CM-2020-151 - 6/5/2020Page 1 oP
Contract Quantity Adjustment/Change Order
ppllNO MOCK k '
rev, u1: 16
Department: Transportation
Project
Name: Sunrise Road and Luther Peterson Place Intersection Improvements Date: 5/18/20
City Project Change Order/Quantity
ID Number Adjustment No. 1
Vendor ATS Signal Construction Co. 4615 Priem Lane, Pflugerville, TX 78660
Company Name Address Phone No.
Justification
(here is a portion of the project that is tying into concrete pavment. Monolithic curb needs to be constructed along this portion and it was not
ncluded in the original plans and specs.
SUMMARY
Original Contract Price:
Previous Quantity Adjustment(s):
This Quantity Adjustment:
Total Quantity Adjustment(s):
Total Contract Price with Quantity Adjustment(s):
Previous Change Order(s):
This Change Order:
Total Change Order(s) To Date:
Adjusted Contract Price [Original Contract Price Plus
Quantity Adjustment(s) Plus Change Order(s)i:
Difference between Original and Adjusted Contract Prices:
Original Contract Time:
Time Adjustment by previous Quan. Adj./Change Order:
Time Adjustment by this Quan. Adj./Change Order:
New Contract Time:
r — �-- h Sut�tiEted ft7�.lovat_ .
Vivek Deshpande, P.E. Project Manager, Kimley-Horn 05/20/2020
150
0
0
150
Amount % Change
$306,461.90 , --_ -
$0.00';
$0.00:
$0.00;
$306,461,901
$0.00 0.00%
$1,380.00 0.45%
$1,380.00 0.45%
$307,841.90,
$1,380.00
Signature
Printed Name, Title, Company
Date
Contract
Signature
Printed Name, Title, Company
Date
City Project
Matthew Bushak, PE, Transportation Engineer
5/20/2020
Manager:
Si ure
Printed Name, Title
Date
Mayor/City
Manager
Signature
Printed Name, Title I
LJ
Date
Page 2 of 3
eouNO Gppf Contract Quantity Adjustment/Change Order
e,0116
Project Name: Sunrise Road and Luther Peterson Place Intersection Improvements
Quan. Adj./Change Order No
Change Order Data
Item #
Item Description
Unit
Qty.
Unit Price
Amount
Contract
Time
Adjustment
(Days)
83
CONCRETE CURB (MONO) (MI)
LF
12
$115.00
$1,380.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTAI
$1,380.001
Paee 3 of 3
Contract Quantity Adjustment/Change Order
MWND RObt
rev, 01/ Io
Project Name: Sunrise Road and Luther Peterson Place Intersection Improvements
Quan. Adj./Change Order No.:
Quantity dtlittctmPnt r)ata
Bid Item #
Item Description
Unit
Qty.
Unit Price
Amount
Contract
Time
Adjustment
$0.00
$0,00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$uo
$0.00
$0.00
T
0.00
0
BEGIN REFL PAY Ma TT I IYI .• ISL11 IIDDMi L1�
STA ID•i.. Dt1
�M RFJL PAY MIN TV I lY1 /• ISLS1 IIWMZJ 1
STA I1.19.GD v
INSTALL " T i
PEYDVE ®IEA
ISTIM FAM
QISTINC STNIPIMD/ARA0.5 ARE FADED.
L9MTNACIOR TD REPAINTin
m A
in
W
ti
W J
L
Ix
W
F
J
QISTIM SIDE-LN—�
CCMG "A (MOM' IT' 111 - 12 LF
Imn
r. INc T.[r.. n T .ars . I YW. [a.10L IK o11NNlc1. wau
RR 1' fAT011r rAi.11l Ili IOIRL Q1.I,fIK rATMo[r.
STOP
.III
—METER iD PY11)-12 SGLEI�1—'•ID'
INSTAtL TT
MIII_ I I
WAL4 TT. T
i
..v[S1MI
n
61f. R RIV A.dAt1.Nf
V.RO
W
to
.. 9
vNvrox
Kimley*Horn
�yy� CJIY GF A7PkD PM
I
I
L.fW
fRI,TINO SI.i.ALR m AYL MY ISIR TT 1 nl Il• m.l III.IILI
wi r�r w n i ni I.Innianu
SUNRISE RD AT
m A.L T. "11 MAR. no.1L'
m-1 9r as 11 1 111 W l£.1 IlOalill
LUTHER PETERSON PLACE
I
�
m .MpC 6iST LTMr 16L
m QISt rAT 11a 10 I.MIN
ID atn sla ip of ASATtS
$%RlP1MG AND
_
' ' n M m r.v ra RR.I
L HY ran I Irl P IIL.11U
PAVEMEN/ A(A%AFG
MDI
...av Ma n I m r ULm u..w
WL
Q1ST RY ra H•1
MIT T 6 1
—Lnv ranrc
n-+.a
9
ssnrTso atu.nntt
GPr
CGp
t I
OIAYIIf1Y
mY
mat
mu
tm
_ 4stw4caAc iRNA14
- — ■ vM(llowt
u
s
mn
tlsu
rwnxw .w to
a
ott
n
a
au
ml
nuuswn ucro a
u
v
u
avu vNn rsl\
t
tsts
tms
ow
u
I
u
u
c n
u
1
mn
u
1
T
ow
ttu
mNm flal r
u
Io
04t
til
m10T1
U
em
oY
cwm r tat t
Yu
tut
rum rvc a
m
6IGiONO1 p0 t4r
U
®
fltCmllM NO. IMSIIAIIG
U
IID
BLCCONpI tAE
tlap
t00
Ilir.CDlp N0. Iwt1Um
U
D
aaltxotosnA IMOY
AM
otlt
swvns M6tt
u
s
w
ss
D
SYIIOSw u4n
u
I
wpl MV twa ttl r l0
4
t4
' iY
m0
Yn MVwM nI
V
WA
M nl
Y
ma
tbt
pn MV YRnI(WIIAYOMnmYI
A
f OQt
iA
�,.
NDIM'I tAanl t011alA
G
t
aY
sm;WIII
t Mvv�cm n o
u
.96 _
wm Mvlwtm sr sml nvru
u
so
1 f
MruNsrtsuwr
ss
u
sY
sY
L
am
vs
NVItrrTslAla u`
v
m
tlu
My r w aM
6tY
II M
;
tal
u
IM
' wr
m
LMVI
msrAu nW ruaA
Y
Y
0A1
1ntlnrAY 4w\M61a
V
t»
•. tii 103_ m [M.D. I� m Ilsq tT1D( OLT
s'n
d4YIMVAW \tNp
Ot7•
1
rAI/RNrIRIIOwttl f
V
Maim:r\vslsnslrtnYL
m
MvsuwM r\r IYN
D
]6
I u7•
®
My MDIDIrt
V
Y
MY ItY'
•v Iwrur/ wwa
m
I4vnrus um. scum
MI
mNo
v + a
u
t
ssu
m
rewsts stt
vvew
m
m
smacllrLml4a
T
OY1
m
•�.
4
a
m
m
Ynrunrsr su�.�
a
s
Yarunv n
u
7
t
m
m
T4raa n uA
D
tte
V
as
01QCftMA4MA4WTCO.MIN
tli
fa Ol COM
V
Vs
n !
am
doM
Y ntl
ar
aar
m*uwnAA
m
m
rrereu AsvArr
u
N
sw
m
rursTea rush tlmaw An
u
r
NY I A
toll
m
NVO]rM[M T
fat
ml
VNY faV nfntl
G
t
VnIY 1110
Im(
m
rlvw cl>,vlslwumNu
D
to
Itm
nNOtYnuVi4lo ISNNKr01�
V
omm4swrcmn.anwoe.m
t
ansm4M.uwctwmnmL1Y
u
s
anccYutoulx•aT >e
prIYA4 ORIF
m
u vn Mo
IRr11/tM
I
,.
City of Round Rock
ROUND ROCK
TEXAS Agenda Item Summary
Agenda Number:
Title: Consider executing Quantity Adjustment/Change Order No. 1 with Austin
Traffic Signal Construction Co., Inc for the Sunrise Road and Luther Peterson
Place Intersection Improvements Project.
Type: City Manager Item
Governing Body: City Manager Approval
Agenda Date: 6/5/2020
Dept Director: Gary Hudder, Transportation Director
Cost: $1,380.00
Indexes: RR Transportation and Economic Development Corporation (Type B)
Attachments: CO#1-Sunrise & Luther Peterson Traffic Signal
Department: Transportation Department
Text of Legislative File CM-2020-151
The plans did not include a portion of the curb that needs to be built between the proposed
ramps on the southwest corner of the intersection of Sunrise Rd and Luther Peterson Place.
The curb type is monolithic since it needs to tie into the concrete apron that exists at the
intersection. There is no bid item for monolithic curb in the project manual, so the item and the
quantity are being added by this change order. This change order is in the amount of $1,380.00
adjusting the original contract amount to $307,841.90.
Cost: $1,380.00
Source of Funds: RR Transportation and Economic Development Corporation (Type B)
City of Round Rock Page 1 Printed on 61412020