 2 - Partners (Signed), LAF - QA-CO_2 w- Partners Remodeling - Clay Madsen Recreation Center Project (00442100xA08F8) Department: Parks and Recreation Department Text of Legislative File CM-2020-137 This item will authorize the City Manager to execute Change Order 2 with Partners Remodeling, Waterproofing, and Restoration for the Clay Madsen Recreation Center Improvement Project 2019. Change order 2 includes demolishing and reinstalling a small section of concrete walkway that had shifted and become a trip hazard at the front of the Clay Madsen Recreation Center. This section of sidewalk had shifted after the ADA assessment was completed so was not included in the original scope of work. Additionally, it was decided to add a small storage area outside of the existing tennis courts to allow collapsible basketball hoops to be stored. This change order includes pouring a concrete pad and small retaining wall to facilitate that storage area. This change order also includes welding additional supports for the fitness equipment at the Yard Fitness Patio. These supports were needed because the containers did not support the stand alone equipment --it was previously thought that the equipment was attached to the overall Movestrong structure and not the containers. Finally, after heavy rains during the construction process, drainage concerns presented themselves. For this reason, it was necessary to install a pipe to divert water around the Yard Fitness Patio, as well as to construction a sloping roof section on top of the containers to divert water. Cost: $14,728.00 Source of Funds: General Self -Financed Construction and 2017 General Obligation Bonds City of Round Rock Page 1 Printed on 511412020