Loading...
R-2020-0204 - 7/23/2020RESOLUTION NO. R-2020-0204 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with PM Construction & Rehab, LLC for the Wastewater Collection System Pipe Bursting Rehabilitation 2020 Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 1, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 1 to the Contract with PM Construction & Rehab, LLC for the Wastewater Collection System Pipe Bursting Rehabilitation 2020 Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 5 51, Texas Government Code, as amended. RESOLVED this 23rd day of July, 2020. CRAIG�(i10RG, Mayor City of Round R ck, Texas ATTEST: SARA L. WHITE, City Clerk 0112.20202; 00449959 EXHIBIT „A» Contract Quantity AdjusbnentJChange Order IWO-- Ax rev, OV-** 16 Department: UES Project Name: Wastewater Coilectlon System Pipe Bursting Rehabilitation 2020 Date: 6i24/20 Page I of 3 City Project Change Order/Quantity ID Number RH620 Adjustment No. Vendor PM Construction &Rehab, LLC --N -------- 131 North Richey Road - Pasadena, TX 77506 {832) 252-4811 Company Name Address Phone No. Justification - --- --- -- - ------- q& Change Order No.. lis needed to improve a wastewater line in Anderson Street from 8-inch to 12-inch. This pipe enlargment is needed for additional wastewater flows in the Northeast Downtown area,, Anew 8-inch wastewater line will replace a damaged existing 6-inch concrete wastewater Hone in Lewis Street from Milam Street northward 450 feet., SUMMARY Original Contract Price: Previous Quantity Adjustrnent(s). _a� a This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Qrdeqs): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price (Original Contract Price Plus 0 Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Pri"ces: Ohginal Contract Time: Time Adjustment by previous Quan. Adj./Change Order, Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Prepared By: Contrattor: C*Ity Project Manager: ianaWre Signatdre O/o Change 0% $186,098.00 13°/b $186,098.00 13% $1,629,218.25 $18b,098.00 18Q 30 210 -- -------- -- - -- Eddie Zapata, Senior Project Manager, Citt lG�jof Round Rock Printed Name, Title,, Company Emily High, Proiect Manager. &Rehab, LLC PM Arl Printed Name, Title, Company Vol,, pop" Eddie Zapata Senior Pro ect Mana -------------- Printed Name, Title r 6/24/2n low Date Date Date Mayor/City (,/ Manager Craig Morgan, Mayor Signature Printed Name,, Title Date Page 42. of 3 Contract Order ipmNa RU_,�~ 01116 Project Namee, Wastewater Wlection System Pipe Bursting Rehabilitation 2020 41 Quanx Adj./Change Order No,* I Chanae Order Da Contract Time RA-2 � Adju*LIMIn't Item # .... ...... ....... ........... ...... . . . ...... .. Item --- De npvon ............. X... ........ ... :--XX ................... ................. ......... ................... . .......... ....... ..................... . ............. Xx: Unit ........ ............ . ............... ............. ............... QtY15 -unit-PrIce Amount ....... .. -- ------------- ... .. ... ..... I .......... . ........................ ............ .......... .......... ................ ........... ........ . ...... .. ...................... . ............ ------------------------------------------- -(Days) ...... . ... CO 1 1 Barricades, Signs, & Trarric Handling --- ----- - EA --------- 2 $3,500v00 $7fOOOeOO Burst existing 8" wastewater line to 12 11 CO 1 2 HDPE wastewater line LF Of% GUO $80-000 $64r000*00 CO 1 3-- Post TV Inspection after rehabilitatio - n --- - L_F .. .... 800--- $5600 $4fOOO 900 12" Wastewater line point repair (8 12 --------------- CO 1,w 4- deep) ---------- - EA� 2� ------ $4,830,00 $9f660s00 CO 1 �5 *&,%nnect Wastewater servkclea lateral re(r..v ffm A &ME% U^ 17 $920oOO $15,640e00 Install 8" wastewater line by open cut (0,, CO 1 uP6�� 8' ee p) LF 450�� $75v00 ----------- $33,750tA00 Wastewater awmervice lateral Immconnect up ------ -------------- ICO 1 �7�� to 51 EA 7 $920v00 $6,440,,00 CO 1 ,8 Extra length service connection over 5' LF 65 $40-s00 $21600v00 CO 1 ,9 Remove & -rca%place end of line cleanout Leon 0% A WAX $1,840*00 $110-T0100 CO 1 -10 Install new 4'dia., Manhole 0 -w 6' deep --- ------ - - $41500o,00 $4,rSO0900 --- ------- CO 141 Repair/Reha 2" A s- nt phi t pavemel 250 -------- --------------- ------ $11,500000 ----- --- MCO 142 Flowable Fill UT 170 �$46900 ---------------- $140s.00 -------- -- $23f800*00 CO 143001-01141- Cement stabilized sand ---------- - - ------- TN 36 $38900 $1,368.00 --------- - ----- ------- - ----------- $0000 ---------------- $0000M ----------------- ------------ -- ------ $0000 ------- ----- --------- - - --- ---- --------- - - - ----- -------- --- --------------------------------- - - ------------------ - --$0fA00 $0000 $00000% $0000 - ------------ NO NNNN --- -------- --------------- --- $0000 --------------$ 0 a 04% 0 ------ ------------- ----- --- - ------ �$0000 -------- --------------------------------- $0*00 ---- ... ........ ....... $0600 ........ ........ ........... . ...... . .. ... ... ... ..... ......... ............. ....... ..... ............ . ............ ........... ........... . ........ ............. ........ ....... ........... ............ ..... ........ ............... .......... .. .......... ....... ............. *.:...:.:.:.:-:.: ......... ......... ........ .......... I ...... ............. L -------------- $186;098100 ...................... .......... . ... ......... ..... ......... .......... ....... . ............. .............. ................. .... *.,.,.-.*.*.'.* : .......... ..... ... ....... ..... . ............. . ............ .......... Ask. U Page 3 of 3 Contract Quantity Adjustment/Change Order �„ka«ns� :e ,.. 0 1116 Project Name: Wastewater Collection System Pipe Bursting Rehabilitation 2020 Quan. Adj./Change Order No..9 1 Quantity Adiustment Data . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . ... ....... . ... . . . . . . .... . . . . . . . . . . . . . . . .. ..................... ... . ..... ........ ................ .......... . . . . . . . . . . . . .. . . . . . . . . . . . . . . ..... .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. X ..... . . . . . . . . . . . x0�"::` . . . . . . . . . . . . . . . . . ....... ....... ................. .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .......... ....... ............ .. . . . . . . . . . . . . . . . . . . . . . . V ..... -xv ...... . . . .*.%.. . . . . . . . . . . . . . . . . . . . . . . . . . . V - .. . . . . . - - , * * . .......... . . . . . . . . . . . . . . . . . . . . . ..... ... .................... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ....... . . . . . . . . . ...... .. ........... ............ .......... ....... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . ....... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ...... ............. ......... . . . . . . . . . . . . . . ..... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . .... .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ... . . . . . . . . . . . . . . ... . . . . . . . . . . . .. . . . . . . . . . . . . ... . . . . . . . . . . . . . . . . . . . ... . . . . . . . . . . . . . . . . . . .. ....... . . . . . . . . . . . . . . ... . . . . . . . . . . . . . . . . . . ................. . ::::. . ..' . X.: -. . ....... ......... ... . ..... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . - - - - - - - - - - - - - - - - - - Bid Item # ItemDescriptionption .......... . .............. ......... .... ...... ...... ....... ... .................. ...... ........ ....... ..... X... ................. . . ..' ::: . : x ........ . . . . . . . . . . . . . . . ................. ................. .............. .%% .......... ...... ................... ........... X .... .......................... . x .............. ... ........ ....... ............. ...... ...... ........... ........ 1110400 ---------------- Unit ............. ........ ......... ........ X --- ---- - - - - Unit P Ce .............. ................. oil ............ ..................... ...... .......... ....................... ... ........... .:.:.: .............. ............ ........... % .... . ............... .. ....... ..... ..... . ................. .. ......... ......... . . . ....... ........... ..... .. .......... ---- --- ---- ----- ----- -- ------ -- ---- Amount .............. ..................... ... ....... . . . . . . ............................ ....... .. .. ... ........ ............. .. .... e X . " "', *:: *.*.*.*. . ................................ ........ ........ . ............ .. . ........... ...... ......... ............. ... ............ --- -------- --- ---- $0.00 - - - - Contra Time Mk - Adjuw%ull eont ...... . ......... X . . . . . . . . . . . ......... *% ..... X ------ w $0.00 ------------- $0.40 -- ----- - $0.00 $0.00$00WW0 $0.00------------- - -------- ----------- $0.00 ----------------- $0.00--- -------- --- --- ----- -- --------- - -11 $O.QO$001no------- $0.00 $0.00 $0.00 $0.00$0*00--------- $0400 -------------- ------- $0.00 $0.00 $a.00 -------------------------------- - ------------- --------------- $0*00 ------------ ---------------------- - ---- -- ---------- --- - --------------- ------ ---------------- - -------------------- ------------- ------ $O.OQ N ------ 11-111111 ------ ilmm $QAO $Q.00 ----------. ............ ................. ................... % . ......... ------- ---------- -- --------------------- -------------- -------- ---------------- - - --------- ............. v . ................. — ....... .. ... ..... .... ....... . ----------- ....................... $0.nn ........ .. ........... ........................ ............... ....................... ... ........ ................ .... ...... ............. ......... ......... ................................... --------------- ---- . .. ............... . x . . ............. ...... . ............. .... .. .... .. ......... . ......... r ..... .. b- b ............ ....... ............. ........... ..... . . ......... ...... ... .................. .... ....... ........... . ....... :: :' ' ' ......... .::*..:.,.:.*.*......%..�*..,.,**4.*... . .* " .. . . . ...... ------------ Illilli --- --------