R-2020-0187 - 7/9/2020RESOLUTION NO. R-2020-0187
WHEREAS, the City of Round Rock ("City") desires to retain professional consulting services
related to construction materials testing services for the Brushy Creek Regional Wastewater System
Plant Expansion Project; and
WHEREAS, MLA Geotechnical has submitted an Agreement for Professional Consulting
Services to provide said services; and
WHEREAS, the City Council desires to enter into said agreement with MLA Geotechnical,
Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS,
That the Mayor is hereby authorized and directed to execute on behalf of the City an
Agreement for Professional Consulting Services for Construction Materials Testing Services with
MLA Geotechnical, a copy of same being attached hereto as Exhibit "A" and incorporated herein for
all purposes.
The City Council hereby finds and declares that written notice of the date, hour, place and
subject of the meeting at which this Resolution was adopted was posted and that such meeting was
open to the public as required by law at all times during which this Resolution and the subject matter
hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act,
Chapter 5 51, Texas Government Code, as amended.
RESOLVED this 9th day of July, 2020.
CRAIG 6RG ,Mayor
City o Round tiock, Texas
ATTEST:
a -A I
V4 V4--
SARA L. WHITE, City Clerk
0112.20202, 00449268
EXHIBIT
„A„
ROCK AGREv',MEN-1 .,1.0x Y OF 12i�ilNU
PItOFESSI(J CONSULTING SERVICES FOR
CC;:tiSTRUCTION'M.ATERIALS TESTTN F.,1ViCS
WITH
MLA GE-OTECHNICAL
I --------- - -------- ---- - ---------- - -- q0&TjVWVW0.1ftV --- ---- --------------
THE STATE UF' TEXAS
THE CITY OF ROUND ROCK
COUNTY OF WILLIAM N §
COUNTY C3F TRAMS §
hNCJW ALL BY THESE PRESENTS
%anowM& CTTALS:
W "Weni; i
AS, City has determined that -there is a need- for a constructx«n material testing
x 0 a 0 e%+.*
services for the Brushy Creek Regional Wastewater System 'Plant Expansion Projevt., and
W
-q&"dMP n"r.desires
IsE a, ity to conM ]aA CM-MExtract f-or such professional services; and
AVEJ
HEI2EAS, the parties desire to enter into this Agreement to set forth in writing their
respeciive rights, duties and obligations hereunder;
NOW, TERFO ITNESSET:
0
That for and zn cc>nsideration of the mutual pronnises contained herein and rather good and
valuable consideration, the sutf-jci'ency and recelt of APi1cb are hereby acknowledv%d it I
S
mutualiagreed between tli.e'j&�)arfies as follows,:IF
1.0.1 EFFECTIVE DATE, DURATION, AND TERM
"I"hl*s -Agreement shall be effective on the date thl*s Agreement has si'gne1..d9.. by each
force Party hereto, and shall remain in fulI and effect unless and until it expires by aperation a�`
the term indicated herein, or is teinated or extended as provided herein.
terminated
The term of thi*s Agreement shall be unb'] f-ull and satisfactory complefi'on of the work,!e -ima-dto
St9 te be completed by December 31, 2023.
0044$1921ss2
City reserves the right to review the Agreement at any tirrae, mid may elect to terminate
the Agreement with or wl'thout causc or a.,..,v elect to contionueN
. K.SEi2Vt;E2.01 PROPOS.4JjrqJ
Consultant has issued its proposal for services for the tasks delineated therein, such
proposal far services bei"ng attached hereto as Exhi*bit "A," the "'Scope of which
documentis"incorporated herein for allpurposes.Exhibit "A" includes tests to be completed at
the City's request and estimated pricing corresponding to each test,
3.01 SCOPE OF Sig'<l2ViCES
4.01 LIMITATION
TO SCUPS C}F S VICES
Consultant and City agree that the scope of services to be. }performed is enumerated in
V
Exhibit"A and Consultant shall not undertake work that is beyond the Scope of Work set forth
in Exhibit "A," hawcver, eiiher party may make writ#en requests for changes to the Scope of
Work." To be eiTective, a change. to the Scope of Work must be negotiated and agreed to and
must be embaciied in a valid Supplemental Agreement as described i"n 9.O1.
5.01 CONTRACT UT
In consideration fnr -the professianal consulting services to bc; performed by Consultant,
City agrees to pay Consultant in accordance with Exhibit" �A." which in payment for services and
0 0 . inthe Sco e o-f Services deliverables as delineated exhibit ".A." The pr�cin� iOn Exhl"bl"t " 'A"
P .66
represents the approximate costs. o*. each -testing service. Costs may vary slightly based on
factors such as overtime costs and weekend or holiday testing services.
Payment for Reimbursable EXPenses,: There shall be no payments for reimbursable-------------- -
6 expenses included in this Agreement.
2
UIREMF.NTS;
TE.RMSOF PAYMENT
6*01 INVOICER'EQ
Should additional backup material be -requested by the City relative to service
deliverables, Consultant shall comply promptly. In this regard, should the City determine it
necessar}�, Consultant shall make all records and. books relati*ng to tlil*s A-greement aval*lable -to
the Cityfor inspection and audit.i.ng purposes.
7.01 PROMPT PAYMENT POLICY
(c) afederalco, gThe terms of ntractrant, regulati*on,, or statute prevent the Cj't'Vwfrom making a. Ptime1avnient with federal funds;; or
w
F�?
IQ is (d) The invoice not mailed to the City in strict accordance with any instruction
on the purchase order relating to the payment.
"q
8.0.1. :'�1+nN-APPROPRIATION AND FISCAL FUNDIN(Y
This Agreement is a comtnitnieni of the City's current revenues only. It is understood and
agreed that the City shall have the right to terminate this Agreement at the end of any City fiscal
year i"f the governing body of the City does not appropriate funds sufficient to purchase the
0 in.0services as deteniii*ned b the CI*tv"-Ps bud.Q-et for the fiscal veY 00 Cl ,,.,.ar question. The City may erect
such terminatian by giving Consultant a written notice of tetmination at the end of its then-
currentI fiscal Near.
VV
9.1 SLTPMF.N'i'4:G.AG.RE EVT
14.01 IATICI
9
Termination Uf ihis Agrccment shall extinguish all rights. duties, and oblig ions o-f the
Citv and the terminatedparty to fulfill contractual obligations., Termination under thi*s secti'on
402 atshall not relieve the terminated -partyof any obligations or liabilities which occurred prior to
termination.
4
31 it .
Nothing contained in this section shall rec�u�re the City to pay for any work whicht%deems unsaft."&f-actorYor which is not erfi
or ed n compliance with the terms of This
Default: Either part}j may terminate this Agreement, in whole or in part, fear de -fault if
c�zth tlie other fal'ls to
the Part-YA, provides the other Party written noticeof such default and
satisfactorily cure such default Within ten (10) business days of receipt of such notice (or a
greater time if agreed upon between the Parties).
The termination of this Agreement for default shall extinguish all rights, duties, and
obligations of the terminating Party and the terminated Party to -fulfill contractual obligations.
Termination under this section shall not relieve the ierminated party of any obligations car
liabilities which occurred prior to terzninabon.
IV 4 V?
Nothing contained lil tI11S section shall require the City to pay -I�or any work whi-ch it
IIqdeems unsatisfactory, or which is liot performed in compuaiie%ewith the terms of this Agreement.
t 1.1 NC3N-(7LICIAIC}N*
All parties agree that they shall not darectly ar 'indirectly solicit E:or employment, employ,
W
or otherwise retai . n staff of the other during the term of this Agreement.
OES
12.01 CITY' SP�V`SIi3ILITIS1A0%Xm-1J
Consultant's perfarmance requires receipt of all requested information reasonably
ntimely manner, to �rc�vide City with a
necessary to provision of services. Consultant agrees, Xa
comprehensive and detailed iniormation request list, i1Fan,y,
13.01 INDEPENDENT CONTR.ACTOR STATUS
0
Consultant is an independent contractor, and is not the CSty's employee. Consultant's
employees or subcontractors are not the City's employees. This Agreement does not create a
partnership, employer -employee, or joi*nt* venture relat*ionshi*p. No party has authority to enter
into conirac;ts as agent for the other party. Consultant and ilxe: City agree to the foilc7wing rights
16
`
consistentan with independent contractor reiationshyp:
{1) Consultant has the right to per•fcanii services for others during the rem' hereof.
(2) u'onsultant has the sole right to corltrUt and ulirect tlie means, niatmer and ynethi>d
I it performs * 0 this Agreement.
by Nv'h*ch its services requiredby
(3) Consultant has the right to hire assistants as subcontractors, or to use employees
toprovide the services required by this Agreement,
(4) Consultant or its employees or subcontractors shall perform services required
hereunder, an. d the City shall not hire, supervise, car pay assistants to help
Consultant.
Ais(5) N.either Consultant nor its e playees or subcontractors shall receive training f*rom
the Ci'tin skills necessary to perform servwes required. by this AtTeement.
V-
(6} t:7ty shall not require Consultant or zts employees or subcontractors to devote full
time to performing the services required by this Agreement.,
(7) Neither Consultant nor its emplayecs or subcontractors are ell'.gl'ble toparticipate
in any- em%MftP ee ensloyion, health,vacati'onpay, sick pay, or other fringe benefit
40 P
plan of the City.
I4.01 CONF7ENTIALITY; E LS OWNERSHIP
The parties recognize and understand that the City is subject to the Texas Public
Information Act and its duties run in accordance therewith.
fi
Any and all materials created and developed by Consultant in connection with services
performed under this Agreement, .including all trademark and copyright rights, shall be the sole
property of City at the expiration af'this Agreement.
15.(�l WARi2ANTI�+:S
Consultant represents that all services performed hereunder shall be performed consistent
industry-AML9 qum�w th Cenerall Prevai*1in pro-f-essi'onal
or standards, mid shall be perfc>rn�edj.n a
professional and workmanlike manner. Consultant shall re -perform any work,- nozn compliance
with this representation.
ILI"I'Y
16.01 LIMITATIONOFL1AB'
Should any of Consultant's services not conforni to the requirements of the City ar of this
.Agreement, then and in that event the City shall give written notification to Consultant;
thereafter, (a) Consultant shall either promptly re -perform such services to the C'ity's satisfaction
at no additional charge, or {b} if such deficient services canna t be cured within the cure Period
set forth herein, then this Agreement may be -terminated for default.
.I.n nv event will Consultant be liable for any loss, damage, cost or expense attribtrtabie to
willfulmiscan�uc�orrn�sre�resentaticnsbv the Ci4vu i*ts. di"rectors,, e:nploy�es or
negiigenv%.,
agents.
I7.0l INDEMNIFICATION"
Consultant agrees to hold harmless exempt, and indemnify City, its officers, agents,
directors, servants,, representah"ves and employees, from and against any and all Sui0ts.,, actl*ons,,lepalProceedings, demands, costs, expenses, losses, damages, fines, penalties, liabilities and
90W
claims of any character, type, or descri"pti"on, i*nc1udi*ng but not limited to any and all expenses oF
litigation., court costs,, attorneys' fees and all other costs and fees incident to any work done as a
result hereof.
0
To the extent allowable by law, City agrees to hold harmless, exempt, and i.lidemnify
Consultant, its otTicers,agents, dircctars, servants, representatives and Lmnloyees, from and
against any and all suits, acti*ons, IeRal nroceedt*ngs, demands, costs, ex-aJaPCnses', losses, damages,
fines. P-A�enalti`es. 1i'abi*1i*fi'es and claims of any character, type, or description,, including but not
.P
7
,
limited to any and al( expenses oa li#tgation, s;Uurt costs, attomcys' fees and all other costs and
fees incident to any work done as a result hereof..
18.01 ASSIGNMENT
AND DELEGATION
16
The parties each hereby bind themselves,, their successors,
representatives to each other with respect to the terms of this Agreement.
1brightsassign miy ar delegate any duties under this Aareement without the
written approval. which approval shall not be unreasonably wzthheld.
1
iiTAXES9*01 LOCil-L9 S 0,AND FEDEILL
Is
assigns and 3e�a1
Neither party may
other party's prior
Consultant shall pay all income taxes, and FICA (Social Security and Medicare taxes)
it In
incuffed,, while Performing services under this Agreement, PoiwAhe City w�l! not do the followtng:
(I) Withhold FICA fro Consultant"s pay ents or make FiGA payments on its
behalf;
(2) Make state and/or federal unemployment compensation contributions on
Consultant's hehalf; or
(3} Wiflahold state nr federal income tax f-rotn any ofonsus PCltant'ayments.
If tegcaested, the City shallt provi'dC.. Consul t wI*th a C.-dettl*-16'1cate from the Ttzxas S-tate
.6 Comptrollerindicating that the City -is a non-profrt corporation and not subject to State of Texas
Sales and Use Tax.
RTZA>fal6-,N
A, 'D 01%"LlC--.AWSCHA R" INCI.J.
8
11.41 FINANCJAI. NT PROH
Consultant covenants and represents that Consultant, I*ts officers, employees, agents.
consultantsand subcontractors will have no financial interest, direct or indirect, zn fhepurchase
or sale of any product, materials or equipment that will be recommended or required hereunder.
oaswft aft& SW.11 %rvnu nVom"0212. XTrIn A AF22.01 DEIGNATION OF it ATA V Ej
'INhe City hereby designates the following representative autharized to act in its behalf
with regard to this AgIU-eement.
David Freireich, PE
Chief Uholifiy Engineer
Department afUtilities and Environmental Services
3400 Sunrise Road
Round Rock.,, TX 78665
(512} 671m2756dfrej0re'ich(&round-j,4oc.ktexas,,iuv
AN
23A1 NOTICES
A[I notices and other communications in connection with this Agreement shall be in
IV
writing and shall bs considered given as follaws:
{i} When delivered personally to recipient's address as stated herein; nr
{2} Three (3) days after being deposited in the United States mail, postage
with
prepaid to the recipient's address as stated in this Agreement..
o#ice to Consultant,:
MLA Geotechnical
2800 LangharnBoulevard, Suite 104
Austin, Texas i8758
City:Notice t0
City Manager, City of Round Rock
221 East Main Street
Round Rock, TX 7664
AND TU:
Stephan L. Sheets, City attorney
309 East Main Street
Round Rock., TX 78664
9
0
T�taihing contained in this section shall be cnstruedo- to restrrci tFie traris�xixssiati of rou�►ne
communications between repcese tah"ves of the City and Consultant.
24.01 INSURANCE
Consultant shall meet all City cif Round Rock Insurance Requirements set forth at1-ittp.���s��v.rc�uncirescl.tex�.s,�rsv;/'/�amcontenU-Vt/ J ads,**2014 t"I2 corr insurance{.d7.`?C?l I?.slf-P
-------------------- -- Ann' IMAM~
W%V
25.01 APPLICABLE LAW; EF CEMENT AND VEN I UE
Thes Agreement shall be enforceable in Round Rock, Texas, and 1f legal action is
necessary by either- party with resp-&N-'Lect to the enforcem.ent of any or all of the ter s or condi*bons
#tnherein, exclusive venuefor same shall lie Williamson County, Texas. This Agreement shall
16be govemed by and construedrn accordance with the laws and court decisions of Texas.
MI[PW EIVIE26.01 EXCLUS. AG T
N
TV"' 27.01 DISPUTE S1"'Lu
ION
The CI'ty and Consultant hereby expressly agree that no clai" s or di"sputes between tlie
0
parties arising out of or relating to this Agreement or a breach thereat°shall be decided by any
including arbitration proceeding, without limitation, any proceeding under the Federal
0
Arbitration Act 9 U S C Section 1-14) r�r any applicable arbitrationstatute.
1W P!"Y
28.OI SE`vF'r7,-RAB1Lijt
10
29.,.01 STANDART) OF CA.R.*F*.4
,sum
Consultant represents that it is specially trained, experienced and competent to perform
45
all of the services,, responsibiliizes and duties specified herein and that such sexvices,
responsibilities andduties shall beperformed,
whether by Consultant ar designated
s 43acceptable to the Gi�y to cenerally acc pted busi'ness
subconsultant in a manner and
practices.
.AID BRIBES
3i1.01 ,A.,r*
i.o1 RIGHT TO AssuRAvcE
Whenever either party to this Agreement, rn good faith, has reason to question the other
party's intent to perform hereunder. then demand mav 'be made to the otlier party for written
assurance of the intent to eri.'orcn.In the event thatno written assurance is given -within the
reasonable time spedfed .when demand 'is made, then and *in that event the demandi*ng partv may
treat such failure an anticipatoiy reptidioatioon of this Agreement,
3a.a1. MISCELLANEOUS PROVISIONS
Ae"A The
Seefi*on Numbers. sech"on num.bers and headings contal'ned herei"n areprovi*-ded for
40 convenience only and shall h-tave no substantive effect on constnaction ofthis Agreement.
C5
M
ultiple Counterparts. This Ajzreement traybe executed ray. multiple.. counter}�arts,
d ed' one original.which taken toget-fier shall be const erThe City agrees , Consultant
with one fully executed orl'anal.
[Signatures on the foilowing page.]
12
Iti' WITNESS WHEKI: QF, tlie parties nave executed this Agreement on the dates
hereafter indicated.*
City of RoundRock, Texas
By.
------- ------ ---ft-Oft --------- M ----------------------
Pri*nted Name:
Title:
LateSigned,. ------------------------------------------------------- ----------------
For City, Attest:
By: ---------------- - -------------- - --------- - ---------------- ----------------
Sara L. White, Cl'tv Clerk
w
For Cif��, AiriroN,,,red as toForm:
v
Ley: -------------- ------------------- -- - --------------------------------------
Stephan L. Sheets, City Attorney
13
MLA
Ge'Stchnic
I V
Y. ------
----------- Prime ameV- ..�.
�1)i .t1e.C-C4 P vlwesl °E' 7
------------
Date S i*gned -- ---- ------ 0 --------------
------- ------
Ce Y
Exhibit "A"
UNRATE FED, E' " IY A' `r — New Cc�nct�•uctic7n MaterI'*aIs'I'esI-j*B(*.".qRWWS PIAtit F,4.x)anSj0fl
DAMIAN*
Round Rack, Texas
Esiiatect
Descs•9ption c�'Test��igad InslRections OuantLnrt Rate Amount
---01
It&zLaboratory Tesfing of Soils
��o'scu�-e r�e►�s;ty Refnt,onst�Ep(.�s"I•��� n sus,.1EX IIJE)
20�i9s.o�r
$3900*00
Atterbeigg Limits
U
204S..l�5.{}t!
$11300zOO
C�radatioxis
20
$40.
$800.00
Proctor Pick-UReport
2()
$tl.{)fi
$OAO
TITechni'dan xne
21
S4I.00
$861A0
Report 2eview
E
$25.Oti
$I,SOO.Od
Trip Ciyirge
7
5s, 1(;,U€}
$70.00
Moisture Density Ficici Testing
u Sbt��tal
58.43i.D0
Field I)ensity Tests
SOii
S16. 0
$8,000AO
Proof Rolling Obsexwation
4
S-0000
$0.00
.Dal*'lv Observaflon Report
4
SO4,00
$0*00
Technician Time
z61
6S, 41.00
la,7o1.00
Report Review
87
$ZS.0t}
$2,175.00
Trip Charge
87
$I0800
$870.00
S�rgradeInvesti"gati'OH
4
S7245,oOO
$22900-VOO
Subtotal
$24,646.0
Hot Mj*x Asphulttc Concrete Testing
Asphalt Coring
12
7.00
$900.00
19
Extraction with Gradation
.1.2
-Oft
$201)60
$2,400.00As..Phlt
Density' Defkt'(Y;IiYiltiflE1 bfC(ii£'. Samples
W
12
�+45*00
$540.00
IINIAC Bulk Sample Pi�:k-Cn
12
Stl.il4l
$0.44
Equi r e t Charge
6
7554t()0
$450-600
F3vee:tab►llty peciens
12
47.00
$54U.Q0
Rice fipeci c Gravity
12
$45.{){I
$540.00
1ulcCing Speeiens
12
5.(l£!
$S40.OU
Tcchnacian "Time
3.6
$41.00
$1,476.40
Report evieW
0�ZS.£}
$1,250.00
Trip Charge
Mp-
C
$t0.f)0
$60600
C,-Sbtotl�3..-Owt696.00
MLA Gmar otechnical Aivdsti17 San Antonio Brya-,"miCollege Station Killeen DaHas/Fort Worth1lus0otlF A144 40 40 le 40a
I
E 9MMMM m bit 'xAq h I
Concrete Inspection
Cloncrete C:YI3riers for Compressive Strength Testing
Air Content Test
C1'tznder }'ic -UReport
Technician "Tines
-ime
Report Review
'14 ri P C'r•e
lep* it
00 -out
200 $Z0.0{1
200
$45.00
S 16%lf.O
u
4 0 0
411f)
S 2.0
40t1 X{l.�tE}
Subtotal
i'a ge; 2 o. f 2
Ffourl}� fees are cnai•�;et� Portal tc> portal. An cBvc°riime multiplier of 1,50 will be added fo. it alI titnes before
lam and after Siamon weekdays. over 8 lioursder claycan
�,�eekdays, and/or Saturday,% Sunday end
V
I3ulie�ays.
iJpan your acceptance cif this agr4emen[, we recommend a meeting with the general contractor and you,,
the ctient, to discuss the anticipated construction schedule, areas ol'` poteniiai tcsting efficiencies anti
savings, and cozxstructi«n sequencing to reiinc this btrciaet.
Client Initials,*
off
MLA Geatechnical Aust.Jh San Antonl'o Bryan/College Station Killeer.... Dallas/Fort Wolth Houston "Aat 44 46 a-e 4-414
l it "A"
.,t 4-fa� ter..
RRRRRAS
uivvsion of M"KA Labs,, Inc.
---------- ----- ---------- ---------------- ---- ------------------------------------------------------
Category
- -- -------- ------ ---------------------------------------------------------------- - - ---------- ---- ------------ ------------------------------
-------------------------
Test Naenn------ - -- --------------- -- ----------------------- -- ---------------------------------
Price ----------------
- -
-------------- - - - --------- - - --- - ---------- - --------------------------------------------------
Concrete
----------------------------------
DA Ramp
2O,t70 -------------
-------------------------------------------------- ------------ ---------------------------------- --------
Adhesive Anc Uplift R------------------------ -------------------------------
--------------- ------- ------------
1UO.t}U
-- ----------------------------- --------------- ----------- --------- ---- - - --- - ----------------
--------------------------------------------
-------- - --------------------------- MR-AMNIM-0
Concrete Cores for Compressive Stren h Testing
25AgV$
Lonctc e PermeabilityT FflowTestSi}.QO
- ---- --- - -------------------------------------- ----------------------------------------------------------------
-------------------------------------------------- -------------------- ---------- - ----------------------------------------
---------- --------
------ ------- ------ --------------------- ------ - — - - - -------------------------------
flexural Beams
$6V-600
--- ---------------- -------- ---------- -------------------- -------- - ----- ------------ - ---------- ---
----------------------------------------------------------------------------
----- -------- --------------- -------------------------
Floor Flatness/Floor Levelness$4UU0U3
3ft AVAL AM
------------
Is 6Indoor rior-izontal Coring$1,1Q4.Q
Outdoor Hal41jftAmU40,0ftorizontal Coring
$7UU
----
Poo!Cdn
---------------- -------------- -- --------------- --------------------------------
7t?O.00f
--------- -----
-------------- ------------------------------- - ----------------------------------------------
------- -------- --------- ---- --------
------ --- ----------------------------------------
Ram Calibration$200,40
AC& &Qk
-------------- ------------------------------- — — -------- -- ----
--------------------- IMP M-M W% ------------------- --- am - -------- - - - - ----------------------------------------------------------------- -----------------------
Roller Ca actedConcrete Inspection Per Day
AMMA kite
$45U0UU
Swiss Hammer Test
$601000
.61A. AUnit Weight
$20100
&Ivajao),or Eission Test
$5UA'%'-.000
Windsor Probe
52 5 Oft 00orain
Inspectipon
epout Rbevi4ew
525.0%L 0
Time
IOUTechnician
41.0uU
rip Charge
1, a,Aft,Rea&""Ort
a P&a a .. i& Inspedtion
KeviewI
UU
Technician T-ime
541AUU
Charge
"LTrip
510600orestop
Isw ion
Kepo, t Keview
$O)04it
ime
ALLchician
45b 4120
V
TCharge
I.rir%
510,600
3tAyr%4
Isction
uraftstop Inspection
1Framint;
Kepon r%ev-iew
25v00-
6&Technician Ti'me
$ fle I.% U^ 0
0AM,ArAL1V 'harceTr
$1VUU
Geo e braner'mond UnerU"""',bse,,,.aUon
Report Review
$259UU
Technician Time
$ 4 16
(ay)
A 0TechnicianTime
Oe WAVSUxUT
6
Charge
^^rip
$134VU
- ------- - ---------- ----------------------------------------------------------------- - -- - ---- ------------------
------------------- --- - ----------------- - - ----------------------------------------- WOW-
---------------- -- ------------- - - --------------------- ---
- -------- --------
unite Inspection
— -- — ---------- -------------- ---- ---- ----------------------------------- ------------------
------------- ---------------------------- — — -- — ------------------- - - - - - -
- ------------------ ----------
---- ------------------------ -------------
------------------------------- ------------------------------------------
Hot Mix Asphaltic Concrete Testing
Insulation Inspection
J66 AQk v,% A
Laboratory Testing ot boils
Lot Fill Testing
- --------- - -----
-------------- - -------------------------------
Moisture Density Field Testing
-------- - - - - -- - - ------------------------- - ---------------------- - --------------------------
Mortar and Grout Inspection
Exhi l*t "A"
Equipment Rental
Oe J? ANF 0 00
Gunifte Cores
$8333
-----------------
Report 2VieW -- ------------------------ - - ---- - -------------
----------------
1$25.00
------------ Technician 1`is
--------------- ------------------ -- -------------------
-------------------------------------------------------------- - ---------
$41.00
-- -- ---- --------------- ----------- -------------- -- - --------------------------------
Trip Charge
-------------------------- $10.0
6" Coring for in-Pface Density $60-900
---- -- ---- -
- - ------------- ----- --- - --------------------- ------------ ------
-------- ---------------------------------------------- - - - - ----------------------------------
HMAC Permeability Flow Test $S£3,00
------------- I -- - --------- ------- ------------------------
Nuclear Field Densities 1. $16.00
----------------------------------------------- ---------------- ------ ----------- ------------------ --------------------------- ---------------------------------
Report Review 25.Q0
--------------- -- - -- - ------ - -------------- ------------------ - - -------------------------------------------------- --------------------------------
Technician Time 41.00
-------- ------- - --------------------
----------- ----- ------- -- ---- ---- -
Trip Charge 2C}.04
Lime Series $450.i}0
-------------------- - - -------------- - - --- --- --------- -- - -------------
----------------------------------- ---------------------------------------------------------------------------- * --------
Material Quafification 125.0(i
------------------------ ---------------------------- Amok
Organic Matter Determination $100.00
Permeability
----- - ------------------
$450.0{}
--------------------------------------------- -- - ------------------------
-------------------------------------------------------------------------------------------- ph Test
$��•��Pond --------------------
----------------
Qualifiers-
$
— - -- - --------- ----------------- - ---------------------------
SU Yates
-----------$100.Q4
------------------------------------------- -------------------------------------------- -------------- ----------------------- -------------
USDA Triangle
--------------------------------------------------- ---------$250.00t
Atterer Limits
--------------------------------------------------
Daily Observation Reports
WdW%, -------------------------------------------- --------------------------------------------------------------
ao
Moisture Conditioned Density Testing -Lots
0
Proof Rolling Observation
Report Review
Technician Time
14 16
Technician Time (Per Day)
Test Pits
Vapor Emission Test
Arnoozerneter
Base Depth Check
Base Depth Check Probe Method
Clay Cap
Lime Depth Check Probe Method
Lime Gradations
---------------- - -- ------------------------------- ... 00 ........ 0 .... 001ft
Moisture Content
- ------------------------------------------------------ - - ------- - ......... --------------
Subgrade Investigation
Full -Time Masonry Inspection
Masonry Grout Samples for Compressive Strength
Masonry Mortar Cubes for Compressive Strength Testing
Masonry Prisms
$65.44
$o.�o
it-----------
$16oOO
A $0.oa
owwwwwwwo- - - w4ftWWWAAA0VWJw'^
$25a.00
---------------------------------------------------
$41LU-00
---------------
-------------------------------- -
$515.40
$ss.a
1ARAMARMARA --------
�zso.on
510.0
725.0
MOM&
Pier Inspection
Pond Liner Observation
RSteeieinforcing Inspection
Sheathing Inspection
-- --------- — ------------------ ----------- ------------- 0.00*90000% ---------------------------------- ------- 0AMANV" 0 9 a -------------------- WjW4W,.,%.AN
------ — ------------- - ..... - -------- 0 0 0 a 004 ----------------------------------
00.00. MAMA&~
Sprayed Hire Resistive Material _.� _^.�
---------- ----------------------------------- ---------
-------------
5tructrlteellspection
li Inspection
------------
---------- — ------ I M F P ----- Ramon --------------- 006.ee.ov ---------------- 0.00 ..... -------
------------- .... 0 .... ...
SAWN*
Exhibit "A"
Report Review$25.00
---------------
----------------.-----------------------
------------- ------------------------------------------ --- ----------------------------------------- ------------------------ - ----- ---------
Sample Pick-Up$45,sOO
-w ------------ I ----------------------- ---- ---------------------- - ------ --- --------------------
Technician Time $41.Ci0
A WAAMMMOMM WWWWWWWW"
$10.(70
"w Trip Charge
Concrete Cylinders
$2Q,00
Cylinder Pick-up Report
$45.00 --------------
--- - ----------
Drilled Pier Shaft Inspection (Per Day)
$450.00
........
--------------------------- .......... ---------------------------------------------- APAPIM10~060*000.0 ----------------
Pile Observation (Per Day)
$40.0(}
------- -------------
---------------- ---------- 00 --- - --- — ---- ----- -------- ------
Report Review
- ------------------------------------
a25�a0
---------- --- - -------- - ----- APAMW -- ------------------------------
-----------
Technician Time
$41,500
---- -------------------------------- -------- ---------------- ------
Trip Charge
----------
$10.00
--------- -- - ----- ----
Report Review $25.00
- ---------
------------------------------ — ----------- --------------------------- jow"10 -WWWWW10 --------------------------- —A-A-MAMANAMANAAAAAAMPAWM --------------- --------------------------------------------- ANAINA, 'N"W"Wo -- ---------- ------------------ WWARN
Technician T'ime $413,00
A-Tri4pCharge $10.00
Report Review $25.00
wwowww~ MAR ------- ---------- 'MW - ----------------
Technician Time $41.00
----------------------------------------------- --------- ------------------------------------ ------------
Trip Charge $1Q. 0
----- ---------------- ------- ----- -
Report Review $zs.0o
-- ---------------------------- - M F1 MFV4WVV%AA0AAPAA"
Technician Time $41.OsJ
Trip Charge $Q.C10
----------- -------------------------------------- ---------------- ---
Dry Density
kf-P%PAA AMAM .... to - WWWWWWAMAOUMh
Report Review
------------ ----------------- --- --------
Technician Time
XMMM4 ----------------------------- ---------
Trip Charge
Magnetic Particle Inspection
Report Revisal
Technician Time
TripCharge ------------ ---------------------------------- --------- 0 WON W low
---------------- --- -------
---------------------------
ultrasoni"c Inspection
-------------
XMO-w-ow ON -00 - ------------ -------------- ----------------
Visual Inspection
------ -- --------------------- wo '00vow --------- -- - ----------
------- --- -----
Visual Weld and Bold Torque Inspection
A 1%
All Day Wall Ins ection
....... PMMMMM___._ WIAR~".o ----------------------------------- -------------- --
Report Review
19 .0 TuneTechnician
Trip
Charge
$50900
1A
S25.ati
$41.0Cl
$104,00
$7s.00
$70xOO
00"olow,nowo
$70oOO